Information
-
Patent Grant
-
6292997
-
Patent Number
6,292,997
-
Date Filed
Friday, May 28, 199925 years ago
-
Date Issued
Tuesday, September 25, 200123 years ago
-
Inventors
-
-
Examiners
- Echols; P. W.
- Blount; Steve
Agents
-
CPC
-
US Classifications
Field of Search
US
- 269 25
- 269 246
- 269 245
- 269 37
- 029 464
- 029 432
- 029 430
- 104 16
- 104 171
- 238 349
- 033 526
- 033 527
- 033 651
- 033 1 Q
- 033 287
-
International Classifications
-
Abstract
Methods are disclosed by which wooden railroad ties are pre-plated prior to use in constructing and/or repairing railroad lines. Methodology disclosed comprises placing two plates on top of each of a succession of wooden ties, temporarily positioning disclosed one of the two plates on each tie with a distance or spacer template temporarily clamping the two plates accurately to the tie using a jig, starting a field spike and a gauge spike (usually with one or more sledge hammers) into each wooden tie through the selected apertures in each plate, and further driving the started spikes into the associated tie (usually using a jackhammer). Typically, the field spike is located outside the field flange of the plate and is driven until the head of the spike is contiguous with the plate. Typically, the gauge spike is displaced through an aperture in the gauge flange of the plate until the head is about 1½ inches above the plate.
Description
FIELD OF THE INVENTION
The present invention relates generally to the use of wooden ties, steel plates and steel spikes in building and/or repairing of railroads and, more particularly, to methods and apparatus for pre-plating wooden railroad ties for subsequent receipt of railroad rails in the initial construction and/or the repair of railroad lines.
BACKGROUND
Railroad lines are comprised of spaced cross ties with superimposed plates, which carry two top spaced rails. The space of the rails determines the gauge of the railroad line. The ties traditionally rest upon ballast, which has been compacted and graded (contoured) to define the path of the railroad line, including axial slope as appropriate and transverse banking to accommodate turning in respect to a change in direction of the rails and ties.
While concrete ties are sometimes used, wooden ties, usually treated with a chemical such as creosote, have historically been used. The present invention is concerned with wooden railroad ties.
Each wooden railroad tie receives two steel railroad plates on the top of the tie. Each plate is secured in position by steel spikes driven into the associated wooden railroad tie through apertures in the plate. Ultimately, at least one field spike and one gauge spike is driven through apertures in the associated plate into the wooden tie until the head of the spike is either contiguous with the top surface of the associated plate or is above the associated plate a distance sufficient to accommodate placement of one side of the lower flange of a rail beneath the head of that spike. This creates a fixed and permanent relationship between the plate and the wooden railroad tie. At the time of rail installation, other spikes are driven through the remaining apertures in each plate. Two apertures exist in each of two central parallel flanges or ridges of each plate and one aperture in each of two plate regions spaced from the flanges. The flanges of each plate are parallel to the direction of the railroad line and perpendicular to the axis of the associated tie. All of the spikes driven through apertures in the flanges of the associated plate into the wooden tie ultimately become contiguous with the top surface of one or the other of two oppositely-directed base, lower or bottom flanges of a railroad rail to hold the rail in a secure position on the plate between the flanges. The rail is thus securely positioned between and parallel to the plate flanges.
In earlier times, it was commonplace to assemble plates, ties, spikes and rails at the site of a railroad line being constructed or repaired. This approach is sometimes still used. Precision in correctly locating each plate on top of the associated tie presented significant problems in the field. Accuracy in field placement of the plates on the ties has been particularly difficult when the plates were worn between the flanges due to prior use.
BRIEF SUMMARY AND OBJECTS OF THE PRESENT INVENTION
In brief summary, the present invention overcomes or substantially alleviates problems associated with the construction and repair of railroad lines and particularly in respect to pre-plating wooden railroad ties. Temporary and permanent placement of two plates (either new or used) on each wooden tie is exceptionally accurate, resulting in few, if any, rejects. Accordingly, subsequent assembly of railroad rails on a series of such pre-plated ties produces corresponding accuracy in the resulting railroad line. Unique jigs provide for the temporary and accurate placement of the plates on the ties, while spikes provide for the permanent and accurate placement of the plates on the ties. Novel methods and apparatus are provided by the present invention for so pre-plating railroad ties. Mass production of pre-plated railroad ties is preferred, although individual pre-plating of railroad ties is within the scope of the present invention. The methodology may comprise placing two plates on top of each of a succession of wooden ties, positioning one of the two plates on each tie with a distance or spacer template, temporarily clamping the two plates accurately to the tie using a jig, starting a field spike and a gauge spike (usually with one or more sledge hammers) into each wooden tie through selected apertures in each plate, and further driving the started spikes into the associated tie (usually using a jackhammer). Typically, the field spike is located outside the field flange of the plate and is driven until the head of the spike is contiguous with the plate. Typically, the gauge spike is displaced through an aperture in the gauge flange of the plate until the head thereof is about 1½ inches above the plate. This gauge spike ultimately is driven downward farther to help hold a rail in position when the rail is superimposed upon the plate between the flanges thereof.
A series of work stations may be employed in carrying out the pre-plating assembly process. One or more of the work stations may use conveyor systems to displace ties as they are pre-plated and to return removed jigs for re-use. Normally, although not necessarily, the spikes are started with one or more sledge hammers, while the driving of spikes is preferable by use of a power tool, such as a jack hammer.
When the pre-plating of the ties is completed, they may be stored for subsequent use or shipped for more immediate use.
For purposes of efficiency and cost effectiveness, a mass production or continuous process of pre-plating ties sequentially is preferred, which requires inventories of ties, plates, spikes and jigs. all made available at an ingress work location. The jigs are recycled, while the ties, plates and spike are transformed into completed pre-plated ties. Testing templates or spacers may be used to initially locate the plates on the ties before spikes are started and to check the permanent locations of the plates of completed pre-plated ties for accuracy or compliance with applicable tolerances. The preferred reference is to the inside surface of the field flange of each plate. One jig is used to so locate both plates in respect to a given wooden railroad tie.
The preferred jig, for accurately locating plates on railroad ties being pre-plated, comprises a frame which seats around side surfaces of a railroad tie, at least one plate position-establishing cross bar or stop extending between frame members for contiguous engagement with an inside surface of a flange of a railroad plate placed on top of the tie, and at least one displaceable clamping member for engagement with an adjacent edge of plate to compressively place the plate in a desired fixed position upon the tie prior to an aperture in the plate receiving a railroad spike. At least one clamping member may be actuated in any desired way, e.g., using a hydraulic or pneumatic cylinder or a mechanical crank of the jig, to engage the field edge of the adjacent plate, for example, insuring that a cross bar or stop of the jig bears against the inside surface of the adjacent field flange of the plate.
With the foregoing in mind, it is a primary object of the present invention to overcome or substantially alleviate problems associated with the construction and/or repair of railroad lines and particularly in respect to pre-plating wooden railroad ties.
Another important object is the temporary and permanent placement of the plates (either new or used) on a wooden tie with exceptional accuracy, resulting in few, if any, rejects, and producing corresponding accuracy within the resulting railroad lines.
A further valuable object is the provision of unique jigs which provide for the temporary and accurate placement of plates on the wooden railroad ties, while spikes, used in conjunction with each jig, provide for the permanent and accurate placement of the plates on the ties.
It is another dominant object of the present invention to provide novel methods and apparatus for pre-plating wooden railroad ties.
It is an additional significant object to provide mass production methods and apparatus for pre-plated wooden railroad ties.
Another valuable object is the provision of methodology which comprises placing two plates on top of each of a succession of wooden railroad ties, temporarily positioning of each of the two plates accurately on each tie using ajig, starting a field spike and a gauge spike into each wooden tie through selected apertures in each plate, and further driving the started spikes into the associated tie.
A further important object is the provision for locating a field spike outside the field flange of an associated plate and driving it until the head of the spike is contiguous with the plate and locating a gauge spike through an aperture into the gauge flange of the plate and driving it until the head thereof is a predetermined distance above the plate so that the gauges spike can ultimately be driven downward farther to help hold a rail in position when the rail is superimposed upon the plate between the flanges thereof.
A further primary object is the provision of a series of work stations for carrying out a pre-plating assembly process for wooden railroad ties.
It is another significant object of the present invention to provide one or more work stations which may use conveyors to displace wooden railroad ties as they are pre-plated and to return removed jigs for re-use.
Another object of value is the provision of mass production or continuous processes of pre-plating wooden railroad ties sequentially, which require inventories of ties, plates, spikes and jigs all made available at an ingress work location.
It is a further object of significance to provide pre-plating jigs for wooden railroad ties which are reusable.
It is a further object of dominance to provide testing templates or spacers used to initially locate the plates on wooden railroad ties before spikes are started and to check the permanent locations of the plates of completed pre-plated wooden railroad ties for accuracy or compliance with applicable tolerances.
An additional object of importance is the provision of pre-plating jigs for accurately locating plates on wooden railroad ties being pre-plated.
It is another valuable object to provide a pre-plating jig for a wooden railroad tie which comprises a frame which seats around side surfaces of a wooden railroad tie, at least one plate position-establishing cross bar or stop extending between frame members for contiguous engagement with an inside surface of a flange of a railroad plate placed on top of the tie, and at least one displaceable clamping member for engagement with an adjacent edge of the plate to compressively place the plate in a desired fixed position upon the tie prior to an aperture in the plate receiving a railroad spike.
It is another object of importance to provide a pre-plating jig for a wooden railroad tic comprising at least one clamping member which is actuated in any desired way, e.g., using a hydraulic or pneumatic cylinder or a mechanical crank of the jig, to engage the field edge of the adjacent plate causing a cross bar or stop of the jig to bear against the inside surface of the adjacent field flange of the adjacent plate.
These and other objects and features of the present invention will be apparent from the detailed description taken with reference to the accompanying drawings.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1
is a flow chart is a flow chart of methodology according to the present invention by which wooden railroad ties are pre-plated;
FIG. 2
is a block diagram showing the way in which
FIGS. 2A
,
2
B and
2
C interrelate one with another;
FIG. 2A
is a fragmentary perspective of an ingress work station or site where wooden railroad ties, steel railroad plates, steel railroad spikes and steel plate-locating jigs are brought together and assembled up to the point where two spikes are started into a wooden tie through apertures in two plates temporarily held in correct positions on top of the tie by the jig comprising opposed crank clamping mechanisms;
FIG. 2B
is a fragmentary perspective of a central work station to further drive the spikes into the associated wooden tie and through which ties from the ingress work station are successively displaced to a jig removal station by a first conveyor system, whereby the removed jigs are returned to the ingress station and the completed pre-plated ties are placed at a discharge station for shipment and/or storage;
FIG. 2C
is a fragmentary perspective of the downstream end of the central work station of FIG.
2
B and the accumulation discharge station or site for shipment and/or storage;
FIG.
2
B′ is a fragmentary perspective of a conveyorless central work station which started spikes are further driven into an associated wooden railroad tie through apertures in the two railroad plates to pre-plate the tie;
FIG. 3
is an enlarged perspective of a hand tool or distance template or spacer with which a plate loosely on a tie is preliminarily located for later receipt of a clamping jig and spikes;
FIG. 4
is an enlarged perspective of a tolerance gauge tool or template or spacer, comprising a stepped foot, with which the location of the spike-secured plates are checked for railroad gauge accuracy;
FIG. 5
is an enlarged perspective of a typical steel railroad plate;
FIG. 6
is an enlarged perspective, with a portion broken away for ease of presentation, of a completed pre-plated wooden railroad tie;
FIG. 7
is a cross sectional view of a jig comprised of a hydraulic or pneumatic cylinder used to temporarily clamp a railroad plate in a correct position on a wooden railroad tie;
FIG. 8
is a perspective of a jig embodying principles of the present invention comprising two end clamps each comprised of a plate flange-engaging cross bar or stop and a crank mechanism with a displaceable clamping head or moveable stop; and
FIG. 9
is a cross section taken along line
9
—
9
of FIG.
8
.
DETAILED DESCRIPTION OF THE ILLUSTRATED EMBODIMENTS
Reference is now specifically made to the drawings wherein like numerals are used to designate like parts throughout.
FIG. 1
is in flow chart form and illustrates one form of methodology which embodies principles in accordance with the present invention by which wooden railroad ties are pre-plated in advance of use in initially constructing or repairing a railroad line. In respect to
FIG. 1
, inventories of wooden railroad ties, steel railroad plates, steel railroad spikes and custom jigs are provided. The ties, plates and spikes may be new or used. Sometimes reconditioned or reclaimed wooden railroad ties are pre-plated. Whether new or used, the railroad ties are positioned so that each one being processed receives on the top thereof, in loose condition, two rail-receiving plates. The preliminary location of one of the two plates in respect to the associated tie may be established using a distance-establishing tool or template or spacer. With the two rail-receiving plates positioned generally correctly on top of the associated railroad tie, a jig is superimposed over the top of the tire at the perimeter thereof, namely along the sides adjacent to the top of the jig such that a position-locating stop or cross bar passes through a channel or rail seat surface of each plate between parallel flanges of the plate.
It is preferred that the methodology depicted in
FIG. 1
be one which comprises mass production techniques so that a series or succession of ties are processed one after another in continuing manner.
Once the jig is correctly placed as if a crown upon the railroad tie, a clamping member at each end of the jig is actuated to clamp against the field edge of the adjacent plate so that the bar or stop forcibly and contiguously engages the inside surface of the field flange of the plate. As a consequence, the two plates are rigidly, though temporarily, held in precisely the desired position on top of the associated railroad tie. Thus, the distance from the inside surface the field flange of one plate to the inside surface of the field flange of the other plate is precisely set to accurately later receive two rails having exactly the correct railroad gauge needed.
At this point, a field spike and a gauge spike are started into the wooden railroad tie through appropriate apertures in each jig-held plate. Specifically, a gauge spike is driven into the wooden railroad tie through an aperture in the field side of each plate which is located remote from the field flange. The gauge spike is driven into the wooden railroad tie through an aperture in the gauge flange of each plate. In both cases, each spike is merely started into the wooden railroad tie. This may be done by manual manipulation of one or more sledge hammers or otherwise as appropriate.
The field spike mentioned above is, thereafter, machine-driven fully into the wooden railroad tie until the head of the field spike is contiguous with the top surface of the associated plate. Preferably a jack hammer or like automated tool is used to so drive the field spike. The gauge spike is likewise machine-driven until the head thereof is on the order of 1½ inches above the gauge flange. The gauge spike is left in this position, with the eccentric portion of the head of the spike directed toward the field flange of the same plate to accommodate later receipt of one side of the bottom flange of a railroad rail when the pre-plated tie is used to construct or repair a railroad line.
Ordinarily, the described pre-plating of railroad ties occurs at a factory or similar location remote from the location where the ties are used to construct or repair a railroad line, although a pre-plating plant could be located near the site where the railroad line is being constructed or repaired and could be portable so as to keep pace with the construction or repair of the railroad line.
Once the one field spike and the one gauge spike are driven in the manner indicated above, the clamping mechanisms of the jig are released and the jig is entirely removed from the tie and the plates. The jig is returned to the ingress area of the pre-plating plant for reuse, while the completed pre-plated tie is checked with a tolerance tool or template or spacer to ensure that the two spiked plates are positioned within the necessary tolerances required for accuracy. The pre-plated ties are removed from an egress station, using a forklift, for example, and either stored or shipped for use in constructing or repairing a railroad line or both.
Reference is now made to
FIG. 2
which illustrates the manner in which the work stations depicted in
FIGS. 2A
,
2
B, and
2
C interrelate. It is to be appreciated that the orientation depicted in
FIG. 2B
is essentially the reverse of and distinct from the orientation depicted in
FIGS. 2A and 2C
. In respect to
FIG. 2A
, an ingress or entry work station, generally designated
10
, is depicted. The ingress work station or site
10
is illustrated as comprising spaced structured I-beams
12
and
14
, which may be supported on the ground, on a floor or above the ground or floor on columns (not shown), for example. The I-beams could be replaced by a platform if desired. Typically, a supply or stack of ties, generally designated as
16
and comprising individual ties
18
, is transported to the work station
10
and deposited across the spaced, parallel I-beams
12
and
14
. A forklift, for example, may be used to place the ties
18
in the position illustrated in FIG.
2
A. The stack
16
of ties
18
may be held together by one or more steel bands (not shown), which are cut before or after placement at the ingress station
10
, as illustrated in FIG.
2
A. Each tie
18
is illustrated as having a metal cleat
20
secured on each end, to prevent damage. It is to be appreciated that not all ties used to form railroad lines have end cleats. It is further to be appreciated that different ties have different dimensions. For example, some ties are approximately nine feet long, while others are shorter.
The ties
18
are removed one-by-one from the stack
16
and are placed sequentially across the rails
12
and
14
, one after another. With continued reference to
FIG. 2A
, two individual ties
18
are illustrated in spaced relation at the right portion of FIG.
2
A. The first separate tie
18
shows two steel railroad plates, generally designated
22
, placed loosely on top of the tie. The unattached placement of right plate, to begin with, may be ascertained by use of a hand tool or spacer, generally designated
24
. As shown in
FIGS. 2A and 3
, placement tool
24
has an L-shaped configuration comprising a long leg
26
and a short leg
28
. The tool
24
is preferably formed from steel, although other suitable materials may be used. The tool
24
is manipulated by a U-shaped handle
30
, which may be welded to the L-shaped portion. The legs
26
and
24
, being respectively planar and disposed at 90 degrees one to the other, accommodate placement of the leg
28
contiguous with one end edge
32
of the tie, with the leg
26
running contiguously along the top surface of the tie. See FIG.
2
A. By placing the field edge
34
of one plate
22
against the free edge
35
of the tool
24
, the one plate is loosely positioned approximately where it will need to be when the pre-plating operation has been completed. The second plate
22
is thereafter correctly positioned on the tie
18
using a jig
70
, as explained hereinafter.
Not all steel railroad plates are dimensionally the same. There are variations in size. The steel railroad plates
22
, which are illustrated in the drawings and described herein, are intended to be representative and not restrictive. As best shown in
FIG. 5
, each illustrated plate
22
comprises a field side and a gauge side, the gauge side being juxtaposed one end of the associated tie
18
and the gauge side being juxtaposed the central portion of the associated tie
18
. The plate
22
is essentially symmetrical about a central line
36
, except for a rail seat surface
40
. The plate
22
comprises a rail-receiving channel
38
, comprising top surface
40
which is slightly sloped toward the gauge side of the plate
22
. Surface
40
spans between a field flange or ridge
42
and a gauge flange or ridge
44
. In use, two plates
22
are held by steel railroad spikes at space locations on top of a railroad tie
18
with the channel
38
extending perpendicular to the axis of the tie. Two railroad rails are positioned respectively in the channels
38
on the sloped surfaces
40
of the two spaced plates
22
, the rails ultimately being secured to the plates against inadvertent displacement by steel railroad spikes passing through two apertures
46
in the field flange
42
and two apertures
48
in the gauge flange
44
, as more fully described hereinafter. The oppositely sloped surfaces
40
on the two plates
22
cause the two rails to slightly toe in toward each other for better performance.
It follows that each field flange
42
defines a channel or interior linear surface
50
, while the gauge flange
44
defines a similar interior surface
52
. The field flange
42
tapers into a field region
54
, which terminates in field edge
34
. Similarly, each gauge flange
44
tapers outwardly across a gauge region
56
, which terminates in edge
58
. Each plate
22
also comprises a trailing edge
60
and a leading edge
62
which are both oriented essentially parallel to the direction of the tie and perpendicular to surfaces
50
,
52
,
58
and
34
. The field region
54
has an aperture
64
for receiving a steel railroad spike during pre-plating at a location remote or spaced from the field flange
42
. Similarly, the gauge region
56
defines a rectangular aperture
66
for receiving a steel railroad spike during rail installation at a location remote from the gauge flange
44
. The spikes which are ultimately driven through apertures
64
and
66
into the associated wooden railroad tie are so displaced until the heads of the spikes are contiguous with the top surface of the associated plate
22
, for the purpose of anchoring the plate
22
to the wooden railroad tie in a precise location. Spikes placed through apertures
64
and
66
may be number one grade or less, while spikes placed in apertures
46
and
48
need to be number one grade.
It is to be understood that the present invention applies to utilization of both new and used or recycled steel railroad plates in the pre-plating of wooden railroad ties. After the two plates
22
have been placed loosely on top of one of the ties
18
, as shown in the lower portion of FIG.
2
A. the next step in the pre-plating process herein disclosed is to temporarily or releasibly secure each of the two plates in a fixed position in respect to the tie so that relative movement between either plate
22
and the tie
18
is prevented and so that the plates are precisely positioned on the top of the tie to meet tolerance requirements and to avoid rejection of pre-plated ties for being out of tolerance.
A jig, generally designated
70
, is used to hold both plates rigidly in the desired positions. See
FIGS. 2A
,
8
and
9
. As best seen in
FIG. 2A
, the jig
70
is superimposed over both the top of the associated tie
18
and over the two plates
22
. More specifically, each side surface of the associated railroad tie
18
is contiguously engaged by one, vertically-directed leg of parallel, spaced structural angle members
72
of the jig. The jig
70
, with the clamping mechanisms retracted, is placed in an angular orientation to the associated tie
18
with the jig end down which is adjacent to the right plate (as viewed in FIG.
2
A). The right cross bar
74
of the jig
70
is next placed in the channel
38
of the right plate
22
, as the left end of the jig
70
is rotated downwardly with the vertical legs of the angle members
72
contiguous with the opposed sides of the tie
18
. The jig rotation is continued until the left cross bar
74
is in the channel
38
of the left plate
22
and the spaced angle members
72
are horizontally disposed and the vertical legs of members
72
are respectively contiguous with the side surfaces of the tie
18
near the top of the tie.
Six cross bars are provided comprising interior parallel cross bars
74
, intermediate parallel cross bars
76
and parallel and/or outside cross bars
78
. Each of the six cross bars
74
,
76
and
78
are welded at their respective ends to the vertical leg of both angle members
72
, to form a rigid frame. While cross bars
78
are illustrated as being arranged to extend across the top surface of the associated tie
18
, if desired, they can be arranged so as to engage tie end surfaces
32
. Cross bars
78
are in a plane slightly above a plane containing cross bars
76
, while cross bars
74
are in a third plane disposed somewhat above and parallel to the plane containing cross bars
78
. See FIG.
8
. The distance between the two planes containing cross bars
76
and cross bars
74
is essentially the thickness of plate
22
at channel
38
. This accommodates placement of the cross bars
74
through the channels
38
of the spaced plates
22
on top of tie
18
, as best depicted in FIG.
2
A.
By locating the cross bars
78
above the cross bars
76
, clamping members of the jigs are slightly sloped to insure firm engagement by the clamping mechanism of the plate edge
34
. The cross bars
74
,
76
and
78
are essentially the same length so that the jig
70
is a rectangle. The length of each cross bar
74
,
76
and
78
is also essentially equal to the width of the railroad tie
18
. Since the dimensions of railroad ties can vary, not only in terms of the height and width but also in terms of the length, jigs for any particularly sized tie are custom manufactured. For larger or smaller railroad ties, jigs of the type illustrated in the drawings are fabricated to match the dimensions of the tie with which they are intended to be used.
Centrally located on each cross bar
76
is a journal block
80
. Each journal block
80
is anchored, as by welding, to its associated cross bar
76
and provides a throughbore
82
, which is centrally disposed and oriented transverse to the associated bar
76
. A distal portion of a shaft
84
, which is smooth, extends through the associated bore
82
for rotation in respect to the bore
82
. Each journal block
80
is welded to a canopy-type plate
86
which eccentrically extends toward the center of the jig
70
beyond the limits of the block
80
, as best shown in
FIGS. 8 and 9
. A clamping end or moveable stop or plate engagement head
88
is disposed immediately below extension plate
86
, plate
86
serving as an anti-rotate member preventing the wedge-shaped clamping head or movable stop
88
from rotating.
Each shaft
84
comprises a threaded distal end
90
(FIG.
9
). Thus, the rounded portion of shaft
84
, which journals in block
80
accommodates rotation of the shaft
84
in respect to the journal block
80
, while the threads
90
of the distal end of the shaft
84
are threaded into or out of a blind threaded bore
92
in head
88
, depending on the direction of rotation. Because the shaft
84
is limited to rotation without axial displacement (as explained hereinafter in greater detail) and because anti-rotation plate
86
prohibits rotation of clamping head
88
, rotation of shaft
84
causes the clamping block
88
to move left or right as viewed in
FIG. 9
in relationship to the shaft
84
, depending upon the direction in which the shaft
84
is rotated. Thus, the movable clamping stop or wedge-shaped head
88
may be advanced toward the adjacent plate
22
or retracted from the adjacent plate
22
, for reasons explained in greater detail later. Each cross bar
78
supports in superposition a journal block
100
, which may be welded centrally to the associated cross bar
78
so that a journaling throughbore
102
of block
100
is located parallel to the journal bore
82
of the journal block
80
. The size of the shaft
84
and that of the throughbore
102
are such that a snug fit is achieved which accommodates selective rotation of the shaft
84
in respect to the stationary journal block
100
. Spaced steel sleeves
104
and
106
are welded to the shaft
84
adjacent the opposed sides of the journal block
100
so as to accommodate rotation of the shaft
84
within the journal blocks
80
and
100
, with the sleeves
104
and
106
preventing axial displacement of the shaft
84
relative to the journal blocks
80
and
100
. See FIG.
9
.
Each shaft
84
is joined at its proximal end to a crank arm mechanism
108
by which rotation of the shaft
84
is accomplished. As shown best in
FIGS. 8 and 9
, the crank arm mechanism
108
comprises a stepped bar
110
, welded to the distal end of the shaft
84
and an eccentric grasping handle
112
, welded to the eccentric end of the plate
110
. Thus, by grasping the handle
112
and causing it to rotate either clockwise or counterclockwise, as desired, the shaft
84
rotates within journal blocks
80
and
100
, with the threads of movable stop
88
inter-reacting with the threads
90
at the distal end of the shaft
84
so that the wedge-shaped movable clamping member
88
is advanced or retracted in respect to the adjacent cross piece
74
.
This motion is important to clamp each of the two plates temporarily but fixedly in respect to the top of the associated tie
18
. This is done by rotating each crank mechanism
108
in the appropriate direction so as to move clamping heads
88
toward the adjacent plate
22
. When the field edge
34
of the adjacent plate
22
is engaged, cranking is continued until such time as the adjacent cross bar or stop
74
is forcibly contiguous with the inside surface
50
of the field flange
42
of the associated plate
22
. The clamping head
88
is similarly firmly contiguous with the edge
34
. Thus, when both clamps of jig
70
have been so activated, both associated plates
22
are temporarily though firmly held in a tolerance-accommodating position. When this position has been achieved, two or more spikes
114
are started, using one or more sledge hammers, into the associated wooden railroad tie
18
through selected apertures in the two plates
22
. While the aperture selection could vary, the selection illustrated in
FIGS. 2A
,
2
B,
2
C and
2
B′ works well. More specifically, one steel railroad spike is illustrated as having been started through plate aperture
64
, which is disposed in the plate region
54
of the associated plate and a second spike is placed in one of the two spike-receiving apertures
48
disposed in the gauge flange
44
. Since the standard railroad spike has an eccentrically-disposed head, the head of the spike
114
in the aperture
64
of each plate is oriented toward the center of the tie
18
, while the head of the spike
114
placed in aperture
48
of each plate
22
is oppositely oriented, i.e. outwardly toward the adjacent crank handle
108
. The assembled nature of the spikes
114
, the plates
22
, the jig
70
and the associated tie
18
is illustrated in
FIG. 2A
, at the upper right location.
While
FIG. 2A
comprises a work station where movement of the ties is manual, it is to be understood that the ties
18
may be placed upon a conveyor system for automatically moving the ties through the work station illustrated in FIG.
2
A.
Each partially pre-plated tie emanating from the work station of
FIG. 2A
is displaced to a second work station, one form of which is illustrated in FIG.
2
B and another in FIG.
2
B′. In reference to
FIG. 2B
, the orientation of that work station, as shown, is essentially the reverse of the orientation of
FIG. 2A
, for clarity of illustration. Each partially pre-plated tie
18
emanating from the work station of
FIG. 2A
is displaced through the work station of
FIG. 2B
via a conveyor system. The tie conveyor system of
FIG. 2B
is generally designated
120
and comprises two parallel chain link conveyors
122
, each of which is conventional and, accordingly, an extensive disclosure thereof is not essential to an understanding of the present invention by those skilled in the art. The ties
18
processed through the work station of
FIG. 2B
move in the direction of the arrows
124
, i.e., from right to left. The parallel conveyors
120
each comprises spaced abutment studs
126
, two of which (one from each conveyor
122
) engage and push on the back side of each tie
18
delivered from the work station of FIG.
2
A. The conveyors
122
preferably are variable speed conveyors so that the rate at which partially pre-plated ties
18
from work station
2
A are displaced through the work station of
2
B may be controlled to ensure both efficiency and accuracy.
The work station of
FIG. 2B
comprises a canopy
128
, cross supports
130
and
132
and three floor segments or catwalks
134
,
136
and
138
comprised of conventional steel grating. The canopy
128
, the cross supports
130
and
132
and the grating platforms
134
,
136
and
138
are suitably supported by conventional structural members in the air above both the conveyors
122
and the partially pre-plated ties
18
so as to accommodate displacement of the ties beneath the canopy
128
, the cross supports
130
and
132
and the grating platforms
134
,
136
and
138
, as shown in
FIG. 2B. A
worker
140
is illustrated in
FIG. 2B
as standing upon grating platforms
134
and
136
while holding a spike-driving, tool
144
, which may be a jackhammer with an appropriate tip or driving head
144
. Other suitable automated driving tools, such as pneumatic and hydraulic cylinder assemblies, may also be used. The jackhammer may be electric, pneumatic or hydraulic and is used to drive the spikes
114
disposed in each aperture
64
fully into the associated wooden railroad tie so that the head thereof is continuous with the plate region
54
. The jackhammer
142
is also used to drive the spike
114
disposed in one of the apertures
48
until the head thereof is on the order of an inch and a half or so above the plate flange
44
. This provides a suitable space for later placement of a railroad rail in the channel
38
so that one side of the bottom flange is spaced directly below the head of the spike
114
disposed in one of the two apertures
48
. It should be apparent that the last mentioned spike
114
will later be driven further so as to become contiguous with the adjacent bottom flange of the rail during field installation of the rail. At that time, spikes would also be suitably driven through the remaining apertures in each plate
22
whereby the spikes in apertures
64
and
66
hold the plate in position on the tie and the spikes in the four apertures
46
and
48
engage the rail at opposed bottom flanges to secure the rail to the plate
22
.
As a consequence, when the pre-plated ties
18
emerge at the back side of the canopy
128
on conveyors
122
, the plates
22
are illustrated as being secured by the two spikes
114
against displacement relative to the associated tie
18
. Accordingly, the jig
70
associated with the tie
18
may be removed by turning the two crank handles so as to loosen the two clamping heads
88
from engagement with the edge
34
of the adjacent plate
22
. At this point, the jig is lifted from the associated tie and is returned to the work station of
FIG. 2A
to be reused.
Preferably, the work station of
FIG. 2B
comprises a second conveyor system, generally designated
140
, which comprises two spaced conventional chain conveyors
142
. The conveyors
142
comprise outwardly directed studs
144
upon which the removed jigs
70
are hung and conveyed from left to right, as viewed in
FIG. 2B
, to a location directly adjacent the work station of FIG.
2
A. The jigs
70
being so conveyed engage two sloped ramp members
146
adjacent to the
FIG. 2A
work station, which removes each jig
70
from the conveyors
142
, following which the jigs
70
are manually reused, in the manner described earlier in conjunction with FIG.
2
A.
When the Jig
18
has been removed from a completed pre-plated tie
18
, the tie
18
has the appearance as shown at the extreme left in FIG.
2
B. It is shown as resting upon two spaced I-beams
148
and
150
, which may in turn be supported on columns or the like (not shown).
One of the advantages of the work station of
FIG. 2B
is that the worker
140
stands on platforms separated from and located above the partially pre-plated ties
18
so that worker damage to the jigs
70
is either entirely eliminated or substantially so.
In lieu of the conveyor-mechanized work station of
FIG. 2B
, the stationary work station of FIG.
2
B′ may be used. While the work station of FIG.
2
B′ is illustrated as being supported upon two I-beams
12
′ and
14
′, almost any type of stationary platform configuration would be suitable for providing support for partially pre-plated ties
18
coming sequentially from the work station of FIG.
2
A. The partially pre-plated tie
18
, with plates
22
, started spikes
114
and jig
70
of the type illustrated in the upper right hand portion of
FIG. 2A
, is also illustrated in FIG.
2
B′ and has been correspondingly numbered. No farther description is necessary, except to say that the worker
140
with jackhammer
142
equipped with socket
144
will stand at least some of the time on the jig
70
in the course of driving the spikes
114
, in the manner heretofore indicated. Where the worker
140
does stand and walk upon jigs
70
, it may be necessary for the jigs to comprise components which are structurally larger and stronger than those used at the work station of FIG.
2
B.
Reference is now made to
FIG. 2C
, which illustrates, in the upper right hand portion, the downstream end of the work station of FIG.
2
B. The pre-plated tie
18
shown at the left in
FIG. 2B
is reproduced on the right in FIG.
2
C. It is to be understood that the pre-plated tie
18
illustrated in
FIG. 2C
may arrive from either the spike-driving work station of
FIG. 2B
or the spike-driving work station of FIG.
2
B′.
The pre-plated tie
18
illustrated at the right in
FIG. 2C
includes a U-shaped distance-measuring tool or template or spacer, generally designated
160
. This distance-measuring tool is illustrated in enlarged perspective in FIG.
4
and comprises opposed plate-like pedestals or feet
162
and
163
. The foot
162
comprises an outside edge surface
164
adapted to engage the inside surface
50
of the field flange
42
of the right plate
22
on top of the pre-plated tie
18
. The left foot
163
comprises an outside edge surface
165
and a bottom notch comprising horizontal surface
167
and vertical surface
169
. The distance of surface
167
from surface
165
to surface
169
equals the permitted tolerance for plate placement. For example, this may be ⅛″ or {fraction (1/16)}″ or otherwise, depending on the specified tolerance. With the right pedestal or foot
162
engaging right plate surface
50
at edge
164
, the plates
22
are within tolerance if the edge
169
is within the channel
38
of the left plate
22
and edge
167
is not within this channel
38
. The tool
160
is preferably formed of steel, although other materials could be used, and comprises opposed short columns
166
of equal length and a connecting beam
168
. Beam
168
may appropriately be welded to columns
166
, which in turn may be welded to plates
162
and
163
.
Since each completed pre-plated tie
18
is manually tested with the tool
160
, it is immediately known whether each tie is within tolerances. Those few which are not, if any, are corrected. However, all or nearly all completed pre-plated ties
18
are found to be within the require accuracy tolerances and, therefore, there are few, if any, rejects.
With continued reference to
FIG. 2C
, the completed pre-plated ties
18
which have been checked for plate location tolerance are next displaced down parallel ramps
170
, until a suitable number have been accumulated, at which time, a forklift or other suitable mechanized lifting apparatus is used to simultaneously hoist several of the completed pre-plated ties
18
for placement in storage or upon or in a suitable vehicle for transportation to another storage site and/or to an installation site where a railroad line is being constructed or repaired. The sloped ramps
170
are illustrated as being connected, as by welding, to a transverse abutment
172
, from which two upwardly-directed triangularly-shaped stops
174
project. Stops
174
are engaged by the initial completed pre-plated tie
18
moving down ramps
170
to establish the aligned grouping of completed ties shown toward the left in FIG.
2
C. It is to be appreciated that ramps
170
may comprise roller conveyors or any other suitable structure for satisfactorily processing completed pre-plated ties
18
from the work station of
FIG. 2C
to another location.
Reference is now made to
FIG. 7
, which illustrates another clamping mechanism which may be used to form part of the above-described jig
70
, in lieu of the crank mechanisms. Specifically, a pneumatic or hydraulic cylinder may be mounted upon cross bar
78
(or cross bar
76
) as by welding at site
80
. The orientation of the cylinder is sloped somewhat downward from left to right. The cylinder
182
is conventional and comprises a piston rod
184
which is reciprocated, the direction of displacement depending upon whether a piston within the cylinder
182
is being advanced or retracted. A clamping block
186
is welded or otherwise secured rigidly to the distal end of the piston rod
184
so that clamping block
186
engages the edge surface
134
of the adjacent plate
22
when advanced to cause the plate surface
50
to forcibly and contiguously engage the associated cross bar
74
of the jig.
The invention may be embodied in other specific forms without departing from the spirit of the essential characteristics thereof. The present embodiments, therefore, are to be considered in all respects as illustrative and are not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Claims
- 1. A method of pre-plating a railroad tie, comprising the acts of:placing two plates on top of a wooden railroad tie having no plate-locating indicia; positioning the two plates each comprising a field flange comprising an inside field flange surface without spikes in apertures of the plates in respect to the railroad tie using a portable plate-locating jig to concurrently contiguously engage a control end of the tie and the inside field flange surface of each plate to establish the correct positional relationship between the plates and the tie; placing for the first tine a field spike and a gauge spike through apertures in each plate into the wooden tie and driving the placed spikes partially into the wooden tie while the jig maintains the position established by the positioning step; driving each field spike fully into the wooden tie until a head thereof is contiguous with the plate while the jig maintains the position established by the positioning step; insuring that each gauge spike is driven into the wooden tie until a head thereof is a distance above the plate ample to later receive a base of the railroad rail.
- 2. A method of pre-plating a wooden railroad tie comprising the steps of:supplying wooden railroad ties, steel railroad plates and steel railroad spikes to an ingress station; placing two plates on top of each tie; superimposing a portable jig continuously with a control end of each tie adjacent with a jig component extending across each plate; clamping each plate in position using the portable jig so that the jig remains contiguous with the control end of the tie so that one said jig component continuously engages an inside surface of a field flange of each plate to accurately position each plate in respect to its associated tie for ultimate accurate reception of railroad rails; inserting and starting a spike through at least one aperture in the field side and at least one aperture in the gauge side of each plate into the wooden tie while the plates and tie are so clamped; driving both spikes through said apertures in each plate until a head of the at least one field spike is contiguous with its associated plate to retain each plate in its accurate location and a head of the at least one gauge spike is disposed above its associated plate a desired distance to thereby complete the pre-plating of the tie; removing the portable jig from the plates and each pre-plated tie; returning each removed portable jig to the ingress station; placing each pre-plated tie discharged from an egress station in storage or on a transport vehicle.
- 3. A method according to claim 2 wherein the placing step comprises use of a hand-held spacer to establish an initial position for one plate on the associated tie.
- 4. A method according to claim 2 wherein the superimposing step comprises manually placing a frame of the portable jig contiguously against the control end and around the sides of each tie juxtaposed the top thereof.
- 5. A method according to claim 2 wherein the superimposing step comprises manually placing a cross bar of the associated portable jig centrally between a field flange and a gauge flange of each plate so that the cross bars contiguously engage the inside surface of each field flange.
- 6. A method according to claim 5 wherein the clamping step comprises displacing a clamping head against a field edge of each plate causing an inside surface of the field flange to contiguously engage the cross bar.
- 7. A method according to claim 6 wherein the displacing step comprises using a crank mechanism to so displace the clamping head.
- 8. A method according to claim 6 wherein the displacing step comprises using a pneumatic or hydraulic cylinder to so displace the clamping head.
- 9. A method according to claim 2 wherein the starting step comprises using at least one sledgehammer.
- 10. A method according to claim 2 wherein the driving step is accomplished using a manual impact tool as the ties are successively displaced along a conveyor system.
- 11. A method according to claim 10 wherein the driving step comprises use of a manual impact jackhammer by a worker standing on support structure adjacent to the conveyor and spaced from the ties.
- 12. A method according to claim 2 wherein each removed portable jig is returned via a conveyor system.
- 13. A method according to claim 2 wherein the returning step is via a conveyor system which traverses to the ingress station above a worker performing the driving step.
US Referenced Citations (17)