The invention relates to a pre-assembled plate consisting of reinforced concrete especially for use as a structural component of a permanent roadway for high-speed vehicles and to an accompanying method of installing and using the plates.
A generic pre-assembled plate consisting of reinforced concrete is known from DE 197 33 909. The pre-assembled plate consisting of reinforced concrete is provided for constructing a compound plate construction, especially a solid roadway for high-speed rail traffic. At least two steel rods extending in the longitudinal direction of the plate and projecting over its two front sides are arranged in the pre-assembled plate consisting of reinforced concrete. Each steel rod is immovably anchored on only one position in the pre-assembled plate consisting of reinforced concrete and is otherwise freely extendable. This makes an extension stretch available that always has the length of each pre-assembled plate consisting of reinforced concrete and consequently exerts a great tensioning force on the concrete introduced into the butt joint. It turned out that this has the disadvantage that theoretical breaking points arranged at regular intervals in the pre-assembled plate consisting of reinforced concrete are bridged by the bracing and stress of the steel rods and thus loose their function. Unavoidable cracks in the pre-assembled plate consisting of reinforced concrete arise as a result at unpredictable locations, especially not in the area of the theoretical breaking points provided.
The method for producing a compound plate construction, especially a solid roadway for high-speed rail traffic that is also suggested in the DE 197 33 909 A1 consists in that at first the ends of the steel rods are frictionally and tensionally connected to each other and that thereafter the two pre-assembled plates consisting of reinforced concrete adjacent to one another are pressed apart from one another with a defined force of the steel rods. The pre-assembled plates consisting of reinforced concrete are held in this position and the entire butt joint between the two front sides adjacent to one another of the pre-assembled plates consisting of reinforced concrete is filled with a solidified filling mass. The defined force is subsequently released and the filling mass braced by the tensioning force of the steel rods that now occurs. This solution has the disadvantage that a positioning and exact adjusting of the pre-assembled plates consisting of reinforced concrete that took place prior to the application of the defined force is lost again since the complete plate must be moved for bracing. This results in a shifting of the plate on the underlying foundation, as a result of which the adjusting screws standing on the foundation are shifted or even somewhat tilted. The positioning and aligning of the pre-assembled plate consisting of reinforced concrete previously performed is distorted again as a consequence. Therefore, a new alignment of the plates is necessary after the filling of the butt joint. This necessitates an additional work expense and creates problems in the area of the filled butt joint.
DE 26 21 793 teaches a method of producing a compound grate or plate construction of pre-tensioned pre-assembled concrete parts. In this reference, the joints between the pre-assembled concrete parts are pre-tensioned after the joining together and aligning of the concrete pre-assembled parts. Tensioning member ends project from the concrete pre-assembled parts with which ends a connection is established between adjacent concrete pre-assembled parts. The joint produced is pressed apart with a pressing device, a mass is introduced into this joint as joint filling and the pressing device is not stress-relieved and removed until after the hardening or setting of the joint filling. After the setting of this mass, rod tighteners that were arranged on the tensioning member ends were tightened with a controlled force, which places the filled joints under a pre-tension. The concrete plates are subsequently underfilled or underpressed. Lastly, the recesses for the rod strainers are closed and sealed. This method has the disadvantage that the pre-tension of the tensioning rod ends is altered by the underfilling or underpressing of the concrete plates. Moreover, the adjusting is possibly influenced by this method so that a subsequent check must take place. Even different temperatures during tensioning or filling of the butt joints and during the underfilling have a negative influence on the precision of the alignment of the concrete plates.
The present invention has the problem of avoiding the disadvantages of the state of the art and in particular of assuring a precise alignment of the pre-assembled plates consisting of reinforced concrete.
This problem is solved by the features of the claims presented here.
In a pre-assembled plate consisting of reinforced concrete each steel rod is anchored in the area between the front side of the pre-assembled plate and a surface defined groove which defines the first theoretical breaking point and is supported in a substantially freely movable manner, starting from this anchoring, in the direction of the particular front side in its longitudinal direction. This assures that the theoretical breaking point is not loaded with pressure, thus possibly loosing its effect. As a result of the fact that the steel rod is movably supported in a defined area directed away from the pre-assembled plate, traction forces in a plate segment limited by the theoretical breaking point are introduced onto the pre-assembled plate containing no theoretical breaking point. This produces cracks in the area of the theoretical breaking point. This is desired since as a consequence thereof the other plate parts remain substantially free of cracks. All theoretical breaking points introduced in the pre-assembled plate can thus fulfill their task.
If the theoretical breaking point is a dummy joint running transversely to the longitudinal direction of the pre-assembled plate the theoretical breaking point can be produced in a simple manner in the casting or pouring of the pre-assembled plate already. As a result of the dummy joint the thickness of the pre-assembled plate is reduced at this position. Cracks then arise in the immediate vicinity of this dummy joint and can thus be purposefully checked for their magnitude. The state of the pre-assembled plate can thus be readily monitored.
It proved to be especially advantageous if the anchoring of the steel rod is approximately 50 cm removed from the front side of the pre-assembled plate. This yields a sufficient length of the steel rod for extending it in accordance with the requirements in a permanent joining of several pre-assembled plates. As a result of the extension a pressure force is applied to the joint that can bring about a penetration of water and therewith a destruction of the joint or of the concrete.
In order to make possible an extension of the steel rod or to prevent the steel rod from being permanently connected in the corresponding area during the manufacture of the pre-assembled plate, it is provided that the steel rod is jacketed in the area between the front side of the pre-assembled plate and the anchoring by a tube or hose, especially by a shrinkdown plastic tubing such as a heat-shrinkable sleeve. This can assure that the steel rod is arranged within the tube or hose or, if the shrinkdown plastic tubing was reduced from a greater diameter to a smaller diameter after the setting of the concrete, is movably arranged in its longitudinal direction in the pre-assembled plate. The anchor point of the steel rod is again located thereby in the first segment of the pre-assembled plate. The steel rod is to be extended from this anchor point to the end of the steel rod relative to the pre-assembled plate. A so-called tenso binding which results also yields a reliable corrosion protection in the non-concreted area.
A sliding of the steel rod within the jacketing is possible, in particular if the jacketing of the steel rod has a greater inside diameter than the outside diameter of the steel rod. The jacketing is permanently connected to the concrete thereby whereas the steel rod can rotate within the jacketing. A sliding between the concrete and the shrinkdown plastic tubing is possible if a shrinkdown plastic tubing is used.
If the steel rod ends in a pocket of the pre-assembled plate, fastening means for joining the steel rod of the one pre-assembled plate to a steel rod of the adjacent pre-assembled plate can be introduced in a simple manner. The pocket also permits the tension path of the steel rod to be sufficiently large.
If the pocket is open toward the top of the pre-assembled plate the steel rod and the end of the steel rod and fastening means connected to them can be readily accessed. Tools for tensioning the steel rod can therefore be introduced in a simple manner.
If the pocket is closed in the direction of the bottom of the pre-assembled plate the substratum can be sealed off or encased in a simple manner. The bottom of the pre-assembled plate thus forms a substantially straight line along the front side of the pre-assembled plate so that appropriate sealing means are simple to apply. Moreover, it is more readily possible with this straight-line closure edge to seal off the substratum and less sealing material is required.
If the pocket has an undercut, such as a back taper, when viewed from the top, an additional clawing of the adjacent pre-assembled plates is produced during the grouting of the pocket, e.g., with concrete. The pocket thus brings about a vertical fixing of the pre-assembled plates to each other so that an additional safeguard against an unintentional shifting of the pre-assembled plates toward each other is provided.
If the pocket of the one pre-assembled plate corresponds to a corresponding pocket of the adjacent pre-assembled plate, a wide joint is produced between the adjacent pre-assembled plates. This wide joint is for its part suited for receiving a fastener for the two pre-assembled plates and facilitates the accessibility to these fastening means during their mounting. In addition, a sufficient free space for the tensioning of the steel rods is achieved.
If a narrow joint is provided between two steel rods of the pre-assembled plate and/or toward the edge of the pre-assembled plate, a sealing compound can be introduced in a defined manner between the two pre-assembled plates.
If the bottom of the front side of the pre-assembled plate has a substantially straight-line course and/or the top has alternating narrow and wide joints, this yields on the one hand a good seal of the substratum below the pre-assembled plate and on the other hand a ready mounting of the tensioning device for the steel rods.
It is especially advantageous if a connecting means for connecting the steel rod of the one pre-assembled plate to the steel rod of the adjacent pre-assembled plate can be arranged inside the wide joint. This substantially facilitates the mounting of the pre-assembled plates. In addition, if a disassembly of the pre-assembled plate is necessary, the connection means can be accessed in a relatively simple manner.
If adjusting devices, especially spindles, are arranged on the pre-assembled plate, the pre-assembled plate can have its height precisely adjusted to the required degree. It is important, especially in the case of high-speed traffic means, that the pre-assembled plates and therewith the guide means for the high-speed vehicles are aligned very exactly with each other.
If the pre-assembled plate is manufactured from fiber concrete, a part of the traditional reinforcement can be dispensed with. Moreover, in addition to this advantage there is the further advantage of lesser crack widths.
If the narrow joint and/or the wide joint is/are filled up with a sealing compound, such as concrete applied between two pre-assembled plates, when a traction force is applied onto the steel rods, a support of the two pre-assembled plates is assured via the filled-up narrow joint. This compresses the narrow joint, reliably preventing the penetration of water into the joint.
In order to fix the fine adjustment of the pre-assembled plate a substratum mass, in particular a bituminous cement mortar, is introduced between the pre-assembled plate and the foundation. This viscous substratum mass is introduced through fill openings in the pre-assembled plate from above or laterally from the plate edge into the hollow space between the pre-assembled plate and the substratum. The hardening of this substratum mass takes place in a substantially temperature-dependent manner, that is, the pre-assembled plate hardens independently of the outdoor temperature in the position that had been precisely aligned previously. The fine adjustment of the pre-assembled plate thus remains substantially preserved.
If the substratum mass is encased in particular with a sealing element, especially with an elastic, preferably porous plastic, the need for additional expensive sealing elsewhere during the underpouring of the pre-assembled plate is avoided. The sealing element is sufficiently elastic that it nevertheless still makes contact with the bottom of the pre-assembled plate and with the top of the foundation during an adjustment in height of the pre-assembled plate for aligning the pre-assembled plate. This arrangement prevents the substratum from running out. A reliable pouring of the substratum is brought about with the aid of these especially advantageous sealing elements even in the sloped regions of the roadway.
Sealing elements have proven to be especially advantageous include a rubber or sponge mat, especially one consisting of neoprene. The elements can either be left where they are after the hardening of the substratum or can be reused when underpouring another pre-assembled plate. Moreover, the use of a sponge makes it possible that air is forced through the sponge by the sealing compound and thus does not result in inclusions under the pre-assembled plate.
If spacers are arranged in the area of the joints, a fixing of the adjacent pre-assembled plates can also take place therewith, instead of the sealing, in order to be able to tension the steel rods. The spacers can be arranged in the area of the narrow joint or of the wide joint. It is especially advantageous if the joint is poured in one piece. The spacers serve to hold the pre-assembled plates in position following the fine adjustment and both before and/or after the tensioning of the steel rods. The spacers may be wedge-shaped to facilitate adjustment to the precise interval position.
In one method in accordance with the invention a compound plate pre-assembled plates consisting of reinforced concrete with at least two steel rods extending in the longitudinal direction of the pre-assembled plate and projecting over its concrete surface on the front side and with a joint between adjacent pre-assembled plates the pre-assembled plate is first placed down and finely adjusted. The finely adjusted pre-assembled plate is then underpoured with a substratum mass and after the substratum has hardened, the pre-assembled plate is joined to the adjacent pre-assembled plate by filling up the joint and connecting the steel rods. This produces a compound plate construction that is precise in its position. Contrary to prior art methods, the individual pre-assembled plate is first brought into its exact position and substantially fixed in this position. This prevents the pre-assembled plate, once it has been aligned, from being shifted out of its position by the joining with other pre-assembled plates of the compound plate construction and thus having to readjusted. After the finely adjusted pre-assembled plate is fixed in this position it is first connected to the other pre-assembled plate. This creates a compound plate construction that is very precise in its position and is permanently fixed. During the connecting of the steel rods of adjacent pre-assembled plates the position of the pre-assembled plates. having been precisely adjusted previously, is retained since the finely adjusted pre-assembled plates had been fixed with a hardened substratum mass. This achieves an especially precise and also a rapid and therewith economical finishing of a compound plate construction that substantially renders a post-adjustment superfluous. Another substantial advantage is that if a pre-assembled plate is damaged, e.g., if a train derails, individual pre-assembled plates can be removed from a compound plate construction and replaced with a new pre-assembled plate. This achieves an assembly that is quite compatible with the method of production in accordance with the invention that has great advantages not only during the first assembly but also during repairs.
The steel rods are advantageously extended in order to connect adjacent pre-assembled plates. This creates a tension between the adjacent pre-assembled plates that assures an additional fixing in place and a water-tight connection of a joint between the pre-assembled plates.
If narrow joints and wide joints are provided at the plate joint, it is especially advantageous if the narrow joints are provided with a sealing compound at first, the steel rods are then tensioned and, finally, the wide joints are closed. This achieves a uniform loading of the pre-assembled plates and of the sealing compound.
If the steel rods are not tensioned until after the hardening of the sealing compound in the narrow joints, a pressing together of the joints between the pre-assembled plates is achieved in an advantageous manner. Any shrinking or contracting, of the sealing compound during setting is thus compensated for and a watertight connection between the pre-assembled plates is obtained.
It is especially favorable for the assembly if the steel rods of adjacent pre-assembled plates are connected by rod tensioners or strainers. The tensioners can be operated in a simple manner with a hand tool or with appropriate tool machines to impart a sufficient tension to the steel rods.
As an alternative to rod tensioners, it may be advantageous in some instances to weld the steel rods to each other. The appropriate welding methods also bring about an extension of the steel rods by heat during the welding and a resulting tension occurs when the welded rods are cooled.
Spindles have proven to be advantageous for a fine adjustment of the pre-assembled plate. Sensitive adjustment of the pre-assembled plates in the order of millimeters may be achieved with the spindles.
If concrete, especially high-grade concrete, is used as sealing compound for the joints between the pre-assembled plates a good permanence of the joint is assured.
A bituminous cement mortar proved to be especially advantageous as substratum mass. Bituminous cement mortar is viscous and is suitable for filling up the intermediate space between the pre-assembled plate and the foundation completely without bubble formation. Additionally, the bituminous cement mortar establishes a good connection to the pre-assembled plate and, moreover, to the foundation, which is frequently a hydraulically bound carrier layer or to an asphalt carrier layer. This bituminous cement mortar brings about an exact positioning of the pre-assembled plate on the foundation and fixes the pre-assembled plate, which had been adjusted prior to the introduction of the substratum mass, in its position.
If an elastic, especially a porous sealing element is used as casing for the substratum, an especially simple, economical and efficient sealing of the intermediate space between the pre-assembled plate and the foundation is obtained. The sealing element prevents the substratum from flowing out of this intermediate space. The casing can be placed before the fine adjustment, in particular before the placing of the pre-assembled plate. On account of its elasticity, it adapts precisely to the intermediate space between the pre-assembled plate and the substratum even during the fine adjusting and brings about a sealing of the hollow space.
If the pre-assembled plate is used as a carrier for rails, it has been found to be especially advantageous to brace the rails on the pre-assembled plate in rail fastenings before the fine adjustment of the pre-assembled plate. Since the proper positioning of the rails is necessary for the overall structural alignment, the rail braces and fastenings are advantageous since any imprecisions in the rail alignment can be compensated.
After the pre-assembled plate has been aligned and the steel rods connected to each other, the wide joints are closed and the rails joined to each other. After this concluding work the compound plate construction with rails is ready for high-speed rail traffic.
It is especially advantageous and an alternative to the filling up of the narrow joint before the bracing of the steel rods if the finely aligned pre-assembled plate is fixed to the adjacent pre-assembled plate with spacers, especially with wedges. following which, the joint is subsequently filled up.
If the spacers are arranged in the area of the narrow joints and/or the wide joints a good support of the spacers on the two pre-assembled plates occurs. After the joints are filled, the spacers can be relieved or removed.
Other advantages of the invention are presented in the following description of the figures.
a to 3d show different method steps in the joining of two pre-assembled plates consisting of reinforced concrete.
Two elevated regions 12 are each arranged on one segment of the pre-assembled plate 10 and in the transverse direction with respect to pre-assembled plate 10. The individual segments are separated from each other by dummy joints 15. Dummy joints 15 function as theoretical breaking points in which unavoidable small cracks of pre-assembled plate 10 consisting of reinforced concrete are purposefully produced in pre-assembled plate 10. As a result of these intentional cracks, the remaining pre-assembled plate 10 consisting of reinforced concrete is substantially spared from cracks and can thus be made stable and its state can be readily checked. The design of pre-assembled plate 10 consisting of reinforced concrete is therefore selected in such a manner that the cracks occur in the area of the theoretical breaking points or dummy joints 15.
In addition to the usual reinforcement of pre-assembled plate 10, several traction or steel rods 19 are arranged in a longitudinal direction in pre-assembled plate 10. Steel rods 19, acting as traction anchor in pre-assembled plate 10, extend from one end of the pre-assembled plate to the other end of pre-assembled plate 10. Steel rods 19 project out of the concrete surface at front sides 17 of pre-assembled plate 10 and can be connected, as will be described in detail later, to the adjacent pre-assembled plate or to its steel rods.
Front side 17 comprises a substantially straight-line, continuous edge and two recesses or pockets 24 in this exemplary embodiment. Pockets 24 are setoffs in relation to straight-line front surface 17 in which setoffs steel rods 19 project out of the concrete surface. In addition, pockets 24 comprise undercuts (shown in dotted lines) that additionally improve the stability of the connection of pre-assembled plate 10 to the adjacent pre-assembled plate (not shown). Moreover, the subsequent filling up of the joints between two pre-assembled plates 10 can be achieved in a more permanent fashion since the penetration of water, among other things, is prevented by these undercuts.
Pre-assembled plate 10 comprises several filling openings 13 (only one shown here). A substratum filler is introduced under pre-assembled plate 10 in its completely aligned state through these filling openings 13.
Several spindles 37 are arranged on pre-assembled plate 10 for aligning pre-assembled plate 10 into the required position. Spindle 37 is supported upon plate 38 in order to provide a solid and uniform foundation which permits a fine adjustment of plate 10 in its height. Spindle 37 extends in this construction through a recess in pre-assembled plate 10 in order to permit a large adjustment path. Pre-assembled plate 10 is brought into its position by adjusting screw 39 on spindle 37. Before pre-assembled plate 10 is placed on a hydraulically bound carrier layer 45, elastic casing 41 is placed in the edge area of pre-assembled plate 10. This casing 41 serves to prevent underfilling 42 poured under pre-assembled plate 10 after it had been aligned from running out. The preferably viscous substratum 42 is held under pre-assembled plate 10 by casing 41. Casing 41 is preferably an elastic or plastic material. In particular, spongy materials with coarse pores or neoprene or similar plastics have proven to be advantageous. Casing 41 can either remain at this position after the substratum has hardened and thus provide a certain protection against moisture. If the casing is to be used for more substrata, it is also possible to remove this casing 41 from the pre-assembled plate 10 out and reuse it.
The individual steps of the joining of two pre-assembled plates 10 is described in the following with reference made to
After steel rods 19 have been connected to each other and extended, the wide joint 27 can be closed in order to prevent corrosion (
The procedure for the joining of the two pre-assembled plates 10 was presented in
Pre-assembled plate 10 comprises elevated regions 12 on which rail 30 is fastened with fastenings 31. Dummy joints 15 are arranged at regular intervals in pre-assembled plates 10 and represent theoretical breaking points for pre-assembled plate 10. Several steel rods 19 have been introduced into pre-assembled plate 10. Each steel rod 19 has opposed ends. Each steel rod 19 has one of its opposed ends projecting from the first front side 17 of the plate 10 and the other of its ends projecting from the second or opposite front side 17 of the plate 10. Each rod 19 has a first near end portion that extends within the plate 10 over a distance that extends substantially from the undercut 29 of the pocket 24 in the first front side and terminates longitudinally before the first transverse groove that forms a dummy joint 15. As shown in
If pocket 24, in which tighteners 28 and the ends of steel rod 19 are located, is designed so that it has an undercut 29 in a top view onto the plate, an additional cogging of pre-assembled plates 10 with each other is achieved if wide joint 27 formed by pockets 24 is filled up with sealing compound 25′. Pre-assembled plates 10 are additionally hindered therewith from moving vertically.
Substratum 42 can be removed again in the instance in which the plate or the substratum lowers in the course of the using of the plate. This happens in that substratum 42 is bored through transversely to the longitudinal direction of the plate. A saw, especially a saw cable, is introduced into the borehole and saws through the substratum under the plate. The plate can then be precisely realigned, e.g., with spindles, and more matter can be poured under it again.
The use of the spacers permits an immediate application of tractive force on the steel rods and a subsequent common sealing of the wide and of the narrow joint. This is especially advantageous if unfavorable temperature and climate conditions for the sealing of the joint are present. A more favorable temperature and a suitable climate can be waited for the final filling up of the wide and of the narrow joint so that an optimum processing of the material is given.
The present invention is not limited to the design presented. Pre-assembled plates 10 can also be used for applications other than the described ones. Steel rods 19 can also be prevented from joining with the concrete of pre-assembled plate 10 in the last segment in a variety of ways. Combinations of the individual features are of course also within the protective scope of the invention.
Number | Date | Country | Kind |
---|---|---|---|
199 48 003 | Oct 1999 | DE | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/EP00/09188 | 9/20/2000 | WO | 00 | 4/5/2002 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO01/25538 | 4/12/2001 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
338057 | Gearon | Mar 1886 | A |
375999 | Jackson | Jan 1888 | A |
1041736 | Caldwell | Oct 1912 | A |
1279062 | Winter | Sep 1918 | A |
2067037 | Alexander | Jan 1937 | A |
2124247 | Fey | Jul 1938 | A |
2260657 | Bohnsack | Oct 1941 | A |
2340263 | Dodson | Jan 1944 | A |
2611262 | Dodson et al. | Sep 1952 | A |
2655845 | Freyssinet | Oct 1953 | A |
2672295 | Cone | Mar 1954 | A |
2780150 | Yeoman | Feb 1957 | A |
2971295 | Reynolds | Feb 1961 | A |
2984417 | Voorhees | May 1961 | A |
3145502 | Rubenstein | Aug 1964 | A |
3156169 | Finsterwalder | Nov 1964 | A |
3173226 | Solnick | Mar 1965 | A |
3234683 | Christiansen | Feb 1966 | A |
3237357 | Hutchings | Mar 1966 | A |
3237537 | Hutchings | Mar 1966 | A |
3295286 | Schaich | Jan 1967 | A |
3317137 | Harmon | May 1967 | A |
3378969 | Larger | Apr 1968 | A |
3596330 | Scott et al. | Aug 1971 | A |
3621624 | Gustafson | Nov 1971 | A |
3678644 | Wakefield et al. | Jul 1972 | A |
3736709 | Koch et al. | Jun 1973 | A |
3819114 | Bush | Jun 1974 | A |
3820293 | Ohe et al. | Jun 1974 | A |
3863840 | Szarka et al. | Feb 1975 | A |
3950465 | Farahar | Apr 1976 | A |
3952468 | Soum | Apr 1976 | A |
3967421 | Dufossez | Jul 1976 | A |
3996715 | Dowse | Dec 1976 | A |
4267085 | Katoh et al. | May 1981 | A |
4357784 | Grady, II | Nov 1982 | A |
4500037 | Braitsch et al. | Feb 1985 | A |
4633700 | Zandel | Jan 1987 | A |
4648147 | Zimmermann et al. | Mar 1987 | A |
4648554 | McQueen | Mar 1987 | A |
4653956 | Lang | Mar 1987 | A |
4703890 | Tognoli et al. | Nov 1987 | A |
4905896 | Eisenmann et al. | Mar 1990 | A |
4909662 | Baker | Mar 1990 | A |
4911360 | Spur | Mar 1990 | A |
4982549 | Beck | Jan 1991 | A |
5163614 | Tamas et al. | Nov 1992 | A |
5272851 | De La Fuente | Dec 1993 | A |
5678952 | Shaw et al. | Oct 1997 | A |
5924630 | Brookhart, Jr. et al. | Jul 1999 | A |
6142847 | Rudy | Nov 2000 | A |
6237856 | Bachmann et al. | May 2001 | B1 |
Number | Date | Country |
---|---|---|
2621793 | Dec 1977 | DE |
3933490 | Apr 1990 | DE |
19501277 | Sep 1996 | DE |
19733909 | Feb 1999 | DE |
165856 | Dec 1985 | EP |
516612 | May 1992 | EP |
2576335 | Jan 1985 | FR |
2016572 | Sep 1979 | GB |
2169327 | Jul 1986 | GB |
54120410 | Sep 1979 | JP |
272101 | Nov 1990 | JP |
137303 | Jun 1991 | JP |