This invention relates to a prefabricated, prestressed bridge system and a method for making same. Prefabricated, prestressed bridges are commonly known, however, the prefabricated, prestressed bridges currently available are cumbersome to manufacture and difficult to erect resulting in an expensive, labor-intensive final product. Prefabricated, prestressed bridges are used in a variety of civil engineering applications such as disclosed in U.S. Pat. No. 5,471,694 Prefabricated Bridge with Prestressed Elements (“Meheen patent”); U.S. Pat. No. 4,493,177 Composite, Pre-Stressed Structural Member and Method for Forming Same (“Grossman patent”); and U.S. Pat. No. 2,373,072 Rigid Frame Bridge and Method of Making the Same (“Wichert patent”). However, improvements are desired to provide a more easily manufacturable, more robust system with more integrated components which assist in providing the prestress to the bridge beams. Implementation of these improvements results in lower cost and increased speed of construction of a prefabricated, prestressed bridge system.
The Meheen patent discloses a prefabricated bridge beam with prestressed elements comprising a rectangular girder-box assembly which includes a bottom plate prestressed in compression and a pair of upstanding side members each having its upper portions prestressed in tension. A poured and cured bridge deck is supported by the said side members, the cured deck securing in place the said tension and compression stresses. However, the Meehan bridge beam utilizes a cantilevered load to deform the bridge beam. And, the Meehan beam lacks integrated structural members that provide constant, localized loads for prestressing.
The Grossman patent discloses a composite, prestressed structural member comprised of concrete and a lower metal support member, and a method for forming and prestressing the same. However, the Grossman structural member requires inversion to a concrete-uppermost position prior to use.
The Wichert patent relates to rigid frame bridges and the fabrication and construction thereof. The Wichert method for fabricating the rigid frame bridge discloses holding the metal span portion of the bridge against sagging upon application of the concrete or, alternatively, positively pressing upwardly the metal span portion prior to pouring the concrete. However, the Wichert rigid frame bridge does not utilize integrated structural members to achieve prestressing.
Accordingly, an apparatus, system, and method are desired for solving the aforementioned problems and providing the aforementioned advantages.
The present invention includes a novel prefabricated, prestressed bridge system and method for making same. The prefabricated, prestressed bridge system is a prefabricated, prestressed beam that can be used in a variety of construction applications including, but not limited to, bridge applications. The prefabricated, prestressed bridge system includes one or more prefabricated, prestressed bridge modules.
A method for making the prefabricated, prestressed bridge module comprises providing and arranging one or more steel beams on three or more supporting formwork elements such that the first supporting formwork element is at a first outer end of the one or more steel beams, the second supporting formwork element is at the middle of the one or more steel beams, the third supporting formwork element is at a second outer end of the one or more steel beams, and the additional formwork elements are at one or more intermediary locations between the first outer end and the middle of the one or more steel beams and at one or more intermediary locations between the second outer end and the middle of the one or more steel beams. The method further comprises adding shear connectors to the one or more steel beams, positioning and extending rebar through the one or more steel beams in a direction perpendicular to the one or more steel beams and above at least two of the supporting formwork elements, pouring concrete to form concrete diaphragms on top of and around the rebar at locations above the supporting formwork elements, adjusting one or more of the supporting formwork elements to stress the one or more steel beams, and fabricating a concrete deck to form a surface atop the diaphragms and the one or more steel beams such that resulting compression stress of the concrete deck secures in place the stresses imparted to the one or more steel beams.
Each prefabricated, prestressed bridge module comprises one or more steel beams arranged on three or more supporting formwork elements such that the first supporting formwork element is at the first outer end of the one or more steel beams, the second supporting formwork element is at the middle of the one or more steel beams, the third supporting formwork element is at a second outer end of the one or more steel beams, and the additional supporting formwork elements are at one or more intermediary locations between the first outer end and the middle of the one or more steel beams and at one or more intermediary locations between the second outer end and the middle of the one or more steel beams. The prefabricated, prestressed bridge module further comprises shear connectors on the one or more steel beams, rebar that runs through the one or more steel beams in a direction perpendicular to the one or more steel beams and above at least two of the supporting formwork elements, concrete material poured to form concrete diaphragms on top of and around the rebar at locations above the supporting formwork elements, one or more supporting formwork elements that are adjusted to stress the one or more steel beams, and a concrete deck fabricated over the surface atop the diaphragms and the one or more steel beams such that resulting compression stress of the concrete deck secures in place the stresses imparted to the one or more steel beams. A prefabricated, prestressed bridge system comprising two or more prefabricated, prestressed bridge modules secured together is also a subject of the present invention.
Accordingly, an object of the present invention is to provide a prefabricated, prestressed bridge module in which camber is produced by selectively lowering supporting formwork elements under the bridge module components while the prefabricated, prestressed bridge module is being made. Alternatively, camber may be achieved by selectively raising one or more supporting formwork elements under the bridge module components while the prefabricated, prestressed bridge module is being made.
It is an additional object of this invention to provide a prefabricated, prestressed bridge module which utilizes the weight of diaphragms in combination with the adjustment of supporting formwork elements to produce camber.
It is an additional object of this invention to provide a prefabricated, prestressed bridge module which uses the weight of diaphragms, the adjustment of supporting formwork elements, and an externally applied load to produce camber.
It is an additional object of the invention to provide a prefabricated, prestressed bridge module which utilizes steel beams that are trapezoidal-shaped, I-beam-shaped, or shaped like other steel beams commonly used in the civil engineering industry.
It is an additional object of the invention to provide a prefabricated, prestressed bridge system that is faster to make, more efficient, and more affordable than other prefabricated, prestressed bridges.
It is an additional object of the invention to provide a prefabricated, prestressed bridge system that consists of one or more prefabricated, prestressed bridge modules that can be joined with one another to make prefabricated, prestressed bridge systems of various sizes.
It is an additional object of the invention to provide a method of making a prefabricated, prestressed bridge system that can be made in a first location and delivered to a second location for installation and use.
It is an additional object of the invention to provide a prefabricated, prestressed bridge module where the diaphragms and the concrete deck of the prefabricated, prestressed bridge module can be poured monolithically and the height levels of each of the three or more supporting formwork elements adjusted into predetermined cambered positions during the pour.
An additional object of the invention is to provide a prefabricated, prestressed bridge system that can serve as a prefabricated, prestressed beam that can be used in a variety of construction applications, including but not limited to bridge applications.
Other and still further objects, features, and advantages of the invention will become apparent from a reading of the following detailed description of the invention taken in connection with the accompanying drawings.
a is a cross-sectional view taken through one of the steel beams in
a is a first exploded view of a steel beam with holes and shear connectors of
b is a second exploded view of a steel beam with holes and shear connectors of
a is a perspective view of the steel beams, shear connectors, supporting formwork elements, and diaphragms with external loads in a camber-producing arrangement used in
a is a perspective view of the steel beams, supporting formwork elements, and diaphragms in a camber-producing arrangement with a concrete deck of an alternate embodiment;
a is a first cross-sectional view taken through the completed prefabricated, prestressed bridge module of
b is a second cross-sectional view taken through the completed prefabricated, prestressed bridge module of
a is a cross-sectional view taken through one of the steel beams in
a is a perspective view of the steel beams, shear connectors, supporting formwork elements, and diaphragms with external loads in a camber-producing arrangement of an alternate embodiment;
a is a first cross-sectional view taken through the completed prefabricated, prestressed bridge module of an alternate embodiment in
b is a second cross-sectional view taken through the completed prefabricated, prestressed bridge module of an alternate embodiment in
a shows external loads for creating camber applied to the prefabricated, prestressed bridge module of
The diaphragms provide a unique, efficient, cost-effective means to pre-camber the steel beams. When the prefabricated, prestressed bridge module is used alone or in combination with one or more prefabricated, prestressed bridge modules, the concrete diaphragms that are not at the ends of the steel beams distribute live loads that the prefabricated, prestressed bridge module bears over the one or more steel beams. When the prefabricated, prestressed bridge module is used alone or in combination with one or more prefabricated, prestressed bridge modules, the concrete diaphragms that are at the ends of the steel beams retain the earth at the bridge and roadway interface. The concrete diaphragms that are not at the middle of the one or more steel beams provide the weight required to pre-camber the steel beams.
The weights of the concrete diaphragms that are not at the middle of the one or more steel beams can be varied to produce specific amounts of camber in the one or more steel beams when one or more of the supporting formwork elements are adjusted to create camber in the one or more steel beams. The concrete diaphragms are an integral part of the prefabricated, prestressed bridge module's structure that serve the additional function of producing camber in the one or more steel beams when one or more of the supporting formwork elements are adjusted.
a shows an alternate embodiment with five diaphragms 40, 43, 41, 44, 42 atop five supporting formwork elements 35, 38, 36, 39, 37.
a shows a first cross-sectional view of the prefabricated, prestressed bridge module of
b shows a second cross-sectional view of the prefabricated, prestressed bridge module of
In combination with adjustment of one or more of the supporting formwork elements, the weight of the diaphragms stresses the one or more steel beams before the concrete deck is fabricated atop the one or more steel beams and diaphragms. The concrete deck forms a surface atop the diaphragms and the one or more steel beams such that resulting compression stress of the concrete deck secures in place the stresses imparted to the one or more steel beams.
An alternate embodiment may be made by utilizing steel beams that have a different shape than steel beams 10 and 11. The alternate embodiment utilizes steel beams 100 and 101 that are an in an “I beam” shape that is commonly used in the construction industry.
a shows external loads for creating camber applied to the prefabricated, prestressed bridge module of
a shows a first cross-sectional view taken through the completed prefabricated, prestressed bridge module of the alternate embodiment of
b shows a second cross-sectional view taken through the completed prefabricated, prestressed bridge module of the alternate embodiment of
The invention of the present prefabricated, prestressed bridge system may be made with one, two, or three prefabricated, prestressed modules. Also, it is contemplated that a scope of the present invention includes the fact that the prefabricated, prestressed bridge system may utilize more than three prefabricated, prestressed modules.
Similarly, the present prefabricated, prestressed bridge system may comprise one or more prefabricated, prestressed modules that use one or more steel beams in each prefabricated, prestressed module. The invention of the present prefabricated, prestressed bridge system may also utilize two or more diaphragms and more than three supporting formwork elements in each prefabricated, prestressed module to achieve the necessary camber.
The present prefabricated, prestressed bridge system utilizes the weight of the diaphragms and, if necessary, an externally applied load to produce camber.
The diaphragms and the concrete deck of the present prefabricated, prestressed bridge system may be poured monolithically and the height levels of one or more of the three or more supporting formwork elements adjusted into predetermined cambered positions during the pour.
Accordingly the present invention provides a prefabricated, prestressed bridge system in which camber is produced by selectively lowering or raising one or more supporting formwork elements while the prefabricated, prestressed bridge system is being made.
In the foregoing description, it will be readily appreciated by those skilled in the art that modifications may be made to the invention without departing form the concepts disclosed herein. Such modifications are to be considered as included in the following claims, unless these claims by their language expressly state otherwise.
The present application claims priority from U.S. Provisional Application No. 60/645,990 filed Jan. 21, 2005, entitled Prefabricated, Prestressed Bridge System and Method of Making Same.
Number | Name | Date | Kind |
---|---|---|---|
1656197 | Henderson | Jan 1928 | A |
1890432 | Billner | Dec 1932 | A |
1912290 | Marks | May 1933 | A |
2064788 | Faber | Dec 1936 | A |
2308943 | Tietig et al. | Jan 1943 | A |
2373072 | Wichert | Apr 1945 | A |
2382139 | Cueni | Aug 1945 | A |
3327028 | Rosenblatt | Jun 1967 | A |
3473273 | Gunkel | Oct 1969 | A |
3566558 | Comolli | Mar 1971 | A |
3794433 | Schupack | Feb 1974 | A |
3944242 | Eubank | Mar 1976 | A |
4301565 | Weinbaum | Nov 1981 | A |
4493177 | Grossman | Jan 1985 | A |
4604841 | Barnoff et al. | Aug 1986 | A |
4646493 | Grossman | Mar 1987 | A |
4700516 | Grossman | Oct 1987 | A |
4709456 | Iyer | Dec 1987 | A |
4809474 | Ekberg, Jr. | Mar 1989 | A |
4972537 | Slaw, Sr. | Nov 1990 | A |
5144710 | Grossman | Sep 1992 | A |
5305575 | Grossman | Apr 1994 | A |
5311629 | Smith | May 1994 | A |
5471694 | Meheen | Dec 1995 | A |
5603134 | Whipkey et al. | Feb 1997 | A |
5644890 | Koo | Jul 1997 | A |
5950390 | Jones | Sep 1999 | A |
5978997 | Grossman | Nov 1999 | A |
5987680 | Sakaya | Nov 1999 | A |
6065257 | Nacey et al. | May 2000 | A |
6170105 | Doyle et al. | Jan 2001 | B1 |
6381793 | Doyle et al. | May 2002 | B2 |
6412132 | Majnaric et al. | Jul 2002 | B1 |
6434893 | Quenzi | Aug 2002 | B1 |
6467223 | Christley | Oct 2002 | B1 |
6708362 | Allen | Mar 2004 | B1 |
6915615 | Won | Jul 2005 | B2 |
20010039773 | Bot | Nov 2001 | A1 |
20030182883 | Won | Oct 2003 | A1 |
20040040233 | Park | Mar 2004 | A1 |
20040118066 | DeLoach, Sr. | Jun 2004 | A1 |
20040216249 | El-Badry | Nov 2004 | A1 |
20050115195 | Bettigole et al. | Jun 2005 | A1 |
20050283926 | Pollard et al. | Dec 2005 | A1 |
Number | Date | Country |
---|---|---|
WO 2004101892 | Nov 2004 | WO |
Number | Date | Country | |
---|---|---|---|
20060162102 A1 | Jul 2006 | US |
Number | Date | Country | |
---|---|---|---|
60645990 | Jan 2005 | US |