The present application claims priority from Japanese application serial no. 2014-121033, filed on Jun. 12, 2014, the content of which is hereby incorporated by reference into this application.
The present invention relates to a power converter that is interconnected between an electric power system and a storage battery and performs AC-DC conversion, and more particularly relates to a power converter that includes a capacitor as a part of the power converter itself and an appropriate function for initially charging the capacitor.
In recent years, distributed power sources utilizing natural energies and power storage systems including power storage means represented by a storage battery have been widely introduced. These distributed power sources and power storage systems internally include power storage devices and store electric power in the form of DC power. Electric power stored in a power storage device is converted into AC electric power having an interconnected power system frequency by a self commutated power converter, and sent out to the electric power system. In addition, power supplied by the electric power system is converted into DC electric power by the self commutated power converter, and stored in the power storage device.
A self commutated power converter includes an inverter that performs AC/DC conversion and a DC circuit, and the DC circuit includes a capacitor. Furthermore, a DC breaker is disposed between a distributed power source or a power storage system and the self commutated power converter, and while the self commutated power converter is in a halt state, the DC breaker is opened.
When the DC breaker is switched on and the distributed power source and the power storage system are connected to the self commutated power converter at the time when the self commutated power converter starts running, an excessive rush current is induced in the capacitor of the DC circuit, which could lead to the damages to these devices. This rush current arises owing to the potential difference between the voltage of the inverter side of the capacitor and the voltage of the distributed power source or the voltage of the power storage device of the power storage system, and the larger the potential difference between both terminals is, the larger the rush current is.
As one of measures against the above problem owing to the initial charging of the capacitor, Japanese Unexamined Patent Application Publication No. Hei8(1996)-126339 discloses a technique in which a switch and an electromagnetic switch having a resistor, both of which are connected in series, are disposed between a distributed power source or a power storage system and a self commutated power converter. The switch is switched on at the time when the self commutated power converter starts running, and the distributed power source or the power storage system is connected to the self commutated power converter via the resistor, and subsequently the electromagnetic switch having the resistor are switched on. Therefore, when the switch is switched on, a current limited by the resistor flows through the capacitor, which decreases the potential difference between both terminals, with the result that an excessive rush current can be prevented from occurring.
According to Japanese Unexamined Patent Application Publication No. Hei8 (1996)-126339, although it is possible to decrease the potential difference between both terminals using a limiting resistor, it is necessary to install a switch and an electromagnetic switch having a resistor, therefore there arises a problem in that the number of necessary parts are increased, and the power converter grows larger and more complex.
The present invention was achieved with the above-mentioned problem in mind, and one of the objects of the present invention is to provide a power converter with a simple configuration that is capable of controlling a rush current.
In order to solve the above problem, a power converter according to the present invention is installed between an electric power system and a power storage device, includes a harmonic filter in an AC circuit on the electric power system side and a DC capacitor and a DC breaker in a DC circuit on the power storage device side, and performs AC/DC conversion using an inverter. In addition, the power converter is configured in such a way that, when the power storage device starts running, a current limited by a limiting resistor is given from the electric power system side to the DC capacitor, the inverter is controlled so that the difference between the voltage of the DC capacitor and the voltage of the power storage device decreases after the starting of inverter's switching, the difference between the voltage of the DC capacitor and the voltage of the power storage device is monitored, and the power converter is connected to the power storage device by switching on the DC breaker on the basis of the monitored difference.
In the power converter according to the present invention, because the above limited current is applied to the DC capacitor, the difference between the voltage of the capacitor and the voltage of the power storage device is monitored, and the power converter is connected to the power storage device on the basis of the monitored difference, a rush current, which could occur in the start process from the time when the DC capacitor is initially charged and to the time when the power converter is connected to the power storage device, can be prevented from occurring. In particular, it is possible to control the rush current using the simple configuration of the power converter.
Embodiments of the present invention will be described in detail with reference to the accompanying drawings hereinafter.
The main circuit section 1A includes an inverter INV as a main component, and AC/DC conversion and frequency conversion are performed in this main circuit section 1A. A DC circuit is formed on the power storage device Bt side of the inverter INV, and the DC circuit includes a DC breaker CBd. The DC breaker CBd is switched on when it is judged that charging a DC capacitor inside the inverter INV is completed, wherein the inverter INV in
An AC circuit is formed on the electric power system G side of the inverter INV, and the AC circuit includes a harmonic filter F for smoothing. The harmonic filter F is used for decreasing the amount of a harmonic current that flows out from the inverter INV to the electric power system G. Furthermore, the AC circuit includes an AC switch Swa and a series circuit composed of an initial charging resistor Rs and an initial charging switch Sws, wherein the series circuit is connected to the AC switch Swa in parallel. The initial charging resistor Rs is used for preventing an excessive rush current from flowing into a filter capacitor FC included in the harmonic filter F and the DC capacitor CD in the inverter INV when the filter capacitor FC and the DC capacitor CD are initially charged, wherein the filter capacitor FC and the DC capacitor CD will be shown later in
A controller C in the control unit 1B takes in current signals and voltage signals from various places of the main circuit section 1A in order to give control signals to various places of the main circuit section 1A. These are interconnection point voltages (a line voltage VSUV, a line voltage VSVW) taken in from voltage detectors PT on the electric power system G side, inverter output currents ISU and ISW taken in from inverter output current detectors CTI, a DC voltage VDC taken in from a DC voltage detector PTd installed in the DC circuit, a storage battery voltage VDB taken in from a battery voltage detector PTb, and the like.
Furthermore, the controller C in the control unit 1B gives the control signals S to various places of the main circuit section 1A as results of judgment and calculation processing using the above input. These are an ON/OFF command S1 to the initial charging switch Sws, an ON/OFF command S2 to the AC switch Swa, an ON/OFF command S3 to the DC breaker CBd, and a gate signal S4 to the inverter INV, and the like.
The inverter INV, which is adaptable to the first embodiment, includes the DC capacitor CD and six IGBT modules IGBT. The inverter INV outputs a three-phase AC voltage, and two IGBT modules IGBT connected in series provide a circuit for one phase component of the three-phase AC voltage. The DC capacitor CD is provided on the DC side of the inverter INV, and a voltage across the capacitor CD is an inverter DC voltage. An IGBT module IGBT is a module including an IGBT and a diode both of which are connected in antiparallel to each other.
In the configuration shown in
In the start sequence of the present invention, an AC breaker (not shown) is switched on manually at the time t0 first. Here, the AC breaker is disposed on the electric power system side of the main circuit section 1A. In addition, at the time t0, the switching means such as the AC switch Swa, the initial charging switch Sws, and the DC breaker CBd are in their open states respectively, and the gate signal S4 has not been applied to the inverter INV yet.
Initial charging during the start time period of the power converter is started by switching on the initial charging switch Sws at the time t1. As a result, a circuit route from the initial charging switch Sws to the DC capacitor CD via the initial charging resistor Rs, the harmonic filter F for smoothing, and the IGBTs (the antiparallel diodes) inside the inverter INV is formed, and the DC voltage VDC across the DC capacitor CD gradually increases owing to the current limited by the initial charging resistor Rs.
The initial charging switch Sws is opened at the time t2 when the DC voltage VDC reaches an initial charging completion threshold voltage. Subsequently, the AC switch Swa is switched on instead at the time t3 just after the time t2. As a result, a circuit route from the AC switch Swa to the DC capacitor CD via the harmonic filter F for smoothing and IGBTs inside the inverter INV is successively formed. Furthermore, at the time t4 just after the time t3, the gate signal S4 begins to be applied to the inverter INV. During the time period of this series of changing-over operations, the DC voltage VDC across the DC capacitor CD slightly increases.
With regard to the sequence operation after the time t4, a means for preventing an excessive current at the time of switching on the DC breaker from occurring, which is a novel aspect of the present invention, will be described. After the time t4, the DC voltage VDC across the DC capacitor CD is controlled by the gate signal S4 input into the inverter INV. In inverter control at this time, the voltage of the storage battery Bt (storage battery voltage VDB) is measured, and the voltage control is performed with a switch-on threshold voltage of the DC breaker CBd, which is set to be a little lower than the storage battery voltage VDB, used as a target. To put it concretely, the voltage control is performed with a DC voltage command value set as the storage battery voltage VDB. This control is continued during the time period from the time t4 to the time t5 when the DC voltage VDC reaches the switch-on threshold voltage of the DC breaker CBd, and when the DC voltage VDC reaches the switch-on threshold voltage, the DC breaker CBd is switched on. As a result, the difference between the DC voltage VDC of the DC capacitor CD and the storage battery voltage VDB becomes a very little, which prevents an excessive current owing to the switching-on of the DC breaker CBd from occurring. At the time t6 after the DC breaker CBd is switched on, the control by the inverter INV is performed so that the electric power system G freely accommodates the power storage device with electric power and vice versa.
The controller C shown in
In the initial charging calculation unit Seq1, the switch-on of the AC breaker is detected by an AC breaker switch-on detection unit b1 first, and then a switch-on signal S1ON of the initial charging switch Sws is output . In addition, the initial charging calculation unit Seq1 monitors the DC voltage VDC, and when the DC voltage VDC reaches the initial charging completion threshold voltage shown in
In the charging calculation unit Seq2, after the switch-on command S2ON to the AC switch Swa is received, the inverter control is performed with the switch-on threshold voltage of the DC breaker CBd used as a target. In order for the voltage control to be performed, the DC voltage VDC across the DC capacitor CD and the storage battery voltage VDB are taken in by the initial charging calculation unit Seq1 on a steady basis, and the voltage difference between these voltages is calculated by a subtracter b4. The above-mentioned gate signal calculation unit includes a voltage command calculator b8 and a gate signal calculator b6. Although the concrete processing contents performed by this gate signal calculation unit will be explained later with reference to
In addition, the voltage difference between the DC voltage VDC of the DC capacitor CD and the storage battery voltage VDB is input into a voltage judgment unit b5, and the detection flag is output by the voltage judgement unit b5 in comparison with the switch-on threshold voltage of the DC breaker CBd when the DC voltage VDC reaches the switch-on threshold voltage. The breaker control signal calculation unit b7 issues a switch-on command S3ON to the DC breaker CBd in response to the detection flag in order to switch on the DC breaker CBd. In the operation of the sequence processing unit Seq hereinafter, the control by the inverter INV is performed so that the electric power system freely accommodates the power storage device with electric power and vice versa. In the above description, the initial charging means an operation in which the capacitor is charged with a current flowing through the initial charging resistor Rs.
In
On the other hand, the phase calculator 104 calculates interconnection point voltage phases from the connection point phase voltages (VSU, VSV, and VSW). On the other hand, the outputs of the phase calculator 104 are input into the d-q converter 102, a d-q converter 107, and an inverse d-q converter 115. The d-q converter 102 takes in the interconnection point voltage α component, the interconnection point voltage β component, and the interconnection point voltage phases that are outputs from the phase calculator 104, and converts the interconnection point voltages into a d-axis component and a q-axis component. The outputs of the d-q converter 102 are input into a power calculator 109. Through the above processing, the main circuit voltages are converted from three-phase components into two-phase components, and then the two-phase components are converted into d-q axis components.
In
In addition, the voltage difference VDCDEF between the DC voltage VDC across the DC capacitor CD and the storage battery voltage VDB shown in
Furthermore, the power calculator 109 receives the d-axis component and q-axis component of the interconnection point voltages and those of the output currents, and outputs an active power PS and a reactive power QS. The output active power PS of the power calculator 109 is input into a subtracter 117, and the output reactive power QS is input into a subtracter 110. On receiving a reactive power command value QREF and a reactive power QS from the power calculator 109, the subtracter 110 outputs a reactive power difference. On receiving the reactive power difference, a reactive power control unit 111 outputs a reactive current command value IQREF. The output IQREF is input into a subtracter 113.
On receiving the output current d-axis component and the active current command value, the subtracter 112 outputs a difference IDDEF. The output difference IDDEF is input into a current controller 114. Furthermore, on receiving the output current q-axis component and the reactive current command value IQREF, the subtracter 113 outputs a difference
IQDEF. The output difference IQDEF is input into the current controller 114.
According to the control shown in
Although the above description has been made about the control sequence to the time when the power storage device is interconnected, wherein the DC voltage control unit 108 calculates the active current command value IDREF, and performs output voltage control, an operation mode changing-over switch 119 is changed over in accordance with a DC breaker on-off state signal CB_Ans after the DC breaker CBd is switched on. At this time, an active power command value PREF transmitted from the upper level system and the output active power PS from the power calculator 109 are input into a subtracter 117, and the subtracter 117 outputs an active power difference. An active power control unit 118 receives the active power difference, and outputs the active current command value IDREF. In the case of the normal operation of the power converter 1, the active power control unit 118 calculates the active current command value IDREF, and performs output voltage control.
According to the first embodiment of the present invention that has been described so far, because the limited current is applied to the DC capacitor, the difference between the voltage of the capacitor and the voltage of the storage battery is monitored, and the power converter is connected to the power storage device on the basis of the monitored difference, a rush current, which could occur in the start process from the initial charge to the connection of the power storage device, can be prevented from occurring.
In the case of a second embodiment shown in
The start circuit is a series circuit formed between an electric power system G and a DC capacitor CD and a circuit route formed by this series circuit does not pass through an inverter. An AC switch Swa, a transformer TR, a rectifier SR, and an initial charging resistor Rs are disposed in the series circuit as the start circuit in this order from the electric power system G side. Because a start control technique in the case of the configuration of this second embodiment is the same as in the case of the configuration of the first embodiment, explanations thereof will be omitted.
According to the second embodiment of the present invention that has been described so far, because the limited current is applied to the capacitor, the difference between the voltage of the capacitor and the voltage of the storage battery is monitored, and the connection of the power storage device is performed on the basis of the monitored difference, a rush current, which could occur in the start process from the initial charge to the connection of the power storage device, can be prevented from occurring. In addition, there is such an advantage that the inverter can be started without introducing an over modulation by adjusting the turn ratio of the transformer TR. Particularly, in the case where there is an existing start circuit, the power converter according to this embodiment can be realized without installing new incidental facilities.
In the case of a third embodiment shown in Fig . 7, a power storage device Bt that is a target to which the present invention is applied comprises a battery unit BTU.
In an example shown in
To put it concretely, as shown in
The controller C according to the third embodiment has to perform start control even when the battery breaker CBb1 is off owing to the replacement of the storage batteries BT1, or BT2 or the like. In this case, because the voltage of the storage battery BT1 and that of the storage battery BT2 are different from each other, there is a possibility that an excessive current flows from the storage battery BT1 to the storage battery BT2 and an inverter when the battery breaker CBb1 is switched on, which may lead to damages to the storage batteries and the inverter.
After the breaker CBb1 is switched on, the on-off state signal CBb1_Ans of the breaker CBb1 is received via communication and input into an operation mode changing-over switch, which changes over the operation mode into inverter control in accordance with the calculation performed by an active power control unit as described in the first embodiment.
According to the above described third embodiment of the present invention, because the limited current is applied to the capacitor, and because the difference between the voltage of the capacitor and the voltage of the storage battery is monitored and the connection of the power storage device is performed on the basis of the monitored difference, a rush current, which could occur in the start process from the initial charge and to the connection of the power storage device, can be prevented from occurring. Particularly, in the case where a storage battery is a large-sized facility, and parts of the storage battery have to be installed in a distributed fashion, the third embodiment of the present invention can be preferable.
Number | Date | Country | Kind |
---|---|---|---|
2014-121033 | Jun 2014 | JP | national |