This disclosure relates generally to equipment utilized and operations performed in conjunction with a subterranean well and, in an example described below, more particularly provides for pressure measurement in highly deviated wells.
In a conventional technique for measuring pressure in a wellbore, a small diameter tube is connected to a top of a chamber in the wellbore, and a bottom of the chamber is exposed to wellbore pressure. Pressurized gas is applied to the tube at the surface to fill the chamber with gas. Measurement of pressure in the tube at the surface enables wellbore pressure to be conveniently determined.
Unfortunately, such a system suffers from disadvantages when it is desired to measure pressure in a wellbore which is highly deviated from vertical. Especially in a horizontal or near-horizontal wellbore, such a system can be unusable.
Therefore, it will be appreciated that improvements are needed in the art of pressure measurement in highly deviated wells.
In the disclosure below, systems and methods are provided which bring improvements to the art of pressure measurement in highly deviated wells. One example is described below in which a weighted blocking device is used to selectively block communication ports in a well pressure measurement system. Another example is described below in which the device selectively establishes communication between upper and lower portions of a chamber and respective pressure sources.
In one aspect, a pressure measurement system for use with a subterranean well is provided to the art by this disclosure. The system can include a chamber positioned in the well, and the chamber having an upper portion and a lower portion as positioned in the well. A device selects the upper portion of the chamber for communication with a line extending to a remote location, in response to gravity acting on the device.
In another aspect, a method of measuring pressure in a well is provided by this disclosure. The method can include: introducing a chamber into the well; then selecting a vertically upper portion of the chamber; and establishing communication between the selected upper portion of the chamber and a line extending to a remote location.
The lower portion of the chamber can be placed in communication with a wellbore or other pressure source for which it is desired to measure its pressure. The upper and lower portions of the chamber are not determined, until the chamber is positioned in the well.
These and other features, advantages and benefits will become apparent to one of ordinary skill in the art upon careful consideration of the detailed description of representative examples below and the accompanying drawings, in which similar elements are indicated in the various figures using the same reference numbers.
Illustrated in
In
The system 10 performs well in substantially vertical wellbores, such as the wellbore 14 depicted in
It is generally considered that the system 10 cannot be used in wellbores which are deviated from vertical greater than about 70°. Significant problems may be experienced when the system 10 is used in wellbores deviated greater than about 60°. As used herein, the term “substantially deviated” is used to describe wellbores which are deviated greater than about 50° from vertical.
It has become increasingly common for wellbores to be drilled horizontally and at other substantial deviations from vertical. The system 10 as depicted in
Representatively illustrated in
As depicted in
In a non-vertical orientation of the apparatus 30 as depicted in
Since the line 16 should be in communication with the chamber upper portion 12a and the chamber lower portion 12b should be in communication with the wellbore 14 for effective pressure measurement, but the rotational orientation of the chamber 12 after installation is not known until after installation, the apparatus 30 provides for selecting the chamber upper portion 12a for communication with the line 16 and selecting the chamber lower portion 12b for communication with the wellbore 14 after installation of the apparatus in the well.
The selection of which portion of the chamber 12 will be placed in communication with the line 16 is performed by a weighted blocking device 40 in conjunction with multiple ports 42 formed through the bulkhead 36. The ports 42 in this example are plugged with plugs 44 which can be blocked by the device 40.
All of the ports 42 are plugged by the plugs 44, as depicted in the as-installed state of the apparatus 30 in
However, if pressure in the line 16 is sufficiently increased, the plugs 44 will be biased to the right as viewed in
The cross-sectional view of
The device 40 is retained radially between the inner and outer housings 32, 34, but is permitted to displace vertically relative to the chamber 12 and the vertically distributed ports 42 and plugs 44. In this manner, gravity acting on the device 40 causes it to be positioned opposite the lower ports 42 and plugs 44, but not the uppermost port and plug.
The device 40 is depicted in
The cross-sectional view of
Referring additionally now to
The increased pressure in the chamber 12 has ejected the lowermost plug 50 from the lowermost port 48 in the bulkhead 38. The increased pressure has, thus, been allowed to act on a rupture disc 52 which previously isolated the interior of the apparatus 30 from wellbore pressure.
When the increased pressure is sufficiently great, the rupture disc 52 will rupture, thereby exposing the chamber 12 to wellbore pressure. The apparatus 30 can now be used to measure pressure in the wellbore 14, because the line 16 is in communication via the opened port 42 with the upper portion 12a of the chamber 12, and the lower portion 12b of the chamber is in communication with the wellbore 14 via the open port 48 and the ruptured disc 52.
Note that the plugs 44, 50 could be releasably secured in their positions in the bulkheads 36, 38 by use of shear pins, snap rings, latches, etc., to maintain the positions of the plugs until a predetermined pressure differential is applied to the plugs.
In the example of the apparatus 30 described above, the devices 40, 46 have inner and outer diameters selected so that the devices block the respective upper or lower ports 42, 48 in the bulkheads 36, 38. However, other configurations may be used, if desired, to selectively block the ports 42, 48 which should not be opened when increased pressure is applied to the line 16. Examples of other configurations are representatively illustrated in
In
In
In
In
It will, thus, be readily appreciated that the scope of this disclosure is not limited to any particular device configuration, placement, etc. Instead, it should be clearly understood that any type of device which can block flow through all but the uppermost of the ports 42, and/or all but the lowermost of the ports 48, may be used in the apparatus 30 or other pressure measurement apparatuses. For example, the devices 40, 46 could block flow through the respective lowermost ports 42 and uppermost ports 48 by sealing off the ports, etc.
The device 40 can allow flow through more than one of the ports 42, and the device 46 can allow flow through more than one of the ports 48, if desired. Thus, it is not necessary for the devices 40, 46 to block flow through all but one of the respective ports 42, 48.
The ports 42, 48 are vertically distributed after the apparatus 30 is installed in the wellbore 14, in that some of the ports 42 are vertically higher than others of the ports 42, and some of the ports 48 are vertically higher than others of the ports 48. This vertical distribution is accomplished in the illustrated examples by spacing the ports 42, 48 in circular patterns through the respective bulkheads 36, 38. However, it should be clearly understood that other ways of vertically distributing the ports 42, 48 may be used, if desired.
In the examples described above, the bulkheads 36, 38 are positioned on opposite ends of the chamber 12, and separate devices 40, 46 are used to block flow through the respective ports 42, 48. In other examples, however, these relative positions of the bulkheads 36, 38 and the chamber 12, and the use of separate devices 40, 46, are not necessary.
In
In any of the configurations of the apparatus 30 described above, the apparatus can be reversed if it will be positioned in a wellbore which is deviated more than 90 degrees from vertical.
It may now be fully appreciated that the above disclosure and accompanying drawings provide several advancements to the art of pressure measurement in wells. In the examples of the apparatus 30 described above, the chamber 12 can be used to measure pressure in highly deviated wells, even though the post-installation rotational orientation of the chamber is not known before installation.
In particular, the above disclosure provides to the art a pressure measurement system 10 for use with a subterranean well. The system 10 can include a chamber 12 positioned in the well, and the chamber 12 having an upper portion 12a and a lower portion 12b as positioned in the well. A device 40 or 62, in response to gravity acting on the device, selects the upper portion 12a of the chamber 12 for communication with a line 16 extending to a remote location.
The device 40 or 62 can selectively block less than all of multiple vertically distributed communication ports 42.
The device 40 or 62 may selectively prevent opening of less than all of the multiple vertically distributed communication ports 42.
The device 40 or 62 may selectively prevent discharge of plugs 44 from less than all of multiple vertically distributed communication ports 42.
Communication between the line 16 and the upper portion 12a of the chamber 12 can be established in response to application of increased pressure to the line 16. Less than all of multiple vertically distributed communication ports 42 may be opened in response to application of the increased pressure to the line 16.
The lower portion 12b of the chamber 12 can be selected in the well. Communication between a wellbore 14 and the lower portion 12b of the chamber 12 can be established in the well. Communication between the wellbore 14 and the lower portion 12b of the chamber 12 can be established in response to application of increased pressure to the line 16.
The device 40 or 62 may displace relative to multiple vertically distributed communication ports 42 in response to gravity acting on the device 40 or 62.
Also described by this disclosure is a method of measuring pressure in a well. The method can include introducing a chamber 12 into the well, then selecting a vertically upper portion 12a of the chamber 12, and establishing communication between the selected upper portion 12a of the chamber 12 and a line 16 extending to a remote location.
Selecting the vertically upper portion 12a of the chamber 12 can be performed by a device 40 or 62 which displaces relative to the chamber 12 in response to gravity acting on the device 40 or 62.
Establishing communication can include applying increased pressure to the line 16. Less than all of multiple vertically distributed communication ports 42 may be opened in response to applying increased pressure to the line 16.
The method can also include selecting a vertically lower portion 12b of the chamber 12 after introducing the chamber 12 into the well. In that case, the method can also include establishing communication between a wellbore 14 and the lower portion 12b of the chamber 12 after selecting the lower portion 12b of the chamber 12. Establishing communication between the wellbore 14 and the lower portion 12b of the chamber 12 can be performed by applying increased pressure to the line 16.
It is to be understood that the various examples described above may be utilized in various orientations, such as inclined, inverted, horizontal, vertical, etc., and in various configurations, without departing from the principles of the present disclosure. The embodiments illustrated in the drawings are depicted and described merely as examples of useful applications of the principles of the disclosure, which are not limited to any specific details of these embodiments.
Of course, a person skilled in the art would, upon a careful consideration of the above description of representative embodiments, readily appreciate that many modifications, additions, substitutions, deletions, and other changes may be made to these specific embodiments, and such changes are within the scope of the principles of the present disclosure. Accordingly, the foregoing detailed description is to be clearly understood as being given by way of illustration and example only, the spirit and scope of the present invention being limited solely by the appended claims and their equivalents.
Number | Name | Date | Kind |
---|---|---|---|
3712129 | Rhoades | Jan 1973 | A |
3874231 | Walther, Jr. | Apr 1975 | A |
4010642 | McArthur | Mar 1977 | A |
4058015 | Stode | Nov 1977 | A |
4976142 | Perales | Dec 1990 | A |
4979563 | Patel | Dec 1990 | A |
5163321 | Perales | Nov 1992 | A |
5503013 | Zeller | Apr 1996 | A |
7546878 | Prado et al. | Jun 2009 | B2 |
20040031319 | Perales | Feb 2004 | A1 |
20080041581 | Richards | Feb 2008 | A1 |
Number | Date | Country |
---|---|---|
0528692 | Feb 1993 | EP |
0695853 | Feb 1996 | EP |
2305724 | Apr 1997 | GB |
2001033294 | Feb 2001 | JP |
Entry |
---|
Welldynamics, “PTS (Pressure Transmission System)”, Presentation, undated, 41 pages. |
Sperry-Sun Drilling Services, “Sperry-Sun Production Services PTS/CTS Equipment” Product manual, dated Feb. 1994, 118 pages. |
Halliburton, “EZ-Gauge Permanent Pressure Monitoring System”, Product brochure, H07002, dated May 2010, 2 pages. |
Japan Patent Abstracts from the European Patent Office, for JP Publication No. 2001033294, dated Feb. 9, 2010, 1 page. |
International Search Report with Written Opinion issued Jul. 12, 2012 for PCT Patent Application No. PCT/US11/063075, 9 pages. |
Number | Date | Country | |
---|---|---|---|
20120145383 A1 | Jun 2012 | US |