- 1. An improved method of implementing an improved power generation facility comprising the steps of:
sizing one or more power generators to provide power appropriate for ultimate consumers of power from the improved power generation facility; obtaining permits for construction of the power generation facility; and constructing the power generation facility to provide a predetermined power generation output.
- 2. The improved method of claim 1 further comprising the steps of:
locating a physical location near the ultimate consumers suitable to contain one or more housings, the housings having a predetermined configuration; and designing a facade for the one or more housings wherein the facade blends visually into an architecture and environment of the physical location in which the power generation facility is located.
- 3. The improved method of claim 2 wherein the physical location is located proximate to a low cost fuel source wherein the one or more power generators uses the low cost fuel source to produce energy.
- 4. The improved method of claim 2 wherein the housings are modular.
- 5. The improved method of claim 1 wherein a final step of constructing the power generation facility is placing the one or more power generators in the one or more housings.
- 6. The improved method of claim 1 wherein the step of constructing the power generation facility comprises the further steps of:
providing an access way to the physical location from a pre-existing access way; constructing a foundation with predetermined dimensions suitable to support the one or more power generators; securing a plurality of legs to the foundation, the legs creating a support structure capable of supporting condenser bays; securing one or more condenser bays to the support structure; installing a central exhaust manifold; suspending at least a portion of the housing from the support structure; placing one or more power generators into the housing; securing the one or more power generators onto the foundation; connecting a power source to the one or more power generators; and connecting the one or more power generators to a power distribution system.
- 7. The improved method of claim 6 further comprising the steps of:
powering up the power generation equipment upon demand; producing an amount of power until demand ceases; and powering down the power generation equipment.
RELATED APPLICATION
[0001] This application is a divisional of application Ser. No. 09/598,182.
Divisions (1)
|
Number |
Date |
Country |
Parent |
09598182 |
Jun 2000 |
US |
Child |
09840498 |
Apr 2001 |
US |