The present invention relates to a power network system which is formed by asynchronously interconnecting a plurality of power cells and, particularly, to a method for operating the power network system.
When a power supply system is constructed, in addition to a further expansion of a power distribution grid in a more stable way, a main issue has been providing such a system with a capability of introducing a large amount of natural energy. A power network system called Digital Grid (registered trademark) has been proposed as a new power network (see Patent literature 1: Japanese Patent No. 4783453, Non-patent literature 1: Website of Digital Grid Consortium, http://www.digitalgrid.org/index.php/jp/).
Digital Grid (registered trademark) is a power network system in which a power network is partitioned into small-sized cells and these cells are asynchronously interconnected. Each power cell may be small (e.g., a house, a building, or a commercial facility) or may be large (e.g., a prefecture or a municipality). Each power cell naturally includes a load, and may also include a power generation facility or a power storage system. The power generation facility may be, as an example, a power generation facility that uses natural energy generated by, for example, photovoltaic power, wind power, and geothermal power.
In order to freely generate power inside each power cell and to further smoothly interchange power among the power cells, the power cells are asynchronously connected. (That is, even when the plurality of power cells are interconnected, a frequency, a phase, and a voltage of power used in each power cell is asynchronous with those used in other power cells.)
The power generation facility may include, as an example, a solar panel 33 and a wind turbine 34.
The power storage system is, for example, a storage battery 34.
In this specification, the power generation facility and the power storage system may be collectively called a distributed power supply.
Further, the power cells 21-24 respectively include power routers 41-44 which serve as connection ports to be connected to other power cells or the utility grid 11.
Each of the power routers 41-44 includes a plurality of legs (LEG). (Due to space constraints, the symbols for the legs are omitted in
Now, each leg includes a connection terminal and a power conversion unit, and an address is attached to each leg. The power conversion by the leg means converting AC to DC or DC to AC and changing the phase, the frequency, and the voltage of the power.
All the power routers 41-44 are connected to a management server 50 by a communication network 51, and operations of all the power routers 41-44 are integrally controlled by the management server 50. For example, the management server 50 instructs each of the power routers 41-44 to transmit or receive power for each leg using the address attached to each leg. Accordingly, power is interchanged among power cells through the power routers 41-44.
Since power interchange among the power cells is achieved, a plurality of power cells can share, for example, one power generation facility 33 or 34 or one power storage system 35. If an excessive power can be interchanged among the power cells, a supply-demand balance of power can be kept stable while greatly reducing the equipment cost.
One of the advantages of the power interchange between the power cells being possible is a response that can be made in the case of a power failure. That is, even if the utility grid breaks down due to the power failure, it is expected to be possible to avoid a large-scale blackout occurring by interchanging excessive power between power cells mutually. However, it is not always true that the power is transferred to one power cell from the adjacent power cell in an emergency. That is, because it is not realistic to install power generation facilities and power storage units in most of the power cells to generate excessive power in terms of cost, it is not always at all certain that the adjacent power cell has excessive power. Therefore, in the case of providing a new power cell in the power network, it is necessary to anticipate appropriately from which power cell the power should be received in the case of a power failure and to consider to which power cells the new power cell should be connected to.
An object of the invention is to provide a guideline for solving the problem of how to set an operation mode of a power conversion leg when adding a new power cell to the power network.
A method for operating a power network system which includes a plurality of power cells having a power router for connecting to an external power system asynchronously and is constituted by connecting the plurality of power cells,
wherein
the power router includes;
a direct current bus maintaining a voltage at a predetermined rated voltage, and
a power conversion leg having one connection end which is connected to the direct current bus and the other connection end which is connected to an external connection partner as an external connection terminal, and having a function of converting the power bi-directionally between the one connection end and the other connection end, and
wherein
the power conversion leg is operatively controlled in either one operation mode out of
a master mode if the voltage of the direct current bus decrease from the rated voltage, a shortage of the power is compensate from the connection partner, and if the voltage of the direct current bus increase from the rated voltage, an excessive power is transferred to the connection partner,
a designate power transmission/reception mode in which a designated power is transferred to the connection partner or the designated power is received from the connection partner, and
a stand-alone mode in which a voltage with designated amplitude and frequency is produced by itself and is transferred/received between the connection partner,
characterized in that
in case a first power conversion leg of a first power router and a second power conversion leg of a second power router are connected, the first power router and the second power router cannot receive a power supply from the utility grid, and the power is transferred by transmitting electricity from the first power conversion leg of the first power router to the second power conversion leg of the second power router,
when there is the power supply from the utility grid,
the operation mode of the first power conversion leg of the first power router is set to the stand-alone, and
the operation mode of the second power conversion leg of a second power router is set to the designate power transmission/reception mode,
when there is not the power supply from the utility grid,
the operation mode of the first power conversion leg of the first power router is set to the stand-alone, and
the operation mode of the second power conversion leg of the second power router is set to the master mode.
By setting the operation mode of the leg in a proper manner, it is possible to respond rapidly to a power failure and to avoid a situation where the power cells undergo the power failure.
(Description of a Power Router and a Power Network System)
The present invention is for transmitting power efficiently between power cells and for enabling a power network system to be optimally operated. As a condition for this, the power network system uses a power router. However, since the power router and the power network system using the power router is not yet a known technique, first, the power router and the power network system using the power router will be described.
The power router 100 includes the DC bus 101 to which the plurality of legs 110-160 are connected in parallel. The DC bus 101 is provided to enable DC power flow, and a voltage of the DC bus 101 is controlled to be constant. (How the voltage of the DC bus 101 is kept constant will be described later.) The power router 100 is connected to the outside through each of the legs 110-160. All the power to be exchanged with the outside is once converted into DC and the DC flows through the DC bus 101. Since power is once converted into DC, it is possible to asynchronously connect power cells without any consideration for the differences in the phase, the voltage, or the frequency thereof. It is assumed here that the DC bus 101 is, as shown in
Next, the plurality of legs 110-160 will be described. The plurality of legs 110-160 are provided in parallel with the DC bus. In
While the first leg 110 to the fifth leg 150 have the same configuration, the sixth leg 160 is different from the first to fifth legs 110-150 in that the sixth leg 160 does not include a power conversion unit. First, the configuration of the first leg 110 to the fifth leg 150 will be described. Since the first leg 110 to the fifth leg 150 have the same configuration, just the configuration of the first leg 110 will be described as an example. The first leg 110 includes a power conversion unit 111, a current sensor 112, a switch 113, a voltage sensor 114, and a connection terminal 115. The power conversion unit 111 converts AC power to DC power or DC power to AC power. Since DC power flows through the DC bus 101, the power conversion unit 111 converts DC power flowing through the DC bus 101 to AC power having a predetermined frequency and voltage to allow the AC power to flow to the outside from the connection terminal 115. Otherwise, the power conversion unit 111 converts AC power that flows from the connection terminal 115 into DC power to allow the DC power to flow through the DC bus 101.
The power conversion unit 111 has a configuration of an inverter circuit in which anti-parallel circuits 111P formed of thyristors 111T and feedback diodes 111D are three-phase bridge-connected. (That is, six anti-parallel circuits 111P are provided for one inverter circuit.) While the power conversion unit 111 is a three-phase inverter circuit since the three-phase AC is used in this example, a single-phase inverter circuit may be used instead. A line that is drawn from a node between two anti-parallel circuits 111P and connects the node and the connection terminal is called a branch line BL. (Since the three-phase AC is used, one leg includes three branch lines BL.)
The direction of the power, the frequency of the AC power and the like are controlled by the controller 190. That is, switching operations of the thyristors 111T are controlled by the controller 190. The operation control by the controller 190 will be described later.
The switch 113 is provided between the power conversion unit 111 and the connection terminal 115. The branch line BL is opened or closed by the operation of the switch 113, which means the connection between the outside and the DC bus 101 is broken or established. Further, the voltage of the branch line BL is detected by the voltage sensor 114 and the current value of the current flowing through the branch line BL is detected by the current sensor 112. The switching operation of the switch 113 is controlled by the controller 190 and the values detected by the voltage sensor 114 and the current sensor 112 are outputted to the controller 190.
While the power conversion unit is the inverter circuit and the connection partner of the leg uses AC as described above, the connection partner of the leg may instead use DC and may be, for example, a storage battery 35. (For example, in
The first leg 110 to the fifth leg 150 have the same configuration stated above.
Next, the sixth leg 160 will be described. The sixth leg 160 does not include a power conversion unit, which means a connection terminal 165 of the sixth leg 160 is not connected to the DC bus 101. The sixth leg 160 is connected to the branch line BL of the fifth leg 150. An internal wire of the sixth leg 160 is also called a branch line BL. The branch line BL of the sixth leg 160 is connected between the connection terminal 155 and the switch 153 of the fifth leg 150.
The sixth leg 160 includes a switch 163, a voltage sensor 164, a current sensor 162, and a connection terminal 165. The branch line BL of the sixth leg 160 is connected to the branch line BL of the fifth leg 150 through the switch 163. That is, the connection terminal 165 of the sixth leg 160 is connected to the connection terminal 155 of the fifth leg 150. Only the switch 163 is provided between the connection terminal 165 of the sixth leg 160 and the connection terminal 155 of the fifth leg 150 and the sixth leg 160 does not include a power converter. Accordingly, power is conducted between the connection terminal 165 of the sixth leg 160 and the connection terminal 155 of the fifth leg 150 without being converted. A leg such as the sixth leg 160 that does not include a power converter may be called an AC-through leg.
The current sensor 162 and the voltage sensor 164 detect a current value and a voltage value of the branch line BL to output the current value and the voltage value to the controller 190. The switching operation of the switch 163 is controlled by the controller 190.
(Operation Modes of Legs)
The first leg 110 to the fifth leg 150 include power converters 111-151 and the switching operations of the thyristors in the power converters are controlled by the controller 190, as already described above. The power router 100 is in the node of the power network 10, and plays an important role of connecting the utility grid 11, the load 30, a distributed power supply, power cells and the like. At this time, the connection terminals 115-165 of the respective legs 110-160 are connected to the utility grid 11, the load 30, the distributed power supply, and power routers of other power cells. The present inventors have noticed that the legs 110-160 have different roles depending on the connection partner and the power routers are not appropriately operated unless each of the legs 110-160 is appropriately operated according to each of their respective roles. While the legs have the same configuration, the present inventors have changed the method of operating the legs depending on the connection partner.
The method of operating the legs is called an operation mode.
The present inventors have prepared three types of operation modes of the legs, and the modes are switched according to the connection partner.
The operation modes of the legs include:
a master mode;
a stand-alone mode; and
a designated power transmission/reception mode.
In the following description, these operation modes will be described in series.
(Master Mode)
The master mode is an operation mode when a leg is connected to a stable power supply source such as an electrical grid, and is an operation mode to keep the voltage of the DC bus 101. In
In the following description, the leg operated in the master mode may be referred to as a master leg.
The operation control of the master leg will be described.
The master leg is started as follows.
First, the switch 113 is set to the opened (broken) state. In this state, the connection terminal 115 is connected to the connection partner. In this embodiment, the connection partner is the utility grid 11.
The voltage sensor 114 measures the voltage of the utility grid of the connection partner and obtains the phase, the frequency, and the amplitude of the voltage of the utility grid using a phase-locked loop (PLL) or the like. After that, the output of the power conversion unit 111 is adjusted so that the voltage of the phase, the frequency, and the amplitude that are obtained is outputted from the power conversion unit 111. That is, the ON/OFF patterns of the thyristors 111T are determined. When this output is made stable, the switch 113 is turned on and the power conversion unit 111 and the utility grid 11 are connected. Since the output of the power conversion unit 111 and the voltage of the utility grid 11 are synchronized at this point, the current does not flow.
The operation control when the master leg is operated will be described.
The voltage of the DC bus 101 is measured by the voltage sensor 103. When the voltage of the DC bus 101 exceeds a predetermined rated bus voltage, the power conversion unit 111 is controlled so that power is sent from the master leg 110 to the utility grid. (At least one of the phase and the amplitude of the voltage outputted from the power conversion unit 111 is adjusted so that power is sent from the DC bus 101 to the utility grid 11 through the master leg 110.) The rated voltage of the DC bus 101 is predetermined.
On the other hand, when the voltage of the DC bus 101 is below the predetermined rated bus voltage, the power conversion unit 111 is controlled so that the master leg 110 is able to receive power from the utility grid 11. (At least one of the phase and the amplitude of the voltage outputted from the power conversion unit 111 is adjusted so that power is sent from the utility grid 11 to the DC bus 101 through the master leg 110.) It will be understood that, according to the operation of the master leg as described above, the voltage of the DC bus 101 can be kept to the predetermined rated voltage.
(Stand-Alone Mode)
The stand-alone mode is an operation mode in which a leg generates a voltage of the amplitude and the frequency specified by the management server 50 by itself, and sends power to and receives power from the connection partner. The stand-alone mode is, for example, an operation mode to supply power to a device such as the load 30 that consumes power. Alternatively, the stand-alone mode is an operation mode to directly receive power sent from the connection partner.
The leg operated in the stand-alone mode is called a stand-alone leg. In one power router, a plurality of stand-alone legs may be provided.
The operation control of the stand-alone leg will be described.
First, a switch 123 is opened (broken). The connection terminal 125 is connected to the load 30. The management server 50 notifies the power router 100 of the amplitude and the frequency of the power (voltage) that should be supplied to the load 30. The controller 190 causes the power (voltage) of the specified frequency and the specified amplitude to be outputted from the power conversion unit 121 to the load 30. (In short, the ON/OFF patterns of the thyristors 121T are determined.) When this output becomes stable, the switch 123 is turned on to connect the power conversion unit 121 and the load 30. Lastly, when the power is consumed in the load 30, the power corresponding to the consumed amount flows out to the load 30 from the stand-alone leg 120.
(Designated Power Transmission/Reception Mode)
A designated power transmission/reception mode is an operation mode for transmitting or receiving a designated energy. Specifically, the designated power transmission/reception mode includes a case in which the designated power is transmitted to the connection partner and a case in which the designated power is received from the connection partner. In
The leg operated in the designated power transmission/reception mode is called a designated power transmission/reception leg. In one power router, a plurality of designated power transmission/reception legs may be provided.
The operation control of the designated power transmission/reception leg will be described. Since the control when the designated power transmission/reception leg is started is basically the same as that when the master leg is started, a description thereof will be omitted.
The operation control when the designated power transmission/reception leg is operated will be described.
(In the following description, symbols attached to the components of the fifth leg 150 will be used.)
A voltage sensor 154 measures the voltage of the electrical grid of the connection partner to obtain the phase and the frequency of the voltage of the connection partner using a phase-locked loop (PLL) or the like. The target value of the current that the power converter 151 receives or outputs is obtained based on an active power value and a reactive power value specified by the management server 50 and the phase and the frequency of the voltage of the connection partner. A current sensor 152 measures the current value of the current. The power converter 151 is adjusted so that the current corresponding to the difference between the target value and the current value is additionally output. (At least one of the phase and the amplitude of the voltage outputted from the power conversion unit 151 is adjusted so that a desired power flows between the designated power transmission/reception leg and the connection partner.)
From the above description, it will be understood that the first to fifth legs having the same configuration can play roles having three different patterns according to the method of the operation control.
(Connection Restrictions)
Since the operations of the legs vary according to the difference in the operation mode, there are respective restrictions regarding the selection of the connection partner and the selection of the operation mode. That is, when the connection partner is determined, the operation mode that can be selected is determined, and in contrast, when the operation mode is determined, the connection partner that can be selected is determined. (When the connection partner is changed, the operation mode of the leg needs to be changed according to the change of the connection partner.)
Patterns of possible combinations of connections will be described below.
In the following description, the expressions in the diagrams are simplified as shown in
Specifically, the master leg is denoted by M.
The stand-alone leg is denoted by S.
The designated power transmission/reception leg is denoted by D.
The AC-through leg is denoted by AC.
Further, the legs may be differentiated from one another by numbers such as “#1” attached to the top of the legs as necessary.
While systematized symbols are attached for each of figures starting from
For example, the symbol 200 in
All the combinations of the connections shown in
A fifth leg 250 is an AC-through leg. The AC-through leg 250 is connected to the designated power transmission/reception leg of another power router 300 and the AC-through leg 250 is connected to the storage battery 35 through a connection terminal 245 of the fourth leg 240. Since the AC-through leg 250 does not include a power conversion unit, this above connection relation is equivalent to the state in which the designated power transmission/reception leg of the other power router 300 is directly connected to the storage battery 35. It is understood that such a connection is permitted.
A sixth leg 260 is connected to the utility grid 11 as the designated power transmission/reception leg. If it is assumed that a predetermined power is received from the utility grid 11 through the sixth leg 260, it is understood that such a connection is permitted. Considering that the first leg 210 is the master leg, if the power received by the sixth leg 260 is insufficient to keep the voltage of the DC bus 201 to the rated voltage, the master leg 210 receives necessary power from the utility grid 11. In contrast, when the power received by the sixth leg 260 exceeds the amount that is necessary to keep the voltage of the DC bus 201 to the rated voltage, the master leg 210 transfers excessive power to the utility grid 11.
Next, a case in which the power routers are connected to each other will be described. Connecting the power routers means connecting a leg of one power router and a leg of another power router. When the legs are connected to each other, the operation modes that can be combined are restricted.
Both of the combinations of the connections shown in
In
As described above, even when the master leg 110 of the first power router 100 and the stand-alone leg 210 of the second power router 200 are connected, each of the master leg 110 and the stand-alone leg 210 can each play a role. Therefore, no disadvantage occurs in each of the operations in the master leg 110 and the stand-alone leg 210. Accordingly, the master leg and the stand-alone leg may be connected as shown in
In
It is assumed that the designated power transmission/reception leg 310 of the third power router 300 is instructed to receive a designated power according to the instruction from the management server 50. The designated power transmission/reception leg 310 draws the designated power from the stand-alone leg 410 of the fourth power router 400. The stand-alone leg 410 of the fourth power router 400 sends power required from the connection partner (in this example, the designated power transmission/reception leg 310). While the voltage of the DC bus 401 of the fourth power router 400 decreases by the energy sent from the stand-alone leg 410, this is supplemented from the utility grid 11 by the master leg 420.
As described above, even when the designated power transmission/reception leg 310 of the third power router 300 and the stand-alone leg 410 of the fourth power router 400 are connected, the designated power transmission/reception leg 310 and the stand-alone leg 410 can each play a role. Therefore, no disadvantage occurs in each of the operations in the designated power transmission/reception leg 310 and the stand-alone leg 410. Accordingly, the designated power transmission/reception leg and the stand-alone leg may be connected as shown in
While the case in which the third power router 300 obtains power from the fourth power router 400 has been described above, it should be understood that there is also no disadvantage in a case in which the third power router 300 gives power to the fourth power router 400.
It is therefore possible to interchange the designated power between the third power router 300 and the fourth power router 400.
When the legs having the power conversion units are directly connected to each other, only two connection patterns shown in
Next, combinations of the legs that cannot be connected will be described.
As shown in
In the case of
The master leg first performs processing for generating power in synchronization with the phase, the frequency, and the voltage of the connection partner, as described above in the description of the operation.
When the connection partner is also a master leg, each master leg tries to be synchronized with the voltage and the frequency of the other master leg. However, since the master leg does not establish the voltage and the frequency in a stand-alone manner, the synchronous processing stated above does not succeed.
Therefore, the master legs cannot be connected to each other.
There are other reasons why the master legs cannot be connected to each other as follows.
The master leg needs to draw power from the connection partner in order to keep the voltage of the DC bus. (Otherwise excessive power needs to be made to flow out to the connection partner in order to keep the voltage of the DC bus.) When the master legs are connected to each other, each master leg cannot meet the requirements of the connection partner. (If the master legs are connected to each other, neither of the power routers can keep the voltage of the DC bus. This may cause a malfunction such as blackout in each power cell.) In this way, if the master legs are connected to each other, the roles of the master legs conflict with each other (do not match). The master legs therefore must not be connected to each other.
While the designated power transmission/reception legs are connected to each other in
As described above in the description of the operation, similar to the master leg, the designated power transmission/reception leg first performs processing for generating power in synchronization with the phase, the frequency, and the voltage of the connection partner.
When the connection partner is also a designated power transmission/reception leg, each leg tries to be synchronized with the voltage and the frequency of the other leg. However, since the designated power transmission/reception leg does not establish the voltage and frequency in a stand-alone manner, the synchronous processing stated above does not succeed.
Therefore, the designated power transmission/reception legs cannot be connected to each other.
There are other reasons why the above legs cannot be connected to each other as follows.
Even if the designated transmitted power that should be sent by one designated power transmission/reception leg 510 is made equal to the designated received power that should be received by the other designated power transmission/reception leg 610, such designated power transmission/reception legs should not be connected to each other. Assume a case, for example, in which one designated power transmission/reception leg 510 adjusts the power conversion unit to send the designated transmitted power. (For example, the output voltage is made higher than that of the connection partner by a predetermined value.) On the other hand, the other designated power transmission/reception leg 610 adjusts the power conversion unit to receive the designated received power. (For example, the output voltage is made lower than that of the connection partner by a predetermined value.) It will be understood that, when such an adjustment operation is executed in both of the designated power transmission/reception legs 510 and 610 at the same time, both of the designated power transmission/reception legs 510 and 610 become uncontrollable.
While the stand-alone legs are connected in
The stand-alone leg generates a voltage and a frequency by itself.
If one of the voltage, the frequency, and the phase generated by the two stand-alone legs is deviated from the other by even a slight amount in a state in which the stand-alone legs are connected, unintended power flows between the two stand-alone legs.
It is impossible to completely keep the voltage, the frequency, and the phase generated by the two stand-alone legs to be equal. Therefore, the stand-alone legs should not be connected.
In
It should be understood from the above description that this connection is not available as well. Even when the master leg 510 transmits power to or receives power from the connection partner to keep the voltage of the DC bus 501, the designated power transmission/reception leg 610 does not transmit or receive power according to the request from the master leg 510. Accordingly, the master leg 510 cannot keep the voltage of the DC bus 501. Further, even when the designated power transmission/reception leg 610 transmits designated power to or receives it from the connection partner (510), the master leg 510 does not transmit or receive power according to the request from the designated power transmission/reception leg 610. Accordingly, the designated power transmission/reception leg 610 cannot transmit the designated power to or receive it from the connection partner (in this example, the master leg 510).
The case in which the legs including power conversion units are connected has been stated above. When an AC-through leg is taken into consideration, patterns shown in
Still, it is convenient to provide the AC-through leg. There may be a case, for example, in which the distance from the first power router 100 to the utility grid 11 is extremely long and some power routers 200 and 300 need to be passed to connect the first power router 100 to the utility grid 11, as shown in
Now, the connection line which connects the power router and the connection partner will be additionally described.
When the connection line that connects power routers is called a power-transmission line, the power-transmission line may be a part of the utility grid or may be separated from the utility grid.
(In
Further, as shown in
As a matter of course, the utility grid 11 may be replaced by a distributed power supply such as a power generation facility or a storage battery in
Further, the example shown in
As described above, the connection partner of the power router may be a utility grid, a distributed power supply including a storage battery or a power generation facility, or another power router. In this specification and claims, the above are collectively called a power system.
With the power router, it is possible to build a power network system in which the power cells are asynchronously interconnected. According to the connection restrictions described in this exemplary embodiment, legs can be connected to each other so that the roles of the legs do not conflict with each other. It is therefore possible to extend the power network system and to operate the whole system in a stable manner.
(Object of the Present Invention)
The object that is achieved by the present invention will be described in series.
Example 1 will be described with reference to
First,
In
In the first power cell 1, the load 30 and the battery 35 are connected to the first power router 100.
The first power router 100 draws the power from the utility grid 11, and supplies the power to the load 30 or the storage battery 35.
On the other hand, in the second power cell 2, the second power router 200 is connected to the load 30.
The second power router 200 draws the power from the utility grid 11, and supplies the power to the load 30.
Here, as the preparedness for the case where the utility grid 11 is down, it is assumed that the first power router 100 and the second power router 200 are connected to each other, and the power can be transferred from one power router (the first power router 100) to the other power router (the second power router 200).
Here, a case in which a third power cell 3 is newly provided will be described.
In the third power cell 3, the load 30 is connected to the third power router 300.
It is assumed that the third power cell 3 does not have storage batteries.
First, the third power router 300 is connected to the utility grid 11. Then, as the preparedness for the case where the utility grid 11 breaks down, it will become a problem whether to connect the third power router 300 to the first power router 100 or the second power router 200.
It is assumed that there is an advantage that the distance from the third power router 300 to the second power router 200 is closer, and the third power router 300 is connected to the second power router 200 with giving paramount weight to this advantage.
This above state is shown in
Here, it will be assumed that the utility grid 11 breaks down.
In this case, as shown in
However, the first power router 100 and the third power router 300 are connected with each other through the second power router 200. In other words, the power transmission from the first power router 100 up to the third power router 300 is a two-hop. The fact that the power transmission distance increases is the first problem. Furthermore, since the power routers are interconnected asynchronously, the power routers carry out the power conversion upon the transmission/reception of the power. (They carry out the power conversion from AC to DC or from DC to AC.) Consequently, when the second power router 200 is provided in between, additional power conversion loss occurs in the power conversion by the second power router 200.
In view of the above, as shown in
Next, the case of Example 2 (
Example 2 is different from Example 1 in two points. The first point is that the third power cell 3, which is a new power cell, is provided with a storage battery 35. The second point is that the output of the first storage battery 35 of the power cell 1 is small, and thus this storage battery 35 cannot fully support the first power cell 1 and the second power cell 2 when the utility grid 11 breaks down.
In
Moreover, it is also possible for the storage battery 35 of the third power cell to transfer the power to the second power cell via the first power cell. Then the power transmission becomes two-hop, and thus the same problem as described above (Example 1) occurs.
In contrast, as shown in
Thus, upon provision of the new power cell, the problem of which one of the existing power cells the new power cell should be connected to has to be solved in order to create a stable power network system.
This is the first problem.
In addition, there is a second problem.
When connecting the power routers, rather than just connecting the wirings, a connection which meets the restrictions should be made to be able to carry out a normal operation. Specifically, the operation mode is set for each leg of the power router, and the operation of each leg differs according to the operation mode.
When newly connecting the power routers, the combination of the operation modes of the legs must be considered. As described above regarding the connection restrictions of the operation modes of the legs, the power routers must be connected to be able to achieve the unimpeded power transfer between the power routers when the utility grid breaks down. The present inventors have found that, upon the provision of the new power router, the operation mode of each router must be set after due consideration of the response in the case of a previous power failure when the new power cell and the existing power cell are connected to each other. Otherwise, even if the wirings themselves are connected, a normal operation cannot be performed, and thus the power transfer cannot be performed, and eventually it becomes impossible to maintain the power system.
The second problem will be described in a little more detail.
See
In
It should be noted that the first power cell 1 includes the first power router 100, the load 30, and the storage battery 35. The second power cell 2 includes the second power router 200 and the load 30. The new third power cell 3 includes the third power router 300, and the load 30.
The master legs 110, 210, 310 of the first power router 100, the second power router 200 and the third power router 300 are connected to the utility grid 11, respectively. Further, the stand-alone leg 120 of the first power router 100 and the designated power transmission/reception leg 220 of the second power router 200 are connected to each other. The designated power transmission/reception leg 150 is connected to the storage battery 35. The stand-alone legs 130, 230, 320 of the first power router 100, the second power router 200 and the third power router 300 are connected to the loads 30, respectively. Here, upon the connection between the first power router 100 and the third power router 300, it is assumed that the designated power transmission/reception leg 140 of the first power router 100 and the stand-alone leg 33 of the third power router 300 are connected to each other. This is the combination that allows this connection relationship, as previously described.
It is assumed that the utility grid 11 breaks down (see
Even if the utility grid 11 breaks down, by transferring the power in the storage battery 35 of the first power cell 1 to the second power cell and the third power cell 3, the power system can be maintained as a whole.
Therefore, when it is detected that the utility grid 11 has had a break down, an operation switching is performed as follows. (The switching state is shown in
(Note, various ways on how to detect whether the utility grid 11 has had a break down and how to indicate the switching operation to each power router may be considered.
The energy supplied from the connection partner (the utility grid in this case) of the master leg for each power router is monitored. When the connection partner of the master leg goes down, the operation mode of each leg may be subjected to switching in a predetermined procedure. Alternatively, when the utility grid 11 breaks down, the switching instruction of the operation mode of the leg may be issued to each power router from the management server.)
First, focusing on the first power router 100, a fifth leg 150 is connected to the storage battery 35 and its operation mode is the designated power transmission/reception mode. Since it is desired that the first power router 100 maintain the voltage of the DC bus by using the power of the storage battery 35, the operation mode of the fifth leg 150 is switched from the designated power transmission/reception mode to the master mode. In the second power router 200, since it is desired that the power be transferred from the first power router 100, the operation mode of the second leg 220 is switched from the designated power transmission/reception mode to the master mode. In the third power router 300, since it is desired that the power be transferred from the first power router 100, the operation mode of the third leg 330 is switched from the stand-alone mode to the master mode. In short, the legs which are connected to the partner having the excessive power are changed to the master legs.
However, even if the operation mode of each leg is switched in this manner, it is not always true that the power interchange is performed normally. In the relationship between the first power router 100 and the second power router 200, it is true that the power transfer from the first power router 100 to the second power router 200 is performed normally.
The partner to which the second leg 220 of the second power router 200 is connected is the second leg 120 of the first power router 100. The second leg 120 of the first power router 100 is operated in the stand-alone mode. Thus, the second leg 120 of the first power router 100 can transfer the energy that the second leg 220 of the second power router 200 requires.
Meanwhile, it is not possible to perform normal power interchange in this state between the first power router 100 and the third power router 300. Although the third leg 330 of the third power router 300 is the master leg, the connection partner of this master leg 330 is the fourth router 140 of the first power router 100, and the fourth router 140 of the first power router 100 is the designated power transmission/reception leg. This connection is a prohibited combination as described above. Therefore, if the third power router 300 tries to continue to operate by the power transferred from the first power router 100, it is not possible to receive the power from the first power router 100 in this state.
Incidentally, in the state shown in
Thus, when the response for the power failure is considered, and when the fourth leg 140 of the first power router 100 is connected to the third leg 330 of the third power router, the fourth leg 140 of the first power router 100 must be a stand-alone leg as shown in
As described above, when the new power cell is newly established, the power routers should be connected to each other to achieve the smooth power transfer between the power routers when the utility grid breaks down in addition to determining to which of the existing power cells the new power cell should be connected. That is, the operation mode of the leg should be taken into account sufficiently.
This is the second problem.
Through their extensive research, the present inventors have succeeded in developing a method of selecting an optimum connection partner by comprehensively considering various circumstances.
A first embodiment of the present invention will be described.
This embodiment includes a preparation process ST100, a connection partner selecting process ST200, and a leg operation mode setting process ST300. That is, necessary information is prepared in the preparation process ST100, and a selection of the connection partner is performed based on this information (ST200).
Furthermore, after the connection partner is determined, the operating mode of the leg is set (ST300).
Each process will be described in detail.
A detailed procedure of the preparation process ST100 is shown in the flowchart of
First, as a first preparation process ST110, the information table of the existing power network system is updated.
An example of the information table of the existing power network is shown in
The information table of the existing power network is a summary of information of the power cells which already exist.
In this information table, an ID number is assigned to each power cell, and information such as a demanded power, a supplied power, an excessive power, and a place are summarized with respect to each power cell.
The demanded power is a power consumed by the load within the power cell, and is represented in watts [W].
For example, when a contracting wattage is determined with respect to each household, factory and commercial building that exists in the power cell, the demanded power may be a total of this wattage.
Alternatively, it may be a power which is a minimum required during a power failure (when the utility grid is down).
For example, a power which hospitals absolutely require and a power required for maintaining lifelines and the like are estimated and summarized, and it may be the demanded power.
The supplied power is a power value that the distributed power supply in the power cell can output.
For example, when the power generation facility and the storage equipment are provided in the power cell, the supplied power may be a sum of their maximum output.
In short, it is the power value that the distributed power supply in the power cell can supply even during the power failure (when the utility grid is down.)
If the power generation facility is the kind which uses natural energy, for example, the supplied power may be the design maximum output, or it may be estimated suppliable power from past performance.
The excessive power is the power in the power cell in the event of a power failure (when the utility grid is down).
Typically, it is sufficient to use the value obtained by subtracting the demanded power from the supplied power.
If the excessive power is a positive value, this means that power is left over in the power cell even during the power failure (when the utility grid is down).
On the other hand, when the excessive power is a negative value, this means that the power is short in the power cell even during the power failure (when the utility grid is down).
Next, as a second preparation process ST120, an information table of the new power cell is created.
The information table of the new power cell is shown in
In the information table of the new power cell, together with the ID number, a demanded power, a supplied power, an excessive power, and a place are summarized.
Furthermore, as a third preparatory process ST130, a general information table is crated (see
The general information table is one obtained by integrating the information table of the existing power network (
The cost is a sum of installation costs and operational costs which are conceivable if it is assumed that the new power cell will be connected to the existing power cell, and is calculated for each existing power cell.
Installation costs include, for example, construction work costs, equipment costs and the like.
For example, construction work costs and equipment costs are also pushed up if they are separated by a great distance or if a cable is set up beyond mountains, the valleys or seas.
The efficiency of power transmission means an efficiency of power transmission after considering the power lost due to the power transmission.
For example, if 5% of the power is lost due to the power transmission, the efficiency of power transmission is 0.95.
As a power transmission distance gets longer, the efficiency of power transmission decreases.
(In addition, the efficiency of power transmission is also changed by the transmission voltage.)
The preparation process ST100 comes to an end when it has been possible to create the general information table as just described, and then the connection partner selecting process ST200 will be performed.
With reference to flowcharts in
First, it is determined whether to build a dependency upon due consideration of the response to the power failure between the new power cell and the existing power network (ST201).
That is, if the excessive power of the new power cell is 0, the new power cell cannot transfer the power to other power cells, and does not need to receive the power from other power cells.
Alternatively, at the discretion of the operator side of the power system, there is a case where it is not desired to build the dependency between the new power cell and the existing power network during the power failure (when the utility grid is down).
If the dependency upon due consideration of the response to the power failure is not built between the new power cell and the existing power network (ST201: YES), the lowest cost power cell from among the existing power cells is selected as the connection partner of the new power cell (ST202).
On the other hand, if the dependency upon due consideration of the response to the power failure is built between the new power cell and the existing power network (ST201: NO), the flow branches depending on whether the excessive power of the new power cell is negative or positive.
First, if the excessive power of the new power cell is positive (ST203: YES), the existing power cell that meets “a first condition group” is searched.
Here, “the first condition group” is represented as follows.
[The excessive power of the existing power cell]<0 (Condition expression 11), and,
[The excessive power of the new power cell]×(The efficiency of power transmission)+[The excessive power of the existing power cell]>0 (Condition expression 12), and,
[The cost]≦(A predetermined cost upper limit) (Condition expression 13)
The fact that the excessive power of the new power cell is positive means that there is room for transmitting the power to another power cell during the power failure.
Thus, the existing power cell in which the power is insufficient in the event of a power failure is preferable as the connection partner of such new power cell.
Therefore, the condition expression 11 is required.
Further, it is prohibited that the sum of the excessive of its own and the negative component of the connection partner become negative.
When the sum of the excessive of its own and the negative component of the connection partner become negative, both of them become down in the event of a power failure.
Further, it is required to take the efficiency of power transmission into account.
Accordingly, the conditional expression 12 is required.
Furthermore, even if there is an existing power cell which satisfies the conditional expression 1 and the conditional expression 2, there is no sense in connecting this existing power cell and the new power cell if it costs too much.
For example, if the cost of installing a cable exceeds the cost of installing the new distributed power supply, there is no sense in installing a long distance cable purposely for power transfer.
Therefore, the condition expression 13 is required.
If there are one or more existing power cells that satisfy the first condition group (ST205: YES), the lowest cost one among them is selected as the connection partner of the new power cell (ST206).
Then, a first update process is performed (ST207).
The first update process is one that updates the excessive power as follows.
The connection partner of the new power cell is assumed to be an existing power cell Y.
[The excessive power of the new power cell after the update]: [The excessive power of the new power cell before the update]+[The excessive power of the existing power cell Y before the update]÷(The efficiency of power transmission)
[The excessive power of the existing power cell Y after the update]: 0
The excessive power of the new power cell after the update represents the power which is left over even if the power which corresponds to the negative component of the existing power cell Y is transferred.
The excessive power of the existing power cell Y after the update is determined to be 0 uniformly.
Here, because the existing power cell Y and the new power cell are connected to each other, it may be thought that the power of the distributed power supply the new power cell has may be included in the excessive power of the existing power cell Y after the update.
In other words, the excessive power of the existing power cell Y after the update is made to be a positive value rather than 0, and the excessive power of the new power cell after the update may be reduced by the amount of the positive value.
The fact that the excessive power of the existing power cell Y after the update is made to be a positive value indicates that the excessive power of the new power cell can be transferred to another power cell via the existing power cell Y.
In the present invention, the thought described above is not definitely excluded, but it is not preferable to “sublet” such power in view of power efficiency and a possibility that the calculation of the condition expression may become complicated. In the present embodiment, the excessive power of the existing power cell Y after the update is determined to be 0 uniformly.
After the update process 1 (ST207), a search is performed to see whether any further existing power cell that satisfies “the first condition group” exists (ST204), and steps ST204 to ST207 are repeated until the existing power cell that satisfies the first condition group is eliminated.
In this way, upon installing the new power cell of which the excessive power is positive, the proper connection partner can be selected.
In ST205, if there is no existing power cell that satisfies the first condition group (ST205: NO), the process branches according to whether or not there was even one existing power cell which satisfies the first condition group.
If there is no existing power cell which meets the first condition group (ST208: YES), which means that there is no existing power cell which makes the dependency between the new power cell, the process returns to ST202, the lowest cost power cell is selected as the connection partner and the process ends.
If there are one or more existing power cells that satisfies the first condition group, and if a loop from ST204 to ST207 is performed more than once (ST208: NO), the process immediately ends.
Here, in
Next, the process when the excessive power of the new power cell is negative (ST203 NO) will be described.
If the excessive power of the new power cell is negative (ST203: NO), a search for an existing power cell that satisfies “a condition group 2” is performed.
“The second condition group” is indicated as follows.
[The excessive power of the new power cell]+[The excessive power of the existing power cell]×(The efficiency of power transmission)≧0 (Condition expression 21), and,
[The cost]≦(A predetermined cost upper limit) (Condition expression 22).
The fact that the excessive power of the new power cell is negative means that it is required that the new power cell receive the power from another power cell in the event of a power failure.
Thus, the existing power cell which has the excessive power during the power failure is preferable as the connection partner of such new power cell, if the sum of its own excessive power and the negative component of the connection partner (the new power cell) does not become negative.
Therefore, the condition expression 21 is required.
(Also, it can be understood that [The excessive power of the existing power cell]<0 is of course true if the conditional expression 21 is met.)
Furthermore, for the same reason as the condition expression 13, even if there is an existing power cell which satisfies the conditional expression 21, since there is no sense in connecting this existing power cell and the new power cell to each other if it costs too much, the condition expressing 22 is required.
If there are one or more existing power cells that satisfy the second condition group (ST210: YES), the lowest cost one among them is selected as the connection partner of the new power cell (ST212).
Then, a second update process is performed (ST207).
The second update process is one that updates the excessive power as follows.
The connection partner of the new power cell is assumed to be an existing power cell Z.
[The excessive power of the new power cell after the update]: 0 [The excessive power of the existing power cell Z after the update]: [The excessive power of the existing power cell Z before the update]+[The excessive power of the new power cell before the update]÷(The efficiency of power transmission).
After the second update process, the process ends.
In this way, upon installing a new power cell of which the excessive power is negative, the proper connection partner is selected.
In ST210, if there is no existing power cell that meets the second condition group (ST210: NO), which means that there is no existing power cell which makes the dependency between the new power cell, the process returns to ST202, the lowest cost power cell is selected as the connection partner and the process ends.
After the connection partner selecting process ST200 ends, a leg operation mode setting process ST300 starts.
The flow chart showing the procedure of the leg operation mode setting process ST300 is shown in
By the processes described above, the connection partner (one or more existing power cells) which connects to the new power cell is determined.
In the leg operation mode setting process ST300, it is determined whether or not the power is transferred between the new power cell and the existing power cell during a power failure (ST310).
If the existing power cell connected to the new power cell has been selected in ST202, it is determined that the power is not transferred between the new power cell and the existing power cell during the power failure. On the other hand, if the existing power cell connected to the new power cell has been selected in ST206 or ST211, it is determined that the power is transferred between the new power cell and the existing power cell during the power failure.
If the power is not transferred between the new power cell and the existing power cell at the power failure (TS310: NO), the operation mode of each leg is set in accordance with a first leg operation setting rule.
The first leg operation setting rule is the following leg operation rule.
It is assumed that the power cell X and the power cell Y are determined to be connected to each other.
(In other words, the power router XR of the power cell X and the power router YR of the power cell Y are connected to each other. More specifically, the leg XRL of the power router XR and the leg YRL of the power router YR are connected to each other.)
(When the power cell X is one of the new power cell and the existing power cell, the power cell Y is the other one of the new power cell and the existing power cell.)
Then, when the utility grid is not down, it is assumed that the power is transferred from the power cell X to the power cell Y.
At this time, the operation mode of the leg XRL of the power router XR and the leg YRL of the power router YR will be set as follows.
When the utility grid is not down, the operation mode of the leg XRL of the power router XR is the designated power transmission/reception mode, and the operation mode of the leg YRL of the power router YR is the stand-alone mode.
Then, when the utility grid goes down and a power failure occurs, the operation of the leg XRL of the power router XR and the leg YRL of the power router YR is stopped.
However, in the power router XR and the power router YR, if there is a leg that is connected to the distributed power supply, the operation mode of the leg that is connected to the distributed power supply is changed to the master mode at the time of the power failure.
In short, the transmission side of the power is made to be the designated power transmission/reception mode, and the reception side of the power is made to be the stand-alone mode.
Further, since the power is not transferred during the power failure of the utility grid, the operation of the leg is stopped during the power failure of the utility grid.
In the first leg operation setting rule, the transmission side of the power is made to be the designated power transmission/reception mode and the reception side of the power is made to be the stand-alone mode because in this case the efficiency of power transmission is better.
It is possible to operate even if the transmission side of the power is made to be the stand-alone mode and the reception side of the power is made to be the designated power transmission/reception mode, and the setting of such operation mode is not excluded from the present invention.
On the other hand, when the power is transferred between the new power cell and the existing power cell at the time of the power failure (ST310: YES), the operation mode of each leg is set in accordance with the second leg operation setting rule.
The second leg operation setting rule is the following leg operation rule.
It is assumed that the power cell J and the power cell K are determined to be connected to each other.
(In other words, the power router JR of the power cell J and the power router KR of the power cell K are connected to each other.
More specifically, the leg JRL of the power router JR and the leg KRL of the power router KR are connected to each other.)
(When the power cell X is one of the new power cell and the existing power cell, the power cell Y is the other one of the new power cell and the existing power cell.)
Then, when the utility grid is down, it is assumed that the power is transferred from the power cell J to the power cell K.
At this time, the operation mode of the leg JRL of the power router JR and the leg KRL of the power router KR will be set as follows.
The operation mode of the leg JRL of the power router JR is set to be the stand-alone mode.
The operation mode of the leg KRL of the power router KR, when the utility grid does not lose power, is the designated power transmission/reception mode.
When the utility grid loses power, the operation mode of the leg KRL of the power router KR is changed to from the designated power transmission/reception mode to the master mode.
(Even if the utility grid loses power, the operation mode of the leg JRL of the power router JR may remain in the stand-alone mode.
In the power router JR, if there is a leg that is connected to the distributed power supply, the operation mode of the leg that is connected to the distributed power supply is changed to the master mode when the utility grid loses power.)
By setting the operation mode of each leg in accordance with the second leg operating setting rule, it is possible to respond promptly to the power failure.
In other words, even if the utility grid is down, it is only necessary to change the operation mode of the leg KRL from the designated power transmission/reception mode to the master mode only in the power router of the reception side (the power router KR).
(In the transmission side, the operation mode of the leg may not be changed.)
Therefore, even if the power cell K does not have excessive power, and the utility grid loses power, it is possible to maintain the voltage of the DC bus of the power router K with the rated voltage by the power transferred from the power cell J and to avoid a situation where the power cell K undergoes a power failure.
With the above process, upon providing the new power cell, it is possible to select an appropriate connection partner.
Therefore, even if the utility grid is down, it is possible to perform the power transfer between the power cells appropriately, and to avoid a situation where a large-scale power failure occurs in the whole or in the wide sphere of the power network.
Further, since the power is allowed to be transferred between the power cells during the power failure, there is no need to invest excessive capital for providing, for example, a distributed power supply such as storage batteries and power generation facilities in the entire power cell.
Then, by setting the operating mode of the legs in a proper manner, it is possible to respond to the power failure promptly, and to avoid a situation where the power cell undergoes the power failure as much as possible.
Note that the present invention is not limited to the exemplary embodiments stated above, and may be changed as appropriate without departing from the spirit of the present invention.
In the above-mentioned ST206, although the lowest cost power cell is selected as the connection partner of the new power cell, the one with the highest demanded power among the existing power cells which meet the first condition group may be selected as the connection partner of the new power cell.
Or, the power cell with the highest absolute value of excessive power among the existing power cells which meets the first condition group may be selected as the connection partner of the new power cell.
It is considered that providing the function for creating and storing the information table of the existing power network, the information table of the new power cell and the general information table in the management server 50 is the most efficient the system design, however, the above-mentioned table may be created and stored by a computer other than the management server 50.
Each process of the process flow described in
The operation program of the power network system may be distributed in a state where it is recorded on a computer-readable non-volatile storage medium, or it may be installed in the computer by being prepared to be downloaded by wire or wirelessly.
The storage batteries may be replaced in the distributed power supplies, including the power generation facilities.
In the above description, all the power cells are connected to the utility grid, and the power cells are to receive the power from the utility grid during a normal operation. Further, the state that the utility grid is down is called a power failure.
Rather than receiving the power from the utility grid during a normal operation, a plurality of power cells could receive the power from the (big) distributed power supply even in a normal operation. In this case, the power failure means that the (big) distributed power supply which is a source of this power is down.
Although embodiments of the present invention are described specifically in the foregoing, the present invention is not restricted to the above-described embodiments. Various changes which is recognized by those skilled in the art may be made without departing from the scope of the invention.
This application is based upon and claims the benefit of priority from Japanese patent application No. 2013-004770, filed on Jan. 15, 2013, the disclosure of which is incorporated herein in its entirety by reference.
Number | Date | Country | Kind |
---|---|---|---|
2013-004770 | Jan 2013 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2013/006988 | 11/28/2013 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2014/111995 | 7/24/2014 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
9013902 | Abe | Apr 2015 | B2 |
20120173035 | Abe | Jul 2012 | A1 |
Number | Date | Country |
---|---|---|
2011-61970 | Mar 2011 | JP |
4783453 | Sep 2011 | JP |
Entry |
---|
Website reference of the Digital Grid Consortium (http://www.digitalgrid.org/jp/). |
International Search Report mailed Mar. 4, 2014 in corresponding PCT International Application. |
Number | Date | Country | |
---|---|---|---|
20150355666 A1 | Dec 2015 | US |