Abstract
A borehole system having a permeability controlled flow profile including a tubular string; one or more permeability control devices disposed in the string; and the plurality of permeability control devices being selected to produce particular pressure drops for fluid entering or exiting various discrete locations along the string and method.
Description
BACKGROUND

Viscous hydrocarbon recovery is a segment of the overall hydrocarbon recovery industry that is increasingly important from the standpoint of global hydrocarbon reserves and associated product cost. In view hereof, there is increasing pressure to develop new technologies capable of producing viscous reserves economically and efficiently. Steam Assisted Gravity Drainage (SAGD) is one technology that is being used and explored with good results in some wellbore systems. Other wellbore systems however where there is a significant horizontal or near horizontal length of the wellbore system present profile challenges both for heat distribution and for production. In some cases, similar issues arise even in vertical systems.


Both inflow and outflow profiles (e.g. production and stimulation) are desired to be as uniform as possible relative to the particular borehole. This should enhance efficiency as well as avoid early water breakthrough. Breakthrough is clearly inefficient as hydrocarbon material is likely to be left in situ rather than being produced. Profiles are important in all well types but it will be understood that the more viscous the target material the greater the difficulty in maintaining a uniform profile.


Another issue in conjunction with SAGD systems is that the heat of steam injected to facilitate hydrocarbon recovery is sufficient to damage downhole components due to thermal expansion of the components. This can increase expenses to operators and reduce recovery of target fluids. Since viscous hydrocarbon reserves are likely to become only more important as other resources become depleted, configurations and methods that improve recovery of viscous hydrocarbons from earth formations will continue to be well received by the art.


SUMMARY

A borehole system having a permeability controlled flow profile including a tubular string; one or more permeability control devices disposed in the string; and the plurality of permeability control devices being selected to produce particular pressure drops for fluid entering or exiting various discrete locations along the string.


A method for controlling a flow profile for a borehole including selecting one or more permeability control devices for inclusion in a completion; and controlling pressure drop for fluid flowing through a wall of the completion by permeability selection.





BRIEF DESCRIPTION OF THE DRAWINGS

Referring now to the drawings wherein like elements are numbered alike in the several figures:



FIG. 1 is a schematic view of a wellbore system in a viscous hydrocarbon reservoir;



FIG. 2 is a chart illustrating a change in fluid profile over a length of the borehole with and without permeability control; and



FIG. 3 is a perspective sectional view of a beaded matrix type permeability control device.





DETAILED DESCRIPTION

Referring to FIG. 1, the reader will recognize a schematic illustration of a portion of a SAGD wellbore system 10 configured with a pair of boreholes 12 and 14. Generally, borehole 12 is the steam injection borehole and borehole 14 is the hydrocarbon recovery borehole but the disclosure should not be understood as limiting the possibilities to such. The discussion herein however will address the boreholes as illustrated. Steam injected in borehole 12 heats the surrounding formation 16 thereby reducing the viscosity of the stored hydrocarbons and facilitating gravity drainage of those hydrocarbons. Horizontal or other highly deviated well structures like those depicted tend to have greater fluid movement into and to of the formation at a heel 18 of the borehole than at a toe 20 of the borehole due simply to fluid dynamics. An issue associated with this property is that the toe 20 will suffer reduced steam application from that desired while heel 18 will experience more steam application than that desired, for example. The change in the rate of fluid movement is relatively linear (declining flow) when querying the system at intervals with increasing distance from the heel 18 toward the toe 20. The same is true for production fluid movement whereby the heel 28 of the production borehole 14 will pass more of the target hydrocarbon fluid than the toe 30 of the production borehole 14. This is due primarily to permeability versus pressure drop along the length of the borehole 12 or 14. The system 10 as illustrated alleviates this issue as well as others noted above.


According to the teaching herein, one or more of the boreholes (represented by just two boreholes 12 and 14 for simplicity in illustration) is configured with one or more permeability control devices 32 that are each configured differently with respect to permeability or pressure drop in flow direction in or out of the tubular. The devices 32 nearest the heel 18 or 28 will have the least permeability while permeability will increase in each device 32 sequentially toward the toe 20 and 30. The permeability of the device 32 closest to toe 20 or 30 will be the greatest. This will tend to balance outflow of injected fluid and inflow of production fluid over the length of the borehole 12 and 14 because the natural pressure drop of the system is opposite that created by the configuration of permeability devices as described. Permeability and/or pressure drop devices 32 useable in this configuration include inflow control devices such as product family number H48688 commercially available from Baker Oil Tools, Houston Tex., beaded matrix flow control configurations such as those disclosed in U.S. Ser. Nos. 61/052,919, 11/875,584 and 12/144,730, 12/144,406 and 12/171,707 the disclosures of which are incorporated herein by reference, or other similar devices. Adjustment of pressure drop across individual permeability devices is possible in accordance with the teaching hereof such that the desired permeability over the length of the borehole 12 or 14 as described herein is achievable. Referring to FIG. 2, a chart of the flow of fluid over the length of borehole 12 is shown without permeability control and with permeability control. The representation is stark with regard to the profile improvement with permeability control.


In order to determine the appropriate amount of permeability for particular sections of the borehole 12 or 14, one needs to determine the pressure in the formation over the length of the horizontal borehole. Formation pressure can be determined/measured in a number of known ways. Pressure at the heel of the borehole and pressure at the toe should also be determined/measured. This can be determined in known ways. Once both formation pressure and pressures at locations within the borehole have been ascertained, the change in pressure (ΔP) across the completion can be determined for each location where pressure within the completion has been or is tested. Mathematically this is expressed as ΔP location=P formation−P location where the locations may be the heel, the toe or any other point of interest.


A flow profile whether into or out of the completion is dictated by the ΔP at each location and the pressure inside the completion is dictated by the head of pressure associated with the column of fluid extending to the surface. The longer the column, the higher the pressure. It follows, then, that greater resistance to inflow will occur at the toe of the borehole than at the heel of the completion. In accordance with the teaching hereof permeability control is distributed such that pressure drop at a toe of the borehole is in the range of about 25% to less than 1% whereas pressure drop at the heel of the borehole is about 30% or more. In one embodiment the pressure drop at the heel is less than 45% and at the toe less than about 25%. Permeability control devices distributed between the heel and the toe will in some embodiments have individual pressure drop values between the percentage pressure drop at the toe and the percentage pressure drop at the heel. Moreover, in some embodiments the distribution of pressure drops among the permeability devices is linear while in other embodiments the distribution may follow a curve or may be discontinuous to promote inflow of fluid from areas of the formation having larger volumes of desirable liberatable fluid and reduced inflow of fluid from areas of the formation having smaller volumes of desirable liberatable fluid. In one embodiment, referring to FIG. 3 the permeability control devices comprise a bore disposed longitudinally through the device is of more than one diameter (or dimension if not cylindrical). This creates a shoulder 120 within the inside surface of the device 110. While it is not necessarily required to provide the shoulder 120, it can be useful in applications where the device is rendered temporarily impermeable and might experience differential pressure thereacross. Impermeability of matrix 114 and differential pressure capability of the devices is discussed more fully later in this disclosure.


The matrix itself is described as “beaded” since the individual “beads” 130 are rounded though not necessarily spherical. A rounded geometry is useful primarily in avoiding clogging of the matrix 114 since there are few edges upon which debris can gain purchase.


The beads 130 themselves can be formed of many materials such as ceramic, glass, metal, etc. without departing from the scope of the disclosure. Each of the materials indicated as examples, and others, has its own properties with respect to resistance to conditions in the downhole environment and so may be selected to support the purposes to which the devices 100 will be put. The beads 130 may then be joined together (such as by sintering, for example) to form a mass (the matrix 114) such that interstitial spaces are formed therebetween providing the permeability thereof. In some embodiments, the beads will be coated with another material for various chemical and/or mechanical resistance reasons. One embodiment utilizes nickel as a coating material for excellent wear resistance and avoidance of clogging of the matrix 114. Further, permeability of the matrix tends to be substantially better than a gravel or sand pack and therefore pressure drop across the matrix 114 is less than the mentioned constructions. In another embodiment, the beads are coated with a highly hydrophobic coating that works to exclude water in fluids passing through the device 110. In addition to coatings or treatments that provide activity related to fluids flowing through the matrix 114, other materials may be applied to the matrix 114 to render the same temporarily (or permanently if desired) impermeable.


Each or any number of the devices 110 can easily be modified to be temporarily (or permanently) impermeable by injecting a hardenable (or other property causing impermeability) substance such as a bio-polymer into the interstices of the beaded matrix 114. Determination of the material to be used is related to temperature and length of time for undermining (dissolving, disintegrating, fluidizing, subliming, etc) of the material desired. For example, Polyethylene Oxide (PEO) is appropriate for temperatures up to about 200 degrees Fahrenheit, Polywax for temperatures up to about 180 degrees Fahrenheit; PEO/Polyvinyl Alcohol (PVA) for temperatures up to about 250 degrees Fahrenheit; Polylactic Acid (PLA) for temperatures above 250 degrees Fahrenheit; among others. These can be dissolved using acids such as Sulfamic Acid, Glucono delta lactone, Polyglycolic Acid, or simply by exposure to the downhole environment for a selected period, for example. In one embodiment, Polyvinyl Chloride (PVC) is rendered molten or at least relatively soft and injected into the interstices of the beaded matrix and allowed to cool. This can be accomplished at a manufacturing location or at another controlled location such as on the rig. It is also possible to treat the devices in the downhole environment by pumping the hardenable material into the devices in situ. This can be done selectively or collectively of the devices 110 and depending upon the material selected to reside in the interstices of the devices; it can be rendered soft enough to be pumped directly from the surface or other remote location or can be supplied via a tool run to the vicinity of the devices and having the capability of heating the material adjacent the devices. In either case, the material is then applied to the devices. In such condition, the device 110 will hold a substantial pressure differential that may exceed 10,000 PSI.


The PVC, PEO, PVA, etc. can then be removed from the matrix 114 by application of an appropriate acid or over time as selected. As the hardenable material is undermined, target fluids begin to flow through the devices 100 into a tubular in which the devices 110 are mounted. Treating of the hardenable substance may be general or selective. Selective treatment is by, for example, spot treating, which is a process known to the industry and does not require specific disclosure with respect to how it is accomplished.


Referring back to FIG. 1, a tubing string 40 and 50 are illustrated in boreholes 12 and 14 respectively. Open hole anchors 42, such as Baker Oil Tools WBAnchor™ may be employed in the borehole to anchor the tubing 40. This is helpful in that the tubing 40 experiences a significant change in thermal load and hence a significant amount of thermal expansion during well operations. Unchecked, the thermal expansion can cause damage to other downhole structures or to the tubing string 40 itself thereby affecting efficiency and production of the well system. In order to overcome this problem, one or more open hole anchors 42 are used to ensure that the tubing string 40 is restrained from excessive movement. Because the total length of mobile tubing string is reduced by the interposition of open hole anchor(s) 42, excess extension cannot occur. In one embodiment, three open hole anchors 42, as illustrated, are employed and are spaced by about 90 to 120 ft from one another but could in some particular applications be positioned more closely and even every 30 feet (at each pipe joint). The spacing interval is also applicable to longer runs with each open hole anchor being spaced about 90-120 ft from the next. Moreover, the exact spacing amount between anchors is not limited to that noted in this illustrated embodiment but rather can be any distance that will have the desired effect of reducing thermal expansion related wellbore damage. In addition the spacing can be even or uneven as desired. The determination of distance between anchors must take into account. The anchor length, pattern, or the number of anchor points per foot in order to adjust the anchoring effect to optimize performance based on formation type and formation strength tubular dimensions and material.


Finally in one embodiment, the tubing string 40, 50 or both is configured with one or more baffles 60. Baffles 60 are effective in both deterring loss of steam to formation cracks such as that illustrated in FIG. 1 as numeral 62 and in causing produced fluid to migrate through the intended permeability device 32. More specifically, and taking the functions one at a time, the injector borehole, such as 12, is provided with one or more baffles 60. The baffles may be of any material having the ability to withstand the temperature at which the particular steam is injected into the formation. In one embodiment, a metal deformable seal such as one commercially known as a z-seal and available from Baker Oil Tools, Houston Tex., may be employed. And while metal deformable seals are normally intended to create a high pressure high temperature seal against a metal casing within which the seal is deployed, for the purposes taught in this disclosure, it is not necessary for the metal deformable seal to create an actual seal. That stated however, there is also no prohibition to the creation of a seal but rather then focus is upon the ability of the configuration to direct steam flow with relatively minimal leakage. In the event that an actual seal is created with the open hole formation, the intent to minimize leakage will of course be met. In the event that a seal is not created but substantially all of the steam applied to a particular region of the wellbore is delivered to that portion of the formation then the baffle will have done its job and achieved this portion of the intent of this disclosure. With respect to production, the baffles are also of use in that the drawdown of individual portions of the well can be balanced better with the baffles so that fluids from a particular area are delivered to the borehole in that area and fluids from other areas do not migrate in the annulus to the same section of the borehole but rather will enter at their respective locations. This ensures that profile control is maintained and also that where breakthrough does occur, a particular section of the borehole can be bridged and the rest will still produce target fluid as opposed to breakthrough fluid since annular flow will be inhibited by the baffles. In one embodiment baffles are placed about 100 ft or 3 liner joints apart but as noted with respect to the open hole anchors, this distance is not fixed but may be varied to fit the particular needs of the well at issue. The distance between baffles may be even or may be uneven and in some cases the baffles will be distributed as dictated by formation condition such that for example cracks in the formation will be taken into account so that a baffle will be positioned on each side of the crack when considered along the length of the tubular.


While preferred embodiments have been shown and described, various modifications and substitutions may be made thereto without departing from the spirit and scope of the invention. Accordingly, it is to be understood that the present invention has been described by way of illustration and not limitation.

Claims
  • 1. A borehole system having a permeability controlled flow profile comprising: a tubular string;one or more beaded matrix permeability control devices disposed in the string; and the one or more beaded matrix permeability control devices being selected to produce particular pressure drops for fluid entering or exiting various discrete locations along the string, each of the beaded matrix permeability control devices including a tubular having a plurality of openings therein;a plurality of beaded matrixes, each having a plurality of beads of a rounded geometry sintered into a mass having interstitial spaces between the rounded beads, the plurality of matrixes each being disposed within a housing having a shouldered inside surface that is itself disposed one each in the plurality of openings the beaded matrixes being configured to be selectively pluggable in situ in the downhole environment.
  • 2. A borehole system as claimed in claim 1 wherein the one or more permeability control devices include one or more devices at a heel of the borehole having a pressure drop of about 45% or less.
  • 3. A borehole system as claimed in claim 1 wherein the one or more permeability control devices include one or more devices at a heel of the borehole having a pressure drop of about 30% or less.
  • 4. A borehole system as claimed in claim 1 wherein the one or more permeability control devices include one or more devices at a toe of the borehole having a pressure drop of about 25% or less.
  • 5. A borehole system as claimed in claim 1 wherein the one or more permeability control devices include one or more devices at a toe of the borehole having a pressure drop of about 1% or less.
  • 6. A borehole system as claimed in claim 1 wherein the one or more permeability control devices include permeability creating pressure drops for a heel of the borehole that is higher than a pressure drop created at a toe of the borehole.
  • 7. A method for controlling a flow profile for a borehole comprising: selecting one or more beaded matrix permeability control devices for inclusion in a completion, each permeability control device including a tubular having a plurality of openings therein;a plurality of beaded matrixes, each having a plurality of beads of a rounded geometry sintered into a mass having interstitial spaces between the rounded beads, the plurality of matrixes each being disposed within a housing having a shouldered inside surface that is itself disposed one each in the plurality of openings the beaded matrixes being configured to be selectively pluggable in situ in the downhole environment; andcontrolling pressure drop for fluid flowing through a wall of the completion by permeability selection.
  • 8. A method as claimed in claim 7 wherein the method further includes producing or injecting through the one or more permeability control devices and producing a flow profile that is generally uniform along the borehole.
  • 9. A method as claimed in claim 7 wherein the controlling is creating a higher pressure drop at a heel of the borehole than at a toe of the borehole.
US Referenced Citations (266)
Number Name Date Kind
1362552 Alexander et al. Dec 1920 A
1488753 Kelly Apr 1924 A
1649524 Hammond Nov 1927 A
1915867 Penick Jun 1933 A
1984741 Harrington Dec 1934 A
2089477 Halbert Aug 1937 A
2119563 Wells Jun 1938 A
2214064 Niles Sep 1940 A
2257523 Combs Sep 1941 A
2391609 Wright Dec 1945 A
2412841 Spangler Dec 1946 A
2762437 Egan et al. Sep 1956 A
2804926 Zublin Sep 1957 A
2810352 Tumlison Oct 1957 A
2814947 Stegemeier et al. Dec 1957 A
2942668 Maly et al. Jun 1960 A
2945541 Maly et al. Jul 1960 A
3103789 McDuff Sep 1963 A
3240274 Solum Mar 1966 A
3273641 Bourne Sep 1966 A
3302408 Schmid Feb 1967 A
3322199 Van Note, Jr. May 1967 A
3326291 Zandmer Jun 1967 A
3333635 Crawford Aug 1967 A
3385367 Kollsman May 1968 A
3386508 Bielstein et al. Jun 1968 A
3419089 Venghiattis Dec 1968 A
3451477 Kelley Jun 1969 A
3468375 States Sep 1969 A
RE27252 Sklar et al. Dec 1971 E
3675714 Thompson Jul 1972 A
3692064 Hohnerlein et al. Sep 1972 A
3739845 Berry et al. Jun 1973 A
3791444 Hickey Feb 1974 A
3876471 Jones Apr 1975 A
3918523 Stuber Nov 1975 A
3951338 Genna Apr 1976 A
3958649 Bull et al. May 1976 A
3975651 Griffiths Aug 1976 A
4153757 Clark, III May 1979 A
4173255 Kramer Nov 1979 A
4180132 Young Dec 1979 A
4186100 Mott Jan 1980 A
4187909 Erbstoesser Feb 1980 A
4245701 Chambers Jan 1981 A
4248302 Churchman Feb 1981 A
4250907 Struckman et al. Feb 1981 A
4257650 Allen Mar 1981 A
4265485 Boxerman et al. May 1981 A
4278277 Krijgsman Jul 1981 A
4283088 Tabakov et al. Aug 1981 A
4287952 Erbstoesser Sep 1981 A
4390067 Willman Jun 1983 A
4398898 Odom Aug 1983 A
4415205 Rehm et al. Nov 1983 A
4434849 Allen Mar 1984 A
4463988 Bouck et al. Aug 1984 A
4484641 Dismukes Nov 1984 A
4491186 Alder Jan 1985 A
4497714 Harris Feb 1985 A
4512403 Santangelo et al. Apr 1985 A
4552218 Ross et al. Nov 1985 A
4552230 Anderson et al. Nov 1985 A
4572295 Walley Feb 1986 A
4576404 Weber Mar 1986 A
4577691 Huang et al. Mar 1986 A
4614303 Moseley, Jr. et al. Sep 1986 A
4649996 Kojicic et al. Mar 1987 A
4817710 Edwards et al. Apr 1989 A
4821800 Scott et al. Apr 1989 A
4856590 Caillier Aug 1989 A
4899835 Cherrington Feb 1990 A
4917183 Gaidry et al. Apr 1990 A
4944349 Von Gonten, Jr. Jul 1990 A
4974674 Wells Dec 1990 A
4997037 Coston Mar 1991 A
4998585 Newcomer et al. Mar 1991 A
5004049 Arterbury Apr 1991 A
5016710 Renard et al. May 1991 A
5040283 Pelgrom Aug 1991 A
5060737 Mohn Oct 1991 A
5107927 Whiteley et al. Apr 1992 A
5132903 Sinclair Jul 1992 A
5156811 White Oct 1992 A
5188191 Tomek Feb 1993 A
5217076 Masek Jun 1993 A
5333684 Walter et al. Aug 1994 A
5337821 Peterson Aug 1994 A
5339895 Arterbury et al. Aug 1994 A
5339897 Leaute Aug 1994 A
5355956 Restarick Oct 1994 A
5377750 Arterbury et al. Jan 1995 A
5381864 Nguyen et al. Jan 1995 A
5384046 Lotter et al. Jan 1995 A
5431346 Sinaisky Jul 1995 A
5435393 Brekke et al. Jul 1995 A
5435395 Connell Jul 1995 A
5439966 Graham et al. Aug 1995 A
5511616 Bert Apr 1996 A
5551513 Surles et al. Sep 1996 A
5586213 Bridges et al. Dec 1996 A
5597042 Tubel et al. Jan 1997 A
5609204 Rebardi et al. Mar 1997 A
5673751 Head et al. Oct 1997 A
5803179 Echols et al. Sep 1998 A
5829520 Johnson Nov 1998 A
5831156 Mullins Nov 1998 A
5839508 Tubel et al. Nov 1998 A
5873410 Iato et al. Feb 1999 A
5881809 Gillespie et al. Mar 1999 A
5896928 Coon Apr 1999 A
5944446 Hocking Aug 1999 A
5982801 Deak Nov 1999 A
6044869 Koob Apr 2000 A
6068015 Pringle May 2000 A
6098020 Den Boer Aug 2000 A
6112815 Bøe et al. Sep 2000 A
6112817 Voll et al. Sep 2000 A
6119780 Christmas Sep 2000 A
6228812 Dawson et al. May 2001 B1
6253847 Stephenson Jul 2001 B1
6253861 Carmichael et al. Jul 2001 B1
6273194 Hiron et al. Aug 2001 B1
6301959 Hrametz et al. Oct 2001 B1
6305470 Woie Oct 2001 B1
6325152 Kelley et al. Dec 2001 B1
6338363 Chen et al. Jan 2002 B1
6367547 Towers et al. Apr 2002 B1
6371210 Bode et al. Apr 2002 B1
6372678 Youngman et al. Apr 2002 B1
6419021 George et al. Jul 2002 B1
6474413 Barbosa et al. Nov 2002 B1
6505682 Brockman Jan 2003 B2
6516888 Gunnarson et al. Feb 2003 B1
6530431 Castano-Mears et al. Mar 2003 B1
6561732 Bloomfield et al. May 2003 B1
6581681 Zimmerman et al. Jun 2003 B1
6581682 Parent et al. Jun 2003 B1
6622794 Zisk, Jr. Sep 2003 B2
6632527 McDaniel et al. Oct 2003 B1
6635732 Mentak Oct 2003 B2
6667029 Zhong et al. Dec 2003 B2
6679324 Den Boer et al. Jan 2004 B2
6692766 Rubinstein et al. Feb 2004 B1
6699503 Sako et al. Mar 2004 B1
6699611 Kim et al. Mar 2004 B2
6712154 Cook et al. Mar 2004 B2
6722437 Vercaemer et al. Apr 2004 B2
6786285 Johnson et al. Sep 2004 B2
6817416 Wilson et al. Nov 2004 B2
6820690 Vercaemer et al. Nov 2004 B2
6830104 Nguyen et al. Dec 2004 B2
6831044 Constien Dec 2004 B2
6840321 Restarick et al. Jan 2005 B2
6857476 Richards Feb 2005 B2
6863126 McGlothen et al. Mar 2005 B2
6896049 Moyes May 2005 B2
6913079 Tubel Jul 2005 B2
6938698 Coronado Sep 2005 B2
6951252 Restarick et al. Oct 2005 B2
6959764 Preston Nov 2005 B2
6976542 Henriksen et al. Dec 2005 B2
7011076 Weldon et al. Mar 2006 B1
7032675 Steele et al. Apr 2006 B2
7059410 Bousche et al. Jun 2006 B2
7084094 Gunn et al. Aug 2006 B2
7159656 Eoff et al. Jan 2007 B2
7185706 Freyer Mar 2007 B2
7207385 Smith et al. Apr 2007 B2
7252162 Akinlade et al. Aug 2007 B2
7258166 Russell Aug 2007 B2
7290606 Coronado et al. Nov 2007 B2
7290610 Corbett et al. Nov 2007 B2
7318472 Smith Jan 2008 B2
7322412 Badalamenti et al. Jan 2008 B2
7325616 Lopez de Cardenas et al. Feb 2008 B2
7360593 Constien Apr 2008 B2
7367399 Steele et al. May 2008 B2
7395858 Barbosa et al. Jul 2008 B2
7398822 Meijer et al. Jul 2008 B2
7409999 Henriksen et al. Aug 2008 B2
7413022 Broome et al. Aug 2008 B2
7451814 Graham et al. Nov 2008 B2
7469743 Richards Dec 2008 B2
7581593 Pankratz et al. Sep 2009 B2
7621326 Crichlow Nov 2009 B2
7644854 Holmes et al. Jan 2010 B1
7647966 Cavender et al. Jan 2010 B2
7673678 MacDougall et al. Mar 2010 B2
7757757 Vroblesky Jul 2010 B1
20020020527 Kilaas Feb 2002 A1
20020125009 Wetzel et al. Sep 2002 A1
20020148610 Bussear et al. Oct 2002 A1
20020170717 Venning et al. Nov 2002 A1
20030221834 Hess et al. Dec 2003 A1
20040009430 Daling et al. Jan 2004 A1
20040052689 Yao Mar 2004 A1
20040060705 Kelley Apr 2004 A1
20040144544 Freyer Jul 2004 A1
20040159447 Bissonnette et al. Aug 2004 A1
20040194971 Thomson Oct 2004 A1
20040244988 Preston Dec 2004 A1
20050016732 Brannon et al. Jan 2005 A1
20050086807 Richard et al. Apr 2005 A1
20050126776 Russell Jun 2005 A1
20050178705 Broyles et al. Aug 2005 A1
20050189119 Gynz-Rekowski Sep 2005 A1
20050199298 Farrington Sep 2005 A1
20050207279 Chemali et al. Sep 2005 A1
20050241835 Burris et al. Nov 2005 A1
20050274515 Smith et al. Dec 2005 A1
20060032630 Heins Feb 2006 A1
20060042798 Badalamenti et al. Mar 2006 A1
20060048936 Fripp et al. Mar 2006 A1
20060048942 Moen et al. Mar 2006 A1
20060076150 Coronado et al. Apr 2006 A1
20060086498 Wetzel et al. Apr 2006 A1
20060108114 Johnson May 2006 A1
20060118296 Dybevik et al. Jun 2006 A1
20060124360 Lee et al. Jun 2006 A1
20060157242 Graham et al. Jul 2006 A1
20060175065 Ross Aug 2006 A1
20060185849 Edwards et al. Aug 2006 A1
20060250274 Mombourquette et al. Nov 2006 A1
20060272814 Broome et al. Dec 2006 A1
20060273876 Pachla et al. Dec 2006 A1
20070012444 Horgan et al. Jan 2007 A1
20070039741 Hailey, Jr. Feb 2007 A1
20070044962 Tibbles Mar 2007 A1
20070045266 Sandberg et al. Mar 2007 A1
20070056729 Pankratz et al. Mar 2007 A1
20070131434 MacDougall et al. Jun 2007 A1
20070181299 Chung et al. Aug 2007 A1
20070209799 Vinegar et al. Sep 2007 A1
20070246210 Richards Oct 2007 A1
20070246213 Hailey, Jr. Oct 2007 A1
20070246225 Hailey, Jr. et al. Oct 2007 A1
20070246407 Richards et al. Oct 2007 A1
20070272408 Zazaovsky et al. Nov 2007 A1
20070289749 Wood et al. Dec 2007 A1
20080035349 Richard Feb 2008 A1
20080035350 Henriksen et al. Feb 2008 A1
20080053662 Williamson et al. Mar 2008 A1
20080135249 Fripp et al. Jun 2008 A1
20080149323 O'Malley et al. Jun 2008 A1
20080149351 Marya et al. Jun 2008 A1
20080169099 Pensgaard Jul 2008 A1
20080236839 Oddie Oct 2008 A1
20080236843 Scott et al. Oct 2008 A1
20080251255 Forbes et al. Oct 2008 A1
20080283238 Richards et al. Nov 2008 A1
20080296023 Willauer Dec 2008 A1
20080314590 Patel Dec 2008 A1
20090056816 Arov et al. Mar 2009 A1
20090057014 Richard et al. Mar 2009 A1
20090071646 Pankratz et al. Mar 2009 A1
20090101330 Johnson Apr 2009 A1
20090101342 Gaudette et al. Apr 2009 A1
20090133869 Clem May 2009 A1
20090133874 Dale et al. May 2009 A1
20090139717 Richard et al. Jun 2009 A1
20090139727 Tanju et al. Jun 2009 A1
20090194282 Beer et al. Aug 2009 A1
20090205834 Garcia et al. Aug 2009 A1
20090301704 Dillett et al. Dec 2009 A1
20100126720 Kaiser et al. May 2010 A1
Foreign Referenced Citations (14)
Number Date Country
1385594 Dec 2002 CN
1492345 Jun 1976 GB
2341405 Mar 2000 GB
59089383 May 1984 JP
1335677 Aug 1985 SU
9403743 Feb 1994 WO
0079097 Dec 2000 WO
0165063 Sep 2001 WO
0177485 Oct 2001 WO
WO0192681 Dec 2001 WO
02075110 Sep 2002 WO
2004018833 Mar 2004 WO
2006015277 Feb 2006 WO
2008092241 Aug 2008 WO
Related Publications (1)
Number Date Country
20100300194 A1 Dec 2010 US