This application claims the priority benefit of Chinese Application No. 201910187168.0, filed Mar. 13, 2019 in Chinese, under 35 U.S.C. ยง 119, which is hereby incorporated by reference.
The present invention relates to the technical field of pneumatic vibration loading systems, and in particular to a portable pneumatic loading system for simulating the operation of a subway train.
To deal with the increasingly prominent traffic jam problem, urban rail transit has been highly appraised as an efficient solution, greatly facilitating residents' life. As one of important facilities for modern urban traffic, the rail transit plays an important role in relieving the traffic pressure on the ground and realizing the sustainable development of urban economy and society, and has become a hotspot for local government investment. Newly-built subway lines in many cities in China will be opened soon. But, how to ensure the successful trail operation of new lines has become an important topic discussed by subway companies.
With the operation of many subway tunnels, it is found that the environmental vibration and noise caused by subway traffic will influence the daily work, life and rest of residents, result in the structural damage or construction damage to buildings, interfere with the normal use of special functional buildings such as hospitals, opera houses and laboratories, and influence the normal operation of precise instruments and devices. Therefore, the problems caused by the vibration of subway trains have attracted more and more attention. Researches on the influence of the vibration of subways on rails, foundations, tunnel walls and surface buildings during the trail operation and normal operation of the subways have been widely carried out.
At present, for most of the experimental devices for such researches, simulation is carried out by automatic drop hammer experiments or experiments are carried out during the actual operation of the subways. It is difficult to determine the magnitude and frequency of the impact force and such a method is not simple enough.
Therefore, there is an urgent need for a set of impact loading devices that can output a definite impact force and can adjust the magnitude and frequency of the impact force to simulate the real vibration characteristics of the subway, thereby providing a new means for subway vibration tests and researches, especially for on-site train vibration monitoring and indoor test and research simulation.
An object of the present invention is to provide a portable pneumatic loading system for simulating the operation of a subway train, which simulates real vibration characteristics of subways and can output the magnitude and frequency of the impact force.
For this purpose, the present invention employs the following technical solutions.
A portable pneumatic loading system for simulating the operation of a subway train is provided, comprising a control cabinet, a powered air station and an air cylinder, wherein a proportional directional valve is disposed between the control cabinet and the powered air station, the control cabinet is connected to the powered air station through an air inlet pipe, and the powered air station is connected to the air cylinder through a hose;
a PLC (programmable logic controller), a switching power supply and a guide rail are arranged in the control cabinet; the PLC and the switching power supply are connected through signal lines to a wiring terminal fixed on the guide rail; a door switch is arranged on the control cabinet, five through holes are formed on a door of the control cabinet, and a frequency regulating knob, an emergency stop switch, a main start button, a power start button and a power indicator are embedded in the through holes, respectively; the frequency regulating knob, the emergency stop switch, the main start button and the power start button are connected to the PLC through signal lines, respectively; the power indicator is connected to the switching power supply through a signal line; and a signal line led out from the top of the control cabinet is connected to the proportional directional valve; and
the air cylinder is connected to the proportional directional valve through a hose; the air cylinder is fixed on air cylinder fasteners through bolts and connected to air cylinder brackets through angle iron; the air cylinder brackets are connected to each other through angle iron; and, lower ends of the air cylinder brackets are detachably connected to subway rails through steel rail fasteners.
Further, a flow regulating valve is arranged on the air inlet pipe.
Further, a pressure sensor is connected to an air inlet of the air cylinder through a three-way connector.
Further, the PLC, the switching power supply and the guide rail are fixed on an inner wall of the control cabinet, respectively, and the wiring terminal is buckled on the guide rail through a buckle.
Further, the proportional directional valve is connected to an upper lid of the control cabinet through a directional valve fastener.
Control of the output frequency: by controlling the setting of a timer inside the PLC, a reversing frequency of a pneumatic reversing valve, i.e., a time interval of movement of the air cylinder, is controlled so as to control the output frequency of the air cylinder. The timer is set as one impact every 2.5 S. That is, all requirements for the impact frequency can be satisfied by changing parameters.
Compared with the prior art, the present invention has the following advantages.
In the portable pneumatic loading system for simulating the operation of a subway train provided by the present invention, the device is light, flexible and portable, and can enter subway tunnels under various working conditions; the design is novel and reasonable, the operation is simple, and the actual engineering operation is highly feasible; the impact force and impact speed that are adjustable in magnitude and frequency can be output, the actual operation process is more rigorous, and the on-site adjustment process is more visible; and, the vibration conditions during the subway operation are simulated on site and in laboratories in a more reliable way, which provides more convenient conditions for vibration signal detection and subsequent researches.
Compared with a hydraulic system, the pneumatic system of the present invention uses air as a power source, so the energy source is readily available and inexhaustible, the cost for purchase, storage and transportation of media is saved, and the energy source is clean, safe and pollution-free. The combination of the control cabinet with the impact part of the air cylinder makes the disassembly and assembly easy, and the whole device is light and portable and suitable for various working conditions. With the use of the pneumatic system as a power part, the pressure loss is low, the system responds rapidly and acts quickly, the maintenance is simple, and it is less likely to block the system pipelines. The pneumatic system has good adaptability to the working environment, and has higher safety and reliability than the hydraulic system particularly when it operates in harsh underground working environments such as dusty and vibratory environments.
The embodiments of the present invention will be further described below in detail with reference to the accompanying drawings.
As shown in
As shown in
The proportional directional valve 15 is disposed between the control cabinet 14 and the powered air station 2, and the control cabinet 14 is connected to the powered air station 2 through the air inlet pipe 16. The flow regulating valve 17 used for controlling or limiting the pressure of air passing through the main air pipe is arranged on the air inlet pipe 16.
As shown in
Control of the output frequency: by controlling the setting of a timer inside the PLC, a reversing frequency of a pneumatic reversing valve, i.e., a time interval of movement of the air cylinder, is controlled so as to control the output frequency of the air cylinder. The timer is set as one impact every 2.5 S. That is, all requirements for the impact frequency can be satisfied by changing parameters.
By using the portable pneumatic loading system for simulating the operation of a subway train, the loading test is implemented by the following steps.
Step S1): The air cylinder 4, the air cylinder brackets 5 and other devices are mounted on a subway rail to be tested, and the subway rail is clamped and fixed by steel rail fasteners 26.
Step S2): The control cabinet 14 is connected to the powered air station 2 through the proportional directional valve 15 and the air inlet pipe 16, and the air cylinder 4 is connected to the powered air station 2 through the hose 1. The control cabinet 14 is powered on, the regulating knob on the flow regulating valve 17 is rotated counterclockwise until it cannot be rotated any more, and the powered air station 2 is activated to ensure the normal operation of the powered air station.
Step S3): Upper and lower pressure limits of the powered air station 2 during this impact are set according to specific test requirements, that is, the rated operating pressure of the system is set.
Step S4): The main start button 11 on the control cabinet 14 is pressed down; if the power indicator 13 lights, it is indicated that the control circuit is normal; then, the power start button 12 is pressed down, and the proportional directional valve 15 begins to operate at the initial set frequency; and, the impact speed of the system is changed by changing the size of the opening of the flow regulating valve 17.
Step S5): The loading experiment is actually simulated, the power supply is turned on, the powered air station 2 is activated, and the control signal of the proportional directional valve 15 is set by the control cabinet 114. The control signal may be set according to different vibration modes, and the control signal may be sine wave, square wave and the like. The frequency may be controlled by the frequency regulating knob to realize variable frequency control.
Step S6): At the end of the simulation experiment, the control signal is stopped, and the regulating knob is rotated to close and cut off the control signal.
Step S7): The powered air station 2 is deactivated, the power supply is turned off, and the power supply to the whole control cabinet 14 is finally cut off.
Step 8): The fixation bolts are unscrewed, the steel rail fasteners 26 are detached, the fixed air cylinder 4 is disassembled from the subway rails, the experimental site is cleaned, and the experimental devices are placed properly. So far, the experiment ends.
The foregoing description merely shows the preferred implementations of the present invention. It should be noted that, to a person of ordinary skill in the art, various improvements and modifications may be made without departing from the concept of the present invention, and these improvements and modifications shall be deemed as falling into the protection scope of the present invention.
Number | Date | Country | Kind |
---|---|---|---|
201910187168.0 | Mar 2019 | CN | national |
Number | Name | Date | Kind |
---|---|---|---|
20150316458 | Logan | Nov 2015 | A1 |
20170197646 | Shubs, Jr. | Jul 2017 | A1 |
20190078967 | Fritsch | Mar 2019 | A1 |
Number | Date | Country | |
---|---|---|---|
20200292412 A1 | Sep 2020 | US |