G-F. Fuh and P. K. Loose, Horizontal Wellbore Stability for Openhole Completions, 1969, Society of Petroleum Engineers, pp. 155-164. |
L. McDonald Schetky, Shape-Memory Alloys, Nov. 1979, Scientific American, pp. 1-10. |
Raychem Corporation, "Tinel" Shape-Memory Alloys, 1989, Brochure of Raychem Corporation Metals Division, pp. 1-13. |
U. Ahmed and S. Jacobsen, Schlumberger, Practical Aspects of Horizontal Well Technology: A Perspective, 1990, Society of Petroleum Engineers, pp. 1-16. |
H. Karlsson, R. Cobbley, and G. E. Jacques, New Developments in Short-, Medium-, and Long-Radius Lateral Drilling, 1989, SPE/IADC, p. 725. |
A. Damgaard, S. D. Bangert, D. J. Murray, R. P. Rubbo and G. W. Stout, A Unique Method for Perforating, Fracturing and Completing Horizontal Wells, 1989, Society of Petroleum Engineers, pp. 1-13. |
D. Ackert et al, Looking Sideways for Oil, (Unknown), The Technical Review, pp. 22-31. |
Dr. S. D. Joshi, Proper Completion Critical for Horizontal Wells, Jan. 1990, Joshi Technologies International, Inc., pp. 1-4. |
Sid B. Nice, Leading Edge Logging, (Unknown), Popular Horizontal, p. 4. |
Derry D. Sparlin, Raymond W. Hagen, Jr., Controlling Sand in a Horizontal Completion, Nov. 1988, World Oil, pp. 54-58. |
E. Brown, R. Thomas and A. Milne, The Challenge of Completing and Stimulating Horizontal Wells, (Unknown), Oilfield Review, pp. 54-63. |
Sid B. Nice, Leading Edge Logging--Well Logging and Completion Technology for Horizontal Wellbores, Jan./Mar. 1991, Popular Horizontal, pp. 4-13. |
Rainer Jurgens, Ron Bitto, Bruce Henderson, Cameron White and Gus Mullins, Horizontal Drilling and Completions: A Review of Available Technology--Medium- and Long-Radius Horizontal Drilling, Mar. 1991, Petroleum Engineer International, pp. 32-37. |
Rainer Jurgens, Ron Bitto, Bruce Henderson, Cameron White and Gus Mullins, Horizontal Drilling and Completions: A Review of Available Technology--Short- and Medium-Radius Horizontal Drilling, Feb. 1991, Petroleum Engineer International, pp. 14-21. |
M. F. Cooney, T. Rogers and R. N. Stephens, Case History of an Opposed-Bore, Dual Horizontal Well in the Austin Chalk Formation of South Texas, 1991, SPE/IADC, pp. 737-748. |
Stepehn A. Graham, Charles E. Graham II & Associates, Inc., Bruce Henderson and Greg Nazzal, Drilling a Dual-Bore Horizontal Well in the Austin Chalk: A Case History, (Unknown), The American Society of Mechanical Engineers, pp. 1-9. |
Cameron White and Mark Hopmann, Controlling Flow in Horizontal Wells, Nov. 1991, Production '91, pp. 1-6. |
T. K. Li, V. Chandelle, and J. Brych, Lateral Drilling: A New Application Shows Promise, Jun. 1986, World Oil, pp. 68-71. |
R. H. Reiley, J. W. Black. T. O. Stagg, D. A. Walters and G. R. Atol, Improving Liner Cementing in High-Angle/Horizontal Wells, Jul. 1988, World Oil, pp. 69, 71-74. |
Ray H. Holifield and Bill Rehm, Recompletion by Horizontal Drilling Pays Off, Mar. 1989, World Oil, pp. 42, 43 and 50. |
Denny Kerr, How to Drill a Smooth Medium-Radius Well, Mar. 1990, World Oil, pp. 46-47. |
R. C. Haas and C. O. Stokley, Drilling and Completing a Horizontal Well in Fractured Carbonate, Oct. 1989, World Oil, pp. 39, 40, 42, 44 and 45. |
Bernhard Prevedel, Case History: How One Operator Drilled Horizontally Through a a Salt Dome, Dec. 1985, World Oil, pp. 69, 73, 76 and 80. |
Chris Zimmerman and Donny Winslow, How to Select the Right Tools for Stimulating Horizontal Wells, Nov. 1989, World Oil, pp. 53-56. |
Mohamed Soliman, Bob Rose, Wadood El Rabaa and James L. Hunt, Planning Hydraulically Fractured Horizontal Completion, Sep. 1989, World Oil, pp. 54-56 and 58. |
Robert D. Grace and Mike Pippin, Downhole Fires Furing Air Drilling: Causes and Cures, May 1989, World Oil, pp. 42-44. |
H. Delafon, BHA Prediction Software Improves Directional Drilling, Apr. 1989, World Oil, pp. 51-56 and 60. |
Haraldur Karlsson and Ron Bitto, Worldwide Experience Shows Horizontal Well Success, Mar. 1989, World Oil, pp. 51-54 and 56. |
H. Delafon, BHA Prediction Software Improves Directional Drilling, Mar. 1989, World Oil, pp. 45-48 and 50. |
Michael J. Economides, John D. McLennan, Ernest Brown and Jean-Claude Roegiers, Performance and Stimulation of Horizontal Wells, Jul. 1989, World Oil, pp. 69-72, 76 and 77. |
Jean-Francois Giannesini, Horizontal Drilling is Becoming Commonplace: Here's How It's Done, Mar. 1989, World Oil, pp. 35-38 and 40. |
William King, Selecting Bits for Extended Reach and Horizontal Wells, Apr. 1990, World Oil, pp. 53, 55, 57, 59 and 60. |
Hanette Kuich, Seismic and Horizontal Drilling Unlock Austin Chalk, Sep. 1990, World Oil, pp. 47, 48, 50, 52 and 54. |
T. O. Stagg and R. H. Relley, Horizontal Well Completions in Alaska, Mar. 1990, World Oil, pp. 37-44. |
Denny Kerr, Designing Tangent Sections for Medium-Radius Horizontal Wells, Mar. 1991, World Oil, pp. 45-47. |
S. B. Nice and W. H. Fertl, Logging, Completing Extended-Reach and Horizontal Wells, Mar. 1991, World Oil, pp. 49, 50, 52, 53, 55 and 56. |
D. R. Holbert, New Interest in Drainhole Drilling Revives Technology, Mar. 1991, World Oil, pp. 57, 58, 61, 62, 64, 66, 70 and 72. |
Larry E. Pendleton and A. Behrooz Ramesh, Bechtel Develops Innovative Method for Horizontal Drilling, May 27, 1985, Oil & Gas Journal, pp. 95-99. |
Anthony W. Gorody, Tedsi Develops Horizontal Drilling Technology, Oct. 1, 1984, Oil & Gas Journal, pp. 118, 120, 125 and 126. |
Les Shane, Downhole Motor Specifically Designed for Directional, Air Drilling, Feb. 3, 1992, Oil & Gas Journal, pp. 45-49. |
Douglas Gust, Horizontal Drilling Evolving from Art to Science, Jul. 24, 1989, Oil & Gas Journal, pp. 43-46 and 49-52. |
Theodore E. Zaleski Jr., and Jefferson P. Ashton, Gravel Packing Feasible in Horizontal Well Completions, Jun. 11, 1990, Oil & Gas Journal, pp. 33-37. |
Guntis Moritis, Horizontal Drilling Technology Keeps Advancing, Mar. 11, 1991, Oil & Gas Journal, pp. 49-54. |
James A. Dech, David D. Hearn, Frank J. Schuh and Bob Lenhart, New Tools Allow Medium-Radius Horizontal Drilling, Jul. 14, 1986, Oil & Gas Journal, pp. 95-99. |
Floyd Harvey, Fluid Program Built Around Hole Cleaning, Protecting Formation, Nov. 5, 1990, Oil & Gas Journal, pp. 37-41. |
Guy Feneyrou, French Three-Leg Multidrain Well Improves Production, Oct. 1, 1984, Oil & Gas Journal, pp. 126-127. |
Kevin T. Corbett and Rapier Dawson, Drillstring Design for Directional Wells, Apr. 30, 1984, Oil & Gas Journal, pp. 61-66. |
Glen Tolle and Thomas Dellinger, Mobil Identifies Extended-Reach-Drilling Advantages, Possibilities in North Sea, May 26, 1986, Oil & Gas Journal, pp. 78, 81-86. |
Alain Spreux, Christian Georges and Jacques Cessi, Most Problems in Horizontal Completions are Resolved, Jun. 13, 1988, Oil & Gas Journal, pp. 48-52. |
Cameron White, Formation Characteristics Dictate Completion Design, Dec. 3, 1990, Oil & Gas Journal, pp. 58-62 and 64. |
Warren Jones, Unusual Stresses Require Attention to Bit Selection, Oct. 22, 1990, Oil & Gas Journal, pp. 81-85. |
Guntis Moritis, Horizontal Drilling Scores More Successes, Feb. 26, 1990, Oil & Gas Journal, pp. 53, 54, 58, 60-64. |
Ron Matson and Rod Bennett, Cementing Horizontal Holes Becoming More Common, Dec. 17, 1990, Oil & Gas Journal, pp. 40-46. |
Andrew Gallup, P. L. Wilson and Robert Marshall, ESP's Placed in Horizontal Lateral Increase Production, Jun. 18, 1990, Oil & Gas Journal, pp. 58-60, 62 and 63. |
Carl W. Stan, Alternative Electronic Logging Technique Locates Fractures in Austin Chaulk Horizontal Well, Nov. 6, 1989, Oil & Gas Journal, pp. 42-45. |
D. D. Cramer, Guides Exist for Fracture Treatment in Horizontal Wells, Mar. 27, 1989, Oil & Gas Journal, pp. 41, 44, 46, 48 and 49. |
Stephen A. Graham and Greg Nazzal, Second Lateral in Horizontal Well Solves Water Problem, Mar. 18, 1991, Oil & Gas Journal, pp. 111-114. |
Richard S. Carden, Air Drilling Has Some Pluses for Horizontal Wells, Apr. 8, 1991, Oil & Gas Journal, pp. 76-78. |
Jiang Wu and Hans C. Juvkam-Wold, Drag and Torque Calculations for Horizontal Wells Simplified for Field Use, Apr. 29, 1991, Oil & Gas Journal, pp. 49-53 and 56. |
Kenneth B. Gunn, Well Cored to 9,800 Ft in Paraguay, May 13, 1991, Oil & Gas Journal, pp. 51-55. |
E. P. Deliac, J. P. Messines and B. A. Thierree, Mining Technique Finds Applications in Oil Exploration, May 6, 1991, Oil & Gas Journal, pp. 85-86, 88 and 90. |
Siegfried K. Schueler, Horizontal Well Improves Recovery in Deep Sour Gas Field, Mar. 23, 1992, Oil & Gas Journal, pp. 93-94, 96 and 97. |
Wade Dickinson, Eric Dickinson, Herman Dykstra and John M. Nees, Horizontal Radials Enhance Oil Production from a Thermal Project, May 4, 1992, Oil & Gas Journal, pp. 116, 118, 120, 122-124. |
Dr. A. S. Picovi, Lic L. Guasaviono, Dr. A. Pozzo and Egn. J. A. Musmarra, Comparing Cost and Performance of Horizontal Wells, Mar. 1991, World Oil, pp. 39, 40, 42-44. |
Jim D. Fultz and Fred J. Pittard, Bottomhole System Works Completes Horizontal Wells, Mar. 1990, World Oil, pp. 48-50. |
Jiang Wu, Pin Chen and Hans C. Juvkam-Wold, Casing Centralization--Centralization of Casing in Horizontal Wells, Apr./Jun. 1991, Popular Horizontal, pp. 14-16, 18-21. |
T. E. Zaleski Jr., Sand-Control Alternatives for Horizontal Wells, May 1991, JPT, pp. 509-511. |
M. Y. Soliman, James L. Hunt and A. M. El Rabaa, Fracturing Aspects of Horizontal Wells, Aug. 1990, JPT, pp. 966-973. |
R. A. Skopec, M. M. Mann, D. Jeffers and S. P. Grier, Horizontal Core Acquisition and Orientation for Formation Evaluation, 1990, Society of Petroleum Engineers, pp. 153-166. |
Giin-Fa Fuh, E. G. Dew, C. A. Ramsey and K. Collins, Borehole Stability Analysis for the Design of First Horizontal Well Drilled in the U.K.'s Southern `V` Fields, 1990, Society of Petroleum Engineers, pp. 31-42. |
C. D. Pope and P. J. Handren, Completion Techniques for Horizontal Wells in the Pearsall Austin Chalk, 1990, Society of Petroleum Engineers, pp. 657-664. |
F. R. Myal and K-H. Frohne, Slant-Hole Completion Test in the Piceance Basin, Colorado, 1991, Society of Petroleum Engineers, pp. 611-622. |
R. C. Leaf and F. J. Pittard, A Review of Horizontal Methods and Drilling Technology, 1991, Society of Petroleum Engineers, pp. 575-584. |
D. J. Hall, J. L. Walker, E. G. Schmelzl and T. B. Haene, Logging and Perforating of Horizontal Wells: An Innovative Approach, 1991, Society of Petroleum Engineers, pp. 307-316. |
T. P. Frick, M. J. Economides and Mining U. Leoben, Horizontal Well Damage Characterization and Removal. 1991, Society of Petroleum Engineers, pp. 429-438. |
O. L. A. Santos, Important Aspects of Well Control for Horizontal Drilling Including Deepwater Situations, 1991, SPE/IADC, pp. 785-796. |
S. B. Claytor, K. J. Manning and D. L. Schmalzried, Drilling a Medium-Radius Horizontal Well with Aerated Drilling Fluid: A Case Study, 1991, SPE/IADC, pp. 759-773. |
John F. Greenip Jr., How to Design Casing Strings for Horizontal Wells, Dec. 1989, Petroleum Engineer, pp. 34-38. |
Steven D. Moore, Meridian Oil Finds Success with Horizontal Wells, Nov. 1989, Petroleum Engineer, pp. 17-20 and 22. |
Tony Beckett, Test Off Philippines Boosts Horizontal Drilling Technology, Nov. 1989, Petroleum Engineer, pp. 24-26. |
G. Norel, C. Dubois and G. Georges, Test Bench Checks Cement in Horizontal Holes, Nov. 1988, Petroleum Engineer, pp. 54-59. |
Christian Mariotti and Evelyne Kou, ELF Improves Horizontal Drilling at Rospo Mare, Aug. 1988, Petroleum Engineer, pp. 30, 32 and 35. |
Staff Report, Getting to the Bottom with Slant-Hole Logging Tools, Feb. 1988, Petroleum Engineer, pp. 32, 34 and 35. |
Gary M. Briggs, How to Design a Medium-Radius Horizontal Well, Sep. 1989, Petroleum Engineer, pp. 26, 30-32, 36 and 37. |
Dennis Dann and David Jetelina, New Logging Approach Detects Fractures in Horizontal Wells, Sep. 1990, Petroleum Engineer, pp. 30, 32, 33, 35 and 36. |
Jay Dobson and T. C. Mondshine, Unique Completion Fluid Suits Horizontal Wells, Sep. 1990, Petroleum Engineer, pp. 42, 44, 46 and 48. |
Sid B. Nice and W. H. Fertl, New Logging, Completion Techniques Boost Horizontal Well Productivity, Nov. 1990, Petroleum Engineer, pp. 20, 22-24, 26-29. |
Bruce Woodlan and G. E. Powell, Casing Design in Directionally Drilled Wells, 1975, Society of Petroleum Engineers, pp. 1-11. |
W. B. Bradley, C. E. Murphey, R. T. McLamore, and L. L. Dickson, Advantages of Heavy Metal Collars in Directional Drilling and Deviation Control, May 1976, Society of Petroleum Engineers, pp. 521-530. |
D. Bryant, T. Hudson and S. Hoover, The Use of Low-Density Particles for Packing a Highly Deviated Well, Oct. 1990, Society of Petroleum Engineers, pp. 387-395. |
Wade Dickinson, Michael J. Pesavento and R. Wayne Dickinson, Data Acquisition, Analysis, and Control While Drilling with Horizontal Water Jet Drilling Systems, 1990, Society of Petroleum Engineers, pp. 127-1-127-10. |
A. Eddison and J. Symons, Downhole Adjustable Gauge Stabilizer Improves Drilling Efficiency in Directional Wells, 1990, Society of Petroleum Engineers, pp. 509-516. |
S. H. Fowler, Jr. and C. W. Plesants, Operation and Utilization of Hydraulic-Actuated Service Tools for Reeled Tubing, 1990, Society of Petroleum Engineers, pp. 631-640. |
P. E. Harness, M. D. Hansen, G. A. Terzian, S. H. Fowler, Jr., and F. J. Golino, An Overview of Reeled-Tubing-Conveyed Production Logging Capabilities in California, 1990, Society of Petroleum Engineers, pp. 155-163. |
D. K. Trichel and M. P. Ohanlan, Unique Articulated Downhole Motor Holds Promising Future for Short Radius Horizontal Drilling, 1990, Society of Petroleum Engineers, pp. 137-149. |
Y. Tsukano and M. Ueno, Development of Lightweight Steel Drillpipe with 165-KSI Yield Strength, 1990, Society of Petroleum Engineers, pp. 403-412. |
O. Rivas, A. Newsky, M. Cadeno and P. Rivera, Sucker Rod Centralizer for Directional Wells, 1990, Society of Petroleum Engineers. |
Fred L. Sebins, Problems in Cementing Horizontal Wells, Apr. 1990, JPT, pp. 398-400. |
J. D. Fultz, F. J. Pittard, F. D. Sawyer and W. R. Farmer, Slim-Hole Drilling in Harsh Environments, 1990, IADC/SPE, pp. 333-340. |
M. R. Islam and A. E. George, Sand Control in Horizontal Wells in Heavy Oil Reservoirs, 1989, Society of Petroleum Engineers, pp. 437-452. |
S. B. Claytor Jr., R. King and J. Speed, Steerable Systems Drilling: The Right Angle for Horizontal Drilling, 1989, Society of Petroleum Engineers, pp. 7-16. |
C. W. White, Drilling and Completion of a Horizontal Lower Spraberry Well Including Multiple Hydraulic Fracture Treatments, 1989, Society of Petroleum Engineers, pp. 205-210. |
R. L. Cook, J. W. Nicholson, M. G. Sheppard and W. Westlake, First Real Time Measurements of Downhole Vibrations, Forces, and Pressures Used to Monitor Directional Drilling Operations, 1989, SPE/IADC, pp. 283-290. |
L. Keelean, S. S. Harris and N. Petronio, Short Radius Drilling Technology Utilizing Mobile Service/Workover Rig, 1989, SPE/IADC, pp. 765-772. |
R. Ehiers, L. Kracht and J. Witte, Case History of Horizontal Wells Drilled with Navigation Technology in European Operations, 1989, SPE/IADC, pp. 315-324. |
H. Karlsson, R. Cobbley and G. E. Jacques, New Developments in Short-, Medium-, and Long-Radius Lateral Drilling, 1989, SPE/IADC, pp. 725-736. |
W. Dickinson, R. G. Knowll, R. Nordlund and W. Dickinson, Flexible Sand Barrier (FSB): A Novel Sand Control System, 1989, Society of Petroleum Engineers, pp. 419-424. |
P. A. Goode and D. J. Wilkinson, Inflow Performance of Partially Open Horizontal Wells, 1989, Society of Petroleum Engineers, pp. 309-320. |
G. E. King, Perforating the Horizontal Well, Jul. 1989, Journal of Petroleum Technology, pp. 671-672. |
J. P. Ashton, J. Liput, R. Leomons and J. Summerlin, Gravel Packing Horizontal and Highly Deviated Openhole Completions Using a Single-Screen Prepacked Liner in Offshore California Fields, 1989, Society of Petroleum Engineers, pp. 165-178. |
R. E. Cooper and J. C. Troncose, An Overview of Horizontal Well Completion Technology, 1988, Society of Petroleum Engineers, pp. 335-350. |
R. E. Cooper, Coiled Tubing in Horizontal Wells, 1988, Society of Petroleum Engineers, pp. 323-334. |
S. A. Andersen, S. A. Hansen and K. Fjeldgaard, Horizontal Drilling and Completion: Denmark, 1988, Society of Petroleum Engineers, pp. 155-165. |
D. Kerr and K. Lesley, Mechanical Aspects of Medium Radius Well Design, 1988, Society of Petroleum Engineers, pp. 719-726. |
J. E. Fontenot, Successful High Angle Completions, Cementing, and Drilling's Impact, 1988, Society of Petroleum Engineers, pp. 831-842. |
J. Lessi and A. Spreux, Completion of Horizontal Drainholes, 1988, Society of Petroleum Engineers, pp. 209-218. |
A. Spreux, A. Louis and M. Rocca, Logging Horizontal Wells--Field Practice for Various Techniques, 1987, Society of Petroleum Engineers, pp. 1-14. |
J. B. Weirich, T. E. Zaleski Jr., and P. M. Mulcahy, Perforating the Horizontal Well: Designs and Techniques Prove Successful, 1987, Society of Petroleum Engineers, pp. 503-508. |
R. H. Reiley, J. W. Black, T. O. Stagg, D. A. Walters and G. R. Atol, Cementing of Liners in Horizontal and High-Angle Wells at Prudhoe Bay, Aslaska, 1987, Society of Petroleum Engineers, pp. 583-590. |
M. B. Webster, G. E. Otott Jr. and D. L. Rice, Cementing High-Angle Wells Using Cement-Expanded Formation Packers and/or Casing Rotation, 1987, SPE/IADC, pp. 745-754. |
D. W. Sherrard, B. W. Brice and D. G. MacDonald, Application of Horizontal Wells at Prudhoe Bay, 1986, Society of Petroleum Engineers, pp. 1-16. |
R. C. Wilson and D. N. Willis, Successful High Angle Drilling in the Statfjord Field, 1986, Society of Petroleum Engineers, pp. 1-13. |
C. Zurdo, C. Georges and M. Martin, Mud and Cement for Horizontal Wells, 1986, Society of Petroleum Engineers, pp. 1-8. |
A. A. Gavignet and I. J. Sobey, A Model for the Transport of Cuttings in Highly Deviated Wells, 1986, Society of Petroleum Engineers, pp. 1-8. |
C. J. Perry, Directional Drilling with PDC Bits in the Gulf of Thailand, 1986, Society of Petroleum Engineers, pp. 1-9. |
William P. Diamon and David C. Oyler, Drilling Long Horizontal Coalbed Methane Drainage Holes from a Directional Surface Borehole, 1990, Society of Petroleum Engineers, pp. 341-346. |
Pat Herbet, Drilling with New-Generation Positive Displacement Motors, 1981, Society of Petroleum Engineers, pp. 1-5. |
M. J. Landman and W. H. Goldthrope, Optimization of Perforation Distribution for Horizontal Wells, 1991, Society of Petroleum Engineers, pp. 567-576. |
U. Ahmed, Horizontal Well Completion Recommendations Through Optimized Formation Evaluation, 1991, Society of Petroleum Engineers, pp. 423-435. |
R. J. Tailby, J. H. Yonker and J. L. Pearce, A New Technique for Servicing Horizontal Wells, 1991, Society of Petroleum Engineers, pp. 43-58. |
J. Misselbrook, G. Wilde and G. Falk, The Development and Use of a Coiled-Tubing Simulation for Horizontal Applications, 1991, Society of Petroleum Engineers, pp. 29-41. |
P. E. Harness, M. D. Hansen, G. A. Terzian, S. H. Fowler Jr., and F. J. Golino, An Overview of Reeled-Tubing-Conveyed Production Logging Capabilities in California, 1990, Society of Petroleum Engineers, pp. 155-163. |
J. Bryant, D. Watson, W. Wisniewski, R. Patterson and L. Smith, Applications and Limitations of Horizontal Drilling in Oklahoma, 1991, Society of Petroleum Engineers, pp. 313-326. |
G-F. Fuh, D. B. Deom and R. D. Turner, Wellbore Stability and Drilling Results from the First Horizontal Well in the Kotter Field Offshore The Netherlands, 1991, Society of Petroleum Engineers, pp. 101-109. |
L. R. B. Hammons, W. C. Barnett, E. K. Fisher and D. H. Sellers, Stratigraphic Control and Formation Evaluation of Horizontal Wells Using MWD, 1991, Society of Petroleum Engineers, pp. 25-38. |
D. B. Gaudin and J. C. Beasley, A Comparison of MWD and Wireline Steering Tool Guidance Systems in Horizontal Drilling, 1991, Society of Petroleum Engineers, pp. 7-18. |
C. M. Matthews and L. J. Dunn, Drilling and Production Practices to Mitigate Sucker Rod/Tubing Wear-Related Failures in Directional Wells, 1991, Society of Petroleum Engineers, pp. 363-374. |
D. Malekzadeh and D. Tiab, Interference Testing of Horizontal Wells, 1991, Society of Petroleum Engineers, pp. 717-727. |
S. Schellenberg, T. Rogers and L. Smith, Deviation Control with Steerable System Lowers Well Costs in Southern Oklahoma, 1991, Society of Petroleum Engineers, pp. 299-312. |
L. Shale, Development of Air Drilling Motor Holds Promise for Specialized Directional Drilling Applications, 1991, Society of Petroleum Engineers, pp. 275-286. |
J. L. Hood III, M. D. Mueller and M. G. Mims, The Uses of Buoyancy in Completing High-Drag Horizontal Wellbores, 1991, Society of Petroleum Engineers, pp. 757-764. |
D. R. Schroeter and H. W. Chan, Successful Application of Drilling Technology Extends Directional Capability; Sep. 1989, SPE Drilling Engineer, pp. 230-236. |
T. M. Gaynor, Downhole Control of Deviation with Steerable Straight-Hole Turbodrills, Mar. 1988, SPE Drilling Engineer, pp. 50-56. |
W. Dickinson, R. R. Anderson and D. W. Dickinson, The Ultrashort-Radius Radial System, Sep. 1989, SPE Drilling Engineer, pp. 247-254. |
M. A. Wilson and F. L. Sabins, A Laboratory Investigation of Cementing Horizontal Wells, Sep. 1988, SPE Drilling Engineer, pp. 275, 278 and 280. |
H. J. Vrlellnk and A. M. Hippman, The Optimization of Slant-Well Drilling in the Lindbergh Field, Dec. 1989, SPE Drilling Engineer, pp. 307-314. |
P. Hardman, Beckingham 36 Horizontal Well, Mar. 1989, SPE Drilling Engineer, pp. 17-23. |
D. B. Chritain, Planning and Operational Requirements for a Shallow-Objective, High-Angle Well in the Gulf of Mexico, Sep. 1988, SPE Drilling Engineer, pp. 241-247. |
T. J. Moo and M. W. Tweedy, Planning and Drilling Australia's First Medium-Radius Horizontal Wells, 1991, Society of Petroleum Engineers, pp. 629-640. |
William J. Lang and Marion B. Jett, High Expectations for Horizontal Drilling Becoming Reality, Sep. 24, 1990, Oil & Gas Journal, pp. 70 72, 74, 76 and 79. |
Ron Matson and Rod Bennett, Cementing Horizontal Holes Becoming More Common, Dec. 17, 1990, Oil & Gas Journal, pp. 40-45. |
Lindsay Fraser, Effective Ways to Clean and Stabilize High-Angle Holes, Nov. 1990, Petroleum Engineer, pp. 30, 32, 34 and 35. |
Michael M. Power, Roger Chapman and Robert O'Neal, Horizontal Well Sets Depth Record--Horizontal Drilling Below 14,600 Ft, Nov. 1990, Petroleum Engineer, pp. 36-38, 40 and 41. |
Svend Aagne Andersen, John M. Conlin, Kjeld Fjeldgaard and Svend Aage Hanse, Exploiting Reservoirs with Horizontal Wells: The Maersk Experience, Schlumberger Oil Field Review--Schlumberger Technical Review, pp. 11-21. |
Peter Betts, Curt Blount, Bill Broman, Brian Clark, Larry Hibbard, Alain Louis and Paul Oosthoek, Acquiring and Interpreting Logs in Horizontal Wells, Schlumberger Oil Field Review; Schlumberger Technical Review, pp. 34-51. |
Jeff H. Littleton, Sohio Studies Extended--Reach Drilling for Prudhoe Bay, Oct. 1985, Petroleum Engineer, pp. 28, 32 and 34. |
(Unknown), Horizontal Drilling Stays Hot, Apr. 1989, Petroleum Engineer International, p. 24. |
Trevor Burgess and Patrick Van de Slijke, Horizontal Drilling Comes of Age, Schlumberger Oil Field Review--Schlumber Technical Review, pp. 22-23. |
(Unknown), Drilling Fluids for Horizontal Wells, Schlumberger Oil Field Review; Schlumberger Technical Review, pp. 8-10. |
(Unknown), Reservoir Selection for Horizontal Wells, (Unknown), Western International, pp. 1-8. |
(Unknown), Cementing of Horizontal Wells, (Unknown), Western International, pp. 9-14. |
(Unknown), Matriz Stimulation of Horizontal Wells, (Unknown), Western International, pp. 15-21. |
(Unknown), Fracturing of Horizontal Wells, (Unknown), Western International, pp. 23-30. |
(Unknown), Horizontal Well Case Histories, (Unknown), Western International, pp. 31-37. |
J. P. Wilkinson, J. H. Smith, T. O. Stagg, and D. A. Walters, Horizontal Drilling Techniques at Prudhoe Bay, Alaska, 1980, Society of Petroleum Engineers, pp. 1-12. |