Exhibit A shows one example of a prior art roof mounted CNG fuel system for a transit bus is that manufactured by New Flyer. (Jul. 15, 1996). |
Exhibit B illustrates another prior art roof mounted CNG fuel supply system for transit buses is that in use by Orion Bus Industries. (undated but admitted to be prior art). |
Exhibit C is an illustration of a prior art fill block (undated but admitted to be prior art). |
Exhibit D is a manual for a prior art fuel system sole by Neoplan USA Corp. (Oct. 1996). |
Exhibit E is a copy of NFPA52 Compressed Natural Gas (CNG) Vehicular Fuel Systems Code 1998 Edition. Section 3-5.2 deals with the mounting of fuel lines. (1998 admitted to be prior art). |
Exhibit F is a copy of Los Angeles County Metropolitan Transportation Authority DR4202 Technical Requirements. Section 13.9 deals with the fuel system, and Section 13.9.2 requires that the fuel cylinders be mounted on the roof in such a manner that replacement of one cylinder shall not require the removal of additional cylinders. (undated but admitted to be prior art). |