Parts handling method

Information

  • Patent Grant
  • RE38622
  • Patent Number
    RE38,622
  • Date Filed
    Friday, August 30, 2002
    21 years ago
  • Date Issued
    Tuesday, October 12, 2004
    19 years ago
Abstract
A new parts handling apparatus is provided which can shorten the index time and increase working ability without increasing the number of components and can restrict the rise of manufacturing cost. X driving member 12 to be moved rightward and leftward in correlation to the rotation of a ball screw 2 by a servomotor 1 is provided with a pair of right and left movable members 7 mounted movably in the Z direction. Two contact hands 5 are attached to each movable member 7 through aligning mechanisms 8 respectively. Each movable member 7 is provided with a Z driving member 6 mounted slidably in the X direction. The Z driving member 6 is engaged with a ball screw 4, and the ball screw 4 is connected to a servomotor 3. When the ball screw 4 is rotated by the servomotor 3, the Z driving member 6 moves vertically in the figure, thereby also moving the movable member 7 vertically.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The present invention relates to a parts handling apparatus, and more particularly, to a structure of an apparatus best-suited to handle electronic parts in an electrical characteristic inspection of integrated circuit (IC) devices.




2. Description of the Related Art




In a conventional process of inspecting the characteristics of integrated circuits (ICs), an IC handler is used to sequentially place many IC devices in an inspection position and to inspect the IC devices. The IC handler is provided with a contact hand for holding the IC device by suction. The contact hand repeats operations of carrying an IC device from a parts supply position, supplying the IC device to an inspection socket located in the inspection position, taking the IC device out of the inspection socket at the completion of an electric characteristic inspection on the IC device, and carrying the IC device to a parts discharge position.




In the characteristic inspection process using the IC handler, it is required to make an inspection on many IC devices in a short time. Here, the time, which is used to take an inspected IC device out of the inspection socket, to set the next IC device to be inspected on the inspection socket and to put outer terminals of the IC device into a stable contact with the inspection socket, is called “index time”. In the above process, it is most important to shorten the index time, and the performance of the IC handler is evaluated by the length of the index time thereof.




One of the most effective methods for shortening the index time is to provide a plurality of contact hands, usually two contact hands, for accessing one inspection position. The provision of two contact hands makes it possible that one contact hand takes an inspected IC device out of the inspection socket and the other contact hand immediately sets an uninspected IC device on the inspection socket. Therefore, the index time of the IC handler can be shortened.





FIG. 9

shows the schematic structure of an IC handler which shortens the index time as mentioned above. In this IC handler, two inspection sockets


11


are placed in an inspection position, and a parts discharge stage


33


for receiving two IC devices from the inspection sockets


11


and a parts supply stage


34


for supplying two IC devices to the inspection sockets


11


are fixed on a shuttle


35


located on one side of the inspection sockets


11


and


11


. The shuttle


35


is so structured as to reciprocate in the extending direction thereof and to put the parts discharge stage


33


and the parts supply stage


34


into a predetermined supply and discharge position (IC device handling position) alternately.




Two turning arms


31


, spaced at 180° about a turning shaft O, are interposed between the inspection sockets


11


and the shuttle


35


. The two turning arms


31


turn about the vertical shaft O integrally on a horizontal plane. Each of the turning arms


31


is provided with a transfer mechanism


32


fixed at the leading end thereof, and a contact hand


5


is mounted at the bottom end of the transfer mechanism


32


to be movable upward and downward. The contact hand


5


can grasp two IC devices arranged on the parts supply stage


34


at a time, and place the IC devices on the inspection sockets while grasping. When one transfer mechanism


32


at the leading end of the turning arm


31


is placed just above the inspection position, the other transfer mechanism


32


is placed just above the handling position on the shuttle


35


. The two transfer mechanisms


32


transfer IC devices from the parts supply stage


34


to the inspection sockets


11


, and from the inspection sockets


11


to the parts discharge stage


33


, alternately.




In the state shown in

FIG. 9

, unillustrated IC devices are held by the contact hand


5


placed just above the inspection sockets


11


, and set on the inspection sockets


11


by moving the contact hand


5


downward. On the other hand, inspected IC devices are held by the contact hand


5


placed above the shuttle


35


, and put onto the parts discharge stage


33


in the handling position on the shuttle


35


by moving the contact hand


5


downward.




Next, after the parts supply stage


34


is put into the handling position by moving the shuttle


35


, the contact hand


5


moves down, takes uninspected IC devices from the parts supply stage


34


, and moves up again. When the characteristic inspection on the IC devices set on the inspection sockets


11


is completed, the contact hand


5


grasping the inspected IC devices moves upward.




The two turning arms


31


turn through 180° in this state, and thereby, the contact hood


5


grasping the uninspected IC devices is moved above the inspection sockets


11


and the contact hand


5


grasping the inspected IC devices is moved above the handling position on the shuttle


35


. At this time, the empty parts discharge stage


33


is placed in the handling position on the shuttle


35


.




In this IC handler, since the IC devices are supplied and discharged alternately by the two contact hands


5


while turning the turning arms


31


through 180°, the index time equals to the sum of the time taken for one contact hand


5


to take IC devices from the inspection sockets


11


, and the turning time of the turning arms


31


and the time taken for the other contact hand


5


to set IC devices.




However, since the IC devices are conveyed from the handling position to the inspection position by turning the turning arms


31


in the above-mentioned IC handler, the conveyance trail of the IC devices is shaped like an arc, and the conveyance distance is p/2 times as long as that of the linear movement. Therefore, in order to obtain an index time equivalent to that of the linear movement of the IC devices, the conveyance speed and acceleration required to convey the IC devices are both increased, which needs a higher-powered drive source and a more rigid conveying mechanism. Particularly, in order to turn the transfer mechanism


32


and the contact hand


5


, which are provided with heavy components such as a driving cylinder and a motor, more swiftly, high driving power is needed to increase the acceleration and deceleration. Therefore, it is quite difficult to achieve such swiftness while keeping the precision of the conveyance position and the structural precision.




As another method for further shortening the index time, it is thought of to increase the number of turning arms as shown in FIG.


10


. In the structure shown in

FIG. 10

, three turning arms


36


are located about a turning shaft. Since the turning arms


36


are spaced at 120°, it seems that the moving distance of IC devices is decreased and thereby the index time is shortened. However, this case requires each of the three turning arms


36


to be provided with a transfer device


32


and a contact hand


5


at the leading end thereof, which increases the number of components of the apparatus and the weight of the moving parts, and needs higher driving power. Therefore, it is difficult to increase the operation speed of individual moving parts, and the manufacturing cost of the IC handler increases.




Furthermore, in the IC handler shown in

FIG. 10

, it can be thought of that the inspection ability is enhanced without shortening the index time by increasing the number of IC devices to be grasped by each contact hand


5


and the number of IC devices to be inspected by the inspection socket


11


at a time. However, in this method, the manufacturing cost of the contact hand


5


and the socket


11


increases according to the increased number of IC devices, and the turning radius is required to be increased by making the turning arms


36


longer in order to prevent the interference among the contact hands


5


resulting from the increased length thereof in the turning direction. As a result, the moving distance of the IC devices is increased, and thereby the index time is increased on the contrary.




OBJECTS OF THE INVENTION




It is an object of the present invention to obviate the above-mentioned problem. It is another object of the present invention to provide a new parts handling apparatus which can shorten the index time and increase working ability without increasing the number of components and can thereby restrict the rise of manufacturing cost.




SUMMARY OF THE INVENTION




In accordance with an aspect of the present invention a parts handling apparatus comprises a processing section for subjecting a part to a predetermined process, a first handling section for supplying and discharging the part placed on one side of the processing section, a second handling section for supplying and discharging the part placed on the other side of the processing section, a first holding section capable of moving between the processing section and the first handling section and holding the part, a second holding section capable of moving between the processing section and the second handling section and holding the part, a main driving means for making the first and second holding sections reciprocate alternately from the first and second handling sections toward the processing section, a first auxiliary driving means for moving the first holding section close to and apart from the processing section and the first handling section, and a second auxiliary driving means for moving the second holding section close to and apart from the processing section and the second handling section.




Since the first handling section and the second handling section are placed on both sides of the processing section and parts are supplied and discharged alternately from both sides by the first holding section and the second holding section, the conveyance route of the parts is freely determined and the index time can be shortened by short-circuiting the conveyance route.




It is preferable that the main driving means reciprocate the first and second holding sections linearly in a first direction, and that the first and second auxiliary driving means reciprocate the first and second holding sections linearly in a second direction intersecting the first direction.




Moreover, since the first and second holding sections are moved linearly close to and apart from the processing section and the first and second handling sections by being moved linearly in the first direction by the main driving means between the processing section and the first and second handling sections, it is possible to simplify the structures of the main driving means and the first and second auxiliary driving means and to reduce the manufacturing cost of the apparatus.




Furthermore, it is preferable in this case that the first auxiliary driving means have a first connecting member for engaging the first holding section therewith movably in the first direction and holding the first holding section in the second direction, and a first drive source fixed to move the first connecting member in the second direction, and that the second auxiliary driving means have a second connecting means for engaging the second holding section therewith movably in the first direction and holding the second holding section in the second direction and a second drive source fixed to move the second connecting member in the second direction.




Although the first and second auxiliary driving means respectively move the first and second holding sections by moving the first and second connecting members by means of the first and second drive sources, since the first and second connecting members are movable in the first direction, the first and second auxiliary driving means do not obstruct the movement made by the main driving means and the driving load of the main driving means can be reduced. Therefore, it is easy to increase the driving speed of the first and second holding sections and to maintain driving accuracy.




Furthermore, it is preferable that a period of movement of the first and second holding sections in the first direction through the main driving means and a period of movement of the first and second holding sections in the second direction through the first and second auxiliary driving means overlap at least partially.




In this case, particularly, it is effective in shortening the index time to set the moving route of the first and second holding sections linearly as short as possible to a degree where there is no interference with peripheral mechanisms. Although the moving route is set to be linear, it is more preferable to set the moving route smoothly in accordance with the acceleration and deceleration characteristics of the main driving means and the first and second auxiliary driving means.




According to this means, since the period of movement made by the main driving means and the period of movement made by the first and second auxiliary driving means overlap, it is possible to optimize the moving route of the first and second holding sections, and to further shorten the index time by changing the setting of the moving route.




Additionally, it is preferable that the main driving means be a single driving system so structured as to move the first and second holding sections in the same direction at the same speed.




Since the first and second holding sections are moved by a single driving system in the same direction at the same speed, it is possible to simplify the structure of the driving system and to reduce the manufacturing cost of the apparatus.




As the main driving means, separate drive sources or driving members may control the first and second holding sections respectively.




Other objects and attainments together with a fuller understanding of the invention will become apparent and appreciated by referring to the following description and claims taken in conjunction with the accompanying drawings.











BRIEF DESCRIPTION OF THE DRAWINGS




In the drawings wherein like reference symbols refer to like parts.





FIG. 1

is a schematic perspective view showing a first operation state of a main structure of a parts handling apparatus according to an embodiment of the present invention;





FIG. 2

is a schematic perspective view showing a second operation state of the present invention;





FIG. 3

is a schematic perspective view showing a third operation state of the present invention;





FIG. 4

is a schematic perspective view showing a fourth operation state of the present invention;





FIG. 5

is a timing diagram showing operations of various members of the present invention;





FIG. 6

is a view explaining movements of a pair of contact hands of the present invention;





FIG. 7

is a graph showing operation states of X, Z


1


-axis and Z


2


-axis driving systems of the present invention;





FIGS. 8A and 8B

are partially enlarged cross-sectional views showing the structure of the contact hand of the present invention;





FIG. 9

is a schematic perspective view showing the structure of a conventional IC handler; and





FIG. 10

is a schematic perspective view showing the structure of another conventional IC handler.











DESCRIPTION OF THE PREFERRED EMBODIMENTS




An embodiment of the present invention will be next described with reference to the accompanying drawings.

FIGS. 1

to


4


show a main mechanism of a parts handling apparatus according to the embodiment of the present invention, and illustrate a series of operation steps of the apparatus in order.




In this embodiment, a servomotor


1


fixed on a frame


10


rotates a ball screw


2


extending in the rightward and leftward direction in the figure (referred to as “X direction” hereinafter). Two guide rails


10


a extending in the X direction are fixed on frame


10


. An X driving member


12


is mounted movably in the X direction on guide rails


10


a, and engaged with ball screw


2


to be moved in the X direction in correlation to the rotation of ball screw


2


.




X driving member


12


is provided with a pair of right and left movable members


7


which are movable in the vertical direction in the figure (referred to as “Z direction” hereinafter). Movable members


7


are each provided with two contact hands


5


as holding members through respective aligning mechanisms


8


. Each of contact hands


5


has a suction mechanism for holding an IC device by suction, which will be described later, and a mechanism for pressing outer terminals of the IC device against an inspection socket which will be also described later. Aligning mechanism


8


is a well-known mechanism for fitting the position of contact hand


5


for the inspection socket, a parts supply stage and a parts discharge stage.




Z driving members


6


are respectively mounted slidably in the X direction on the movable members


7


, and engaged with ball screws


4


which are respectively connected to servomotors


3


fixed on frame


10


. When ball screw


4


is rotated by servomotor


3


, Z driving member


6


moves up and down, thereby moving movable member


7


up and down.




In the following description, a mechanism consisting of movable member


7


, Z driving member


6


, ball screw


4


and servomotor


3


on the left side is referred to as a Z


1


-axis driving system, and a mechanism consisting of movable member


7


, Z driving member


6


, ball screw


4


and servomotor


3


on the right side is referred to as a Z


2


-axis driving system. A mechanism consisting of X driving member


12


, ball screw


2


and servomotor


1


is referred to as an X-axis driving system.




Two inspection sockets


11


are placed as a processing section at the center below the above mechanisms, and each are provided with an inspection pad corresponding to outer terminals of an IC device. When the outer terminals of the IC device are brought into contact with the inspection pad of inspection socket


11


, the inspection on the electrical characteristics of the IC device is performed.




On the other hand, shuttles


21


and


22


are placed on the left and right sides of inspection sockets


11


(in the X direction) to reciprocate in the forward and backward directions in the figure. Inspection sockets


11


are positioned just at the midpoint between shuttles


21


and


22


. A parts supply stage


23


and a parts discharge stage


24


are fixed on each of shuttles


21


and


22


. Parts supply stage


23


and parts discharge stage


24


can each hold two IC devices corresponding to two contact hands


5


mounted on movable member


7


. Parts supply stage


23


holds two uninspected IC devices, and supplies the IC devices to contact hands


5


, and parts discharge stage


24


receives inspected IC devices from contact hands


5


, and discharges the IC devices.




The above Z


1


-axis driving system transfers IC devices between the shuttle


21


and the inspection sockets


11


, and the Z


2


-axis driving system transfers IC devices between the shuttle


22


and the inspection sockets


11


. When X driving member


12


moves in the X direction, and, for example, the Z


1


-axis driving system moves from shuttle


21


to inspection sockets


11


, and the Z


2


-axis driving system moves from the inspection sockets


11


to the shuttle


22


. Although not illustrated, a loading robot for supplying IC devices to parts supply stage


23


and an unloading robot for taking IC devices out of parts discharge stage


24


are respectively placed in front of and behind shuttles


21


and


22


.




In the above inspection apparatus, the following operations are performed. First, as shown in

FIG. 1

, Z


1


-axis contact hands


5


press two IC devices against inspection sockets


11


to make inspection. At this time, Z


2


-axis contact hands


5


are standing by above a handling position preset on shuttle


22


while holding two uninspected IC devices taken out of the parts supply stage


23


. On the other hand, empty part discharge stage


24


is already standing by at a handling position on the shuttle


21


.




Next, when the inspection on the IC devices at the inspection sockets


11


is completed, Z


1


-axis servomotor


3


is put into operation, Z driving member


6


is lifted in correlation to the rotation of ball screw


4


, and Z


1


-axis contact hands


5


pull the inspected IC devices up from inspection sockets


11


. Then, servomotor


1


is put into operation, and the X driving member


12


starts to move leftward in correlation to rotation of the ball screw


2


. When X driving member


12


moves, contact hands


5


in both the Z


1


and Z


2


axis driving systems move together in the leftward direction in the figure. In a short time, Z


1


-axis contact hands


5


arrive above the handling position on the shuttle


21


, and Z


2


-axis contact hands


5


arrive above the inspection sockets


11


.




Then, Z


2


-axis servomotor


3


is put into operation, Z driving member


6


is moved down in correlation to the rotation of ball screw


4


, and Z


2


-axis contact hands


5


press the uninspected IC devices against the respective inspection sockets as shown in FIG.


2


. On the other hand, Z


1


-axis contact hands


5


also move down and transfer the inspected IC devices onto parts discharge stage


24


.




As shown in

FIG. 3

, while inspection is being made on the IC devices pressed against the inspection sockets


11


by Z


2


-axis contact hands


5


, shuttle


21


moves backward to move parts discharge stage


24


backward and positions parts supply stage


23


to the handling position. On the other hand, shuttle


22


moves forward and positions parts discharge stage


24


to the handling position.




When the inspection on the IC devices is completed, Z


2


-axis contact hands


5


move up above the handling position on the shuttle


22


as shown in

FIG. 4

, and, on the other hand, Z


1


-axis contact hands


5


press and contact uninspected IC devices with inspection sockets


11


. Z


2


-axis contact hands


5


move down and transfer the IC devices to parts discharge stage


24


.




This apparatus repeats the above-mentioned operations shown in

FIGS. 1

to


4


, and the Z


1


-axis and Z


2


-axis driving systems operate to alternately supply IC devices to inspection sockets


11


.

FIG. 5

is a timing diagram showing the above operations and the operations of the loading robot and the unloading robot. IC device receiving operations performed at the sections are indicated by projections and IC device transferring operations performed at the sections are indicated by recesses in the diagram. Although two lines respectively representing the positions of parts supply stage


23


and parts discharge stage


24


are drawn at shuttle


21


, the lower line indicates the stage in the handling position. Similarly, although two lines respectively representing the positions of parts supply stage


23


and parts discharge stage


24


are drawn at shuttle


22


, the upper line indicates the stage in the handling position. Furthermore, in an index unit, the upper solid line indicates the operation of Z


1


-axis driving system and the lower solid line indicates the operation of Z


2


-axis driving system. An inspection period in the figure refers to a period in which IC devices are inspected at inspection sockets


11


.




The loading robot repeats operations of transferring uninspected IC devices onto parts supply stage


23


on shuttle


21


, two at a time, sequentially receiving two new IC devices from a parts supply tray or the like where IC devices are arranged, transferring the IC devices onto parts supply stage


23


on shuttle


22


, two at a time, and sequentially receiving two IC devices again from the parts supply tray or the like.




On shuttle


21


, parts supply stage


23


receives two uninspected IC devices from the loading robot, parts discharge stage


24


receives inspected IC devices from the Z


1


-axis contact hands


5


, parts supply stage


23


moves to the handling position, and then, the IC devices held by parts supply stage


23


are transferred to the Z


1


-axis contact hands


5


. At the same time, the inspected IC devices held by parts discharge stage


24


are taken out by the unloading robot.




In the index unit, the positions and operations of Z


1


-axis and Z


2


-axis contact hands


5


are shown. In the same manner as above, Z


1


-axis contact hands


5


press and fix IC devices on inspection sockets


11


for inspection, and move toward shuttle


21


at the completion of inspection. At this time, Z


2


-axis contact hands


5


transfer the inspected IC devices onto parts discharge stage


24


on shuttle


22


, receive new IC devices from the parts supply stage


23


, and move toward the inspection position. After that, Z


2


-axis contact hands


5


transfer the inspected IC devices onto parts discharge stage


24


on shuttle


22


. On the other hand, Z


1


-axis contact hands


5


transfer the inspected IC devices onto parts discharge stage


24


on shuttle


21


, and Z


2


-axis contact hands


5


press the IC devices against inspection sockets


11


for inspection.




Shuttle


22


repeats just the same operations as those of shuttle


21


. The unloading robot receives inspected IC devices two by two from parts discharge stages


24


on shuttles


21


and


22


, and then, sequentially puts the IC devices into a predetermined position on an unillustrated inspected parts tray.





FIG. 6

illustrates the operations of Z


1


-axis and Z


2


-axis contact hands


5


. Each Z


1


-axis contact hand


5


reciprocates between shuttle


21


and inspection socket


11


, and each Z


2


-axis contact hand


5


reciprocates between shuttle


22


and inspection socket


11


.

FIG. 6

shows a case in which Z


1


-axis contact hand


5


conveys an inspected IC device from the inspection socket


11


to parts discharge stage


24


on shuttle


21


(parts discharge operation) and Z


2


-axis contact hand


5


conveys an uninspected IC device from parts supply stage


23


on shuttle


22


(parts supply operation). The Z


1


-axis parts supply operation and the Z


2


-axis parts discharge operation are performed symmetrically with the Z


2


-axis parts supply operation and the Z


1


-axis parts discharge operation.




First, the most basic operation mode will be described. In this mode, in order to shorten the index time, while Z


1


-axis contact hand


5


is pressing the IC device under inspection at the inspection socket


11


, Z


2


-axis contact hand


5


takes an uninspected IC device out of parts supply stage


23


on shuttle


22


, Z driving member


6


is moved up, and contact hand


5


is set to stand by at a standby point P set at a predetermined height from parts supply stage


23


.




Next, when the inspection at inspection socket


11


is completed, Z


1


-axis contact hand


5


moves upward through a takeout point S, and reaches a center point Q above the inspection socket


11


as indicated by an alternate long and short dashed line in the figure. Then, Z


1


-axis contact hand and Z


2


-axis contact hand are both moved leftward horizontally along the alternate long and short dashed line by moving X driving member


12


leftward. Z


1


-axis contact hand


5


reaches a standby point R, and Z


2


-axis contact hand


5


reaches the center point Q. After that, Z


2


-axis contact hand


5


is moved down vertically from the center point Q together with the Z driving member


6


, and pressed against inspection socket


11


. As mentioned above, in this basic operation mode, the time, during which Z


1


-axis contact hand


5


reaches the center point Q from the inspection socket


11


and the Z


2


-axis contact hand reaches the inspection socket


11


from the standby point P through the center point Q, is taken as index time.




However, in such an operation mode, the moving route of the contact hand is wasteful as indicated by the alternate long and short dashed line, and the index time is not yet sufficiently reduced. In order to save lifting time from inspection socket


11


to the center point Q, the operation periods of X driving member


12


and Z driving member


6


are corrected, so that X driving member


12


is moved to the standby point R moment Z


1


-axis contact hand


5


reaches the takeout point S set above inspection socket


11


, and Z


2


-axis contact hand


5


is moved from the standby point P to the takeout point S. Routes are schematically shown by a dotted line in the figure.




In this case, the takeout point S is set as low as possible to a degree where the contact hand


5


can move in the horizontal direction without interfering with the mechanisms on the periphery of inspection socket


11


. The lower the takeout point S is, the shorter the index time is.




When Z


1


-axis contact hand


5


moves up from inspection sockets


11


together with Z driving member


6


and reaches the takeout point S, X driving member


12


starts to move leftward. The mutually parallel upward movement of Z driving member


6


and leftward movement of X driving member


12


allow the contact hand to move toward the standby point R along a route denoted by U


1


in FIG.


6


. On the other hand, when Z driving member


6


starts to move downward almost simultaneously with the start of movement of the X driving member


12


, Z


2


-axis contact hand


5


is thereby moved toward the takeout point S along a route denoted by U


2


in FIG.


6


.




When Z


1


-axis contact hand


5


reaches the standby point R, Z


2


-axis contact hand


5


reaches the takeout point S. After that, Z


2


-axis Z driving member


6


moves down and sets an IC device onto inspection socket


11


. In this case, the index time is the time during which Z


1


-axis contact hand


5


moves from the inspection position to the takeout point S and Z


2


-axis contact hand


5


reaches the takeout point S from the standby point P and then reaches inspection sockets


11


from the takeout point S.




Since the moving time from the standby point P to the takeout point S is determined by the moving time of X driving member


12


which has a long moving distance, it is almost equal to the moving time from the standby point P to the center point Q. On the contrary, the moving time of Z


1


-axis contact hand


5


from the inspection position to the center point Q is longer than the moving time from the inspection position to the takeout point S, and the moving time of Z


2


-axis contact hand


5


from the center point Q to the inspection position is longer than the moving time from the takeout point S to the inspection position. Therefore, this operation mode of moving the contact hands by way of the takeout point S makes it possible to shorten the index time.




In a case in which the difference in moving distance between X driving member


12


and Z driving member


6


is small, or in a case in which the moving distance of Z driving member


6


is longer than that of X driving member


12


, in order to shorten the index time, it is preferable to set the standby points P and R as low as possible to a degree where the contact hands


5


are not disturbed by the mechanisms on the periphery of shuttle


22


. In this case, if the standby point P is set to such a low position that the movement of the X driving member


12


causes the moving track of the contact hand


5


to be disturbed by the mechanisms on the periphery of shuttle


22


, movement of Z driving member


6


may be started later than that of X driving member


12


to some degree so that contact hand


5


starts to descent in the Z direction from a corrected point T horizontal to the standby point P.




In order to realize a moving track of the contact hand shown by the solid line in

FIG. 6

, another operation mode is adopted. In this operation mode, as shown in

FIG. 7

, the leftward movement of X driving member


12


and the downward movement of the Z


2


-axis driving system are started almost simultaneously at the time when Z


1


-axis driving system starts upward movement and Z


1


-axis contact hand


5


reaches the takeout point S, the upward movement of the Z


1


-axis driving system and the movement of the X driving member are stopped almost simultaneously, and then, the Z


2


-axis driving system is moved downward until an IC device held by the contact hand is pressed against inspection socket


11


. By thus setting the periods of the X-direction movement and the Z-direction movement so that they overlap with each other, the index time can be shortened without varying accelerations and maximum speeds of the X-direction and Z-direction driving systems. In this embodiment, the index time is shortened by more than about 30% compared to that of the operation mode shown by the alternate long and short dashed line in FIG.


6


.





FIGS. 8A and 8B

are cross-sectional views showing the structure of a main part of the contact hand


5


in this embodiment. Contact hand


5


is mounted so that the angle thereof is changeable and the center position thereof is adjustable within a predetermined range with respect to aligning mechanism


8


. As shown in

FIG. 8A

, a positioning plate


50


is disposed horizontally at the bottom end of contact hand


5


, and a main body


51


attached to aligning mechanism


8


is mounted on the upper surface of positioning plate


50


. A plurality of guide holes


50


a are formed on the periphery of positioning plate


50


. When contact hand


5


comes close to the inspection socket


11


, parts supply stage


23


or parts discharge stage


24


, guide holes


50


a are fitted on guide pins


60


formed on the upper surface of inspection socket


11


, parts supply stage


23


or parts discharge stage


24


, thereby positioning contact hand


5


accurately.




On the lower surface of positioning plate


50


, a presser member


52


made of synthetic resin and provided with a presser surface


52


a for pressing outer terminals


61


a of an IC device


61


against an unillustrated inspection pad of inspection socket


11


is mounted so as to project downward. A holding frame


53


for holding the position of IC device


61


is placed inside presser member


52


. Contact hand


5


is provided with a center through hole inside thereof in which a guide block


54


is fitted movably up and down. A suction head


55


made of synthetic rubber is mounted on guide block


54


.




An elastic member


56


formed of a coil spring or the like is housed on guide block


54


to urge guide block


54


downward. The center through hole formed inside the contact hand


5


is connected to an exhaust device which is not illustrated, and the IC device


61


is held by suction head


55


.




When no load is imposed from outside before the IC device


61


is held by suction, suction head


55


and IC device


61


are pressed down by elastic member


56


in a state shown in FIG.


8


A.




On the other hand, when the IC device


61


is held with suction by suction head


55


, since there is negative pressure inside the center through hole of the


35


contact hand


5


, a package of IC device


61


is positioned in contact with the holding frame


53


as shown in

FIG. 8B

, and the outer terminals


61


a of the IC device


61


are brought into contact with the presser surface


52


a of the presser member


52


.




In this state shown in

FIG. 8B

, IC device


61


is handled in a precise position, and outer terminals


61


a of IC device


61


are pressed against the inspection socket


11


precisely and reliably.




According to this embodiment, since shuttles


21


and


22


are placed on the right and left sides of inspection socket


11


, uninspected IC devices are conveyed from parts supply stages


23


and shuttles


21


and


22


toward inspection sockets


11


, and inspected IC devices are withdrawn onto the parts discharge stage


24


, IC devices can be supplied to the inspection position by the right and left contact hands alternately, and a free linear transfer route can be taken. Therefore, the index time can be shortened relatively easily without increasing the manufacturing cost.




In this embodiment, particularly, since two contact hands are moved in the X direction by the drive of a single X driving member, a single driving system having a single drive source and a single driving mechanism works sufficiently, which makes it possible to simplify the apparatus structure and to reduce the manufacturing cost.




In this embodiment, since movable member


7


, aligning mechanisms


8


and contact hands


5


are only supported by the X driving member


12


and Z-axis driving systems each consisting of servomotor


3


, ball screw


4


and Z driving member


6


are supported by frame


10


, the weight load on the X-axis driving system can be reduced. This enhances acceleration and deceleration performance and driving accuracy of the X-axis driving system. Therefore, it is possible to speed up the operation and further shorten the index time without changing the driving ability.




Although the inspection apparatus for making an electrical inspection on IC devices is described in the above embodiment, the present invention can be applied not only to such an inspection apparatus, but also to parts handling apparatuses used in various types of working machines and assembling machines.




Furthermore, although two contact hands are operated by a single X-axis driving system in the above embodiment, separately controlled driving systems may be provided for the respective contact hands. In this case, the two contact hands may be moved in the horizontal direction at different speeds and timings in order to further shorten the index time.




As mentioned above, the present invention has the following advantages.




Since the first handling section and the second handling section are placed on both sides of the processing section and parts are supplied and discharged alternately from both sides by the first holding section and the second holding section, the conveyance route of the parts is freely determined and the index time can be shortened by short-circuiting the conveyance route.




Additionally, since the first and second holding sections are moved linearly close to and apart from the processing section and the first and second handling sections by being moved linearly in the first direction by the main driving means between the processing section and the first and second handling sections, it is possible to simplify the structures of the main driving means and the first and second auxiliary driving means and to reduce the manufacturing cost of the apparatus.




Although the first and second auxiliary driving means respectively move the first and second holding sections by moving the first and second connecting members by means of the first and second drive sources, since the first and second connecting members are movable in the first direction, the first and second auxiliary driving means do not obstruct the movement made by the main driving means and the driving load of the main driving means can be reduced. Therefore, it is easy to increase the driving speed of the first and second holding sections and to maintain driving accuracy.




Since the period of movement made by the main driving means and the period of movement made by the first and second auxiliary driving means overlap, it is possible to optimize the moving route of the first and second holding sections, and to further shorten the index time by changing the setting of the moving route.




Since the first and second holding sections are moved by a single driving system in the same direction at the same speed, it is possible to simplify the structure of the driving system and to reduce the manufacturing cost of the apparatus.




While the invention has been described in conjunction with several specific embodiments, it is evident to those skilled in the art that many further alternatives, modifications and variations will be apparent in light of the foregoing description. Thus, the invention described herein is intended to embrace all such alternatives, modifications, applications and variations as may fall within the spirit and scope of the appended claims.



Claims
  • 1. A method for subjecting a part to a predetermined process on a processing section comprising the steps of:(a) supplying a first part placed at a first handling section located at a first side of the processing section; (b) subjecting a second part to the predetermined process at the processing section; (c) after step (b), moving the second part from the processing section to a second handling section located at a second side of said processing section; (d) contemporaneously with step (c) moving the first part from the first handling section to the processing section; (e) after step (d), subjecting the first part to the predetermined process at the processing section; (f) after step (c), discharging the second part at the second handling section; (g) after step (f), supplying a third part at the second handling section; (h) after step (g), moving the third part from the second handling section to the processing section; (i) contemporaneously with step (h), moving the first part from the processing section to the first handling section; (j) after step (h), subjecting the third part to the predetermined process at the processing section; and (k) after step (i), discharging the first part at the first handling section.
  • 2. A method according to claim 1, further comprising the steps of:(l) repeating steps(a)-(k) a predetermined number of times.
  • 3. A method according to claim 1,wherein in step (a), the first part is placed at a first handling section by movement parallel to a first axis, wherein in step (f), the second part is discharged at the second handling section by movement parallel the first axis, wherein in step (c), the second part is moved parallel to a second axis and a third axis, wherein in step (d) the first part is moved parallel to the second axis and the third axis, wherein the first axis is orthogonal to the second axis, wherein the second axis is orthogonal to the third axis, and wherein the first axis is orthogonal to the third axis.
  • 4. A method for subjecting a part to a predetermined process on a processing section between a first handling section and a second handling section, each including a supply stage that supplies a part before applying the predetermined process to the part, and a discharge stage that receives a part after applying the predetermined process to the part, the method comprising the step of:(a) supplying a first part to the first handling section; (b) subjecting a second part to the predetermined process at the processing section; (c) after step (b), moving the second part from the processing section to the second handling section; (d) contemporaneously with step (c), moving the first part from the first handling section to the processing section; (e) after step (d), subjecting the first part to the predetermined process at the processing section; (f) contemporaneously with step (e), moving the first handling section to a supply side; (g) contemporaneously with step (e), moving the second handling section to a discharge side; (h) after step (f), supplying a third part to a first supply stage of the first handling section; (i) after step (g), removing the second part from a second discharge stage of the second handling section; (j) after step (i), moving a fourth part from the second handling section to the processing section; (k) contemporaneously with step (j), moving the first part from the processing section to the first handling section; (l) after step (j), subjecting the fourth part to the predetermined process at the processing section; (m) contemporaneously with step (l), moving the first handling section to the discharge side; (n) contemporaneously with step (l), moving the second handling section to the supply side; (o) after step (m), removing the first part from a first discharge stage of the first handling section; and (p) after step (n), supplying a fifth part to a second supply stage of the second handling section.
  • 5. A method according to claim 4, further comprising the step of:(q) repeating steps (a)-(p) a predetermined number of times.
  • 6. A method according to claim 4,wherein in step (c), the second part is moved parallel to a second axis and a third axis, wherein in step (d), the first part is moved parallel to the second axis and the third axis, wherein in step (f), the first handling section is moved to the supply side by movement parallel to a first axis, wherein in step (g), the second handling section is moved to the discharge side by movement parallel to the first axis, wherein the first axis is orthogonal to the second axis, wherein the second axis is orthogonal to the third axis, and wherein the first axis is orthogonal to the third axis.
  • 7. A method according to claim 4,wherein in step (c), the second part is moved by a second holding section movable between the processing section and the second handling section for holding the second part, wherein in step (d), the first part is moved by a first holding section movable between the processing section and the first handling section for holding the first part, the first holding section and the second holding section are moved by a main motor for driving the first holding section and the second holding section to reciprocate alternately between the first handling section and the processing section and between the second handling section and the processing section, respectively.
  • 8. A method according to claim 7, wherein the main motor is a single driving system so constructed as to move the first holding section and the second holding section in the same direction at similar speeds.
  • 9. A method according to claim 7, wherein the main motors are separately constructed so as to separately control the first holding section and the second holding section.
  • 10. A method for inspecting an integrated circuit device at an inspection section between a first handling section and a second handling section, each including a supply stage that supplies an integrated circuit device before inspecting the integrated circuit device and a discharge stage that receives an integrated circuit device after inspecting the integrated circuit device, the method comprising the step of:(a) supplying a first integrated circuit device to the first handling section; (b) inspecting a second integrated circuit at the inspection section; (c) after step (b), moving the second integrated circuit from the inspection section to the second handling section; (d) contemporaneously with step (c), moving the first integrated circuit device from the first handling section to the inspection section; (e) after step (d), inspecting the first integrated circuit device at the inspection section; (f) contemporaneously with step (e), moving the first handling section to a supply side; (g) contemporaneously with step (e), moving the second handling section to a discharge side; (h) after step (f), supplying a third integrated circuit device to a first supply stage of the first handling section; (i) after step (g), removing the second integrated circuit device from a second discharge stage of the second handling section; (j) after step (i), moving a fourth integrated circuit device from the second handling section to the inspection section; (k) contemporaneously with step (j), moving the first integrated circuit device from the inspection section to the first handling section; (l) after step (j), inspecting the fourth integrated circuit device at the inspection section; (m) contemporaneously with step (l) moving the first handling section to the discharge side; (n) contemporaneously with step (l) moving the second handling section to the supply side; (o) after step (m), removing the first integrated circuit device from a first discharge stage of the first handling section; and (p) after step (n), supplying a fifth integrated circuit device to a second supply stage of the second handling section.
  • 11. A method according to claim 10, further comprising the step of:(q) repeating steps (a)-(p) a predetermined number of times.
  • 12. A method according to claim 10,wherein in step (c), the second integrated circuit device is moved parallel to a second axis and a third axis, wherein in step (d), the first integrated circuit device is moved parallel to the second axis and a third axis, wherein in step (f), the first handling section is moved to the supply side by movement parallel to a first axis, wherein in step (g), the second handling section is moved to the discharge side by movement parallel to the first axis, wherein the first axis is orthogonal to the second axis, wherein the second axis is orthogonal to the third axis, and wherein the first axis is orthogonal to the third axis.
  • 13. A method for manufacturing an integrated circuit device comprising an inspecting process for supplying and discharging an integrated circuit device to an inspection section with the inspection method as described in claim 10.
  • 14. A method for inspecting an integrated circuit device on a inspection section comprising the steps of:(a) supplying a first integrated circuit device at a first handling section; (b) inspecting a second integrated circuit device at the inspection section; (c) after step (b), moving the second integrated circuit device from the inspection section to a second handling section; (d) contemporaneously with step (c) moving the first integrated circuit device from the first handling section to the inspection section; (e) after step (d), inspecting the first integrated circuit device at the inspection section; (f) after step (c), discharging the second integrated circuit device at the second handling section; (g) after step (f), supplying a third integrated circuit device at the second handling section; (h) after step (g), moving the third integrated circuit device from the second handling section to the inspection section; (i) contemporaneously with step (h), moving the first integrated circuit device from the inspection section to the first handling section; (j) after step (h), inspecting the third integrated circuit device at the inspection section; and (k) after step (i), discharging the first integrated circuit device at the first handling section.
  • 15. A method according to claim 14, further comprising the steps of:(l) repeating steps (a)-(k) a predetermined number of times.
  • 16. A method according to claim 14,wherein in step (a), the first integrated circuit device is placed at a first handling section by movement parallel to a first axis, wherein in step (f), the second integrated circuit device is discharged at the second handling section by movement parallel to the first axis, wherein in step (c), the second integrated circuit device is moved parallel to a second axis and a third axis, wherein in step (d), the first integrated circuit device is moved parallel to the second axis and the third axis, wherein the first axis is orthogonal to the second axis, wherein the second axis is orthogonal to the third axis, and wherein the first axis is orthogonal to the third axis.
  • 17. A method for subjecting a part to a predetermined process on a processing section comprising the steps of:(a) supplying a first part at a first handling section; (b) subjecting a second part to the predetermined process at the processing section; (c) after step (b), moving the second part from the processing section to a second handling section; (d) contemporaneously with step (c) moving the first part from the first handling section to the processing section; (e) after step (d), subjecting the first part to the predetermined process at the processing section; (f) after step (c), discharging the second part at the second handling section; (g) after step (f), supplying a third part at the second handling section; (h) after step (g), moving the third part from the second handling section to the processing section; (i) contemporaneously with step (h), moving the first part from the processing section to the first handling section; (j) after step (h), subjecting the third part to the predetermined process at the processing section; and (k) after step (i), discharging the first part at the first handling section.
  • 18. A method according to claim 17, further comprising the steps of:(l) repeating steps (a)-(k) a predetermined number of times.
  • 19. A method according to claim 17,wherein in step (a), the first part is placed at a first handling section by movement parallel to a first axis, wherein in step (f), the second part is discharged at the second handling section by movement parallel the first axis, wherein in step (c), the second part is moved parallel to a second axis and a third axis, wherein in step (d) the first part is moved parallel to the second axis and the third axis, wherein the first axis is orthogonal to the second axis, wherein the second axis is orthogonal to the third axis, and wherein the first axis is orthogonal to the third axis.
Priority Claims (2)
Number Date Country Kind
8-185200 Jul 1996 JP
9-127691 May 1997 JP
CROSS REFERENCE TO RELATED APPLICATIONS

This applicationThis reissue application is a continuation of U.S. Reissue patent application Ser. No. 09/754,968, filed Jan. 5, 2001 (now abandoned), which is a reissue application of U.S. patent application Ser. No. 09/234,727, filed Jan. 21, 1999(now issued as U.S. Pat. No. 6,036,431), which is a divisional application of U.S. patent application Ser. No. 08/890,266, filed Jul. 9, 1997 (now issued as U.S. Pat. No. 5,919,024), which is incorporated herein in its entirety by reference.

US Referenced Citations (12)
Number Name Date Kind
4268219 Nakagawa et al. May 1981 A
4784562 Kishi et al. Nov 1988 A
4818169 Schram et al. Apr 1989 A
5002448 Kamijima et al. Mar 1991 A
5040291 Janisiewicz et al. Aug 1991 A
5074741 Johansson Dec 1991 A
5135376 Watanabe et al. Aug 1992 A
5310039 Butera et al. May 1994 A
5330043 Stuckey Jul 1994 A
5469953 Igarashi et al. Nov 1995 A
5486080 Sieradzki Jan 1996 A
5596270 Mitsui Jan 1997 A
Foreign Referenced Citations (8)
Number Date Country
118775 Sep 1989 CN
204708 Apr 1993 CN
295950 Jan 1997 CN
195 12 144 Jan 1996 DE
6-64180 Sep 1994 JP
6-293434 Oct 1994 JP
7-239367 Sep 1995 JP
8-292233 Nov 1996 JP
Non-Patent Literature Citations (3)
Entry
The Collection of Mechanical Automatic Device Illustrations, Nicholas P. Chironis, p. 105, Mar. 1980.
Operations Research, vol. 36, No. 2, pp. 171-179, Mar.-Apr. 1988.
Journal of Manufacturing Systems, vol. 10, No. 2, pp. 146-157, 1991.
Divisions (1)
Number Date Country
Parent 09/234727 Jan 1999 US
Child 10/232179 US
Continuations (1)
Number Date Country
Parent 09/754968 Jan 2001 US
Child 09/234727 US
Reissues (1)
Number Date Country
Parent 09/234727 Jan 1999 US
Child 10/232179 US