The present invention relates to precast composite floor systems. More specifically, the present invention relates to a precast composite floor which provides decreased weight, is able to bolt directly into a steel frame structure, and which allows for forming holes through the floor slab without concern for tensioning strands as well as the passage of mechanical equipment through the vertical stem wall of the floor section.
Precast concrete construction is often used for commercial and industrial buildings, as well as some larger residential buildings such as apartment complexes. Precast construction has several advantages, such as more rapid erection of a building, good quality control, and allowing a majority of the building structural members to be precast. Conventional precast structures, however, suffer from several disadvantages such as being heavy, requiring more material, and requiring more difficult connections between precast members and to the rest of the building structure.
Currently, precast single tee and double tee panels are used for constructing floors. The precast single and double tees are typically eight feet wide and often between 25 and 40 feet long or longer. The single tee sections typically have a deck surface of about 1.5 to 2 inches thick and a concrete beam extending down from the deck surface along the longitudinal center of the deck. The beam is usually about 8 inches thick and about 24 inches tall.
Double tee panels usually have a deck surface which is about 2 inches thick and have two beams extending down from the deck. The beams are placed about four feet apart running down the length of the panel, and are about 6 inches thick and 24 inches tall. Often, the single and double tee panels are installed and about 2 or 3 inches of concrete topping is placed on top of the panels.
Single and double tee panels have several drawbacks. These precast floor panels are heavy. Heavy floor panels require heavier columns and beams to support the floor panels and so on, increasing the weight of nearly every part of the building structure. Heavier structural elements use more materials and are thus more expensive, require increased lateral and vertical support, and may limit the height of the building for a particular soil load bearing capacity.
Another drawback of the conventional precast floor systems is that mechanical equipment and ducts must be suspended beneath the beams, increasing the vertical space required for a floor.
The present invention is a precast composite floor system which is made up of composite floor panels and composite girders. The floor system is able to be fabricated in a factory, shipped to a job site, and erected in a manner that is quicker and more efficient than existing systems. The present invention provides precast panels which are lighter than existing panels. Reducing the amount of material in the floor of a building reduces the overall weight of the building, which in turn allows for smaller columns, foundations, and lateral systems.
It is an object of the present invention to provide an improved precast composite concrete floor system.
According to one aspect of the invention, a floor system is provided which reduces the weight of the floor panels. Floor panels of the present invention weigh about half as much as conventional double tee floor panels. Reducing the weight of the floor panels reduces the load placed on the columns and other structural members of the building, allowing further reductions in weight. The reduction in building weight allows for the construction of taller structures and alleviates other construction limitations such as soil with poor load bearing capacity.
According to another aspect of the present invention, a floor panel is provided with openings formed in the stem wall, allowing mechanical equipment to be run through the stem wall. Placing mechanical equipment through the stem walls reduces or eliminates the need for suspending ducts or other equipment below the floor panels, reducing the vertical space necessary for the floor.
According to another aspect of the invention, a floor panel is provided which bolts into the steel structure of a building. Conventional precast floor panels are reinforced concrete members which have weld plates embedded therein. The floor panels are supported by concrete girders and columns, and the weld plates are welded to adjacent weld plates in other floor or wall members. Bolting the floor panels of the present invention to a steel structure allows for more rapid construction while requiring fewer trades to be present to install the floor panels.
According to another aspect of the invention, there are no tensioning strands in the floor deck (slab), allowing most openings through the deck to be made at any time during the construction process, and allowing holes to be cut through virtually any location in the floor slab except for directly over the beam section.
These and other aspects of the present invention are realized in a precast composite floor system as shown and described in the following figures and related description.
Various embodiments of the present invention are shown and described in reference to the numbered drawings wherein:
It will be appreciated that the drawings are illustrative and not limiting of the scope of the invention which is defined by the appended claims. The embodiments shown accomplish various aspects and objects of the invention. It is appreciated that it is not possible to clearly show each element and aspect of the invention in a single FIGURE, and as such, multiple figures are presented to separately illustrate the various details of the invention in greater clarity. Similarly, not every embodiment need accomplish all advantages of the present invention.
The invention and accompanying drawings will now be discussed in reference to the numerals provided therein so as to enable one skilled in the art to practice the present invention. The drawings and descriptions are exemplary of various aspects of the invention and are not intended to narrow the scope of the appended claims.
The present system has several advantages over conventional concrete double tee systems. The biggest advantage is the reduced weight. A concrete double tee system with similar spans and loading conditions would weigh approximately 100% more per square foot than the present invention. Other structural members such as concrete girders and concrete columns that are used with double tee systems are also much heavier than columns used with the present invention. Increased weight of the double tee floor system necessitates larger footings and foundation walls. This is restrictive for taller structures and for construction in areas with poor soil bearing capacity.
The vertical legs or walls of a double tee floor panel are solid and will not allow for passage of mechanical, plumbing or electrical through the Tee, thereby increasing the floor to floor dimension because all of the utilities need to be run below the floor structure. Openings in the stem wall of the present system allow the mechanical, electrical and plumbing to pass through the structure, thereby eliminating the need to run these elements below the floor structure.
The present system also allows for greater flexibility in locating slab penetrations (openings through the floor slab) because the beams are spaced farther apart, typically 8 feet on center versus 4 or 5 feet for the legs of a double tee system.
Double tee systems are assembled by weld plates embedded in each component and must bear on concrete or masonry structures. The current system is bolted into a lighter steel structure which makes it possible to use in mid to high-rise construction.
Conventional steel and concrete composite construction also has several problems which are alleviated by the present invention. Conventional composite floor framing is very labor intensive on site. After installation of the columns for a conventionally framed floor, the rest of the materials for the conventional system are installed individually, and include the girders, joists, metal deck, nelson studs, reinforcing, edge enclosures, and poured concrete. This assembly takes much longer than the present invention due to the precast nature of the present system. With the present invention, tradesmen are able to occupy the floor to complete construction in a much shorter time frame which means shortened overall construction time.
Because of the way the calculations are performed for a conventional composite floor, the concrete that is below the top of the flute in the decking is not used in the composite section, but still contributes to the weight of the concrete in the building and the cost for that material. By precasting the floor panels, the present system has eliminated the need for the metal deck. This eliminates the material and the labor required to weld the steel deck in place.
In normal steel construction, the controlling factor over the size of the steel members is the necessity of the steel framing members to carry the full weight of the wet concrete without any of the concrete strength. In the present invention, the steel beams will be completely shored by the forms while the concrete is wet. This by itself reduces the size of the steel beam and eliminates the need for precambering the beam since the beams aren't required to support the weight of the wet concrete.
Additionally, in normal steel construction the beams are aligned so that the tops of the girders and joists are flush. This is done because the metal deck is placed on the joists and girders and the deck is used as a form for the concrete slab. When calculating the section properties for this system, the distance from the top of steel beam to the middle of the concrete is one of the biggest factors. The present invention places a composite stem wall between the steel beam and the concrete deck, thereby increasing the distance from top of the steel beam to the centerline of the concrete slab. As such, the load-bearing strength and span capabilities of the precast panel system are greatly increased. The present flooring system eliminates a significant amount of steel and concrete material as compared to a conventional poured-in-place system.
In describing the composite flooring system of the present invention, multiple views of the floor panel and girder are shown, including views of the parts thereof and cross-sectional views showing the internal construction thereof. Not every structure of the panel or girder is labeled or discussed with respect to every figure for clarity, but are understood to be part of the panel or girder.
As shown in
When a beam supported at both ends is loaded the top half of the beam is under compression while the bottom half of the beam is under tension. Concrete has high compressive strength but low tensile strength, while steel has high tensile and compressive strength. In the present invention, the concrete slab at the top of the tee is under compression and the steel beam at the lower portion of the tee is under tension. The configuration of materials of the floor panel 15 utilizes the best structural properties of each material, making the panel more efficient.
The stem wall 4, for the majority of the span of the floor, can have large openings 4a, or blockouts. Preferably, 50 percent of the thickness of the floor deck 2 is retained at the top of the stem wall 4, leaving a small ridge as is visible in
Diagonal braces 3 which are welded to the panel beam 1 and embedded weld plates in the slab 2 provide additional support for the slab. In a typical configuration, the floor slab 2 is about 8 feet wide and between 25 and 40 feet long. The concrete floor deck 2 is typically about 3 inches thick. The stem wall 4 is typically between 12 and 36 inches tall. The openings 4a in the stem wall 4 are typically located adjacent the stem wall, and may occupy the entire height of the stem wall if necessary. Thus, for an exemplary 24 inch stem wall 4, the openings 4a may be about 24 inches wide and 24 inches tall and have approximately 12 inch pillars of concrete between the openings. The steel beam 1 is typically about 12 inches tall and between 4 and 8 inches wide.
As shown in
The girder 16 is typically long enough to support several floor sections as shown in
Panel Construction
The composite panel 15 is cast in steel forms 30, as shown in
The structure of the floor panel 15 is illustrated in
Lifting loops 10 made from reinforcing bar which have been bent into u-shapes are welded to the top flange 1b of the beam at a point between the vertical reinforcing bars 6 where the concrete of the stem wall 4 will be poured to surround the lifting loops 10 and vertical reinforcing bars 6, leaving the tops of the lifting loops uncovered by concrete for lifting the panel with a crane. The length of the lifting loops 10 is approximately 0.25″ less than the distance from the top side of the top flange 1b of the beam 1 to the top surface of the finished concrete slab 2. Lifting loops 10 are spaced at intervals determined by the overall length of the composite panel 15. Typically three lifting loops 10 are used per panel 15, with a minimum of two lifting loops on any single panel.
The beam assembly, consisting of the wide flange beam 1, lifting loops 10 and vertical L-shaped reinforcing bar 6, is then moved to a floor-mounted jig to hold it steady while the horizontal slab reinforcing rebar 8, 9 is tied to the horizontal leg 6a of the L-shaped vertical reinforcing bars 6. Reinforcing bars 9 running parallel to the longitudinal axis of the beam 1 are tied into place using standard tie wire to the underside of the horizontal leg 6a of the L-shaped reinforcing bar 6 which was welded to the beam 1. Horizontal reinforcing bars 8 running perpendicular to the longitudinal axis of the beam 1 are tied to the previously installed horizontal reinforcing bars 9 which are running parallel to the longitudinal axis of the beam 1. Reinforcing bars 8, 9 are cut to a length about two inches shorter than the overall length or width of the slab 2 in which they are to be cast. Horizontal reinforcing bars 8, 9 are typically tied with 16 gauge tie wire at all intersections.
Openings 4a in the concrete stem wall 4 are created by attaching a formed shape to the beam 1 between the vertical reinforcing bars 6. These openings 4a are typically referred to as blockouts. Blockout forms are made using a variety of materials, including but not limited to, styrene foam, rubber, wood and steel. The most common method of blockout form construction is styrene foam blocks which are secured to the beam 1 by use of tape or glue. The blockout forms are coated in form release oil or silicone to prevent it from bonding to the stem wall concrete 4 that is poured around it.
Weld plates 5, 11 are placed into the form bed and secured by tie wire or small bolts to hold the weld plates into position until the concrete has cured sufficiently. These weld plates are also referred to as embedded weld plates or simply as embeds. There are several configurations of weld plates 5, 11 used at different locations in the panel slab 2. The slab edge embed 5 consists of a short length of angle iron 5a, usually eight to twelve inches in length, with two straight reinforcing bars 5b welded to the inside of the angle 5a in a manner so that they extend out in the horizontal plane of the concrete slab 2 once they are placed in the forms. The weld plates 5, 11 are spaced at equal intervals along both sides of the concrete slab 2 and are used to connect adjacent panels 15 to each other at the slab 2 level.
Slab end weld plates 11 consist of short lengths of flat steel bar 11a, usually eight to twelve inches in length, with two L-shaped reinforcing bars 11b welded to one side of the flat bar and positioned so that the long leg of the L-shape will extend outward into the horizontal plane of the concrete slab 2 once they are placed in the forms. Slab end weld plates 11 are used to secure the panel slab 2 to the girder 16 below.
The beam assembly, consisting of the steel wide flange beam 1 with attached vertical reinforcing 6, the horizontal slab reinforcing 8, 9 and the stem wall blockout forms, is lifted and set into the forms which have been sprayed with form release oil. The weld plates 5, 11 have been tied or bolted to the forms and are then in contact with the horizontal reinforcing rebar 8, 9 and all bars of the weld plates 5, 11 are then tied with 16 gauge tie wire to intersecting reinforcing bars at each intersection.
Rebar chairs may be placed under the horizontal reinforcing 9 to maintain the minimum distance between the bottom surface 2a of the concrete slab 2 and the underside of the horizontal reinforcing 9. Rebar chairs are spaced as needed, as determined by visual inspection once the beam assembly has been set in place and all weld plates 5, 11 have been tied securely to the horizontal reinforcing 8, 9.
Concrete is placed in the forms in a manner to ensure that all reinforcing bar 8, 9 is sufficiently covered. The upper surface of the concrete slab 2b is finished to industry standards for concrete floors. Typically the panels 15 are covered by plastic or concrete blankets and heated air is introduced under the forms to accelerate curing of the concrete. Once the concrete has cured sufficiently the panel 15 is lifted out of the forms by the lifting loops 10 attached to the beam 1. The panel 15 is set on a flat, level surface and is held level by blocking, stands or other means acceptable to hold it level without putting excessive stresses on any one point in the panel 15.
Braces 3 are then welded to the underside of the slab at the slab edge weld plates 5 and run diagonally down to intersect with the vertical web id of the wide flange panel beam 1. The brace 3 is welded to the beam 1 and the embed 5 so that in plan view the brace is perpendicular to the longitudinal axis of the panel beam 1. One brace 3 is attached at each slab edge embed 5.
The blockout forms are removed from the beam assembly leaving voids in the concrete stem wall 4. All bolts or tie wire which were used to secure the weld plates 5,11 in place before the concrete was formed and which are projecting from the concrete slab 2 are cut off flush with the bottom surface of the concrete slab 2a.
Girder Construction
As shown in
Lifting loops 10, made from reinforcing bar which has been bent into a u-shape, are welded to the top flange 17b of the beam. The length of the lifting loops 10 is approximately 0.25″ less than the distance from the top side of the top flange 17b of the beam to the top surface of the girder stem wall. Lifting loops 10 are spaced at intervals determined by the overall length of the composite girder 16. A minimum of two lifting loops 10 are used on any single girder 16.
The beam assembly, consisting of the wide flange beam 17, lifting loops 10 and vertical L-shaped reinforcing bar 18, is then moved to a floor-mounted jig to hold it steady while the horizontal reinforcing 19 is tied to the horizontal leg of the L-shaped vertical reinforcing bars 18 which have been welded to the beam 17. Reinforcing bars 19 running parallel to the longitudinal axis of the beam 17 are tied into place using 16 gauge tie wire to the top side of the horizontal leg 18a of the L-shaped reinforcing bar 18 which was welded to the beam 17.
Blockouts or openings 12a in the concrete of the girder 16 are created by attaching a formed shape to the beam 17 between the vertical reinforcing bars 18 which were welded to the beam 17. The blockouts 12a in a girder 16 are formed in the same manner as the blockouts in a panel stem wall 4.
The girder beam assembly is placed into the forms 31 on its side (although they could also be poured vertically. Rebar chairs 14 are used as necessary to keep the rebar 19 away from the form bed. Weld plates 25 (as shown in
Floor Assembly
Once the girders 16 are in position, the panels 15 can be installed. A panel 15 is lifted by a crane secured to the lifting loops 10 which were welded to the panel beam 1 and embedded into the concrete of the stem wall 4. The panel 15 is set into place so that the vertical web 1d of the panel beam 1 is in line with the appropriate shear tab 21. The shear tabs are welded inside the girder beam 17, connecting to the top flange, bottom flange, and web as shown. A separate bolt plate 20 is attached to both the girder shear tab 21 and the panel beam 1 with bolts. The bolted connection transfers all of the gravity forces acting on the panel 15 into the girder beam 17.
Floor panels 15 are connected to each other through the embedded weld plates 5a at the slab edges. Lateral forces are transferred through these connections at the slab edge. As shown in
The underside of the panel slab 2 is attached to the top of the girder 16 by welding the embedded weld plate 11 in the bottom of the slab 2 to the embed weld plate 25 in the top of the girder 16. Once all of the floor panels 15 are in place and all joints have been filled with grout 24 a lightweight topping of concrete 26 is often poured over the floor slabs 2 to provide the final wear surface and level out any variations in the slab elevations.
There is thus disclosed an improved precast composite flooring system. It will be appreciated that numerous changes may be made to the present invention without departing from the scope of the claims.
The present application claims the benefit of U.S. Provisional Application Ser. No. 61/053,147, filed May 14, 2008, which is herein incorporated by reference in its entirety.
Number | Name | Date | Kind |
---|---|---|---|
644940 | Orr | Mar 1900 | A |
1891763 | Henderson | Dec 1932 | A |
2016616 | Schaub | Oct 1935 | A |
2171338 | Henderson | Aug 1939 | A |
2184464 | Myers | Dec 1939 | A |
2294554 | Henderson | Sep 1942 | A |
2297952 | Friberg | Oct 1942 | A |
2423695 | Falco | Jul 1947 | A |
2675695 | Coff | Apr 1954 | A |
2987855 | Singleton et al. | Jun 1961 | A |
3210900 | Sattler | Oct 1965 | A |
3257764 | Cripe | Jun 1966 | A |
3282017 | Rothermel | Nov 1966 | A |
3385015 | Hadley | May 1968 | A |
3550332 | Wiesman | Dec 1970 | A |
3567816 | Embree | Mar 1971 | A |
RE29249 | Rice | Jun 1977 | E |
4300320 | Rooney | Nov 1981 | A |
4646493 | Grossman | Mar 1987 | A |
4653237 | Taft | Mar 1987 | A |
4912794 | Thivans | Apr 1990 | A |
4972537 | Slaw | Nov 1990 | A |
4991248 | Allen | Feb 1991 | A |
5029426 | Larson et al. | Jul 1991 | A |
5052309 | Haselwander et al. | Oct 1991 | A |
5131201 | Larson et al. | Jul 1992 | A |
5279093 | Mead | Jan 1994 | A |
5317854 | Yoshida et al. | Jun 1994 | A |
5373675 | Ellison, Jr. | Dec 1994 | A |
5671573 | Tadros et al. | Sep 1997 | A |
5678373 | Franklin et al. | Oct 1997 | A |
5884442 | Breault | Mar 1999 | A |
5924254 | Franklin et al. | Jul 1999 | A |
5978997 | Grossman | Nov 1999 | A |
6094878 | Schluter | Aug 2000 | A |
6668412 | Tadros et al. | Dec 2003 | B1 |
6668507 | Blanchet | Dec 2003 | B2 |
6708362 | Allen | Mar 2004 | B1 |
6709192 | Smith | Mar 2004 | B2 |
6898908 | Messenger et al. | May 2005 | B2 |
6915615 | Won | Jul 2005 | B2 |
7010890 | DeSutter | Mar 2006 | B2 |
7275348 | Desutter | Oct 2007 | B2 |
20030093961 | Grossman | May 2003 | A1 |
20030182883 | Won | Oct 2003 | A1 |
20060059835 | Werner | Mar 2006 | A1 |
20060272267 | Mentado-Duran | Dec 2006 | A1 |
20090100794 | Holmes et al. | Apr 2009 | A1 |
Number | Date | Country |
---|---|---|
3837774 | May 1990 | DE |
0011555 | May 1980 | EP |
922480 | Jun 1947 | FR |
1322754 | Jul 1973 | GB |
2010-265689 | Nov 2010 | JP |
02090660 | Nov 2002 | WO |
Number | Date | Country | |
---|---|---|---|
20090288355 A1 | Nov 2009 | US |
Number | Date | Country | |
---|---|---|---|
61053147 | May 2008 | US |