The disclosure relates generally to a system for transferring an integrated offshore platform deck load from a vessel to a pre-installed platform substructure under rough seas or under swell conditions.
Offshore Floatover Installation
An offshore platform is generally composed of two sections: 1) a substructure such as a jacket for a fixed platform, and 2) a superstructure such as a deck to be installed on the top of a substructure.
A floatover installation is referred to a set of offshore operational procedures to install an integrated platform deck onto a pre-installed substructure at an offshore location under open sea environments.
The first procedure is the transportation of a platform deck from an onshore fabrication yard to an offshore installation site. When a barge or a heavy transport vessel loaded with the integrated deck arrives at the offshore installation, the substructure should be already installed with a set of upwardly extending substructure legs to form a slot for the transport vessel to move into.
The second procedure is the docking procedure in which the transport vessel is moved in and docked with the pre-installed substructure upstanding legs. The transport vessel is maneuvered into the open slot so that the downwardly extending deck legs from the platform deck are aligned above the substructure upwardly extending legs. During this process, mooring lines and fendering system are usually employed. Prior to entering of the slot, in some cases, the platform deck could be lifted, such as in a Uni-deck floatover method described below, in order to increase the air gaps between the downwardly extending deck leg bottoms and the substructure upwardly extending leg tops. Once the alignment is within design requirements, ballasting of the transport vessel commences.
The third procedure is the mating procedure to transfer the load of the deck from the vessel deck supports on the transport vessel deck to the substructure upwardly extending legs. This is a critical phase of any floatover installations because the load transfer operation has to be conducted under wave induced vessel motions, especially heave motions. Impacts will occur between the deck downwardly extending legs and substructure upwardly extending legs and such repeated impacts may result in damages to both structures.
The fourth procedure involves separating the vessel from the platform deck and withdrawing the vessel from the substructure slot. This is another critical phase of the floatover installation. Once the majority of the deck load has been transferred to the substructure upwardly extending legs, due to the vessel ballasting induced vessel draft change, the deck starts to separate from the supports at the barge deck Immediately after the initial separation, the relative motions between the vessel and the deck may pose a potential danger of damages due to the impact between the two bodies induced by vessel motions.
The potential damage during the mating phase usually occurs at the contact surfaces (mating surfaces) between the downwardly extending deck legs and the substructure upwardly extending legs. The potential damage during the separating phase usually occurs at the contact surfaces (separating surfaces) between the support tops at the vessel deck and the associated deck bottom structure. Most systems and methods in prior art for floatover installations intend to introduce different systems or devices at these two above-mentioned surfaces.
Several methods and systems have been introduced in the prior art. U.S. Pat. No. 4,662,788 to Kypke et al., issued May 5, 1987, describes two different stiffness springs with the second spring rate higher than the first one at the mating surfaces to improve the mating operation. U.S. Pat. No. 4,729,695 to Silvestri, issued Mar. 8, 1988, describes a deck to substructure load transfer system, at both mating surfaces and separating surfaces, wherein hydro-pneumatic jacks and hydraulic lift cylinders, respectively, are used to raise and then lower the deck downwardly extending legs to the substructure upwardly extending legs. U.S. Pat. No. 4,761,097 to Turner, issued Aug. 2, 1988, describes a system at mating surfaces with a spud can and a sand pin for absorbing shock loading during the mating operation. At the separating surfaces, drop block assemblies, an active system, are introduced to create an immediate gap between the contact surfaces. U.S. Pat. No. 4,848,967 to Weiler, issued Jul. 18, 1989, describes a deck to substructure transfer system at mating surfaces wherein each of the deck leg includes a hydro-pneumatic cylinder and piston type actuator, producing different spring stiffness rates, in addition with stacked elastomeric disks which are compressed between the cylinders and the deck legs. At the separating surfaces, drop block assemblies are introduced to create an immediate gap between the contact surfaces. U.S. Pat. No. 4,930,938 to Rawstron et al, issued Jun. 5, 1990, describes a system at mating surfaces with primary and secondary load transfer devices and with stacked elastomeric elements. At the separating surfaces, drop block assemblies, an active system, are introduced to create an immediate gap between the contact surfaces. U.S. Pat. No. 5,219,451 to Datta et al, issued Jun. 15, 1993, describes a system at mating surfaces with plural spaced-apart annular elastomeric elements. At separating surfaces, elastomeric shock-absorbing pads, a passive system, are utilized to reduce the impact loads during the separating phase of the floatover installation. U.S. Pat. No. 5,522,680 to Hoss et al, issued Jun. 4, 1996, describes a hydraulic system at mating surfaces with cylinder and plunger assemblies and with controllable flow rates and directions. At separating surfaces, removable raft assemblies, an active system, are utilized to create quick gaps during the separating phase of floatover installations. This method and system aim to perform a floatover installation in swell conditions wherein the vessel is under high swell induced heave motions. One advantage in this method is that these expensive hydraulic cylinders and plungers can be reused for other floatover applications.
In any floatover installation methods and systems, the governing issue is how to overcome the barge heave motions during the mating phase and during the separating phase. Vessel heave motions are caused primarily by significant wave heights (Hs) and peak wave periods (Tp). In a calm water condition for a floatover installation operation with a defined wave height Hs, the Tp is usually in a small range (5˜8 seconds) and the wave length is usually much less than the length of a floatover vessel. Under such conditions, the vessel maximum heave motion is usually less than 0.5 m (about 1.5 ft). Swells are long period waves (Tp about 10˜14 seconds) generated from a long distance away. The wave length of a swell is much greater than the length of a floatover vessel and the vessel heave natural period is usually in the range of 10˜12 seconds, very close to the Tp of swells. Therefore, the heave motions of a floatover vessel under swells are usually very high (0.5˜1.2 m, about 1.5 ft˜4 ft).
Over the last 30 years in offshore installation fields, more than 50 floatover installations have been successfully conducted. Different types of methods have been utilized and compared. Finally, two basic types of floatover methods have gained offshore industry general acceptance. The High-Deck method has been employed in the majority of successful floatover installations so far under open calm water conditions. Under swell conditions, the Uni-Deck method with an active hydraulic jacking system has been employed on the majority of successful floatover installations. The advantages and disadvantages of these two floatover installation methods are described below:
Therefore there is a need for a simple, inexpensive and reliable system capable of performing floatover installation in all environmental conditions including both calm water conditions and well conditions.
A pneumatic load-transfer system and method for mating an integrated deck with a pre-installed platform substructure using a special type of air bags, called launching air bags (SLAB), is disclosed herein.
The pneumatic load-transfer system disclosed herein is a passive system capable of performing a floatover installation in both swell conditions and calm water environments with high reliability. The disclosed system is less expensive comparing with existing floatover methods. The major improvement of the present disclosure is to provide a pneumatic system at separating surfaces to perform multiple functions such as deck heave motion reduction, air gap enhancement, shock absorbing and the ability to adjust vertical support stiffness easily.
In accordance with one aspect of the present disclosure, the system provides a layer of air pads composed of a plurality of SLABs between the tops of supports at a vessel deck and the bottom surfaces of a platform deck. When air is injected to all SLABs at the same time and with the same pressure, these SLABs can be expanded to lift the deck upwardly generating an air gap quickly between the supports and the deck. The layer then becomes a spring in a series arrangement with the water plane spring acting at the floatover vessel. Once the air gap is stabilized, the deck will achieve a stable heave motion by its own and telescopic sleeves are installed between the upper covers of these SLABs and the bottom covers of these SLABs to ensure the stability of the deck against wind induced forces, during its own heave motions. Two favorable consequences are resulted to the deck heave motions: 1) a relative heave motion is created between the deck and the vessel to cause the reduction of relative heave motions between the deck and the re-installed substructure at mating surfaces; 2) the dynamic inertial force, generated by the relative heave motions between the deck and the vessel, can be utilized to reduce the vessel heave motion with a proper adjustment of the stiffness of this layer of air pads.
In accordance with another aspect of the present disclosure, the stiffness adjustability of the layer of SLAB air pads can be utilized to suit different environmental conditions at an installation site. Based on the site existing environmental conditions (Hs and Tp), the stiffness of the layer can be adjusted to achieve a minimum heave motion of the deck under the site waves, relative to the installed substructure and prior to the entering of the substructure slot. In this manner, expensive LMUs in a traditional High-Deck method could be replaced with inexpensive sand cans and most floatover installation related apparatuses can be reused for other floatover applications to further reduce the total floatover installation system costs.
In accordance with a further aspect of the present disclosure, the system is a simple and passive system without the employment of powerful hydraulic systems and other mechanical devices. The load transfer process, both in mating and separating phases, is conducted through the combination of a simple ballasting operation and a simple set of air releasing/injecting operations. Therefore, the reliability of the whole system is improved significantly, especially for the separating operation where any steel-to-steel contact is NOT allowed. With the improvement of the system reliability, the safety of the associated floatover installation is also improved.
The above-mentioned superior features and advantages of the present disclosure, together with other important aspects thereof will be further appreciated by those skilled in the art upon reading the detailed description which follows in conjunction with these drawings listed below.
The drawings described herein are for illustrating purposes only of selected embodiments and not all possible implementations, and are not intended to limit the scope of the present disclosure. For further understanding of the nature and objects of this disclosure reference should be made to the following description, taken in conjunction with the accompanying drawings in which like parts are given like reference materials, and wherein:
Shipbuilding in sand beaches started in 1980's in Southern China. Builders place wood blocks on sand beach and start ship construction on the tops of these blocks with the utilization of land cranes. When the construction is complete, a special type of air bags, Ship Launching Air Bags (SLAB), is placed under the ship keel longitudinally between two rows of wood blocks. Injecting air to these SLABs and the whole ship can be lifted off these wood blocks. After the lifting operation, these wood blocks can be then removed off the ship keel. Once cutting holding lines, the ship will be moved toward the sea along with the rolling of these SLABs.
The ship launching method described above has been successfully used in China for over 20 years. Recently, the applications of SLAB have expanded to other areas, such as ship salvages and a floatation tool for the transportation of a large concrete structure for a bridge. Over the years, SLABs have become a mature, reliable and off shelf product in shipbuilding industry with excellent characteristics, such as light in weight, durable, scratch resistant, and tolerant of high internal pressure, etc. Specifications of SLAB fabrications and ship launching operations using SLABs in shipbuilding industry have been widely published.
The back end cone section does not have the pressure meter or the air valve. The middle section and the surfaces of the two end sections are covered with nature rubbers mixed with several layers of polyester nets. With this assembly, each SLAB 100 becomes a flexible pressure vessel.
When the air bag is assembled, it will be put into a sealed container with high temperature for a designed duration with a vulcanization process to make the rubber layers tightly bonded with the cone steel surfaces at two ends and the rubbers bonded with the layers of polyester nets at the middle section.
SLAB is a mature product and it has several unique characteristics suitable for floatover installation applications:
Embodiments of the present disclosure utilize multiple SLABs to form a layer of air pads at the separating surfaces. Instead of using multiple supports with a concentrated load at each of these separating surfaces, this layer of SLAB air pads provides a uniform load distribution over a large area of the deck bottom surfaces. This layer of SLAB air pads provides several functions during the mating and the separating phases of a floatover installation: 1) to function as a lift cylinder to elevate the deck to create sufficient air gaps at mating surfaces; 2) to function as a motion-damper spring with adjustable spring rates to reduce deck relative heave motions relative to the pre-installed substructure and as a shock-absorbing spring to reduce impact loads at both at the mating surfaces and at the separating surfaces; 3) to function as a retractable support to generate an air gap quickly, through releasing the air inside all SLABs at the same time, at the separating surface.
Air injection to all SLABs at the same time requires a large value of compressed air within a short time period. Therefore, a pressure vessel is usually required as an accumulator to provide an accurate air pressure to each SLAB during the floatover operation. During the air releasing, a designed system should be able to stop air releasing when a designed air pressure is reached.
Swells are usually directional. Therefore, the orientation of a jacket under a swell environment is designed accordingly to suit the swell directions. In a normal environment for a floatover installation, a designer should consider waves from all directions. In a swell environment, a designer usually consider a small range of headings based on the swell dominate directions, usually a heading sea plus+/−30 degrees.
Referring now to
After the transport vessel arrives at an installation site, a floatover installation operation will have to wait for a weather window suitable for installation. Once a suitable weather window is confirmed, the floatover installation operation will commence with a proper ballasting of the vessel 210 to a design draft and trim. Air will then be injected into all SLABs 100 in the layer of air pads 110 quickly to a preset air pressure level, as a result, the deck 220 is then lifted to a height with motions relative to the vessel deck 212, as shown in
In accordance with one embodiment, a motion monitoring system is installed at the vessel deck 212 to monitor the relative motions between the deck 220 and the pre-installed jacket 200 at mating surfaces 204 and between the deck 220 and the vessel deck 212. The spring rate of the layer of air pads 110 is dependent on the internal pressure of these SLABs 100. The higher the air pressure, the higher the vertical stiffness. In order to achieve a minimal relative motion between the deck 220 and the pre-installed jacket mating surfaces 204, air in SLABs 100 may be initially injected to a preset pressure level higher than the desired internal air pressure for the intended mating operation. After the relative motions are stabilized, internal air of the SLABs 100 could be released slowly and the vertical stiffness of the layer of air pads 110 is gradually reduced until a minimal relative motion is achieved.
Referring to
On the right side of the housing 113, there is a telescopic device 116 between the upper cover 111 and the lower cover 112. The telescopic device 116 helps to maintain the stability of the deck during the lifting/lowering and under the loads of winds during the relative vertical motions of the upper cover 111 and the lower cover 11. On the left side of the housing 113, clip plates 118 are utilized to tie the upper cover 111 and the lower cover 112 together during the transportation.
In
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Although a preferred embodiment of a system and method in accordance with the present invention have been described herein, respectively, those skilled in the art will recognized that various substitutions and modifications may be made to the specific features described without departing from the scope and spirit of the invention as recited in the appended claims.
The present invention has been described in terms of specific embodiments incorporating details to facilitate the understanding of principles of construction and operation of the invention. Such reference herein to specific embodiments and details thereof is not intended to limit the scope of the claims appended hereto. It will be readily apparent to one skilled in the art that other various modifications may be made in the embodiment chosen for illustration without departing from the spirit and scope of the invention as defined by the claims.