Claims
- 1. A method of constructing a cast-in-place concrete pile including driving a pile casing into the earth, making a hollow below the end of the pile casing, filling the pile casing and the hollow with cement mortar to form a concrete pile with an enlarged base, wherein the improvements comprise: before filling the pile casing and the hollow with cement mortar, lowering an injection tube into the pile casing until the tube extends into the hollow; after filling the pile casing and the hollow with cement mortar and before the cement mortar consolidates, injecting a soil stabilizing agent through the injection tube and then through the cement mortar into the surrounding soil so as to form first passages in the enlarged base; after the cement mortar consolidates, injecting a highly flowable cement mortar through the injection tube and then through the first passages into the surrounding soil so as to form a supplemental concrete body; and subsequent to the injection of the highly flowable cement mortar and before the highly flowable cement mortar consolidates, injecting a soil stabilizing liquid agent through the injection tube, then through the first passages, and finally through the highly flowable cement mortar into the surrounding soil so that second passages are formed in the supplemental concrete body.
- 2. A method of constructing a concrete pile with an enlarged base, comprising the steps of:
- driving a pile casing into the earth;
- making an enlarged hollow below the end of the pile casing;
- lowering an injection tube into the pile casing until the tube extends into the bottom part of the enlarged hollow;
- filling the pile casing and the hollow with cement mortar to form a concrete pile with an enlarged base; and
- injecting a liquid through the injection tube before the cement mortar consolidates so as to prevent blockage at the end of the tube and to form first passages extending from the end of the tube to the surrounding of the enlarged base.
- 3. The method of constructing a concrete pile of claim 2 and further comprising the step of: injecting a highly flowable cement mortar through the injection tube into the surrounding soil so as to form a supplemental base.
- 4. The method of constructing a concrete pile of claim 3 and further comprising the step of: injecting a liquid through the injection tube before the highly flowable cement mortar consolidates so that second passages extending from the first passages are formed in the supplemental base.
- 5. The method of constructing a concrete pile of claim 4 in which: the liquid injected through the injection tube is a soil stabilizing agent.
Parent Case Info
This application is a continuation-in-part application of U.S. patent application Ser. No. 602,595, filed Apr. 20, 1984, which is now abandoned.
US Referenced Citations (13)
Foreign Referenced Citations (1)
Number |
Date |
Country |
306033 |
Jun 1918 |
DEX |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
602595 |
Apr 1984 |
|