FIG. 1 is a perspective view of a power and data center showing our new design in a fully-closed configuration;
FIG. 2 is another perspective view of the power and data center, shown in a partially-open configuration;
FIG. 3 is another perspective view of the power and data center of FIG. 2;
FIG. 4 is another perspective view of the power and data center, shown in another partially-open configuration;
FIG. 5 is another perspective view of the power and data center, shown in another partially-open configuration;
FIG. 6 is another perspective view of the power and data center, shown in a fully-open configuration;
FIG. 7 is a top plan view of the power and data center of FIG. 1;
FIG. 8 is a bottom plan view of the power and data center of FIG. 1;
FIG. 9 is a right side elevation of the power and data center of FIG. 1;
FIG. 10 is a left side elevation of the power and data center of FIG. 1;
FIG. 11 is a front end elevation of the power and data center of FIG. 1;
FIG. 12 is a rear end elevation of the power and data center of FIG. 1;
FIG. 13 is a top plan view of the power and data center of FIGS. 2 and 3;
FIG. 14 is a bottom plan view of the power and data center of FIG. 2;
FIG. 15 is a right side elevation of the power and data center of FIG. 2;
FIG. 16 is a left side elevation of the power and data center of FIG. 2;
FIG. 17 is a front end elevation of the power and data center of FIG. 2;
FIG. 18 is a rear end elevation of the power and data center of FIG. 2;
FIG. 19 is a top plan view of the power and data center of FIG. 6;
FIG. 20 is a bottom plan view of the power and data center of FIG. 6;
FIG. 21 is a right side elevation of the power and data center of FIG. 6;
FIG. 22 is a left side elevation of the power and data center of FIG. 6;
FIG. 23 is a front end elevation of the power and data center of FIG. 6; and,
FIG. 24 is a rear end elevation of the power and data center of FIG. 6.
The broken lines in the figures represent unclaimed environment only and form no part of the claimed design.