Claims
- 1. A process for constructing a basement comprising:
- (a) excavating spaced vertical holes along the perimeter of a construction site to the depth of bearing strata for the basement;
- (b) forming piles at the bottoms of the vertical holes;
- (c) erecting steel posts in said vertical holes on said piles to serve as main posts of the basement;
- (d) excavating soil from the entire area of the construction site to form an upper part of a cavity to receive the basement, the bottom of said upper part of said cavity being far above the bearing strata;
- (e) forming upper portions of concrete walls of the basement along the wall of said cavity;
- (f) forming the remaining portions of said concrete walls extending downward from the bottoms of said upper portions of said concrete walls to the bearing strata by alternatively repeating the steps (d) and (e).
- 2. A process as claimed in claim 1, further comprising step (g): forming concrete floors of the basement while performing the step (d) or (e).
- 3. A process as claimed in claim 1, further comprising step (h): forming piles in the bearing strata after step (f).
Parent Case Info
This is a continuation of copending application Ser. No. 07/606,033 filed on Oct. 30, 1990 now abandoned.
US Referenced Citations (4)
Foreign Referenced Citations (1)
Number |
Date |
Country |
0912836 |
Mar 1982 |
SUX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
606033 |
Oct 1990 |
|