Abstract
A tool for replacing pipe, in which the existing underground pipe is fractured or cut into fragments, which are forced inward so that they pass through the tool. The tool has breaking members that extend radially outwards and backwards from a nose such that, when the tool is pulled through an existing underground pipe, the breaking members are forced against the inside of the existing underground pipe, thereby breaking it. The fragments are forced inwards by the leading edge of the cylindrical base of the tool and pass through a bore in the cylindrical base. In this way the replacement of existing underground pipe is made possible without expanding the cavity of the existing underground pipe. The tool may additionally include a pipe guide for guiding replacement pipe into place behind the tool as the tool is pulled through the existing underground pipe. The fragments pass through the pipe guide and into the replacement pipe. The tool additionally includes clearing mechanisms for removing the fragments from the replacement pipe.
Description
FIELD
The present invention relates to an apparatus for the replacement of underground pipe.
BACKGROUND
Underground pipes are subject to inevitable deterioration and wear and, therefore, must be replaced from time to time. An obvious method for replacing existing underground pipe with replacement pipe is to excavate the entire length of the existing pipe, remove it and place new replacement pipe into the excavation. Excavation of existing pipe is time-consuming, labor-intensive and results in damage to the area surrounding the excavation. In many instances pipes often lie beneath driveways, buildings, or gardens, and property owners are very concerned about any damage that may result thereto. In addition, excavation is often made difficult by the presence of underground utilities.
Accordingly, it is an object of the present invention to provide an apparatus and method for replacing underground pipe requiring minimal excavation.
Other devices and methods have previously been proposed for use in replacement of underground pipes and mains. For example, those disclosed in U.S. Pat. No. 6,171,026 issued to Crane et al.; U.S. Pat. No. 6,092,553 issued to Hodgson; U.S. Pat. No. 5,544,977 issued to Crane et al.; U.S. Pat. No. 4,720,211 issued to Streatfield et al.; and U.S. Pat. No. 4,738,565 issued to Streatfield et al. However, all of the devices and methods disclosed by the above patents suffer from several drawbacks.
Often the earth surrounding underground pipes is extremely hard because it has been compacted or has settled over the years that the pipes have been in the ground. Many of the tools of the prior art, such as those described in U.S. Pat. No. 4,720,211 issued to Streatfield et al., and U.S. Pat. No. 5,098,225 issued to Rockower et al., involve the movement outwards of fragments of the existing underground pipe and expansion of the cavity thereof in order to create a cavity large enough to accommodate a replacement pipe. Obviously, in very compact earth, expansion of the cavity of the existing underground pipe can be very difficult and sometimes impossible. Furthermore, such expansion can damage nearby underground utilities or surface features (e.g. where an existing pipe passes under a sidewalk the sidewalk, may be cracked by expansion of the cavity of the existing pipe). Therefore it is an object of the present invention to provide an apparatus and method for replacing underground pipe that does not cause the expansion of the cavity of the existing underground pipe. It is a further object of the present invention to provide an apparatus and method for replacing underground pipe that does not cause outward movement of fragments of existing underground pipe.
In order to replace existing underground pipe without causing expansion of the surrounding earth, it is often necessary to remove fragments of the existing underground pipe from the cavity of the existing underground pipe. Generally, the prior art tools and methods for replacing underground pipe fracture or cut the existing underground pipe in situ and draw replacement pipe into the cavity of the fractured or cut existing underground pipe. In other words the fragments of the fractured or cut existing underground pipe remain in the ground surrounding the replacement pipe, once it is drawn into place. One exception is the tool described in U.S. Pat. No. 6,171,026 issued to Crane et al., wherein the existing underground pipe is cut in two and the resulting slit pipe is drawn out of the borehole, drawing replacement pipe into place in the process. The method and apparatus of U.S. Pat. No. 6,171,026 is obviously not suitable for use with frangible or fracturable pipe. Accordingly, it is an object of the present invention to provide an apparatus and method for the replacement of both frangible and non-frangible pipes wherein fragments of the existing underground pipe are removed from the cavity thereof, thereby making it possible to replace existing underground pipe without expanding the pipe or the surrounding earth.
SUMMARY OF THE INVENTION
A tapered tool for the replacement of underground pipe is provided that has a nose smaller than the inside diameter of an existing underground pipe, a cylindrical base with an outside diameter at least as large as the outside diameter of the existing underground pipe, and a plurality of breaking members joining the nose to the base such that the breaking members are angled radially outwards from the nose to the base, such that the breaking members are forced against the inside surface of the existing underground pipe and are operative to fracture the existing underground pipe into fragments as the tool is pulled through the existing underground pipe. The edge of the base that is closest to the nose is operative to force the fragments of the existing underground pipe radially inward, such that they pass through the bore of the base.
By forcing the fragments of the existing underground pipe inwards and allowing them to pass through the tool and into the replacement pipe the tool of the present invention makes it possible to replace existing underground pipe without expanding the cavity of the existing underground pipe, thereby protecting surface features and nearby underground utilities that might be damaged by such expansion. This is especially true when the existing underground pipe is found in very hard ground. Such compact earth is not further compressed by the forces applied to expand the cavity of the existing underground pipe but instead transmits the forces directly to, for example, nearby underground utilities.
In an alternative embodiment the breaking members of the tool are curved to form a conical helix. The helical tool rotates about its axis as it is pulled through the existing underground pipe thereby breaking the existing underground pipe in a helical pattern.
In addition, the expansion of the cavity of existing underground pipes found in very hard ground requires the application of greater force and may in some instances be impossible. The use of greater force additionally results in an increased risk of tool breakage. Therefore, by not expanding the cavity of the existing underground pipe, the tool of the present invention makes possible the replacement of existing underground pipes found in very hard ground with the use of less force, with less risk of damage to nearby utilities and surface features and with less risk of tool breakage.
In an alternate embodiment of the tool of the present invention, one side of the tool comprises a curved plate and the other comprises breaking members similar to those of the first embodiment described above. The breaking members fracture the existing underground pipe and the fragments are directed radially inward and pass through the tool as described above. The curved plate results in a more even distribution of force against the side of the existing underground pipe and therefore prevents expansion of the existing underground pipe on that side. In addition, the curved plate prevents fragments and earth from one side of the existing underground pipe from entering the tool. Therefore, the embodiment incorporating a curved plate allows the replacement of existing underground pipe in hard ground while reducing the amount of debris that passes through the tool.
Trenchless pipe replacement tools, such as the tool of the present invention, are often used in conjunction with a pipe guide or other means for drawing replacement pipe into place behind the tool. When used in conjunction with a pipe guide the tool directs the fragments of the existing underground pipe radially inwards and allows them to pass through the tool, through the pipe guide and into the replacement pipe. Therefore, the present invention additionally comprises mechanisms for clearing fragments and earth from the replacement pipe.
A first embodiment of the debris clearing mechanism comprises a sprocket supported on a support member inside the pipe guide. A chain enters the replacement pipe at one end, passes through the replacement pipe to the pipe guide, where it passes over the sprocket and then back through the replacement pipe until it exits at the same end it entered. The sprocket is preferably supported so that it is vertically oriented thereby dividing the chain into a top length and a bottom length. In one embodiment the chain is a closed loop. The chain is then moved such that the top length advances through the pipe towards the sprocket and the bottom length advances through the pipe away from the sprocket. In this manner the bottom length of the chain moves fragments and earth away from the tool and clears it from the replacement pipe. In an alternative embodiment the chain has paddles or clearing members connected to the links to clear the fragments and earth more effectively.
A second embodiment of the debris clearing mechanism comprises a high-pressure jetter supported on a support member inside the pipe guide. The jetter is connected to a hose that passes through the replacement pipe to a high-pressure water source. The jetter is operative to direct a plurality of high-pressure jets towards the side of the replacement pipe at an angle such that fragments of the existing underground pipe are forced back and away from the tool and are cleared from the replacement pipe. Since many pipes, such as sewer pipes, have a gradient to allow water to naturally flow in one direction, the gradient of a pipe is utilized to aid in draining the water from the pipe and clearing the fragments. In an alternative embodiment, the jetter emits an additional jet forward towards the nose of the tool.
A third embodiment of the debris clearing mechanism comprises an auger. In a preferred embodiment the auger comprises a cable having a metal band intertwined with strands of said cable such that said band extends approximately perpendicularly from said cable in a helical manner. Alternatively, the metal band can be made of some other material, such as plastic. One end of the cable is connected to a rotatable joint supported on a support member in the pipe guide. The cable passes from the rotatable joint through the replacement pipe until it exits the replacement pipe, where the other end of the cable is connected to a rotary drive mechanism. The rotary drive mechanism turns the cable such that the helical metal band forces the fragments of the existing underground pipe away from the tool and out of the replacement pipe.
BRIEF DESCRIPTION OF THE DRAWINGS
Further features and advantages will be apparent from the following detailed description, given by way of example, of a preferred embodiment taken in conjunction with the accompanying drawings, wherein:
FIG. 1
is a perspective view of a breaking head of the pipe replacement tool;
FIG. 2
is a perspective view of the breaking head of the pipe replacement tool with breaking members in helical form;
FIG. 3
is a perspective view of the breaking head of the pipe replacement tool with breaking members one side only;
FIG. 4
is a side view of the pipe replacement tool comprising a breaking head and pipe guide;
FIG. 5
is a cut-away view of a pipe replacement tool incorporating a chain and sprocket wheel for clearing earth and fragments;
FIG. 6
is a cut-away view of a pipe replacement tool incorporating a jetter for clearing earth and fragments;
FIG. 7
is a cut-away view of a pipe replacement tool incorporating a cable with a fin for clearing earth and fragments;
FIG. 8
is a cut-away view of a pipe replacement tool incorporating a jetter supported by a cable and pulley.
DETAILED DESCRIPTION WITH REFERENCE TO THE DRAWINGS
The present invention comprises a tool for trenchless replacement of underground pipes. The tool is drawn through an existing underground pipe, in the process fracturing or cutting the existing underground pipe and drawing replacement pipe into place.
Referring to
FIG. 1
, a breaking head
10
of the tool of the present invention is shown. The breaking head
10
comprises three breaking members
12
connecting a nose
14
and a base
16
. The nose
14
has an outside diameter smaller than the inside diameter of the existing underground pipe. The base
16
has an outside diameter larger than the inside diameter of the existing underground pipe. Therefore, when the breaking head
10
is drawn through the existing underground pipe the underground pipe is broken into fragments. In alternative embodiments of the breaking head, the breaking members
12
may comprise blades, whereby the existing underground pipe is cut into fragments. The nose
14
has an eye
18
in the center for passing a pulling chain. As the breaking head
10
is drawn through the existing underground pipe, the base
16
directs fragments of the existing underground pipe inwards so that they pass through the breaking head
10
.
Referring to
FIG. 2
, an alternative embodiment of the breaking head
10
is shown, comprising helical breaking members
20
. The helical breaking members
20
cause the breaking head
10
to rotate about an axis parallel to the axis of the existing underground pipe as the breaking head
10
is drawn through the existing underground pipe. Furthermore, the helical breaking members
20
result in the breaking of the existing underground pipe in a helical pattern. As with the embodiment of
FIG. 1
, the breaking head
10
with helical breaking members
20
has a base
16
and a nose
14
with an eye
18
for passing a pulling chain.
As the breaking head
10
is drawn through the existing underground pipe, the base
16
directs fragments of the existing underground pipe inwards so that they pass through the breaking head
10
. Obviously, in an alternative embodiment of breaking head
10
wherein the helical breaking members
20
comprise blades, the existing underground pipe is cut into helical fragments as the breaking head
10
is drawn through.
Referring to
FIG. 3
, yet another alternative embodiment of the breaking head
10
of the present invention is shown, comprising nose
14
, base
16
, breaking members
20
on one side of the tool, and plate
22
on another side of the tool. In a preferred embodiment the plate
22
and the breaking members
20
are located on the top and bottom of the tool, respectively. The plate
22
is operative to prevent fragments of the top side of the existing underground pipe from entering and passing through the tool. The plate
22
also distributes the force of impact of the tool evenly against the top side of the existing underground pipe so that the top side of the existing underground pipe is only minimally expanded. Alternatively, the plate
22
and breaking members
20
could be located on the left and right sides of the tool.
Referring to
FIG. 4
, a side view of the tool
5
of the present invention is shown comprising a breaking head
10
and pipe guide
30
. The pipe guide
30
is connected to the breaking head
10
such that it can be drawn through the existing underground pipe behind the breaking head
10
. Also shown are replacement pipe
40
, pulling chain
50
, and block
52
. In one embodiment the replacement pipe
40
is drawn into place behind the tool by the pipe guide
30
. Alternatively, the replacement pipe
40
may be pushed into place behind the tool
5
with the pipe guide
30
acting solely to guide the replacement pipe
40
into the cavity of the existing underground pipe.
Referring to
FIGS. 1
,
2
,
3
and
4
, a pulling chain
50
is passed through the eye
18
of nose
14
and connected to a block
52
. The block
52
has a size and shape such that it cannot pass through the eye
18
. Therefore when tension is applied to the pulling chain
50
, the block is forced against the nose
14
and the breaking head
10
is drawn forward.
Referring to
FIGS. 2 and 4
, in the case of the breaking head
10
comprising helical breaking members
20
, the block
52
is capable of rotation about an axis parallel to the pulling chain
50
. Therefore when tension is applied to the pulling chain
50
, the block is forced against the nose
14
and the breaking head
10
moves forward, rotating about an axis parallel to the pulling chain, breaking the existing underground pipe into fragments in a helical pattern, without twisting the pulling chain
50
. Alternatively, the nose
14
could be capable of rotation.
Again referring to
FIGS. 2 and 4
, in the case of the breaking head
10
comprising helical breaking members
20
, the connection between the breaking head
10
and pipe guide
30
is rotatable such that the pipe guide
30
does not rotate with the breaking head
10
as they are drawn through the existing underground pipe.
Referring to
FIG. 5
, a side view of the tool
5
is shown with the pipe guide
30
, replacement pipe
40
, and a debris clearing mechanism in the form of a sprocket
42
and clearing chain with a top length
44
and a bottom length
45
for clearing fragments and earth from the interior of the replacement pipe
40
. The sprocket
42
is supported on an arm
46
connected to the pipe guide
30
such that the sprocket is vertically oriented. The chain has paddles
48
connected thereto to clear fragments and earth from the replacement pipe. As the tool
5
is drawn through the existing underground pipe the breaking members
20
of the breaking head
10
fracture the existing underground pipe into fragments. The base
16
of the breaking head
10
directs the fragments into the pipe guide
30
and replacement pipe
40
. The clearing chain is moved such that the top length
44
moves in the same direction as the advancement of the tool
5
through the existing underground pipe and the bottom length
45
moves in the opposite direction, thereby clearing fragments of the existing underground pipe backwards through the replacement pipe.
Referring to
FIG. 6
, a side view of the tool
5
is shown with the pipe guide
30
, replacement pipe
40
, and a debris clearing mechanism in the form of a high-pressure jetter
54
. The high-pressure jetter
54
is supported within the pipe guide
30
by support member
60
and connected to a high-pressure water supply by hose
56
. In a preferred embodiment, the jetter
54
emits a plurality of high-pressure water jets
58
; one forward in the direction of travel of the tool
5
and three directed radially out and angled back to clear fragments of the existing underground pipe from the interior of the replacement pipe
40
. Since many pipes have a gradient running down toward a larger pipe or main, the water emitted by the jetter
54
naturally flows down the gradient, thereby clearing the fragments of the existing underground pipe from the replacement pipe
40
.
Referring to
FIG. 7
, a side view of the tool
5
is shown with the pipe guide
30
, replacement pipe
40
, and a debris clearing mechanism in the form of an auger mechanism
70
. In the present embodiment the auger mechanism
70
takes the form of a cable with a band wound between the strands thereof. As the auger mechanism is rotated about its axis, fragments of the existing underground pipe are moved back through the replacement pipe
40
. The auger mechanism is supported and connected to the pipe guide by an arm
72
and a rotatable head
74
.
Referring to
FIG. 8
, an alternative embodiment of the debris clearing mechanism comprising a jetter
54
. The jetter
54
is supported by the tension between a cable
80
and hose
56
. The cable
80
passes through a pulley
82
and out of the replacement pipe
40
. The pulley
82
is supported on a support member
60
. The position of the jetter
54
can be adjusted by moving the adjustment of the tension in the cable
80
. In this manner the jetter can be moved all the way back through the replacement pipe
40
thereby clearing the fragments and earth from the replacement pipe
40
completely.
Accordingly, while this invention has been described with reference to illustrative embodiments, this description is not intended to be construed in a limiting sense. Various modifications of the illustrative embodiments, as well as other embodiments of the invention, will be apparent to persons skilled in the art upon reference to this description. It is therefore contemplated that the appended claims will cover any such modifications or embodiments as fall within the true scope of the invention.
Claims
- 1. A tapered tool for the replacement of underground pipe, said tool having a central longitudinal axis, wherein said tool comprises:a) a nose having an outside diameter smaller than an inside diameter of an existing underground pipe, said nose additionally having an eye for connecting a chain thereto for pulling said tool through the existing underground pipe; b) a cylindrical base having a central axis coincident with said central longitudinal axis of said tool, an outside diameter larger than an outside diameter of the existing underground pipe, and a bore therethrough parallel to said central longitudinal axis; and c) a plurality of breaking members joining said nose to said base; wherein said breaking members are connected to said base and said nose such that said breaking members are angled radially outwards from said nose to said base such that said breaking members are forced against an inside surface of the existing underground pipe and are operative to fracture the existing underground pipe into fragments as said tool is pulled through the existing underground pipe, and wherein an edge of said base closest to said nose is operative to force the fragments of the existing underground pipe radially inward, and wherein said bore of said base is operative to allow the fragments of the existing underground pipe to pass through said base.
- 2. The tool of claim 1, wherein said breaking members are curved such that said breaking members form a tapered helix which causes said tool to rotate about its axis as it is pulled through the existing underground pipe.
- 3. The tool of claim 1, wherein said edge of said base closest to said nose is operative to force earth surrounding the existing underground pipe inwards so that the earth passes through said base along with the fragments as said tool is pulled through the existing underground pipe.
- 4. The tool of claim 1, wherein said breaking members comprise blades operative to cut the existing underground pipe into the fragments as said tool is pulled through the existing underground pipe.
- 5. The tool of claim 1, additionally comprising a pipe guide connected to said base such that said pipe guide is drawn through the existing underground pipe behind said base, said pipe guide having an approximately cylindrical shape and an outside diameter not larger than said outside diameter of said base, wherein said pipe guide is operative to receive a first section of replacement pipe and to guide said first section of replacement pipe into a cavity of the existing underground pipe, said pipe guide having a longitudinal bore substantially parallel to an axis of said tool, said bore operative to allow the fragments of the existing underground pipe to pass through said pipe guide and into the first section of replacement pipe as said tool is pulled through the existing underground pipe.
- 6. The tool of claim 5, wherein said pipe guide is removably coupled to the first section of replacement pipe such that said first section of replacement pipe and subsequent sections of replacement pipe are pulled into the cavity of the existing underground pipe behind said tool.
US Referenced Citations (31)
Foreign Referenced Citations (2)
Number |
Date |
Country |
2138532 |
Oct 1984 |
GB |
2213904 |
Sep 1989 |
GB |