The present invention relates to a power plant and a water cleaning method for a once-through water-steam cycle of a power plant.
More specifically, the invention relates to water cleaning during start-up of the power plant.
According to the state of the art, in the bottoming cycle of for example a combined cycle power plant the iron content in the water can be too high, especially when the water has been standing still in the heat recovery steam generator for a while. This iron needs to be removed from the water before it is all turned into steam, to avoid damage in equipment downstream of the evaporator part in the heat recovery steam generator.
Known combined cycle power plants with a once-through steam generation system typically comprise a separator arranged in the heat recovery steam generator and installed to separate the water fraction (containing the dissolved iron) and to take that water fraction out of the steam flow. The separated water fraction is then thrown away or can be further cleaned.
A typical disadvantage of such an arrangement is that a separator requires extra connections, piping, and a support structure. This makes the heat recovery steam generator heavier, more complex and more voluminous.
It is therefore a goal of the present invention to provide a power plant, which overcomes the above-mentioned disadvantage. A further goal of the invention is to provide a water cleaning method for a power plant with water-steam-cycle.
The object of the invention is achieved by the independent claims. The dependent claims describe advantageous developments and modifications of the invention.
In accordance with the invention there is provided a power plant with a water-steam-cycle. The power plant comprises a steam generator with a plurality of heating surfaces configured to carry a fluid and to transfer heat to said fluid, the plurality of heating surfaces comprising an economizer for preheating said fluid and an evaporator for producing steam, the evaporator being fluidly connected to the economizer. The power plant further comprises a steam turbine that is configured to receive the steam produced in the steam generator to generate power output; the power plant also comprises a condenser configured to condense steam from the steam turbine, the condenser comprising a hotwell as collection container for condensed steam or water. Finally, the power plant also comprises a polishing plant that is arranged fluidly between the hotwell of the condenser and the economizer. A drain line interconnects an outlet of the economizer and the hotwell of the condenser and a fluid line interconnects the outlet of the economizer and the evaporator and the fluid line comprises means to hold back water in the economizer. The invention is characterized in that tubes at the outlet header of the economizer are bent upwards to create a syphon.
In other words, in preparation of the start-up of the power plant, the water contained in the economizer (the rest of the steam generator is empty during stand-still) is pumped through the drain to the hotwell, where it is diluted and the water from there is led at least partly through the polishing plant and cleaned. As soon as the water in the economizer has been replaced by clean water from the hotwell and the polishing plant, the steam generator is ready to start-up. When the water from the hotwell is not of the correct quality, water can be circulated over this drain and led through the polishing plant until it is clean enough for starting the steam generator.
A syphon carries out its function passively without any moveable components and its thermal stability is identical to the other tubes in the steam generator. Depending on the syphon's height above the inlet of the economizer, a part of the preheated water may get into evaporator and superheater tubes. This fluid would have to be drained afterwards.
Therefore, it is advantageous, when the cyphon reaches till above the inlet header of the economizer, even more advantageously as high as possible.
In an embodiment of the power plant according to the invention, at the outlet of the economizer an outlet header for collecting preheated feedwater and for evenly spreading this preheated feedwater over the evaporator tubes is arranged. From this outlet header the drain line to the hotwell and the fluid line to the evaporator branch off.
According to an embodiment a polishing plant is arranged fluidly between the hotwell of the condenser and the economizer and a capacity of the polishing plant in parallel flow to a main condensate line is less than 100% of an amount of water supplied to the economizer at base load.
The invention is applicable to all power plants with a water-steam-cycle. It is particularly advantageous when the heat source for the steam generator is a gas turbine.
The method according to the present invention comprises the following steps of—draining water contained in the economizer to the hotwell, where it is diluted,—leading water from the hotwell at least in part through a polishing plant in order to clean it,—supplying the economizer with water from the hotwell and water from the polishing plant, and—starting-up the steam generator as soon as at least a part of the water in the economizer has been replaced by clean water from the hotwell and the polishing plant and is characterized by the step that water getting over syphon tubes at an economizer outlet into evaporator and superheater tubes is drained by a drip leg at a steam generator outlet and led to the hotwell.
The advantages of this method largely correspond to the above-mentioned advantages of the power plant.
Preferably, water is continuously drained from the economizer, led at least partly through the polishing plant and supplied to the economizer in case water from the hotwell and the polishing plant is not of a required quality, until it is clean enough for starting the steam generator.
It is appropriate that water contained in the economizer is drained by pumping boiler feedwater into the economizer and where applicable by opening a drain at an economizer outlet header.
Expediently, the circulation of water is maintained until an iron level is low enough.
An important advantage of the power plant according to the present invention is the implementation of a mechanical arrangement such that only the economizer contains water at standstill, and that an intermediate loop can be formed to circulate the water over the polishing plant until it is clean.
This leads to a very compact design of the bundle, and no separator and connecting piping is needed anymore. This saves a lot of weight and volume, resulting in a lighter and more compact steam generator. This can amount to 20% weight saving, which especially for offshore applications is very important.
Furthermore, the size of the polishing plant can be kept small. Another way to clean up the water that is used, is to install a polishing plant of 100% capacity, and all the water is led through this polishing plant. While filling the steam generator, just prior to start-up, it is with clean water. With this new system the steam generator doesn't need to be drained and refilled, and the polishing plant can be kept at its regular size of about 50%.
Keeping always water in (a part of) the bundle drastically reduces temperature excursions and thus thermal shocks, while in some other designs a gas turbine is started while the heating surfaces are empty, creating severe thermal stresses when filling the heating surfaces. Therefore, the new design is much better suited for fast starting and flexible operation because of this avoidance of thermal stresses.
Especially for offshore applications significant savings are made in weight and space, making the use of e.g. a combined cycle power plant more attractive, or use this as a steam tail for existing simple cycle operating gas turbines (where adding weight on an existing platform or ship is strictly limited).
Embodiments of the invention are now described, by way of example only, with reference to the accompanying drawings, of which:
The illustration in the drawings is in schematic form. It is noted that in different figures, similar or identical elements may be provided with the same reference signs.
According to the embodiment of
According to the embodiment of in
The combined cycle power plant 22 illustrated in
According to the embodiment, a condenser 7 is located at an exit of the steam turbine 6 and is configured to condense steam from the steam turbine 6, the condenser 7 comprising a hotwell 8 as collection container for condensed steam or water.
The power plant 1 of
Condenser 7 (+ polishing plant 9), steam generator 2 and steam turbine 6 form a water-steam cycle.
Although the present invention has been described in detail with reference to an embodiment, it is to be understood that the present invention is not limited by the disclosed example, and that numerous additional modifications and variations could be made thereto by a person skilled in the art without departing from the scope of the invention.
Number | Date | Country | Kind |
---|---|---|---|
19174635.3 | May 2019 | EP | regional |
This application is the US National Stage of International Application No. PCT/EP2020/054074 filed 17 Feb. 2020, and claims the benefit thereof. The International Application claims the benefit of European Application No. EP19174635 filed 15 May 2019. All of the applications are incorporated by reference herein in their entirety.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2020/054074 | 2/17/2020 | WO | 00 |