The present invention relates to performing a change order during, or after, a chip is designed, and more specifically, to using a Boolean equivalence checking tool to perform the change order.
In chip design, an engineering change order is the process of inserting a logic change directly into the netlist after it has already been processed by an automatic layout tool. Before the chip masks are made, engineering change orders (ECOs) are usually done to save time, by avoiding the need for full ASIC logic synthesis, technology mapping, place, route, layout extraction, and timing verification. Electronic design automation (EDA) tools are often built with incremental modes of operation to facilitate this type of ECO.
One of the most common ECOs in ASIC design is the gate-level netlist ECO. In this flow, engineers manually (and often tediously) edit the gate-level netlist, instead of re-running logic synthesis. The netlist files are searched for the logic affected by the change, edited to implement the changes, and verified to ensure changes are made without introducing errors into the design. This is a very time and resource-intensive process highly subject to errors. Therefore, formal equivalence checking is normally used after ECOs to ensure the revised implementation matches the revised specification.
One embodiment of the present invention is a system that includes a computer processor and a memory containing a program that, when executed on the computer processor, performs an operation for processing data. The operation includes receiving an ECO that lists a name of a component in a first netlist and receiving a file linking the name of the component to a plurality of alternative names in a second netlist, where the plurality of alternative names represents components in the second netlist that are logically equivalent to the component in the first netlist. The operation also includes selecting one of the plurality of alternative names based on one or more criteria, updating the ECO to include the selected alternative name, and updating the second netlist based on the updated ECO.
Another embodiment of the present invention is computer program product for performing an ECO that includes a computer-readable storage medium having computer-readable program code embodied therewith. The computer-readable program code executable by one or more computer processors to receive the ECO that lists a name of a component in a first netlist and receive a file linking the name of the component to a plurality of alternative names in a second netlist, where the plurality of alternative names represents components in the second netlist that are logically equivalent to the component in the first netlist. The program code is executable to select one of the plurality of alternative names based on one or more criteria, update the ECO to include the selected alternative name, and update the second netlist based on the updated ECO.
Embodiments herein describe performing an engineering change order (ECO) after a physical design team has begun (or finished) a physical design (PD) netlist that defines the layout of a semiconductor chip. In one embodiment, the PD netlist is generated after a circuit design team provides a design netlist (also referred to as a “golden” or original netlist) to the PD team. The design netlist may list different logic (e.g., gates, transistors, buffers, interfaces, etc.) and the inputs/outputs of this logic which are referred to herein as nets. However, the design netlist may be placement agnostic. Stated differently, the design netlist may indicate what logic should be in the chip and how the logic is interconnected using nets, but the netlist does not indicate where in the chip the logic and nets should be located. Instead, using one or more automatic layout tools, the PD design team alters the design netlist to generate a PD netlist which is placement aware, and as such, considers physical constraints such as distance between logic, the physical dimensions of the chip, metal density requirements, and the like. As a result, the PD netlist may be very different from the design netlist.
If the design team wishes to alter the circuit design, they generate an ECO. However, the ECO may describe changes or additions to the logic and/or nets using component names found in the design netlist. However, these names may have been altered or deleted by the PD team when generating the PD netlist. Because the relationship between the components in the design netlist (e.g., the logic gates, nets, pins, etc.) and the components in the PD netlist may be unknown, typical tools used to perform ECOs may result in major changes in the PD netlist which requires a lengthy validation process to ensure the changes were correct. Instead, embodiments herein generate an equivalents nets file that links components in the design netlist to the components in the PD netlist. When performing an ECO, the PD team can use this file to map the components in the ECO (which are based on the design netlist) to all the equivalent components in the PD netlist. The PD team then selects one of the equivalent components using selection criteria (e.g., distance, congestions, timing, etc.). By linking the components in the design netlist to equivalent (i.e., alternative) components in the PD netlist, the embodiments herein may reduce the amount of changes made when performing an ECO, thereby reducing the time needed to validate the new design which reduces the delay caused by performing the ECO.
In one embodiment, the design netlist is placement agnostic and does not consider physical constraints such as timings, distance between logical units, size of the components, coupling capacitance, and the like. At block 110, the design team passes the design netlist to the PD team that generates a PD netlist that does consider the placement of the different components on the chip. Ideally, the function of the design netlist and the PD netlist is the same. That is, given the same inputs, the outputs of the two circuits should be the same. However, the PD team may have to alter the design netlist to account for the factors described above. In one example, the PD team may need to add buffers to a trace between two logical units to account for signal attenuation or noise. In another example, the PD team may need to add dummy traces to achieve a certain metal density or mitigate coupling capacitance. Thus, the PD netlist generated by the PD team that includes these new or altered components may be very different than the design netlist provided by the design team.
At block 115, the design team may submit an ECO to the PD team. For example, the design team may have found a flaw in the circuit or wish to add additional functionality. As mentioned above, the ECO may list changes to the components in the design netlist instead of the PD netlist. However, the component names may have changed when the PD team generated the PD netlist. As such, the PD team may be unable to simply change the PD netlist using the changes in the ECO. For example, the PD netlist may have divided the interconnect coupling two logical units into a plurality of different buffers because of the distance between the units. Thus, a net name used in the design netlist to connect the two logical units may be replaced by multiple different nets in the PD netlist. Without identifying this change, a software tool performing the ECO may change larger portions of the PD netlist than would otherwise be needed. Instead, the PD team may use a Boolean equivalence checker (BEC) tool 111 (which may be software, hardware, or some combination thereof) to generate an equivalents nets file used to link the component names in the design netlist to the equivalent component names in the PD netlist. This enables the PD team to identify specific locations in the PD netlist that should be changed rather than replacing large chunks of code in the PD netlist.
Method 100 returns to block 115 where the PD team uses an ECO tool 112 to perform the ECO using the equivalent nets file. For example, the ECO tool 112 may update the PD netlist to add new circuitry, re-wire the logical gates, remove circuitry, and the like. In one embodiment, the ECO tool 112 (which may be software, hardware, or some combination thereof operating in a computing system with a processor and memory) validates or checks the updated PD netlist to ensure the ECO changes did not introduce errors into the logic or functionality of the chip. Once validated, at block 120, the chip is fabricated using the PD netlist. For example, different layers or masks may be developed to form the components listed in the PD netlist. The chip is fabricated using these masks.
Comparing
Returning to method 200, at block 210, the PD team compares the design netlist to the PD netlist using a BEC tool to generate an equivalent nets list. Although the design netlist is changed to account for the physical constraints of implementing a circuit in a physical chip, nonetheless, the functionality of the circuits defined by the design and PD netlists should be the same. As such, in many cases, the components listed in the design netlists will have at least one (if not multiple) alternative components in the PD netlist. Using
Returning to method 200, at block 215, the PD team receives an ECO which changes components in the design netlist. Put differently, the ECO alters or adds one or more nets, pins, or logical circuitry in the design netlist. However, because the ECO may list changes that include component names that correspond to the design netlist, these names may have been altered or removed from the PD netlist. Thus, it may not be readily apparent how changes listed in the ECO should alter the PD netlist.
At block 220, an ECO tool identifies alternative components in the PD netlist that are listed in the ECO using the equivalent nets file. Again using
At block 225, the ECO tool selects one of the alternative components for each component in the ECO using one or more criteria. For example,
In one embodiment, the ECO tool may use distance as a criteria to select one of the equivalent nets. For example, Logic B is closest to Net B_4, thus, in
Additionally or alternatively, the ECO tool considers congestion, available routing paths between logic modules in the chip, signal strength, cost, and the like as criteria for selecting one of the alternative components in the PD netlist. As discussed below, the ECO tool may assign a score to the alternative components based on a combination of the criteria mentioned above and select the component with the highest score. Again using
At block 230, the ECO tool updates the PD netlist using the alternative components. In the example shown in
At block 810, the ECO tool identifies the possible combinations of the alternative components that could be used to perform the ECO tool. For example, the logic circuit 900 in
Graph 1005 illustrates the different combinations of the alternative components for Net A and Net B. For example, row 1 illustrates that Net A_1 and Net B_1 could be used as the inputs to Logic E, row 2 illustrates that Net A_1, and Net B_2 could be used as inputs to Logic E, and so forth. Because the nets in
At block 815, the ECO tool generates a score for each combination of the nets according to the total distance between the alternative components. Referring to
If the circuitry indicated in the ECO is already in the PD netlist, the location of the circuitry can be used to calculate distance scores for the different net combinations listed in graph 1005. Using
However, the ECO change 905 illustrated in
In graph 1005, the distance scores for each of the net combinations are shown in the rightmost column. Here, the net combination that is the closest to Logic E (i.e., the combination that results in the smallest router distance) is the combination of Net A_2 and Net B_1 as indicated by its distance score. Although this embodiment uses distance to calculate the score, other criteria may also be considered in addition to, or alternatively of distance such as congestion, available routing paths between logic modules in the chip, signal strength, cost, and the like. For example, if the two combinations both have the lowest distance score, then congestion or available routing paths may be used to break the tie.
In other embodiments, instead of (or in addition to) using the centroid between nets to determine the location of the new circuitry to be added by the ECO, the ECO tool may determine the location using factors such as congestion or the impact on other circuits. For example, the centroid may be too congested to fit the new circuitry, or adding the new circuitry may cause problems such as crosstalk or introduce noise. Thus, these factors may be considered when determining the location for the new circuitry.
Returning to method 800, at block 820, the ECO tool updates the PD netlist using the alternative components in the combination with the best score. For example, the ECO tool may update the originally received ECO to include the alternative components with the best score. That is, where the original ECO listed Net A and Net B, these net names are replaced by Net A_2 and Net B_1, respectively, in the ECO. This new ECO may be used to update the PD netlist, thereby changing the layout of the chip. As shown by the ECO change 1105 in
The descriptions of the various embodiments of the present invention have been presented for purposes of illustration, but are not intended to be exhaustive or limited to the embodiments disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The terminology used herein was chosen to best explain the principles of the embodiments, the practical application or technical improvement over technologies found in the marketplace, or to enable others of ordinary skill in the art to understand the embodiments disclosed herein.
In the preceding, reference is made to embodiments presented in this disclosure. However, the scope of the present disclosure is not limited to specific described embodiments. Instead, any combination of the following features and elements, whether related to different embodiments or not, is contemplated to implement and practice contemplated embodiments. Furthermore, although embodiments disclosed herein may achieve advantages over other possible solutions or over the prior art, whether or not a particular advantage is achieved by a given embodiment is not limiting of the scope of the present disclosure. Thus, the aspects, features, embodiments and advantages described herein are merely illustrative and are not considered elements or limitations of the appended claims except where explicitly recited in a claim(s). Likewise, reference to “the invention” shall not be construed as a generalization of any inventive subject matter disclosed herein and shall not be considered to be an element or limitation of the appended claims except where explicitly recited in a claim(s).
Aspects of the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment (including firmware, resident software, micro-code, etc.) or an embodiment combining software and hardware aspects that may all generally be referred to herein as a “circuit,” “module” or “system.”
The present invention may be a system, a method, and/or a computer program product. The computer program product may include a computer readable storage medium (or media) having computer readable program instructions thereon for causing a processor to carry out aspects of the present invention.
The computer readable storage medium can be a tangible device that can retain and store instructions for use by an instruction execution device. The computer readable storage medium may be, for example, but is not limited to, an electronic storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the foregoing. A non-exhaustive list of more specific examples of the computer readable storage medium includes the following: a portable computer diskette, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or Flash memory), a static random access memory (SRAM), a portable compact disc read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanically encoded device such as punch-cards or raised structures in a groove having instructions recorded thereon, and any suitable combination of the foregoing. A computer readable storage medium, as used herein, is not to be construed as being transitory signals per se, such as radio waves or other freely propagating electromagnetic waves, electromagnetic waves propagating through a waveguide or other transmission media (e.g., light pulses passing through a fiber-optic cable), or electrical signals transmitted through a wire.
Computer readable program instructions described herein can be downloaded to respective computing/processing devices from a computer readable storage medium or to an external computer or external storage device via a network, for example, the Internet, a local area network, a wide area network and/or a wireless network. The network may comprise copper transmission cables, optical transmission fibers, wireless transmission, routers, firewalls, switches, gateway computers and/or edge servers. A network adapter card or network interface in each computing/processing device receives computer readable program instructions from the network and forwards the computer readable program instructions for storage in a computer readable storage medium within the respective computing/processing device.
Computer readable program instructions for carrying out operations of the present invention may be assembler instructions, instruction-set-architecture (ISA) instructions, machine instructions, machine dependent instructions, microcode, firmware instructions, state-setting data, or either source code or object code written in any combination of one or more programming languages, including an object oriented programming language such as Smalltalk, C++ or the like, and conventional procedural programming languages, such as the “C” programming language or similar programming languages. The computer readable program instructions may execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server. In the latter scenario, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or the connection may be made to an external computer (for example, through the Internet using an Internet Service Provider). In some embodiments, electronic circuitry including, for example, programmable logic circuitry, field-programmable gate arrays (FPGA), or programmable logic arrays (PLA) may execute the computer readable program instructions by utilizing state information of the computer readable program instructions to personalize the electronic circuitry, in order to perform aspects of the present invention.
Aspects of the present invention are described herein with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and/or block diagrams, and combinations of blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer readable program instructions.
These computer readable program instructions may be provided to a processor of a general purpose computer, special purpose computer, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions/acts specified in the flowchart and/or block diagram block or blocks. These computer readable program instructions may also be stored in a computer readable storage medium that can direct a computer, a programmable data processing apparatus, and/or other devices to function in a particular manner, such that the computer readable storage medium having instructions stored therein comprises an article of manufacture including instructions which implement aspects of the function/act specified in the flowchart and/or block diagram block or blocks.
The computer readable program instructions may also be loaded onto a computer, other programmable data processing apparatus, or other device to cause a series of operational steps to be performed on the computer, other programmable apparatus or other device to produce a computer implemented process, such that the instructions which execute on the computer, other programmable apparatus, or other device implement the functions/acts specified in the flowchart and/or block diagram block or blocks.
The flowchart and block diagrams in the Figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of the present invention. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of instructions, which comprises one or more executable instructions for implementing the specified logical function(s). In some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems that perform the specified functions or acts or carry out combinations of special purpose hardware and computer instructions.
Embodiments of the invention may be provided to end users through a cloud computing infrastructure. Cloud computing generally refers to the provision of scalable computing resources as a service over a network. More formally, cloud computing may be defined as a computing capability that provides an abstraction between the computing resource and its underlying technical architecture (e.g., servers, storage, networks), enabling convenient, on-demand network access to a shared pool of configurable computing resources that can be rapidly provisioned and released with minimal management effort or service provider interaction. Thus, cloud computing allows a user to access virtual computing resources (e.g., storage, data, applications, and even complete virtualized computing systems) in “the cloud,” without regard for the underlying physical systems (or locations of those systems) used to provide the computing resources.
Typically, cloud computing resources are provided to a user on a pay-per-use basis, where users are charged only for the computing resources actually used (e.g. an amount of storage space consumed by a user or a number of virtualized systems instantiated by the user). A user can access any of the resources that reside in the cloud at any time, and from anywhere across the Internet. In context of the present invention, a user may access applications (e.g., the BEC or ECO tools) or related data available in the cloud. For example, the ECO tool could execute on a computing system in the cloud and receive the change orders from the user, generate updated orders using the equivalents file, and provide an update PD netlist. In such a case, the ECO tool could generate and store the net equivalents file and the original PD netlist at a storage location in the cloud. Doing so allows a user to access this information from any computing system attached to a network connected to the cloud (e.g., the Internet).
While the foregoing is directed to embodiments of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof, and the scope thereof is determined by the claims that follow.
Number | Name | Date | Kind |
---|---|---|---|
6453454 | Lee | Sep 2002 | B1 |
20040230920 | Blinne et al. | Nov 2004 | A1 |
20060271899 | Tan et al. | Nov 2006 | A1 |
20060282810 | Dutt et al. | Dec 2006 | A1 |
20090178015 | Federovsky et al. | Jul 2009 | A1 |
20120254818 | Liu et al. | Oct 2012 | A1 |
Number | Date | Country |
---|---|---|
9637855 | Nov 1996 | WO |
2006012335 | Feb 2006 | WO |
2011147075 | Dec 2011 | WO |
Entry |
---|
Nelson, Kelvin et al., Physical-Design-Friendly Hierarchical Logic Built-In Self-Test—A Case Study, 13th International Symposium on Quality Electronic Design, Mar. 2012, pp. 1-6, IEEE, Piscataway, United States. |
Zuchowski, Paul S. et al., A Hybrid ASIC and FPGA Architecture, Proceedings of the 2002 IEEE/ACM international conference on Computer-aided design, 2002, 8 pages, ACM, New York, United States. |