The present invention relates to the field of energy generation and distribution. More specifically, the present invention relates to the regulation and optimization of the electrical energy distribution networks in the presence of renewable sources.
At present, it is well known that energy accumulator systems and electric batteries can help to improve and optimize the management of electricity networks in various different ways. Mainly, two different divisions of battery systems, are detailed below:
1) Depending on the place where the electricity system is installed, it can be divided as follows:
2) Depending on the battery operation mode, it can be divided as follows:
Furthermore, a battery system connected to an inverter may supply reactive power as a support to the network voltage independently from the charge status of the battery, only guaranteeing that it does not exceed the current limits in the equipment.
More specifically, a battery with storage capacity of 1 MWh can perform 2 daily cycles: one to load 1 MWh in night off-peak value and transfer it in morning peak hours, and another in the afternoon/evening off-peak hours and transfer it in peak night hours. However, a great potential for use of said battery the rest of the day is lost in performing just 1 or 2 cycles, and its management and operation can be clearly optimized.
The technical problem posed here is that energy accumulator systems and devices are currently designed to perform a single functionality (regulation of the power variations of a plant, regulation of network frequency, movement of energy from off-peak hours to peak hours, etc.), in many cases several batteries with different functions being combined at the same point, with the consequent financial cost entailed.
Typically, in a renewable plant, wherein an accumulator unit is necessary to optimize generation (avoid too fast fluctuations in the energy delivered to the network and/or move energy from certain hours of the day to others due to price or saturation), it will be gauged to the worst condition of the production year and is exclusively devoted to this service. However, as the production costs of the renewable plant are dependent on wind or solar resources and, therefore, are very variable, there are a great number of hours in the year where the accumulator system is underused.
A single accumulator unit will be typically formed by a set of individual systems that are connected in series and in parallel to build the system. Therefore, the set of accumulator units that have a single control unit that manages its joint operation is considered a single accumulator system. It is therefore a logical and not physical unit. A plant that contains several accumulator elements but that are managed from a single central control unit central operates in practice as a single accumulator system. The configuration of each of the system's accumulator elements for a specific service (which can be several different ones) is, therefore, considered as state of the art.
The object of the present invention is a supply and accumulation control process of electrical energy provided by a renewable plant to the network. For this purpose using a single energy storage unit, such as a battery, that makes it possible to simultaneously provide both capacity sale services and energy sale services, varying the accumulation capacity devoted to each one of said services depending on the operating conditions of the renewable plant (depending on the wind or solar resource conditions), thus maximizing the efficiency and output of the electrical installations.
The simultaneous provision of different services and the capacity assigned to each one of them at any given time is based on the use of weather data to: a) predict the battery requirement of each one of said services; b) predict the energy produced throughout the day and with this define the charging and discharging cycles of the battery; and c) establish the services to be offered by the battery.
To complement the description being made and in order to aid towards a better understanding of the characteristics of the invention, in accordance with a preferred example of practical embodiment thereof, a set of drawings is attached wherein, with illustrative and non-limiting character, the following has been represented:
The present invention resolves the aforementioned drawbacks providing a supply and accumulation control process of electrical energy provided by a renewable energy generation plant, which, by the actuation of a single energy accumulator unit, allows the simultaneous:
More specifically, the process object of the invention makes it possible to control the supply and accumulation of the electrical energy provided by a renewable energy generation plant comprising:
Furthermore, the adjustment has been provided of the hourly supply program depending on the evolution of the functional parameters of generation in real time, the market values which are given in real time, and the production prediction during the following hours. In the event of real time necessity, it is possible to adjust the operation of the renewable plant to support the services given by the energy accumulator unit, for example, forcing the plant to produce or consume reactive power to support voltage regulation, or forcing the plant to vary its active power to support frequency regulation if the accumulator unit cannot comply with desired service during a time.
The control process described here additionally comprises introducing in the control unit historic values of energy quantity and power stored or delivered by the energy accumulator unit on previous days with similar weather conditions, in order, with these data, to be able to estimate what is the portion of the energy accumulator unit to be allocated to the stabilization of the power supplied by the plant to the network. Likewise, in accordance with embodiments, the process further comprises introducing variables regarding market costs of energy and variations in market costs of energy between off-peak hours and peak hours, in the control unit.
Likewise, it has been provided that said variables regarding market costs are entered in the control unit periodically, as they vary, to obtain a new hourly energy supply program in real time for the financial optimization of the energy to be supplied.
Furthermore, the control process additionally comprises the sending of operating instructions from the control unit to the control and actuation units of the generation elements depending on the hourly energy supply program generated.
The phase of determining the values of energy quantity to be produced by the plant is performed depending on the weather conditions, providing an idea of the variation which may arise in the plant on hourly basis. For example, a clear day has little production variability and a very accurate prediction, on a par with a high level of energy production. However, a cloudy day may have important variations in plant production, as well as a worse energy prediction thereof.
More specifically, the phase of determining the values of energy quantity to be produced by the plant is performed from statistical models which, on hourly basis, make it possible to predict the energy to be provided by the accumulator unit to stabilize the power supplied by the plant to the network, regulate the frequency and the voltage of the network, and transfer the energy between off-peak hours and peak hours, or from hours with saturation of the network to hours without saturation. Preferably, the statistical models react in real time throughout the day to modifications in market prices, modifying the service provided by the energy accumulator unit to adapt to new economic optimums. Said modification is performed bearing in mind the penalties imposed due to not providing the agreed services.
Furthermore, throughout the day it will be necessary to recalculate the use of the available energy in the accumulator unit to provide the different functions, since the reality will almost certainly not be the same as the predictions. The adjustment is calculated based on the production obtained in the plant during the most recent hours, and the production forecast in the coming hours, since the financial calculation of the penalties will not only made based on the function to be performed with the energy available in the accumulator unit, but also on the sale of energy from the plant.
In this way and by way of example, if the energy devoted to the frequency regulation function in the network is greater than that forecast, it can be decided at a determined time to reduce the sale of energy from the plant to the network to further charge the accumulator unit or battery, and thus, be able to continue providing frequency regulation services, for example, either because the production exceeds the energy consumption and generation program or because at that time the market tariffs outweigh the execution of said functionality.
Recall the special characteristic that during the provision of the frequency regulation service only a small percentage of the available power offered by the storage unit is consumed, for which reason it is possible to estimate a use of said unit, less than that offered, if the price prediction models of the aforementioned market are available.
Finally, it has been provided that the hourly energy supply program further comprises the generation of an hourly program of reactive energy supply to the network, depending on the generation capacity available in the generation elements and the accumulator unit. In this way, the energy accumulator unit can provide voltage regulation services in the network, through the delivery or consumption of reactive power irrespective of the charge status (hereinafter SOC) of said accumulator unit.
Therefore, an energy accumulator unit or battery managed according to the process of the present invention can at all times transfer available energy from one function to another. It is therefore feasible to design a greater number of functionalities for a given capacity of said accumulator unit, making it possible to manage the non-performances that arise in the provision of the functions in optimal fashion. This achieves a renewable plant that is always energy producing, able to give network services, and a service to the plant to improve the quality of the energy delivered to the general electricity network.
In accordance with embodiments, the regulation process of the charging status of a battery, which stores energy produced by a solar photovoltaic plant depending on three sets of parameters, is described below:
The process consists of the following stages:
The energy necessary to cover the energy off is determined based on the weather prediction of each operating hour of the day of the solar plant, bearing the following parameters in mind: radiation level with its percentiles of probability of occurrence, temperature, wind speed and cloud level. This prediction is combined with statistical models that reflect the past operation of the solar plant or solar plants with similar dimensions and conditions.
More specifically,
Finally, instead of a battery any energy storage device can be used, such as, for example, compressed air energy storage (CAES), which is based on the storage of wind power in the subsoil for its later use.