The present disclosure relates generally to a diverse networks and, more specifically, the present disclosure relates to data beam nulling.
Wireless communication has been one of the most successful innovations in modern history. Recently, the number of subscribers to wireless communication services exceeded five billion and continues to grow quickly. The demand of wireless data traffic is rapidly increasing due to the growing popularity among consumers and businesses of smart phones and other mobile data devices, such as tablets, “note pad” computers, net books, eBook readers, and machine type of devices. In order to meet the high growth in mobile data traffic and support new applications and deployments, improvements in radio interface efficiency, coverage, and quality of service are of paramount importance.
The present disclosure relates to precoding matrix indicator (PMI)-based data beam nulling with a channel state information (CSI) report.
In an embodiment, an apparatus is provided. The apparatus includes a transceiver configured to communicate via a wired or wireless communication medium and a processor coupled to the transceiver. The processor is configured to identify restricted PMI beams in a nulling direction for supported ranks; receive, via the transceiver from a user equipment (UE), a CSI report including a rank, a PMI, and channel quality indicator (CQI) feedback; and determine whether the reported PMI is restricted. The processor is further configured to select an alternative PMI among a number of unrestricted PMIs for the reported rank; boost a reported CQI if a reduced transmit power is configured; and select a modulation coding scheme (MCS) and generate a precoder for a data beam based on at least one of: the CSI report, the alternative PMI, and the boosted CQI.
In another embodiment, a method is provided. The method includes identifying restricted PMI beams in a nulling direction for supported ranks; receiving, from a UE, a CSI report including a rank, a PMI, and CQI feedback; and determining whether the reported PMI is restricted. The method further includes selecting an alternative PMI among a number of unrestricted PMIs for the reported rank; boosting a reported CQI based on a reduced transmit power being configured; and selecting a MCS and generating a precoder for a data beam based on at least one of: the CSI report, the alternative PMI, and the boosted CQI.
In yet another embodiment, a non-transitory computer readable medium is provided. The non-transitory computer readable medium comprises program code, that when executed by a processor of an apparatus, causes the apparatus to: identify restricted PMI beams in a nulling direction for supported ranks; receive, via a transceiver of the apparatus from a UE, a CSI report including a rank, a PMI, and CQI feedback; determine whether the reported PMI is restricted; select an alternative PMI among a number of unrestricted PMIs for the reported rank; boost a reported CQI if a reduced transmit power is configured; and select a MCS and generate a precoder for a data beam based on at least one of: the CSI report, the alternative PMI, and the boosted CQI.
Other technical features may be readily apparent to one skilled in the art from the following figures, descriptions, and claims.
Before undertaking the DETAILED DESCRIPTION below, it may be advantageous to set forth definitions of certain words and phrases used throughout this patent document. The term “couple” and its derivatives refer to any direct or indirect communication between two or more elements, whether or not those elements are in physical contact with one another. The terms “transmit,” “receive,” and “communicate,” as well as derivatives thereof, encompass both direct and indirect communication. The terms “include” and “comprise,” as well as derivatives thereof, mean inclusion without limitation. The term “or” is inclusive, meaning and/or. The phrase “associated with,” as well as derivatives thereof, means to include, be included within, interconnect with, contain, be contained within, connect to or with, couple to or with, be communicable with, cooperate with, interleave, juxtapose, be proximate to, be bound to or with, have, have a property of, have a relationship to or with, or the like. The term “controller” means any device, system, or part thereof that controls at least one operation. Such a controller may be implemented in hardware or a combination of hardware and software and/or firmware. The functionality associated with any particular controller may be centralized or distributed, whether locally or remotely. The phrase “at least one of,” when used with a list of items, means that different combinations of one or more of the listed items may be used, and only one item in the list may be needed. For example, “at least one of: A, B, and C” includes any of the following combinations: A, B, C, A and B, A and C, B and C, and A and B and C.
Moreover, various functions described below can be implemented or supported by one or more computer programs, each of which is formed from computer readable program code and embodied in a computer readable medium. The terms “application” and “program” refer to one or more computer programs, software components, sets of instructions, procedures, functions, objects, classes, instances, related data, or a portion thereof adapted for implementation in a suitable computer readable program code. The phrase “computer readable program code” includes any type of computer code, including source code, object code, and executable code. The phrase “computer readable medium” includes any type of medium capable of being accessed by a computer, such as read only memory (ROM), random access memory (RAM), a hard disk drive, a compact disc (CD), a digital video disc (DVD), or any other type of memory. A “non-transitory” computer readable medium excludes wired, wireless, optical, or other communication links that transport transitory electrical or other signals. A non-transitory computer readable medium includes media where data can be permanently stored and media where data can be stored and later overwritten, such as a rewritable optical disc or an erasable memory device.
Definitions for other certain words and phrases are provided throughout this patent document. Those of ordinary skill in the art should understand that in many if not most instances, such definitions apply to prior as well as future uses of such defined words and phrases.
For a more complete understanding of the present disclosure and its advantages, a reference is now made to the following description taken in conjunction with the accompanying drawings, in which like reference numerals represent like parts:
To meet the demand for wireless data traffic having increased since deployment of 4G communication systems and to enable various vertical applications, efforts have been made to develop and deploy an improved 5G/NR or pre-5G/NR communication system. Therefore, the 5G/NR or pre-5G/NR communication system is also called a “beyond 4G network” or a “post LTE system.” The 5G/NR communication system is considered to be implemented in higher frequency (mmWave) bands, e.g., 28 GHz or 60 GHz bands, so as to accomplish higher data rates or in lower frequency bands, such as 6 GHz, to enable robust coverage and mobility support. Aspects of the present disclosure may also be applied to deployment of 5G communication system, 6G or even later release which may use terahertz (THz) bands. To decrease propagation loss of the radio waves and increase the transmission distance, the beamforming, massive multiple-input multiple-output (MIMO), full dimensional MIMO (FD-MIMO), array antenna, an analog beam forming, large scale antenna techniques are discussed in 5G/NR communication systems.
In addition, in 5G/NR communication systems, development for system network improvement is under way based on advanced small cells, cloud radio access networks (RANs), ultra-dense networks, device-to-device (D2D) communication, wireless backhaul, moving network, cooperative communication, coordinated multi-points (CoMP), reception-end interference cancelation and the like. In the 5G system, Hybrid FSK and QAM Modulation (FQAM) and sliding window superposition coding (SWSC) as an advanced coding modulation (ACM), and filter bank multi carrier (FBMC), non-orthogonal multiple access (NOMA), and sparse code multiple access (SCMA) as an advanced access technology have been developed.
The discussion of 5G systems and frequency bands associated therewith is for reference as certain embodiments of the present disclosure may be implemented in 5G systems. However, the present disclosure is not limited to 5G systems, or the frequency bands associated therewith, and embodiments of the present disclosure may be utilized in connection with any frequency band. For example, aspects of the present disclosure may also be applied to deployment of 5G communication systems, 6G or even later releases which may use terahertz (THz) bands.
In many cases, cellular networks are deployment in locations where satellite earth-stations (ES) exist. Cellular operation bands can be adjacent to ES operation band. There are harsh constraints on the amount of interference that ES can tolerate in their band of operation. Even though cellular networks are operating in a different adjacent band, out of band (OOB) emission still affects ES. Hence, transmission back-off is required to avoid OOB interference.
Power reduction is one way to reduce interference to ESs, which, however, will cause a smaller coverage and performance degradation. In order to reduce interference to ESs while maintaining coverage and mitigating performance degradation, PMI-based data beam can be designed so that the radiation power is reduced directionally towards the ES, referring to as directional nulling. Methods of directional nulling of PMI-based data beam need to be designed.
For beam generating for different ranks, the PMI bitmaps are different. To reduce overhead in control channel or due to system capability, the BS can set only one CSI report configuration, so that a single PMI bitmap is configured for the UE to report PMIs for different ranks. In this case, the configured PMI bitmap may not accurately indicate restricted and unrestricted PMIs for a certain rank, that is, although a reported PMI is unrestricted according to the configured PMI bitmap, the reported PMI may need to be restricted and replaced by alternative ones by the BS. On the other hand, the reported CQI can be measured based on power-reduced CSI-RS if power-reduced CSI-RS is used by the BS for ES interference control, so reported CQI may not be proper for full-power beam generation. To transmit a full-power data beam directionally nulled in ES direction, the reported CQI is be boosted for MCS (Modulation Coding Scheme) selection. Regarding these two issues, embodiments of the present disclosure provide an approach to PMI-based data beam nulling with one CSI report.
Embodiments of the present disclosure provide methods for PMI-based data beam nulling with one CSI report, where a shared PMI bitmap is used in PMI feedback for different ranks. Two methods are designed to select an alternative PMI when the reported PMI is restricted. Three options are designed for CQI boosting and precoder generation to optimize performance. Embodiments of the present disclosure can be applied, but not limited, to interference reduction to satellite earth stations, which should be considered in an inclusive manner without exclusion of other use cases.
As shown in
The gNB 102 provides wireless broadband access to the network 130 for a first plurality of UEs within a coverage area 120 of the gNB 102. The first plurality of UEs includes a UE 111, which may be located in a small business; a UE 112, which may be located in an enterprise (E); a UE 113, which may be located in a WiFi hotspot (HS); a UE 114, which may be located in a first residence (R); a UE 115, which may be located in a second residence (R); and a UE 116, which may be a mobile device (M), such as a cell phone, a wireless laptop, a wireless PDA, or the like. The gNB 103 provides wireless broadband access to the network 130 for a second plurality of UEs within a coverage area 125 of the gNB 103. The coverage area 125 provided by gNB 103 can be part of a non-terrestrial network (NTN). The second plurality of UEs includes the UE 115 and the UE 116. In some embodiments, one or more of the gNBs 101-103 may communicate with each other and with the UEs 111-116 using 5G/NR, LTE, LTE-A, WiMAX, WiFi, or other wireless communication techniques.
Depending on the network type, t the term ‘gNB’ can refer to any component (or collection of components) configured to provide remote terminals with wireless access to a network, such as base transceiver station, a radio base station, transmit point (TP), transmit-receive point (TRP), an enhanced base station (eNodeB or eNB), a ground gateway, an airborne gNB, a satellite system, mobile base station, a 5G/NR base station (gNB), a macrocell, a femtocell, a WiFi access point (AP), and the like. Base stations may provide wireless access in accordance with one or more wireless communication protocols, e.g., 5G/NR 3GPP new radio interface/access (NR), long term evolution (LTE), LTE advanced (LTE-A), high speed packet access (HSPA), Wi-Fi 802.11a/b/g/n/ac, etc. For the sake of convenience, the terms “BS” and “TRP” are used interchangeably in this patent document to refer to network infrastructure components that provide wireless access to remote terminals. Also, depending on the network type, the term “user equipment” or “UE” can refer to any component such as “mobile station,” “subscriber station,” “remote terminal,” “wireless terminal,” “receive point,” or “user device.” For the sake of convenience, the terms “user equipment” and “UE” are used in this patent document to refer to remote wireless equipment that wirelessly accesses a BS, whether the UE is a mobile device (such as a mobile telephone or smartphone) or is normally considered a stationary device (such as a desktop computer or vending machine).
Dotted lines show the approximate extents of the coverage areas 120 and 125, which are shown as approximately circular for the purposes of illustration and explanation only. It should be clearly understood that the coverage areas associated with gNBs, such as the coverage areas 120 and 125, may have other shapes, including irregular shapes, depending upon the configuration of the gNBs and variations in the radio environment associated with natural and man-made obstructions.
As described in more detail below, one or more of the UEs 111-116 include circuitry, programing, or a combination thereof for beam directional nulling. In certain embodiments, and one or more of the gNBs 101-103 includes circuitry, programing, or a combination thereof for beam directional nulling.
Although
As shown in
The RF transceivers 210a-210n receive, from the antennas 205a-205n, incoming RF signals, such as signals transmitted by UEs in the network 100. The RF transceivers 210a-210n down-convert the incoming RF signals to generate IF or baseband signals. The IF or baseband signals are sent to the RX processing circuitry 220, which generates processed baseband signals by filtering, decoding, and/or digitizing the baseband or IF signals. The RX processing circuitry 220 transmits the processed baseband signals to the controller/processor 225 for further processing.
The TX processing circuitry 215 receives analog or digital data (such as voice data, web data, e-mail, or interactive video game data) from the controller/processor 225. The TX processing circuitry 215 encodes, multiplexes, and/or digitizes the outgoing baseband data to generate processed baseband or IF signals. The RF transceivers 210a-210n receive the outgoing processed baseband or IF signals from the TX processing circuitry 215 and up-converts the baseband or IF signals to RF signals that are transmitted via the antennas 205a-205n.
The controller/processor 225 can include one or more processors or other processing devices that control the overall operation of the gNB 103. For example, the controller/processor 225 could control the reception of UL channel signals and the transmission of DL channel signals by the RF transceivers 210a-210n, the RX processing circuitry 220, and the TX processing circuitry 215 in accordance with well-known principles. The controller/processor 225 could support additional functions as well, such as more advanced wireless communication functions. For instance, the controller/processor 225 could support beam forming or directional routing operations in which outgoing/incoming signals from/to multiple antennas 205a-205n are weighted differently to effectively steer the outgoing signals in a desired direction. Any of a wide variety of other functions could be supported in the gNB 103 by the controller/processor 225.
The controller/processor 225 is also capable of executing programs and other processes resident in the memory 230, such as an OS. The controller/processor 225 can move data into or out of the memory 230 as required by an executing process.
The controller/processor 225 is also coupled to the backhaul or network interface 235. The backhaul or network interface 235 allows the gNB 103 to communicate with other devices or systems over a backhaul connection or over a network. The interface 235 could support communications over any suitable wireless connection(s). When disposed as part of a terrestrial network, such as gNB 101 and gNB 102, The interface 235 could support communications over any suitable wired or wireless connection(s). For example, when the gNB 103 is implemented as part of a cellular communication system (such as one supporting 5G/NR, LTE, or LTE-A), the interface 235 could allow the gNB 103 to communicate with other gNBs over a wireless backhaul connection while gNB 101 and gNB 102 can communicate with other gNBs over a wired or wireless backhaul connection. When the one or the gNBs 101-103 is implemented as an access point, the interface 235 could allow the gNB 102 to communicate over a wired or wireless local area network or over a wired or wireless connection to a larger network (such as the Internet). The interface 235 includes any suitable structure supporting communications over a wired or wireless connection, such as an Ethernet or RF transceiver.
The memory 230 is coupled to the controller/processor 225. Part of the memory 230 could include a RAM, and another part of the memory 230 could include a flash memory or other ROM.
Although
As shown in
The RF transceiver 310 receives, from the antenna 305, an incoming RF signal transmitted by a gNB of the network 100. The RF transceiver 310 down-converts the incoming RF signal to generate an intermediate frequency (IF) or baseband signal. The IF or baseband signal is sent to the RX processing circuitry 325, which generates a processed baseband signal by filtering, decoding, and/or digitizing the baseband or IF signal. The RX processing circuitry 325 transmits the processed baseband signal to the speaker 330 (such as for voice data) or to the processor 340 for further processing (such as for web browsing data).
The TX processing circuitry 315 receives analog or digital voice data from the microphone 320 or other outgoing baseband data (such as web data, e-mail, or interactive video game data) from the processor 340. The TX processing circuitry 315 encodes, multiplexes, and/or digitizes the outgoing baseband data to generate a processed baseband or IF signal. The RF transceiver 310 receives the outgoing processed baseband or IF signal from the TX processing circuitry 315 and up-converts the baseband or IF signal to an RF signal that is transmitted via the antenna 305.
The processor 340 can include one or more processors or other processing devices and execute the OS 361 stored in the memory 360 in order to control the overall operation of the UE 116. For example, the processor 340 could control the reception of DL channel signals and the transmission of UL channel signals by the RF transceiver 310, the RX processing circuitry 325, and the TX processing circuitry 315 in accordance with well-known principles. In some embodiments, the processor 340 includes at least one microprocessor or microcontroller.
The processor 340 is also capable of executing other processes and programs resident in the memory 360, such as processes for beam management. The processor 340 can move data into or out of the memory 360 as required by an executing process. In some embodiments, the processor 340 is configured to execute the applications 362 based on the OS 361 or in response to signals received from gNBs or an operator. The processor 340 is also coupled to the I/O interface 345, which provides the UE 116 with the ability to connect to other devices, such as laptop computers and handheld computers. The I/O interface 345 is the communication path between these accessories and the processor 340.
The processor 340 is also coupled to the touchscreen 350 and the display 355. The operator of the UE 116 can use the touchscreen 350 to enter data into the UE 116. The display 355 may be a liquid crystal display, light emitting diode display, or other display capable of rendering text and/or at least limited graphics, such as from web sites.
The memory 360 is coupled to the processor 340. Part of the memory 360 could include a random-access memory (RAM), and another part of the memory 360 could include a Flash memory or other read-only memory (ROM).
Although
A communication system includes a downlink (DL) that refers to transmissions from a base station or one or more transmission points to UEs and an uplink (UL) that refers to transmissions from UEs to a base station or to one or more reception points.
A time unit for DL signaling or for UL signaling on a cell is referred to as a slot and can include one or more symbols. A symbol can also serve as an additional time unit. A frequency (or bandwidth (BW)) unit is referred to as a resource block (RB). One RB includes a number of sub-carriers (SCs). For example, a slot can have duration of 0.5 milliseconds or 1 millisecond, include 14 symbols and an RB can include 12 SCs with inter-SC spacing of 15 KHz or 30 KHz, and so on.
DL signals include data signals conveying information content, control signals conveying DL control information (DCI), and reference signals (RS) that are also known as pilot signals. A gNB transmits data information or DCI through respective physical DL shared channels (PDSCHs) or physical DL control channels (PDCCHs). A PDSCH or a PDCCH can be transmitted over a variable number of slot symbols including one slot symbol. For brevity, a DCI format scheduling a PDSCH reception by a UE is referred to as a DL DCI format and a DCI format scheduling a physical uplink shared channel (PUSCH) transmission from a UE is referred to as an UL DCI format.
A gNB transmits one or more of multiple types of RS including channel state information RS (CSI-RS) and demodulation RS (DMRS). A CSI-RS is primarily intended for UEs to perform measurements and provide channel state information (CSI) to a gNB. For channel measurement, non-zero power CSI-RS (NZP CSI-RS) resources are used. For interference measurement reports (IMRs), CSI interference measurement (CSI-IM) resources associated with a zero power CSI-RS (ZP CSI-RS) configuration are used. A CSI process consists of NZP CSI-RS and CSI-IM resources.
A UE can determine CSI-RS transmission parameters through DL control signaling or higher layer signaling, such as radio resource control (RRC) signaling, from a gNB. Transmission instances of a CSI-RS can be indicated by DL control signaling or be configured by higher layer signaling. A DMRS is transmitted only in the BW of a respective PDCCH or PDSCH and a UE can use the DMRS to demodulate data or control information.
The transmit path 400 as illustrated in
As illustrated in
The serial-to-parallel block 410 converts (such as de-multiplexes) the serial modulated symbols to parallel data in order to generate N parallel symbol streams, where N is the IFFT/FFT size used in the gNB 102 and the UE 116. The size N IFFT block 415 performs an IFFT operation on the N parallel symbol streams to generate time-domain output signals. The parallel-to-serial block 420 converts (such as multiplexes) the parallel time-domain output symbols from the size N IFFT block 415 in order to generate a serial time-domain signal. The add cyclic prefix block 425 inserts a cyclic prefix to the time-domain signal. The up-converter 430 modulates (such as up-converts) the output of the add cyclic prefix block 425 to an RF frequency for transmission via a wireless channel. The signal may also be filtered at baseband before conversion to the RF frequency.
A transmitted RF signal from the gNB 102 arrives at the UE 116 after passing through the wireless channel, and reverse operations to those at the gNB 102 are performed at the UE 116.
As illustrated in
Each of the gNBs 101-103 may implement a transmit path 400 as illustrated in
Each of the components in
Furthermore, although described as using FFT and IFFT, this is by way of illustration only and may not be construed to limit the scope of this disclosure. Other types of transforms, such as discrete Fourier transform (DFT) and inverse discrete Fourier transform (IDFT) functions, can be used. It may be appreciated that the value of the variable N may be any integer number (such as 1, 2, 3, 4, or the like) for DFT and IDFT functions, while the value of the variable N may be any integer number that is a power of two (such as 1, 2, 4, 8, 16, or the like) for FFT and IFFT functions.
Although
Rel.14 LTE and Rel.15 NR support up to 32 CSI-RS antenna ports which enable an eNB to be equipped with a large number of antenna elements (such as 64 or 128). In this case, a plurality of antenna elements is mapped onto one CSI-RS port. For mmWave bands, although the number of antenna elements can be larger for a given form factor, the number of CSI-RS ports—which can correspond to the number of digitally precoded ports—tends to be limited due to hardware constraints (such as the feasibility to install a large number of ADCs/DACs at mmWave frequencies).
In the example shown in
Since the above system utilizes multiple analog beams for transmission and reception (wherein one or a small number of analog beams are selected out of a large number, for instance, after a training duration—to be performed from time to time), the term “multi-beam operation” is used to refer to the overall system aspect. This includes, for the purpose of illustration, indicating the assigned DL or UL transmit (TX) beam (also termed “beam indication”), measuring at least one reference signal for calculating and performing beam reporting (also termed “beam measurement” and “beam reporting”, respectively), and receiving a DL or UL transmission via a selection of a corresponding receive (RX) beam.
Additionally, the antenna 500 system is also applicable to higher frequency bands such as >52.6 GHz (also termed the FR4). In this case, the system can employ only analog beams. Due to the O2 absorption loss around 60 GHz frequency (˜10 decibels (dB) additional loss @100 m distance), larger number of and sharper analog beams (hence larger number of radiators in the array) will be needed to compensate for the additional path loss.
In many cases, cellular networks are deployed in locations where satellite earth-stations (ES) 605 exist. In certain embodiments, ES 605 is configured to perform satellite communications. The ES 605 is primarily deployed to be fixed and receive-only for satellite communication.
Cellular operation bands, such as via gNB 102, can be adjacent to ES 605 operation band. For example, 5G emission, in coverage area 610, from gNB 102 can interfere with the ES 605. Additionally, there are harsh constraints on the amount of interference that 605 can tolerate in their band of operation. That is, the 5G massive MIMO system on C-band can cause some interference to the ES 605 for satellite communication. The Federal Communication Commission (FCC) has implemented regulations on the C-Band emissions. To comply with the FCC regulations, the 5G massive MIMO system needs to be designed to control the interference to the ES 605, namely, for the satellite communication in C-band.
For the coexistence, FCC regulation on C-band emission in USA: 1) Out-of-band Emission (4.0-4.2 GHz)-PFD limit of −124 dBW/m2/MHz as measured at the earth station antenna; or In-band, receiver blocking protection (3.7-3.98 GHz)-PFD limit of −16 dBW/m2/MHz as measured at the earth station antenna. Thus, interference control to earth stations in C-band needs to be addressed for the coexistence of 5G massive MIMO systems and satellite earth stations (ES).
Power reduction is one way to reduce interference to the ES 605, which, however, will cause a smaller coverage and performance degradation. Even though cellular networks are operating in a different adjacent band, out of band (OOB) emission still affects ES 605, hence, transmission power back-off may be required in some cases to avoid OOB interference. In certain scenarios, to mitigate OOB interference, gNB 102 may perform power reduction and transmit to a reduced coverage area 615. In response, the ES 605 continues to measure the interference while gNB 102 continues to reduce the power so that the interference coming from gNB 102 would comply with the regulations. A problem with this power back off is that it deteriorates the through-put. That is, reducing the power to reduce the interference may affect the performance of the system as well.
In certain embodiments, to reduce interference to ES 605 while maintaining coverage in coverage area 610 and mitigating performance degradation, PMI-based data beams can be designed so that the radiation power from gNB 102 is reduced directionally towards the ES 605, referring to as directional nulling.
The data beam can be formed based on the PMI feedback in a CSI report sent by a UE. In order to reduce interference to an ES, the PMIs forming beams pointing to the ES can be restricted so that the data beam is nulled in the ES direction. One CSI report can be configured with only one PMI bitmap, and a UE reports selected PMIs among all allowed PMIs indicated in the bitmap for different ranks. For example, a full PMI bitmap can be configured. For a certain rank value, if the reported PMIs belong to the set of restricted PMIs, alternative PMIs have to be selected at the BS to generate the data beam. In certain embodiments, PMI-based MIMO transmission, data beam can be generated based on CSI measurement report consisting of channel quality indicator (CQI), preceding matrix indicator (PMI), and rank indicator (RI), where the PMIs indicates UE-selected beam directions. To null data beam in ES direction, PMIs pointing to the ES are restricted.
In PMI-based MIMO transmission, data beams can be generated based on UE CSI measurement on downlink CSI-RS, which consists of CQI, PMI, and RI feedback through uplink. The interference from MMUs to an ES can be reduced directionally by restricting PMIs forming data beams pointing to the ES. UE may only select and report unrestricted PMIs that are informed by the BS via a PMI bitmap parameter with 1 indicating allowed PMI beam and 0 indicating restricted PMI beam. For different ranks, the restricted PMIs can be different. However, due to limited capacity of control channel, a shared PMI bitmap is used for different ranks in one CSI report configuration. The reported PMIs for lower ranks could fall in ES nulling direction and, thus, need to be restricted and replaced by alternative ones. It is necessary to design the approach to data beam nulling in PMI-based MIMO transmission with one CSI report.
In certain embodiments, gNB 102 generates a data beam 705 containing k data streams to a UE 116 while nulling in the ES 605 direction 710, a rank-k precoder (i.e., beamforming matrix) consisting of k orthogonal beamforming vectors can be designed via zero-forcing (ZF) beamforming. The gNB 102 forms the data beam with zero power leakage (interference) in the ES 605 direction 710 while maintaining beam radiation towards the UE 116.
The gNB 102 has prior knowledge of ES 605, namely ES direction 710, location, etc., the gNB 102 identifies restricted PMIs. The gNB 102 configures a PMI bitmap with 1 indicating allowed PMI and 0 indicating restricted PMI, and the UE 116 will select and report only from the unrestricted PMIs.
In certain embodiment, the data beam 705 can be formed based on the PMI feedback in a CSI report sent by a UE 116. In order to reduce interference to an ES 605, the PMIs forming beams 720 pointing to the ES 605 can be restricted so that the data beam 705 is nulled in the ES direction 710. One CSI report is configured with only one PMI bitmap, and a UE 116 reports selected PMIs among all allowed PMIs indicated in the bitmap for different ranks. For example, a full PMI bitmap can be configured. For a certain rank, if the reported PMIs belong to the set of restricted PMIs, alternative PMIs have to be selected at the gNB 102 to generate the data beam 705. For a fixed set of restricted PMIs, a mapping between restricted PMIs and alternative PMIs can be predefined. If reduced transmit power is configured, the reported CQI measured based on power-reduced CSI-RSs need to be boosted for MCS selection, if directionally nulled data beam is used. The directionally nulled data beam can be generated causing limited interference to ES direction 710, based on the reported PMI if unrestricted or the alternative PMI if restricted PMI is reported. Alternatively, based on the reported PMI, the data beam with reduced transmit power can be generated if better performance can be achieved, which causes reduced power radiation in all directions.
For beam generating for different ranks, the PMI bitmaps are different. To reduce overhead in control channel or due to system capability, gNB 102 can set only one CSI report configuration, so that a single PMI bitmap is configured for the UE 116 to report PMIs for different ranks.
In this case, the configured PMI bitmap may not accurately indicate restricted and unrestricted PMIs for a certain rank, that is, although a reported PMI is unrestricted according to the configured PMI bitmap, the reported PMI may actually need to be restricted and replaced by alternative ones by the BS.
On the other hand, the reported CQI can be measured based on power-reduced CSI-RS if power-reduced CSI-RS is used by the BS for ES interference control, so reported CQI may not be proper for full-power beam generation. To transmit a full-power data beam directionally nulled in ES direction, the reported CQI has to be boosted for MCS (Modulation Coding Scheme) selection.
Regarding these two issues, embodiments of the present disclosure provide an approach to PMI-based data beam nulling with one CSI report.
In operation 805, gNB 102 identifies one or more restricted PMI beams in nulling direction for all supported ranks. The gNB 102 also configures one CSI report and a corresponding PMI bitmap.
In operation 810, gNB 102 receives a CSI report from UE 116. The CSI report includes a rank, PMI, and CQI feedback sent by UE 116.
In operation 815, gNB 102 checks whether the reported PMI is restricted for the reported rank. If the reported PMI is restricted, then gNB 102 proceeds to select an alternative PMI in operation 820. Alternatively, if the reported PMI is not restricted, then gNB 102 proceeds to boost the reported CQI in operation 825.
In operation 820, gNB 102 selects an alternative PMI among the unrestricted PMIs for the reported rank. For a CSI report with RI=1 and 1-layer PMI feedback, if the reported PMI is restricted, the alternative PMI can be selected from the unrestricted PMIs as follows. For one embodiment of alternative PMI selection, denote vk as the normalized vector corresponding to the reported PMI for a certain layer, with k as the index of the vector, where 0≤k≤255, for example, for Type-I 1-layer and 2-layer codebook with codebookMode=1, (N1=4, N2=4) and (O1=4, O2=4), and as specified in 3GPP, TS 38.214 v16.3.0, Physical layer procedures for data, the contents of which are incorporated by reference.
The index set of beam vectors corresponding to unrestricted PMIs is denoted S. In certain embodiments, if the reported PMI vk is restricted, an alternative PMI, denoted vk′ is selected that is the one mostly correlated (nearest in direction) to vk among the unrestricted PMIs. For example, the alternative PMI beam, denoted vk′, is selected to be the one mostly correlated to vk among the unrestricted beams according to Equation 1:
In certain embodiments of alternative PMI selection, gNB 102 determines the alternative PMI beam vk′ as the nearest beam to vk in parameter domain, such as, nearest with respect to a 2-dimensional index of PMI. Specifically, given a reported PMI and the corresponding beam weight vector vk, the index k can be represented using horizontal and vertical indices, lk and mk, respectively, where:
k−(mk−1)*N1O1+lk, for 0≤lk≤N1O1−1,0≤mk≤N2O2−1, (2)
For example, a Type-I codebook with codebookMode=1, as specified in 3GPP, TS 38.214 v16.3.0, Physical layer procedures for data.
In certain embodiments, for rank>1, multiple PMIs are reported where each PMI is for each layer. The alternative PMI can be selected for each layer independently by selecting from:
Option 1: all the unrestricted PMIs; or
Option 2: the subset of all unrestricted PMIs that guarantees the orthogonality between layers.
The rank of beam can be determined as the reported RI or based on a performance metric, such as, an estimated rate.
In operation 825, gNB 102 boosts the reported CQI if a reduced transmit power is configured. CQI is measured and reported based on power-reduced CSI-RS if reduced transmit power is configured for ES interference control. To transmit a full-power data beam directionally nulled in ES direction 710, the reported CQI is boosted for MCS selection, and the precoder generated based on the reported PMI or the selected alternative PMI is boosted in power if reference signal (RS) for CSI measurement is configured with reduced transmit power.
In the example shown in
where (lk, mk) and (ln, mn) denote the two-dimension representations of indices k and n, respectively. If the set o is empty, the alternative beam vk′ is selected among all unrestricted beams according to Equation 4:
For a CSI report with RI>1 and multi-layer PMI feedback, the alternative PMI can be selected for each layer independently using the method mentioned above, where the rank of the data beam is as the reported RI. For another embodiment, if the reported PMI of a certain layer is restricted in a CSI report with RI>1, the alternative PMI can be selected for the layer independently by the method above, and the rank of the data beam can be selected from {1, 2, . . . , RI} based on a performance metric g, which can be a function of CSI. For example, the rank r can be determined according to Equation 5:
where gn be the estimated achievable rate, i.e., gn(n, CQIn)=n*log2 (1+B*CQIn), where B denotes a scalar determined in the outer loop error rate, and CQIn denotes the CQI of rank-n data beam. The CQI of rank-RI data beam can be the reported CQI. The CQI of rank-n data beam can be determined based on the n-layer PMI for n<RI, where the PMI is not reported but can be selected from the unrestricted PMIs corresponding to the rank-n PMI bitmap using the method mentioned above.
CQI is measured and reported based on power-reduced CSI-RS if reduced transmit power is configured for ES interference control. To transmit a full-power data beam directionally nulled in ES direction, the reported CQI is boosted for MCS selection, and the precoder generated based on the reported PMI or the selected alternative PMI has to be boosted in power if reference signal (RS) for CSI measurement is configured with reduced transmit power. CQI boosting is performed via one of three options:
Option 1: CQI is boosted by scaling up the reported CQI to full power regardless the reported PMI is restricted or not.
Option 2: If the reported PMI is unrestricted, the reported CQI is scaled up to full power;
If the reported PMI is restricted, the CQI is first scaled up to full power, and further scaled by the correlation coefficient (i.e., ω) between the reported PMI beam vk and the selected alternative PMI beam vk′, where:
ω=∥vkH*vk′∥. (6)
Option 3: If the reported PMI is unrestricted, CQI is boosted by option 2 and the precoder is generated using the reported PMI with boosted power. If the reported PMI is restricted, choose either the power-reduced data beam or the directionally nulled full-power data beam based on a performance metric such as estimated achievable rate:
f
red(r,CQIrep)=r*log2(1+B*CQIrep) (7)
f
full(r,CQIboost)=r*log2(1+B*CQIboost) (8)
where r is reported RI; B denotes a scalar for the outer loop error rate
In operation 1005, gNB 102 checks whether the reported PMI is restricted for the reported rank. If the reported PMI is unrestricted, then gNB 102 proceeds to option 1, which is boost by scaling in operation 1010. Alternatively, if the reported PMI is restricted, then gNB 102 proceeds to select an alternative PMI in operation 1015.
In certain embodiments, a scaling value is used to boost the reported CQI in operation 1010. In certain embodiments, the boosted CQI is obtained by scaling the reported CQI by the reduced power no matter if the reported PMI is restricted or not. The MCS is selected based on the boosted CQI. Then, in operation 1020, the precoder is generated using the reported PMI if unrestricted or the selected alternative PMI if restricted PMI is reported. The power of the precoder is boosted to full power if reference signal (RS) for CSI measurement is configured with reduced transmit power.
In certain embodiments, in operation 1010, if the reported PMI is unrestricted, the reported CQI is scaled by the reduced power. Then, in operation 1020, the precoder is generated using the reported PMI and boosting power if reduced transmit power is configured.
If the reported PMI is restricted and an alternative PMI is selected for each layer in operation 1015, the CQI is first scaled by the reduced power in operation 1025. The CQI is further scaled by the correlation coefficient between the reported PMI beam vk and the selected alternative PMI beam vk′, denoted ω, namely Equation 6 above, where ω=∥vkH*vk′∥. The MCS is selected based on the boosted CQI. The precoder is generated using the reported PMI if unrestricted or the selected alternative PMI if restricted PMI is reported. The power of the precoder is boosted to full power if reference signal (RS) for CSI measurement is configured with reduced transmit power.
In certain embodiments, if the reported PMI is unrestricted, the MCS is selected based on the boosted CQI and the precoder is generated using the reported PMI with boosted power if reference signal (RS) for CSI measurement is configured with reduced transmit power.
If the reported PMI is restricted, gNB 102 selects an alternative PMI for each layer in operation 1015. In operation 1025, gNB 102 boosts the CQI by scaling the reported CQI by the reduced power and the correlation coefficient. In operation 1030, gNB 102 calculates metrics for the data beam. Either a power-reduced data beam or the directionally nulled full-power data beam is used, whichever provides better estimated performance measured by a metric f, which can be a function of CSI. In an example, the metric f can be the estimated achievable rate, such as according to Equation 9:
f(r,CQI)=r*log2(1+B*CQI), (9)
In Equation 9, r can be the reported RI and B denotes a scalar determined in an outer loop error rate. For the power-reduced data beam, gNB 102 calculates the metric fred based on the reported CSI, including the reported PMI and the reported CQI. For the directionally nulled full-power data beam, gNB 102 calculates the metric fnull based on the selected alternative PMI and the boosted CQI, that is, the reported CQI scaled by the reduced power and the correlation coefficient ω.
In operation 1035, gNB 102 compares fred and fnull. If fred>fnull, a power-reduced data beam is used in operation 1040. In operation 1040, the precoder is generated based on the reported PMI and the MCS is selected based on the reported CQI. If fred≤fnull, a directionally nulled full-power data beam is used in operation 1045. In operation 1045, the precoder is generated using the selected alternative PMI and the power is boosted to full power if PDSCH is configured with reduced transmit power. The MCS is selected based on the boosted CQI, that is, the reported CQI scaled by the reduced power and the correlation coefficient ω.
The above flowcharts illustrate example methods that can be implemented in accordance with the principles of the present disclosure and various changes could be made to the methods illustrated in the flowcharts herein. For example, while shown as a series of steps, various steps in each figure could overlap, occur in parallel, occur in a different order, or occur multiple times. In another example, steps may be omitted or replaced by other steps.
Although the present disclosure has been described with exemplary embodiments, various changes and modifications may be suggested to one skilled in the art. It is intended that the present disclosure encompass such changes and modifications as fall within the scope of the appended claims. None of the description in this application should be read as implying that any particular element, step, or function is an essential element that must be included in the claims scope. The scope of patented subject matter is defined by the claims.
The present application claims priority to U.S. Provisional Patent Application No. 63/225,244, filed on Jul. 23, 2021. The contents of the above-identified patent documents are incorporated herein by reference.
Number | Date | Country | |
---|---|---|---|
63225244 | Jul 2021 | US |