Claims
- 1. A power receiving system comprising:
- a plurality of network lines for delivering power and a network bus for receiving said power, with each network line having associated therewith:
- a network transformer connected between said network line and said network bus;
- a protector breaker and a current detector both of which are connected to a secondary side of said network transformer;
- a breaker provided on a primary side of said network transformer and having a breaker interruption capacity which is smaller than that of said protector breaker; and
- relay means responsive to a detection current which is detected by said current detector, for opening said breaker and said protector breaker when said current detector detects a first type of accident current flowing in a direction opposite to that of a normal current flow and indicating an accident point on the secondary side of said network transformer, and for opening only said protector breaker when said current detector detects a second type of accident current flowing in a direction opposite to that of said normal current flow and indicating an accident point on a primary side of said network transformer.
- 2. A power receiving system according to claim 1 wherein said relay means includes an operation controller.
- 3. A power receiving system according to claim 1 wherein said breaker includes at least one of a vacuum breaker and a vacuum contactor.
- 4. A power receiving system comprising:
- a plurality of network lines for delivering power and a network bus for receiving said power, with each network line having associated therewith:
- a network transformer connected between a load side of said network line and said network bus;
- a load switch connected to a primary side of said network transformer;
- a protector breaker and a current detector both of which are connected to a secondary side of said network transformer;
- a breaker provided on a primary side of said network transformer and having a breaker interruption capacity which is smaller than that of said protector breaker; and
- an operation controller responsive to detection of a current for opening said breaker and said protector breaker when there is detected a first type of current flowing in a direction opposite to a direction of a normal current flow and indicating an accident point on the secondary side of said network transformer, and for opening only said protector breaker when there is detected a second type of current flowing in a direction opposite to a direction of said normal current flow and indicating an accident point on the primary side of said network transformer.
- 5. A power receiving system according to claim 4 wherein said load switch includes a breaker.
- 6. A power receiving system comprising:
- a plurality of network lines for delivering power and a network bus for receiving said power, with each network line having associated therewith:
- a network transformer connected between a load side of said network line and said network bus;
- a protector breaker and a current detector both of which are connected to a secondary side of said network transformer;
- a breaker provided on a primary side of said network transformer, and having a breaker interruption capacity which is smaller than that of said protector breaker;
- relay means responsive to a detection signal which is detected by said current detector, for opening said breaker and said protector breaker when said current detector detects a first type of accident current flowing in an opposite direction than a normal current flow on the secondary side of said network transformer and indicating an accident point on a secondary side of said network transformer, and for opening only said protector breaker when said current detector detects a second type of accident current flowing in an opposite direction than said normal current flow and indicating an accident point on a primary side of said network transformer;
- a load switch connected to the breaker side of the network lines; and
- a delay device connected to said load switch and said breaker to open said load switch after lapse of a predetermined time from when said breaker is opened.
- 7. A power receiving system according to claim 6 wherein said relay means include an operation controller.
Priority Claims (2)
Number |
Date |
Country |
Kind |
3-008287 |
Jan 1991 |
JPX |
|
3-056356 |
Mar 1991 |
JPX |
|
Parent Case Info
This application is a continuation of Ser. No. 07/826,604, filed Jan. 28, 1992, now abandoned.
US Referenced Citations (5)
Foreign Referenced Citations (1)
Number |
Date |
Country |
0252122 |
Oct 1989 |
JPX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
826604 |
Jan 1992 |
|