POWER GENERATION SYSTEM HAVING COMPRESSOR CREATING EXCESS AIR FLOW AND STORAGE VESSEL FOR AUGMENTING EXCESS AIR FLOW

Abstract
A power generation system includes: a first gas turbine system including a first turbine component, a first integral compressor and a first combustor to which air from the first integral compressor and fuel are supplied, the first combustor arranged to supply hot combustion gases to the first turbine component, and the first integral compressor having a flow capacity greater than an intake capacity of the first combustor and/or the first turbine component, creating an excess air flow. A second gas turbine system may include similar components to the first except but without excess capacity in its compressor. A control valve system controls flow of the excess air flow from the first gas turbine system to the second gas turbine system. A storage vessel may be coupled to the excess air flow path for augmenting the excess air flow with additional air during a peak demand period.
Description
BACKGROUND OF THE INVENTION

The disclosure relates generally to power generation systems, and more particularly, to a power generation system including a gas turbine system having a compressor creating an excess air flow and a storage vessel for augmenting the excess air flow.


Power generation systems oftentimes employ one or more gas turbine systems, which may be coupled with one or more steam turbine systems, to generate power. A gas turbine system may include a multi-stage axial flow compressor having a rotating shaft. Air enters the inlet of the compressor and is compressed by the compressor blade stages and then is discharged to a combustor where fuel, such as natural gas, is burned to provide a high energy combustion gas flow to drive a turbine component. In the turbine component, the energy of the hot gases is converted into work, some of which may be used to drive the integral compressor through a rotating shaft, with the remainder available for useful work to drive a load such as a generator via a rotating shaft (e.g., an extension of the rotating shaft) for producing electricity. A number of gas turbine systems may be employed in parallel within a power generation system. In a combined cycle system, one or more steam turbine systems may also be employed with the gas turbine system(s). In this setting, a hot exhaust gas from the gas turbine system(s) is fed to one or more heat recovery steam generators (HRSG) to create steam, which is then fed to a steam turbine component having a separate or integral rotating shaft with the gas turbine system(s). In any event, the energy of the steam is converted into work, which can be employed to drive a load such as a generator for producing electricity.


When a power generation system is created, its parts are configured to work together to provide a system having a desired power output. The ability to increase power output on demand and/or maintain power output under challenging environmental settings is a continuous challenge in the industry. For example, on hot days, the electric consumption is increased, thus increasing power generation demand. Another challenge of hot days is that as temperature increases, compressor flow decreases, which results in decreased generator output. One approach to increase power output (or maintain power output, e.g., on hot days) is to add components to the power generation system that can increase air flow to the combustor of the gas turbine system(s). One approach to increase air flow is adding a storage vessel to feed the gas turbine combustor. This particular approach, however, typically requires a separate power source for the storage vessel, which is not efficient.


Another approach to increasing air flow is to upgrade the compressor. Currently, compressors have been improved such that their flow capacity is higher than their predecessor compressors. These new, higher capacity compressors are typically manufactured to either accommodate new, similarly configured combustors, or older combustors capable of handling the increased capacity. A challenge to upgrading older gas turbine systems to employ the newer, higher capacity compressors is that there is currently no mechanism to employ the higher capacity compressors with systems that cannot handle the increased capacity without upgrading other expensive parts of the system. Other parts that oftentimes need to be upgraded simultaneously with a compressor upgrade include but are not limited to the combustor, gas turbine component, generator, transformer, switchgear, HRSG, steam turbine component, steam turbine control valves, etc. Consequently, even though a compressor upgrade may be theoretically advisable, the added costs of upgrading other parts renders the upgrade ill-advised due to the additional expense.


BRIEF DESCRIPTION OF THE INVENTION

A first aspect of the disclosure provides a power generation system, comprising: a first gas turbine system including a first turbine component, a first integral compressor and a first combustor to which air from the first integral compressor and fuel are supplied, the first combustor arranged to supply hot combustion gases to the first turbine component, and the first integral compressor having a flow capacity greater than an intake capacity of at least one of the first combustor and the first turbine component, creating an excess air flow; a second gas turbine system including a second turbine component, a second compressor and a second combustor to which air from the second compressor and fuel are supplied, the second combustor arranged to supply hot combustion gases to the second turbine component; a control valve system controlling flow of the excess air flow from the first gas turbine system to the second gas turbine system along an excess air flow path; and a storage vessel coupled to the excess air flow path for augmenting the excess air flow with additional air during a peak demand period.


A second aspect of the disclosure provides a power generation system, comprising: a first gas turbine system including a first turbine component, a first integral compressor and a first combustor to which air from the first integral compressor and fuel are supplied, the first combustor arranged to supply hot combustion gases to the first turbine component, and the first integral compressor having a flow capacity greater than an intake capacity of at least one of the first combustor and the first turbine component, creating an excess air flow; a second gas turbine system including a second turbine component, a second compressor and a second combustor to which air from the second compressor and fuel are supplied, the second combustor arranged to supply hot combustion gases to the second turbine component; a control valve system controlling flow of the excess air flow to at least one of a discharge of the second compressor, the second combustor and a turbine nozzle cooling inlet of the second turbine component along an excess air flow path; and a storage vessel coupled to the excess air flow path for augmenting the excess air flow with additional air during a peak demand period, wherein the control valve system includes a first control valve controlling a first portion of the excess air flow to the discharge of the second compressor, a second control valve controlling a second portion of the excess air flow to the second combustor, and a third control valve controlling a third portion of the flow of the excess air flow to the turbine nozzle cooling inlets of the second turbine component, and wherein an exhaust of each of the first turbine system and the second turbine system are supplied to at least one steam generator for powering a steam turbine system.


A third aspect of the disclosure provides a method comprising: extracting an excess air flow from a first integral compressor of a first gas turbine system including a first turbine component, the first integral compressor and a first combustor to which air from the first integral compressor and fuel are supplied, the first integral compressor having a flow capacity greater than an intake capacity of at least one of the first combustor and the first turbine component; directing the excess air flow to a second gas turbine system including a second turbine component, a second compressor and a second combustor to which air from the second compressor and fuel are supplied, the second combustor arranged to supply hot combustion gases to the second turbine component; and augmenting the excess air flow with additional air during a peak demand period using a storage vessel coupled to the excess air flow path.


The illustrative aspects of the present disclosure are designed to solve the problems herein described and/or other problems not discussed.





BRIEF DESCRIPTION OF THE DRAWINGS

These and other features of this disclosure will be more readily understood from the following detailed description of the various aspects of the disclosure taken in conjunction with the accompanying drawing that depicts various embodiments of the disclosure, in which:



FIG. 1 shows a schematic diagram of a power generation system according to embodiments of the invention.





It is noted that the drawing of the disclosure is not to scale. The drawing is intended to depict only typical aspects of the disclosure, and therefore should not be considered as limiting the scope of the disclosure. In the drawing, like numbering represents like elements between the drawings.


DETAILED DESCRIPTION OF THE INVENTION

As indicated above, the disclosure provides a power generation system including a gas turbine system including a compressor that creates an excess air flow. Embodiments of the invention provide ways to employ the excess air flow to improve output of the power generation system.


Referring to FIG. 1, a schematic diagram of a power generation system 100 according to embodiments of the invention is provided. System 100 includes a first gas turbine system 102. First gas turbine system 102 may include, among other components, a first turbine component 104, a first integral compressor 106 and a first combustor 108. As used herein, first “integral” compressor 106 is so termed as compressor 106 and turbine component 104 may be integrally coupled together by, inter alia, a common compressor/turbine rotating shaft 110 (sometimes referred to as rotor 110). This structure is in contrast to many storage vessels that are separately powered, and not integral with turbine component 104.


Combustor 108 may include any now known or later developed combustor system generally including a combustion region and a fuel nozzle assembly. Combustor 108 may take the form of an annular combustion system, or a can-annular combustion system (as is illustrated in the figures). In operation, air from first integral compressor 106 and a fuel, such as natural gas, are supplied to combustor 108. Diluents may also be optionally delivered to combustor 108 in any now known or later developed fashion. Air drawn by first integral compressor 106 may be passed through any now known or later developed inlet filter housing 120. As understood, combustor 108 is arranged to supply hot combustion gases to first turbine component 104 by combustion of the fuel and air mixture. In turbine component 104, the energy of the hot combustion gases is converted into work, some of which is used to drive compressor 106 through rotating shaft 110, with the remainder available for useful work to drive a load such as, but not limited to, a generator 122 for producing electricity, and/or another turbine via rotating shaft 110 (an extension of rotating shaft 110). Turbine component 104 may include any now known or later developed turbine for converting a hot combustion gas flow into work by way of rotating shaft 110.


In one embodiment, gas turbine system 102 may include a model MS7001FB, sometimes referred to as a 7FB engine, commercially available from General Electric Company, Greenville, S.C. The present invention, however, is not limited to any one particular gas turbine system and may be implemented in connection with other systems including, for example, the MS7001FA (7FA) and MS9001FA (9FA) models of General Electric Company.


In contrast to conventional gas turbine system models, first integral compressor 106 has a flow capacity greater than an intake capacity of turbine component 104 and/or first combustor 108. That is, compressor 106 is an upgraded compressor compared to a compressor configured to match combustor 108 and turbine component 104. As used herein, “capacity” indicates a flow rate capacity. For example, an initial compressor of gas turbine system 102 may have a maximum flow capacity of about 487 kilogram/second (kg/s) (1,075 pound-mass/second (lbm/s)) and turbine component 104 may have a substantially equal maximum flow capacity, i.e., around 487 kg/s. Here, however, compressor 108 has replaced the initial compressor and may have an increased maximum flow capacity of, for example, about 544 kg/s (1,200 lbm/s), while turbine component 104 continues to have a maximum flow capacity of, e.g., around 487 kg/s. Consequently, turbine component 104 cannot take advantage of all of the capacity of compressor 106, and an excess air flow 200 is created by compressor 106 above a maximum capacity of turbine component 104. Similarly, the flow capacity of integral compressor 106 may exceed the maximum intake capacity of combustor 108. In a similar fashion, the power output of turbine component 104 if exposed to the full flow capacity of integral compressor 106 could exceed a maximum allowed input for generator 122. While particular illustrative flow rate values have been described herein, it is emphasized that the flow rate capacities may vary widely depending on the gas turbine system and the new, high capacity integral compressor 106 employed. As will be described herein, the present invention provides various embodiments for power generation system 100 to employ the excess air flow in other parts of power generation system 100.


In the embodiment shown in FIG. 1, power generation system 100 also includes one or more second gas turbine system(s) 140. Each second gas turbine system 140 may include a second turbine component 144, a second compressor 146 and a second combustor 148. Each second gas turbine system 140 may be substantially similar to first gas turbine system 102 except compressor 146 thereof has not been upgraded or replaced and continues to have a flow capacity configured to match that of its respective turbine component 144 and/or combustor 148. As described herein relative to first integral compressor 106, air from second compressor 146 is supplied to second combustor 148 along with a fuel, and second combustor 148 is arranged to supply hot combustion gases to second turbine component 144. Diluents may also be optionally delivered to second combustor 148 in any now known or later developed fashion. Air drawn by second compressor 146 may be passed through any now known or later developed inlet filter housing 150. In second turbine component 144, the energy of the hot combustion gases is converted into work, some of which is used to drive compressor 146 through rotating shaft 152, with the remainder available for useful work to drive a load such as, but not limited to, a generator 154 for producing electricity, and/or another turbine via rotating shaft 152 (an extension of rotating shaft 152).


Second turbine component 144 may also include one or more turbine nozzle cooling inlet(s) 158. As understood in the art, a stationary nozzle in a turbine component may include a number of inlets (not shown) for a cooling fluid flow to be injected for cooling, among other things, the nozzles of the turbine component. Passages within and about the nozzles direct the cooling fluid where necessary. Although only one inlet is shown at a first stage of turbine component 144 for clarity, it is understood that each stage of turbine component 144 may include one or more inlets, e.g., circumferentially spaced about the turbine component. In addition, although turbine nozzle cooling inlet 158 is illustrated as entering at or near a first stage of second turbine component 144, as understood, inlet(s) may be provided at practically any stage.


As also shown in FIG. 1, in one embodiment, power generation system 100 may optionally take the form of a combined cycle power plant that includes a steam turbine system 160. Steam turbine system 160 may include any now known or later developed steam turbine arrangement. In the example shown, high pressure (HP), intermediate pressure (IP) and low pressure (LP) sections are illustrated; however, not all are necessary in all instances. As known in the art, in operation, steam enters an inlet of the steam turbine section(s) and is channeled through stationary vanes, which direct the steam downstream against blades coupled to a rotating shaft 162 (rotor). The steam may pass through the remaining stages imparting a force on the blades causing rotating shaft 162 to rotate. At least one end of rotating shaft 162 may be attached to a load or machinery such as, but not limited to, a generator 166, and/or another turbine, e.g., one of gas turbines 102, 140. Steam for steam turbine system 160 may be generated by one or more steam generators 168, 170, i.e., heat recovery steam generators (HRSGs). HRSG 168 may be coupled to an exhaust 172 of first turbine system 102, and HRSG 170 may be coupled to an exhaust 174 of second turbine system(s) 104. That is, exhaust 172, 174 of gas turbine system 102 and/or gas turbine system(s) 140, respectively, may be supplied to at least one HRSG 168, 170 for powering steam turbine system 160. Each gas turbine system may be coupled to a dedicated HRSG, or some systems may share an HRSG. In the latter case, although two HRSGs 168, 170 are illustrated, only one may be provided and both exhausts 172, 174 directed thereto. After passing through HRSGs 168, 170, the combustion gas flow, now depleted of heat, may be exhausted via any now known or later developed emissions control systems 178, e.g., stacks, selective catalytic reduction (SCR) units, nitrous oxide filters, etc. While FIG. 1 shows a combined cycle embodiment, it is emphasized that steam turbine system 160 including steam generators 168, 170 may be omitted. In this latter case, exhaust 172, 174 would be passed directly to emission control systems 178 or used in other processes.


Power generation system 100 may also include any now known or later developed control system 180 for controlling the various components thereof. Although shown apart from the components, it is understood that control system 180 is electrically coupled to all of the components and their respective controllable features, e.g., valves, pumps, motors, sensors, electric grid, generator controls, etc.


Returning to details of first gas turbine system 102, as noted herein, first integral compressor 106 has a flow capacity greater than an intake capacity of turbine component 104 and/or first combustor 108, which creates an excess air flow 200. Excess air flow 200 is shown as a flow extracted from first integral compressor 106 at a discharge thereof. It is emphasized, however, that excess air flow 200 may be extracted at any stage of integral compressor 106 where desired, e.g., at one or more locations upstream of the discharge, at the discharge and one or more locations upstream of the discharge, etc., using appropriate valves and related control systems. In any event, excess air flow 200 eventually passes along an excess air flow path 250, which may include one or more pipes to second turbine system(s) 140. In the FIG. 1 embodiment, a control valve system 202 is provided for controlling flow of excess air flow 200 to second gas turbine system(s) 140. Although illustrated as if excess air flow 200 is directed to just one second gas turbine system 140, it is understood that the excess air flow may be directed to one or more second gas turbine system(s) 140, where desired and where the excess air flow can support more than one system.


Power generation system 100 may also include a storage vessel 252 coupled to excess air flow path 250 for augmenting excess air flow 200 with additional air 254 during a peak demand period. Storage vessel 252 may take the form of any pressurized storage vessel capable of holding pressurized air. Storage vessel 252 may be filled with pressurized air in any now known fashion, e.g., a compressor other than that shown or by one or more compressors 106, 146, and may be maintained with pressurized air continually or periodically replaced (i.e., actually replaced or flow selected between a number of similar vessels) once depleted. In one embodiment, one or both compressors 106, 146 may pressurize storage vessel 252, e.g., during an off-peak period(s) of operation, and storage vessel 252 may be depleted of the pressurized air during a peak demand period. That is, storage vessel 252 receives, during an off-peak demand period, at least one of: a portion of excess air flow path 200 from excess air flow path 250 (see dashed arrow parallel to arrow for additional air 254), and a portion of an air flow output 258 of second compressor 146 (along optional piping shown with dashed lines). The portion of each flow used can be user defined, i.e., 0-100%. As understood, an off-peak period indicates a time when one or more turbine systems 102, 140 are not operating at or near full capacity in terms of the air flow intake, and a peak demand period is a time when one or more turbine systems 102, 140 are operating at or near full capacity in terms of air flow intake. In one example, storage vessel 252 may be coupled just to excess air flow path 250 for capturing a portion of excess air flow 200 from compressor 106, e.g., during periods of off-peak operation, and augment excess air flow 200 with additional air 254 during a peak demand period. In the former case, additional air 254 would flow into storage vessel 252, i.e., arrow of additional air 254 would be to the left as shown with dashed arrow and not out of storage vessel 252 to the right as illustrated, as controlled by a control valve 266. That is, control valve 266 may operate to control the amount of additional air 254 provided by storage vessel 252 to excess air flow path 250 during peak demand period(s), or the amount of additional air 254 drawn from excess air flow path 250 during off-peak demand period(s) to supply storage vessel 252. Where storage vessel 252 is also supplied by second compressor 146, another control valve 260 may be provided. A control valve 256 may also operate to control the amount of excess air flow 200 in excess air flow path 250.


Excess air flow 200 can be directed from first gas turbine system 102 to second turbine system 140 in a number of ways by control valve system 202. As illustrated, control valve system 202 controls flow of excess air flow 200 to at least one of a discharge 210 of second compressor 146, second combustor 148 and turbine nozzle cooling inlet(s) 158 of second turbine component 144. Control valve system 202 may include any number of valves necessary to supply the desired part of second turbine system 140 with at least a portion of excess air flow 200. As illustrated, control valve system 202 may include three valves. A first control valve 212 may control a first portion of excess air flow 200 to discharge 210 of second compressor 146. In this fashion, excess air flow 200 can add to the flow of air from compressor 146 without additional energy consumption thereby. A second control valve 214 may control a second portion of excess air flow 200 to second combustor 148, thus providing additional air for combustion. A third control valve 216 may control a third portion of excess air flow 200 to turbine nozzle cooling inlet(s) 158 of second turbine component 144 to provide a cooling fluid for, among other things, the nozzles of the turbine component. In operation the example shown may function as follows: first, with control valve 210 open and control valves 212, 214 closed, excess air flow 200 is supplied to discharge 210 of second compressor 146; second, with control valves 210 and 216 closed and control valve 214 open, excess air flow 200 is supplied to combustor 148; and finally, with control valves 210, 212 closed and control valve 216 open, excess air flow 200 is supplied to turbine nozzle cooling inlet(s) 158 of second turbine component 144. Each control valve 210, 212, 214 may be positioned in any position between open and closed to provide the desired partial flows to the stated components. Further, while one passage to each component is illustrated after each control valve, it is emphasized that further piping and control valves may be provided to further distribute the respective portion of excess air flow 200 to various sub-parts, e.g., numerous turbine nozzle cooling inlets 158 on second turbine component 144, numerous combustion cans of combustor 148, etc. Control valve system 202 may also include control valve 256 for controlling excess air flow 200 in excess air flow path 250 and control valve 266 controlling additional air supplied by storage vessel 252. As also illustrated, at least one sensor 220 may be provided for measuring a flow rate of at least a portion of excess air flow 200, e.g., as extracted from first integral compressor 106, after each control valve 212, 214, 216, etc. Each sensor 220 is operably coupled to control valve system 202, which may include any now known or later developed industrial control for automated operation of the various control valves illustrated.


Control valve system 202 and hence flow of excess air flow 200 and operation of storage vessel 252, and control valves 260, 266, may be controlled using any now known or later developed industrial controller, which may be part of an overall power generation system 100 control system 180. Control system 180 may control operation of all of the various components of power generation system 100 in a known fashion, including controlling control valve system 202.


Power generation system 100 including first gas turbine system 102 having first integral compressor 106 that creates an excess air flow 200 provides a number of advantages compared to conventional systems. For example, compressor 106 may improve the power block peak, base and hot-day output of power generation system 100 at a lower cost relative to upgrading all compressors in the system, which can be very expensive where a number of gas turbines are employed. In addition embodiments of the invention, reduce the relative cost of an upgraded compressor, i.e., compressor 106, and in-turn improves the viability and desirability of an upgraded compressor by providing a way to efficiently consume more of the excess air flow. Further, power generation system 100 including first integral compressor 106 expands the operational envelope of system 100 by improving project viability in the cases where any one or more of the following illustrative sub-systems are undersized: turbine component 104, generator 122, transformer (not shown), switchgear, HRSG 168, steam turbine system 160, steam turbine control valves, etc. In this fashion, system 100 provides an improved case to upgrade a single compressor in, for example, a two gas turbine and one steam turbine combined cycle (2x1 CC) system as compared to upgrading both compressors 106, 146 or the do-nothing case.


The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the disclosure. As used herein, the singular forms “a”, “an” and “the” are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms “comprises” and/or “comprising,” when used in this specification, specify the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof.


The corresponding structures, materials, acts, and equivalents of all means or step plus function elements in the claims below are intended to include any structure, material, or act for performing the function in combination with other claimed elements as specifically claimed. The description of the present disclosure has been presented for purposes of illustration and description, but is not intended to be exhaustive or limited to the disclosure in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the disclosure. The embodiment was chosen and described in order to best explain the principles of the disclosure and the practical application, and to enable others of ordinary skill in the art to understand the disclosure for various embodiments with various modifications as are suited to the particular use contemplated.

Claims
  • 1. A power generation system, comprising: a first gas turbine system including a first turbine component, a first integral compressor and a first combustor to which air from the first integral compressor and fuel are supplied, the first combustor arranged to supply hot combustion gases to the first turbine component, and the first integral compressor having a flow capacity greater than an intake capacity of at least one of the first combustor and the first turbine component, creating an excess air flow;a second gas turbine system including a second turbine component, a second compressor and a second combustor to which air from the second compressor and fuel are supplied, the second combustor arranged to supply hot combustion gases to the second turbine component;a control valve system controlling flow of the excess air flow from the first gas turbine system to the second gas turbine system along an excess air flow path; anda storage vessel coupled to the excess air flow path for augmenting the excess air flow with additional air during a peak demand period.
  • 2. The power generation system of claim 1, wherein the excess air flow is supplied to a discharge of the second compressor.
  • 3. The power generation system of claim 1, wherein the excess air flow is supplied to the second combustor.
  • 4. The power generation system of claim 1, wherein the excess air flow is supplied to a turbine nozzle cooling inlet of the second turbine component.
  • 5. The power generation system of claim 1, wherein the control valve system controls flow of the excess air flow to at least one of a discharge of the second compressor, the second combustor and a turbine nozzle cooling inlet of the second turbine component.
  • 6. The power generation system of claim 5, wherein the control valve system includes a first control valve controlling a first portion of the excess air flow to the discharge of the second compressor, a second control valve controlling a second portion of the excess air flow to the second combustor, and a third control valve controlling a third portion of the flow of the excess air flow to the turbine nozzle cooling inlets of the second turbine component.
  • 7. The power generation system of claim 6, further comprising at least one sensor for measuring a flow rate of at least a portion of the excess air flow, each sensor operably coupled to the control valve system.
  • 8. The power generation system of claim 1, wherein an exhaust of each of the first turbine system and the second turbine system are supplied to at least one steam generator for powering a steam turbine system.
  • 9. The power generation system of claim 1, wherein the storage vessel receives during an off-peak demand period at least one of: a portion of the excess air flow path from the excess air flow path, and a portion of an air flow output of the second compressor.
  • 10. The power generation system of claim 1, wherein the storage vessel receives a portion of the excess air flow path from the excess air flow path during an off-peak demand period.
  • 11. A power generation system, comprising: a first gas turbine system including a first turbine component, a first integral compressor and a first combustor to which air from the first integral compressor and fuel are supplied, the first combustor arranged to supply hot combustion gases to the first turbine component, and the first integral compressor having a flow capacity greater than an intake capacity of at least one of the first combustor and the first turbine component, creating an excess air flow;a second gas turbine system including a second turbine component, a second compressor and a second combustor to which air from the second compressor and fuel are supplied, the second combustor arranged to supply hot combustion gases to the second turbine component;a control valve system controlling flow of the excess air flow to at least one of a discharge of the second compressor, the second combustor and a turbine nozzle cooling inlet of the second turbine component along an excess air flow path; anda storage vessel coupled to the excess air flow path for augmenting the excess air flow with additional air during a peak demand period,wherein the control valve system includes a first control valve controlling a first portion of the excess air flow to the discharge of the second compressor, a second control valve controlling a second portion of the excess air flow to the second combustor, and a third control valve controlling a third portion of the flow of the excess air flow to the turbine nozzle cooling inlets of the second turbine component, andwherein an exhaust of each of the first turbine system and the second turbine system are supplied to at least one steam generator for powering a steam turbine system.
  • 12. The power generation system of claim 11, wherein the excess air flow is supplied to a discharge of the second compressor.
  • 13. The power generation system of claim 11, wherein the excess air flow is supplied to the second combustor.
  • 14. The power generation system of claim 11, wherein the excess air flow is supplied to a turbine nozzle cooling inlet of the second turbine component.
  • 15. The power generation system of claim 11, wherein the storage vessel receives during an off-peak demand period at least one of: a portion of the excess air flow from the excess air flow path, and a portion of an air flow output of the second compressor.
  • 16. The power generation system of claim 11, wherein the storage vessel receives a portion of the excess air flow path from the excess air flow path during an off-peak demand period.
  • 17. A method comprising: extracting an excess air flow from a first integral compressor of a first gas turbine system including a first turbine component, the first integral compressor and a first combustor to which air from the first integral compressor and fuel are supplied, the first integral compressor having a flow capacity greater than an intake capacity of at least one of the first combustor and the first turbine component;directing the excess air flow to a second gas turbine system including a second turbine component, a second compressor and a second combustor to which air from the second compressor and fuel are supplied, the second combustor arranged to supply hot combustion gases to the second turbine component; andaugmenting the excess air flow with additional air during a peak demand period using a storage vessel coupled to the excess air flow path.
  • 18. The method of claim 17, further comprising supplying the storage vessel, during an off-peak demand period, with at least one of: a portion of the excess air flow from the excess air flow path, and a portion of an air flow output of the second compressor.
  • 19. The method of claim 17, further comprising supplying the storage vessel with a portion of the excess air flow path from the excess air flow path during an off-peak demand period.
  • 20. The method of claim 17, further comprising supplying an exhaust of each of the first turbine system and the second turbine system to at least one steam generator for powering a steam turbine system.
CROSS-REFERENCE TO RELATED APPLICATIONS

This application is related to co-pending U.S. application Ser. Nos. ______, GE docket numbers 280346-1, 280347-1, 280348-1, 280349-1, 280352-1, 280354-1, and 280355-1, all filed on ______.