This application is based upon and claims the benefit of priority from Japanese Patent Applications No. 2022-111307, filed Jul. 11, 2022, the entire contents of which are incorporated herein by reference.
Embodiments described herein relate generally to a power distribution system, a power transaction system, and a power system operating system.
There is a load shedding system that cuts off power supply to a power distribution area connected to a feeder by an under frequency relay (UFR) installed for each feeder of a substation in a power system when supply and demand become tight even after a power saving request such as a demand response due to a sudden change in temperature or an unplanned stop of a large power plant so that the system stability deteriorates.
Further, when the supply and demand is tight, it is also examined to divide the power distribution area into several groups and perform a planned power outage before a system power outage.
In a case where set values (for example, frequencies) at which under frequency relays installed in a plurality of substations operate are set to be the same, loads are simultaneously shed in the plurality of substations when the frequency is greatly reduced due to a system accident, a disaster, or the like. Then, there is a problem that the power supply exceeds the demand, the system frequency rises more than expected, and an over frequency relay (OFR) of the power plant operates to cause the system power outage.
Further, UFRs with a frequency change rate element (df/dt) function also operate at the same time when set values are the same. Then, there is a problem that the power supply exceeds the demand, the system frequency rises more than expected, and the over frequency relay (OFR) of the power plant operates to cause the system power outage.
Further, the planned power outage based on the grouping also has a problem that the planned power outage is not performed in time due to unexpected supply and demand tightness due to a disaster or the like.
Embodiments will be described hereinafter with reference to the accompanying drawings.
In general, according to one embodiment, a power distribution system includes a plurality of switchgear units and a power system operating system. The plurality of switchgear units are interposed between a feeder connected to a substation and a plurality of power distribution areas. The power system operating system that is capable of communicating with the plurality of switchgear units and is configured to control power supply to the plurality of power distribution areas via the plurality of switchgear units. The power system operating system is configured to set any one of an allowable frequency, an allowable frequency change rate, and an allowable response time for at least two switchgear units among the plurality of switchgear units based on priority orders assigned to the plurality of power distribution areas. Each of the at least two switchgear units: cuts off a power supply path between the feeder and the power distribution area when a frequency of power on the feeder falls below the allowable frequency in a case where the allowable frequency has been set; cuts off the power supply path between the feeder and the power distribution area when a frequency change rate of power on the feeder exceeds the allowable frequency change rate in a case where the allowable frequency change rate has been set; and cuts off the power supply path between the feeder and the power distribution area when an elapsed time since a state in which the power supply path between the feeder and the power distribution area is to be cut off is formed exceeds the allowable response time in a case where the allowable response time has been set. An absolute value of a difference between the allowable frequency and a reference frequency is larger as the priority order is higher. The allowable frequency change rate is higher as the priority order is higher. The allowable response time is longer as the priority order is higher.
First, a power distributing mechanism in which power is supplied from a power generation utility 1 (or electricity retailer 3) to a consumer 2 will be roughly described with reference to
The electricity retailer 3 and a power transmission and distribution utility 5 are interposed between the power generation utility 1 and a consumer 2. The power transmission and distribution utility 5 includes a power transmission utility, a specified power transmission and distribution utility, and the like in addition to a general power transmission and distribution utility. A wholesale power market A is formed as a market in which the power generation utility 1 and the electricity retailer 3 trade power. The wholesale power market A is operated by Japan Electric Power Exchange (JEPX) 4. Further, a retail power market B is formed as a market in which the electricity retailer 3 and the consumer 2 trade power. The retail power market B is an abstract market in which there is no official exchange such as the JEPX 4 in the wholesale power market A. Further, the power generation utility 1 and the electricity retailer 3 may perform a relative transaction under a relative contract. The electricity retailer 3 sometimes pays a wheeling charge to the power transmission and distribution utility 5 to supply power to the consumer 2. In
The consumer 2 can arbitrarily select the electricity retailer 3 from among a plurality of the electricity retailers 3 and can make an electricity supply and demand contract. For example, the consumer 2 can freely select a contract plan from among a wide variety of contract plans by referring to, comparing, and examining the contract plans provided by the plurality of electricity retailers 3 via the Internet, and taking into consideration the expected power consumption, cost, and the like. That is, the consumer 2 is one contractor who makes an electricity supply and demand contract with a certain electricity retailer 3. The electricity retailer 3 includes a power transaction system 100 configured to acquire the electricity supply and demand contract from the consumer 2 in the retail power market B or to provide after-sales service to the consumer 2 who has made the electricity supply and demand contract. The power transaction system 100 is achieved by, for example, a computer called a server or the like.
In order to stably supply power to the consumer 2 making the electricity supply and demand contract, the electricity retailer 3 makes an electricity supply and demand contract with the power generation utility 1 via the wholesale power market A. For example, the electricity retailer 3 can purchase, from the power generation utility 1, a shortage of power that needs be supplied to the consumer 2, the shortage that is hardly covered by its own power generation facility, or can sell a surplus to the power generation utility 1.
Further, the power generation utility 1 and the electricity retailer 3 make a wheeling contract with the power transmission and distribution utility 5. The power transmission and distribution utility 5 transmits power from the power generation utility 1 and the electricity retailer 3 to the consumer 2 based on the wheeling contract. The power transmission and distribution utility 5 includes a power distribution system 200 configured to control such power transmission. The power distribution system 200 is achieved by, for example, a computer called a server or the like.
Since the above distributing mechanism is formed, the balance of power supply and demand between the power generation utility 1 and the electricity retailer 3, and the consumer 2 is maintained.
However, for example, in a case where the amount of power demand drastically increases due to a sudden change in temperature or the amount of power supply drastically decreases due to a disaster, there is a possibility that the amount of power demand exceeds the amount of power supply without being prevented by the above-described adjustment using the distributing mechanism in time. When the balance of power supply and demand suddenly collapses (when power shortage occurs suddenly), there is a possibility that a planned power outage is not performed in time. At that time, if mechanisms (for example, under frequency relays (UFR)) for protecting the system operate simultaneously, the worst situation such as a system power outage is likely to be caused.
Therefore, the power transaction system 100 and the power distribution system 200 cooperate to rationally control the under frequency relay (UFR) in order to avoid such a situation in the present embodiment. Hereinafter, this point will be described in detail.
As illustrated in
The power grid 10 efficiently transmits power from the power generation utility 1 or the electricity retailer 3 to the consumers 2 scattered in a wide range by gradually lowering the voltage from a utility grid 11 which is a long-distance power transmission line at the highest voltage through a plurality of hierarchically installed substations 12. A grid 14 is, for example, one power distribution area grouped for each geographical range. Each of the grids 14 includes a plurality of the consumers 2. In other words, each of the consumers 2 belongs to any of the grids 14.
The switchgear unit 13 is installed between a feeder extending from the substation 12 and each of the grids 14. The switchgear unit 13 cuts off a power supply path from the feeder to the grid 14 when a set operation condition is satisfied. The switchgear unit 13 is, for example, an under frequency relay (UFR). That is, the power grid 10 includes a load shedding system 30 capable of disconnecting a load (demand) for each of the grids 14. Note that the switchgear unit 13 is not necessarily installed for all the grids 14. For example, the grid 14 including a medical institution or an important public institution may be excluded from a target of a planned power outage, and may be placed outside the load shedding system 30.
The power system operating system 20 includes a database 21. The database 21 stores priority orders assigned to the plurality of grids 14. Then, the power system operating system 20 sets operation conditions of a plurality of the switchgear units 13 based on the priority orders stored in the database 21.
Specifically, the power system operating system 20 notifies each of the plurality of switchgear units 13 of a set value of the operation condition. The assignment of the priority order will be described later.
The power system operating system 20 sets the operation conditions of the plurality of switchgear units 13 such that the power supply is cut off in order from the grid 14 with a lower priority order when power shortage that is likely to lead to the system power outage occurs. As a result, it is possible to prevent a situation in which all of the plurality of switchgear units 13 operate simultaneously to cause the system power outage in the present embodiment.
Here, it is assumed that higher priorities (priority orders) are given in order of a grid “A” 14, a grid “B” 14, a grid “C” 14, and a grid “D” 14 (A>B>C>D). Here, it is assumed that a frequency of power on the feeder is about 50 Hz when the balance of power supply and demand is maintained.
When the amount of power demand exceeds the amount of power supply due to an increase in the amount of power demand or a decrease in the amount of power supply, the frequency of power on the feeder decreases. Focusing on such a phenomenon, the power system operating system 20 sets the operation conditions of the switchgear units 13 based on the priority orders given to the respective grids 14. For example, the power system operating system 20 notifies a switchgear unit “A” 13 interposed between the feeder and the grid “A” 14 of the lowest 48.0 Hz among all the switchgear units 13 as a set value of the operation condition. The switchgear unit “A” 13 sets 48.0 Hz notified from the power system operating system 20 as a threshold. The power system operating system 20 notifies the switchgear unit “B” 13 interposed between the feeder and the grid “B” 14 of the next lowest 48.5 Hz as a set value of the operation condition. Similarly, the power system operating system 20 notifies the switchgear unit “C” 13 interposed between the feeder and the grid “C” 14 of 49.0 Hz as a set value of the operation condition, and notifies the switchgear unit “D” 13 interposed between the feeder and the grid “D” 14 of the highest 49.5 Hz among all the switchgear units 13 as a set value of the operation condition.
In a case where the frequency of power on the feeder decreases due to the fact that the amount of power demand exceeds the amount of power supply under a state in which such a setting has been made, first, the operation condition set for the switchgear unit “D” 13 is satisfied at a point in time when the frequency decreases to 49.5 Hz so that the switchgear unit “D” 13 operates. As a result, a power supply path from the feeder to the grid “D” 14 is cut off. In other words, the consumer 2 belonging to the grid “D” 14 is disconnected from the power grid 10.
When the consumer 2 belonging to the grid “D” 14 is disconnected from the power grid 10, the demand for power disappears by such an extent, and thus, there is a possibility that the power shortage may be resolved. On the other hand, when the state in which the amount of power demand exceeds the amount of power supply continues and the frequency of power on the feeder further decreases, the operation condition set for the switchgear unit “C” 13 is satisfied at a point in time when the frequency decreases to 49.0 Hz so that the switchgear unit “C” 13 operates. As a result, a power supply path from the feeder to the grid “C” 14 is cut off, and the consumer 2 belonging to the grid “C” 14 is disconnected from the power grid 10. Similarly, when the state in which the amount of power demand exceeds the amount of power supply continues and the frequency of power on the feeder further decreases, the switchgear units 13 operate in ascending order of the priority order (B→A).
In this manner, the power system operating system 20 can set the operation conditions of the switchgear units 13 such that the power supply is cut off in order from the grid 14 with a lower priority order.
Although
Meanwhile, an example of using an event in which the frequency of power on the feeder decreases when the amount of power demand exceeds the amount of power supply and the power becomes insufficient has been described here. The amount of power supply may exceed the amount of power demand in a certain layer depending on a connection form of a generator in the system to which the substations are hierarchically connected. When power is left, the frequency of power on the feeder increases contrary to the above example. When power becomes excessive, an event called reverse power flow occurs in which the excessive power is transmitted from the substation to a higher-level power transmission network. In a case where the switchgear unit 13 configured to cut off the reverse power flow is to be installed, a frequency (a value higher than that in a normal state) as the set value of the operation condition may be changed and set for each of the substations.
For example, when an abnormality of a generator is detected by a protective device or the like and the generator is disconnected from the power grid 10 in an emergency measure, the frequency of power on the feeder changes. The change in the frequency increases as a ratio of the amount of power generated by the generator to the amount of power supply increases. That is, the greater the frequency changes, the greater the influence of the amount of lost power on the system. Focusing on this point, in the second setting example, the frequency change rate is set as the set value of the operation condition of the switchgear unit 13, and the power system operating system 20 sets the operation condition of each of the switchgear units 13 based on a priority order given to each of the grids 14.
Here, it is also assumed that higher priorities (priority orders) are given in order of the grid “A” 14, the grid “B” 14, the grid “C” 14, and the grid “D” 14. For example, the power system operating system 20 notifies the switchgear unit “A” 13 interposed between the feeder and the grid “A” 14 of the highest 5 Hz among all the switchgear units 13 as the set value of the operation condition. The power system operating system 20 notifies the switchgear unit “B” 13 interposed between the feeder and the grid “B” 14 of the next highest 3 Hz as the set value of the operation condition. Similarly, the power system operating system 20 notifies the switchgear unit “C” 13 interposed between the feeder and the grid “C” 14 of 2 Hz as the set value of the operation condition, and notifies the switchgear unit “D” 13 interposed between the feeder and the grid “D” 14 of the lowest 1 Hz among all the switchgear units 13 as the set value of the operation condition.
Under a state in which such a setting has been made, for example, even in a case where the frequency of power on the feeder changes due to occurrence of disconnection of a generator, which has served as a part of power supply, from the system, none of the operation conditions set for the switchgear units “A” 13 to “D” 13 are satisfied so that power supply paths from the feeder to the grids are not cut off if a ratio of the amount of power generated by the generator to the amount of power supply is small and the frequency change rate does not reach 1 Hz/S.
As described above, the change in the frequency of the power on the feeder increases as the ratio of the amount of power generated by the generator disconnected from the system to the amount of power supply increases. When the frequency change rate reaches 1 Hz/S, the operation condition set for the switchgear unit “D” 13 is satisfied so that the switchgear unit “D” 13 operates. As a result, a power supply path from the feeder to the grid “D” 14 is cut off. In other words, the consumer 2 belonging to the grid “D” 14 is disconnected from the power grid 10.
When the frequency change rate reaches 2 Hz/S, the operation conditions set for the switchgear unit “C” 13 and the switchgear unit “D” 13 are satisfied so that the switchgear unit “C” 13 and the switchgear unit “D” 13 operate. As a result, the power supply paths from the feeder to the grid “C” 14 and the grid “D” 14 are cut off. In other words, the consumers 2 belonging to the grid “C” 14 and the grid “D” 14 are disconnected from the power grid 10. Similarly, the switchgear units “B” 13 to “D” 13 operate when the frequency change rate reaches 3 Hz/S, and the switchgear units “A” 13 to “D” 13 operate when the frequency change rate reaches 5 Hz/S.
In this manner, the power system operating system 20 can set the operation conditions of the switchgear units 13 such that the power supply is cut off in order from the grid 14 having the lower priority order according to the degree of influence of the amount of lost power supply.
Similarly to the frequency in
Here, it is also assumed that higher priorities (priority orders) are given in order of the grid “A” 14, the grid “B” 14, the grid “C” 14, and the grid “D” 14. For example, the power system operating system 20 notifies the switchgear unit “A” 13 interposed between the feeder and the grid “A” 14 of the longest 20 seconds among all the switchgear units 13 as the set value of the operation condition. The power system operating system 20 notifies the switchgear unit “B” 13 interposed between the feeder and the grid “B” 14 of the next longest 15 seconds as the set value of the operation condition. Similarly, the power system operating system 20 notifies the switchgear unit “C” 13 interposed between the feeder and the grid “C” 14 of 10 seconds as the set value of the operation condition, and notifies the switchgear unit “D” 13 interposed between the feeder and the grid “D” 14 of the shortest 5 seconds among all the switchgear units 13 as the set value of the operation condition.
Under such a condition, it is assumed that a decrease in the frequency of power on the feeder occurs due to the amount of power demand exceeding the amount of power supply and the frequency decreases until falling below the thresholds at which the switchgear unit “A” 13 to the switchgear unit “D” 13 are to operate. Then, in each of the switchgear units “A” 13 to “D” 13, counting of the response time is started, and the counting is continued while the frequency remains below the threshold. Then, first, the operation condition set for the switchgear unit “D” 13 is satisfied at a point in time when the counting is performed up to 5 seconds so that the switchgear unit “D” 13 operates. As a result, a power supply path from the feeder to the grid “D” 14 is cut off. In other words, the consumer 2 belonging to the grid “D” 14 is disconnected from the power grid 10.
When the consumer 2 belonging to the grid “D” 14 is disconnected from the power grid 10, the demand for power disappears by such an extent, and thus, there is a possibility that the power shortage may be resolved. On the other hand, if a state in which the amount of power demand exceeds the amount of power supply continues thereafter and the counting proceeds to 10 seconds with the frequency of power on the feeder remaining below the threshold, the operation condition set for the switchgear unit “C” 13 is satisfied so that the switchgear unit “C” 13 operates. As a result, a power supply path from the feeder to the grid “C” 14 is cut off, and the consumer 2 belonging to the grid “C” 14 is disconnected from the power grid 10. Similarly, if a state in which the amount of power demand exceeds the amount of power supply continues and the counting proceeds with the frequency of power on the feeder remaining below the threshold, the switchgear units 13 operate in ascending order of the priority order (B→A).
In this manner, the power system operating system 20 can set the operation conditions of the switchgear units 13 such that the power supply is cut off in order from the grid 14 with a lower priority order.
Note that the power system operating system applies the above-described first to third setting examples exclusively and selectively to the entire system. That is, there is no case where the power system operating system 20 applies the frequency to a certain switchgear unit 13 and does not apply the frequency change rate to another switchgear unit 13 as the operation conditions for shifting operation timings of the switchgear units 13. However, the power system operating system 20 can switch the first setting example to the third setting example as the entire system such that the frequency is applied at a certain point in time and the frequency change rate is applied at another point in time.
Next, an example of shifting operation timings of the switchgear units 13 among the plurality of consumers 2 in addition to shifting the operation timings of the switchgear units 13 among the plurality of grids 14 will be described with reference to
In
Specifically, in this example, not only the switchgear units “A” 13 to “D” 13 are installed between the feeder extending from the substation and the respective grids 14 but also switchgear units “A1” 13 to “A3” 13 and switchgear units “D1” 13 to “D3” 13 are installed between power supply paths guided into the grid 14 and the respective consumers 2.
Here, it is assumed that higher priorities (priority orders) are given in order of a consumer “A1” 2, a consumer “A2” 2, and a consumer “A3” 2 in the grid “A” 14, and higher priorities are given in order of a consumer “D1” 2, a consumer “D2” 2, and a consumer “D3” 2 in the grid “D” 14. Here, it is further assumed that the frequency described with reference to
For example, the power system operating system 20 notifies the switchgear unit “A1” 13 of 48.0 Hz as a set value of the operation condition, notifies the switchgear unit “A2” 13 of 49.6 Hz as a set value of the operation condition, and notifies the switchgear unit “A3” 13 of 49.7 Hz as a set value of the operation condition. Further, the power system operating system 20 notifies the switchgear unit “D1” 13 of 49.5 Hz as a set value of the operation condition, notifies the switchgear unit “D2” 13 of 49.6 Hz as a set value of the operation condition, and notifies the switchgear unit “D3” 13 of 49.7 Hz as a set value of the operation condition.
Under a state in which such a setting has been made, if an increase in the amount of power demand or a decrease in the amount of power supply occurs so that the amount of power demand exceeds the amount of power supply and the frequency of power on the feeder decreases, the operation condition set for the switchgear unit “D” 13 is satisfied at a point in time when the frequency decreases to 49.5 Hz so that the switchgear unit “D” 13 operates as described with reference to
On the other hand, when the operation conditions set for the switchgear unit “A3” 13 of the grid “A” 14 and the switchgear unit “D3” 13 of the grid “D” 14 are satisfied at a point in time when the frequency decreases to 49.7 Hz, and thus, power supply to the consumer “A3” 2 and the consumer “D3” 2 is cut off. Even when power demand from the consumer “A3” 2 and the consumer “D3” 2 disappears, the power shortage is not resolved, and if the frequency of power continues to decrease, the operation conditions of the switchgear unit “A2” 13 of the grid “A” 14 and the switchgear unit “D2” 13 of the grid “D” 14 are satisfied at a point in time when the frequency decreases to 49.6 Hz so that power supply to the consumer “A2” 2 and the consumer “D2” 2 is cut off. Similarly, power supply to the consumer “D1” 2 is cut off if the frequency of power continues to decrease so that the frequency decreases to 49.5 Hz, and power supply to the consumer “A1” 2 is cut off if the frequency of power further continues to decrease so that the frequency decreases to 48.0 Hz.
In this manner, the power system operating system 20 can gradually cut off the power supply based on the priority order for each of the consumers 2 having a finer granularity than the grid 14. That is, it is possible to cut off the power supply starting from the consumer 2 with a lower priority order ((A3, D3)→(A2, D2)→D1→A1).
Here, an example of assigning priority orders to the plurality of grids 14 (and the plurality of consumers 2) will be described with reference to
The power transaction system 100 of the electricity retailer 3 includes a control unit 110 and a database 120. The database 120 stores plan information 121 and customer information 122.
For example, the control unit 110 generates and transmits an HTML file configured to display a transaction (inquiry) screen 50 as illustrated in
Contract plans include, for example, a plan in which power supply is likely to be cut off when power shortage occurs but a charge is inexpensive, and a plan in which power supply is less likely to be cut off but a charge is expensive. The control unit 110 obtains the current contract plan 51 from the customer information 122 in the database 120, and obtains the comparative plan 52 from the plan information 121 in the database 120.
The power transaction system 100 presents the current contract plan 51 and the comparative plan 52, thereby enabling the consumer 2 to examine switching of the plan and take a procedure therefor. In the case of the new consumer 2, if there is a desired plan among the recommended plans, a contract procedure for the plan can be taken. For example, it is conceivable that the consumer 2 including a power generation facility and a power storage facility selects the plan in which the power supply is likely to be cut off but the charge is inexpensive.
The control unit 110 stores information of the consumer 2 including the electricity supply and demand contract (plan) with the consumer 2 in the database 120 as the customer information 122. The control unit 110 determines a priority order of the consumer 2 or the grid 14 to which the consumer 2 belongs based on the customer information 122 including the plan contracted by the consumer 2. The control unit 110 notifies the power system operating system 20 of the determined priority order. The control unit 110 may acquire the priority order from the power system operating system 20 and present (disclose) the priority order to the consumer 2 through the transaction (inquiry) screen 50 when generating the transaction (inquiry) screen 50. In other words, the power system operating system 20 may have a function of transmitting the priority order notified at the time of the determination described above to the power transaction system 100 in response to a request from the power transaction system 100. For example, the control unit 110 may present a priority order in the current contract plan 51 and a priority order in the comparative plan 52 together on the transaction (inquiry) screen 50. When the priority orders are visualized (for example, disclosed via the Internet) in this manner, the consumer 2 can examine switching of the plan in consideration of the presented priority orders.
The power system operating system 20 stores the priority order received from the power transaction system 100 in the database 21 (as priority order information 211). The power system operating system 20 notifies the switchgear unit 13 in the power grid 10 of a set value of an operation condition based on the priority order information 211.
The control unit 110 of the power transaction system 100 may further determine priority orders of the grids 14 based on contract plans of the consumers 2. For example, various methods can be adopted as a method for determining the priority orders of the grids 14, such as setting a higher priority order as an average value of a power purchase price (by the consumer 2) determined in a plan contracted by the consumer 2 in the grid 14 is higher, or setting a higher priority order as a maximum value of the power purchase price in the grid 14 is higher.
Alternatively, the control unit 110 of the power transaction system 100 may determine priority orders of the grids 14 in advance, and determine any grid 14 to which a consumer 2 is to belong according to a power purchase price when an electricity supply and demand contract is made with the consumer 2. For example, the plurality of grids 14 having different priority orders may be provided in an overlapping manner in the same geographical range to group a plurality of the consumers 2 in the same geographical range.
Furthermore, a plan provided by the power transaction system 100 to the consumer 2 may include a power purchase price from the consumer 2 in addition to a sale price (charge) to the consumer 2. For example, the price may be set such that a higher power purchase price is set for a plan in which power supply is less likely to be cut off when power shortage occurs. That is, as the priority order of the grid 14 increases, the power purchase price from the consumer 2 belonging to the grid 14 may be increased. Alternatively, in a case where priority orders are assigned in units of the consumers 2, the power purchase price from the consumer 2 may be increased as the consumer 2 is assigned with a higher priority order. Further, an electricity charge according to the priority order may be determined in terms in which a retailer sets the electricity charge and the like.
The power transmission and distribution utility 5 may set different wheeling charges among the priority orders of the grids 14. For example, a higher wheeling charge is set for a grid with a higher priority order. A higher electricity charge is set for a grid in which the power supply is less likely to be cut off.
Here, it is assumed that a frequency of power on the feeder is below 49.5 Hz, an operation condition of the switchgear unit “D” 13 is satisfied, and power supply to the grid “D” 14 is cut off. At this time, the grid “D” 14 of the embodiment may transition to a microgrid 14A. Here, it is assumed that there is a power plant “D1” 15 in the grid “D” 14, and a local independent system (microgrid) is formed by power from the power plant. The local independent system is also referred to as an off-grid. The off-grid refers to a state of not being connected to the power grid 10 of the power transmission and distribution utility 5 or a state of being self-sufficient without depending on the power grid 10 of the power transmission and distribution utility 5. Note that the power plant 15 may be the consumer 2 that includes a power generation facility such as a solar panel and has a contract to make the electricity retailer 3 purchase surplus power equal to or more than power consumed by the consumer 2 itself. Alternatively, there may be a case where the power generation utility 1 or the electricity retailer 3 constructs the microgrid by supplying power to a specific consumer 2 using a line owned by the power generation utility 1 or the electricity retailer 3 itself in a form called specific supply or the like.
In this case, the switchgear unit “D2” 13 and the switchgear unit “D3” 13 are installed to disconnect the consumer 2 when it is difficult for the power plant “D1” 15 to cover power demand in the microgrid “D” 14A. The switchgear unit “D1” 13 is also installed to prevent power of the power plant “D1” 15 from being output to the microgrid “D” 14A, for example, for preservation of the power plant “D1” 15. Here, it is assumed that the frequency described with reference to
First, if the frequency of power of the power plant “D1” 15 falls below 48.7 Hz, the operation condition of the switchgear unit “D3” 13 is satisfied so that power supply to the consumer “D3” 2 is cut off. If the frequency of power continues to decrease even after power demand of the consumer “D3” 2 disappears and falls below 48.6 Hz, the operation condition of the switchgear unit “D2” 13 is satisfied so that power supply to the consumer “D2” 2 is cut off. Nevertheless, if the frequency of power continues to decrease (with power demand of the consumer 2 not illustrated) and falls below 48.5 Hz, the operation condition of the switchgear unit “D1” 13 is satisfied so that the power supply from the power plant “D1” 15 to the microgrid “D” 14A is cut off.
In this manner, it is possible to prevent a situation in which all of the plurality of switchgear units 13 simultaneously operate to cause the system power outage in the microgrid 14A as well in the present embodiment.
Recently, the number of the consumers 2 including the power generation facility or power storage facility has been increasing. This type of power generation facility or power storage facility includes an inverter configured for efficient operation. There are roughly two types of algorithms to which the inverter can be applied, that is, a current control type called a grid following inverter and a voltage control type called a grid forming inverter. The grid following inverter is an algorithm used as a conventional grid-connected inverter, and controls an output current of the inverter. On the other hand, the grid forming inverter is an algorithm for controlling an output voltage of the inverter, and can output a voltage from the inverter to supply power even during the system power outage.
Therefore, when the grid 14 transitions to the microgrid 14A (when the microgrid 14A is formed) as the power from the system is cut off by the switchgear unit 13 in the embodiment as described with reference to
Alternatively, both the grid following inverter and the grid forming inverter may include a virtual synchronous generator (VSG) that supplies a simulated inertial force as a function of supporting the system. The VSG is an algorithm of a simulated inertia control type. In a case where the VSG is provided, a transition from the algorithm of the VSG having no simulated inertia may be made to the algorithm having the simulated inertia in the grid following inverter or the grid forming inverter with the transition to the microgrid 14A as a trigger.
In the above description, the power system operating system 20 notifies each of the plurality of switchgear units 13 of the set value of the operation condition. As described above, the power system operating system 20 can communicate with various facilities (including at least the switchgear units 13) in the power grid 10. That is, the power system operating system 20 can grasp states of the respective switchgear units 13 by communication.
Here, it is assumed that a communication failure occurs between the power system operating system 20 and the switchgear unit 13. Then, it is assumed that, for example, the frequency of power on the feeder decreases and the operation condition of the switchgear unit 13 is satisfied in the middle of the communication failure. In this case, from the viewpoint of the power system operating system 20, the power supply to the grid 14 is cut off by the switchgear unit 13 whose state has not been grasped. Therefore, the power system operating system 20 further notifies the switchgear unit 13 of a set value of the operation condition to be applied when the communication failure occurs in the embodiment. For example, in the case of the frequency, the value is lower than that in the normal state. That is, the operation condition of the switchgear unit 13 is less likely to be satisfied at the value as compared with the normal state.
When detecting the communication failure with respect to the power system operating system 20, the switchgear unit 13 switches a set value of the operation condition from that for the normal state to that for the communication failure state. As a result, it is possible to suppress the power supply cut-off by the switchgear unit 13 whose state has not been grasped by the power system operating system 20 within a certain range.
The switchgear unit 13 may calculate the set value of the operation condition for the communication failure state based on the set value of the operation condition for the normal state, instead of further receiving the set value of the operation condition of the communication failure state from the power system operating system 20. For example, in the case of the frequency, a predetermined value may be subtracted from the set value of the operation condition for the normal state to obtain the set value of the operation condition for the communication failure state.
Further, the power system operating system 20 may give up coping with the switchgear unit 13 whose state is not graspable due to the communication failure, and conversely, may set the set value of the operation condition for the communication failure state to a value at which the operation condition of the switchgear unit 13 is more likely to be satisfied as compared with the normal state. In this case, the value is higher than that of the normal state, for example, in the case of the frequency.
As described above, the switchgear unit 13 can be rationally controlled based on, for example, the priority order determined by the power purchase price without causing the system power outage when the balance of power supply and demand is lost according to the power distribution system (and the power transaction system) of the embodiment.
While certain embodiments have been described, these embodiments have been presented by way of example only, and are not intended to limit the scope of the inventions. Indeed, the novel embodiments described herein may be embodied in a variety of other forms; furthermore, various omissions, substitutions and changes in the form of the embodiments described herein may be made without departing from the spirit of the inventions. The accompanying claims and their equivalents are intended to cover such forms or modifications as would fall within the scope and spirit of the inventions.
Number | Date | Country | Kind |
---|---|---|---|
2022-111307 | Jul 2022 | JP | national |