Claims
- 1. In a process for producing mesophase pitch wherein a heavy aromatic hydrocarbon feedstock is heat soaked at a first pressure until a substantial portion of the feedstock has been converted to optically anisotropic material, and in which mesophase pitch is recovered from the heat soaked material by gravity settling, the improvement comprises:
- subjecting and maintaining for a time of up to about 15 minutes said heat soaked material, prior to recovery of mesophase pitch therefrom, to a second pressure which is at least 30 kPa higher than said first pressure for a time of up to about 15 minutes, whereby boiling of the heat soaked material is reduced and settling of mesophase pitch is enhanced.
- 2. The process of claim 1 wherein said heat soaked material is retained in a heat soaking vessel, and said second pressure is applied to said vessel prior to recovery of settled mesophase pitch therefrom.
- 3. The process of claim 1 wherein said heat soaked material is transferred from a heat soaking vessel to a settling vessel maintained at said second pressure, and mesophase pitch is recovered from said settling vessel.
- 4. The process of claim 3 wherein the remaining heat soaked material in said settling vessel, after recovery of mesophase pitch therefrom, is returned to said heat soaking vessel and further heat soaked.
- 5. The process of claim 3 wherein the remaining heat soaked material in said settling vessel, after recovery of mesophase pitch therefrom, is transferred to a second settling vessel from which additional settled mesophase pitch is recovered.
- 6. A process for producing mesophase pitch comprising:
- (a) heat soaking a heavy aromatic hydrocarbon feedstock at a temperature of from 350.degree. to 475.degree. C. for a time of from 0.5 to 120 hours and at a first pressure until a substantial portion of said feedstock has been converted to mesophase pitch;
- (b) subjecting said heat soaked feedstock containing mesophase pitch to a second pressure which is at least 30 kPa higher than said first pressure;
- (c) maintaining said heat soaked feedstock at said second pressure for a time of up to about 15 minutes while mesophse pitch settles therefrom; and
- (d) recovering said settled mesophase pitch.
Parent Case Info
PRIOR APPLICATION
This application is a continuation-in-part of application Ser. No. 871,978, filed June 1, 1986, now abandoned.
US Referenced Citations (10)
Foreign Referenced Citations (6)
Number |
Date |
Country |
0141487 |
Sep 1982 |
JPX |
0142974 |
Aug 1983 |
JPX |
0180585 |
Oct 1983 |
JPX |
0137987 |
Jul 1985 |
JPX |
0137989 |
Jul 1985 |
JPX |
2083492 |
Mar 1982 |
GBX |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
871978 |
Jun 1986 |
|