Process For Improving Energy Supply To A Scrap Bulk

Abstract
The present invention relates to a process for improving energy supply when heating and melting a scrap bulk wherein a preheated oxidizing gas with addition of fossil fuels melts a channel into the scrap bulk and further energy supply occurs through this channel. A significant improvement of the process is achieved by supplying hot blast to the scrap bulk from the top.
Description

The process has been described in the patent application at hand as an advantageous application for a hearth-type furnace. It may, however, be applied analogously to a converter.


Figure one shows a schematic diagram of a hearth-type furnace (1) with a hot blast lance (2), which according to the invention is installed within the roof. The hot blast lance is moved by means of a device (3) similar to the electrode holder of an electric arc furnace. The hot blast lance is inserted vertically, until it is located approx. 30 cm above the scrap bulk. The orifice for the hot blast jet consists of a central orifice and four separate orifices with an angle of inclination of 15°. Natural gas is supplied to the hot blast jet via separate pipes (4). Six oxygen bottom tuyeres (5) are installed in the bottom. It is advantageous to arrange the orifices in such a way that they are located below the point of contact of the central hot blast jet. The off-gases are released from the furnace via a duct (6). In FIG. 1 orifices are also installed for oxygen supply via “coherent jets” in the sidewall (7) as an alternative. Natural gas or coal may be supplied simultaneously with the oxygen via four injectors. The lateral orifice system is operated as burner for preheating the scrap during the first phase.



FIG. 2 exemplifies an advantageous design of the hot blast lance. The lance in question is a lance for melting 110 tons of scrap in a 100-ton hearth-type furnace. During phase 1 40,000 Nm3/h hot blast are fed to the process at 1,200° C. and a pressure of 0.95 bar via a water-cooled hot blast lance (8) with an inside diameter of 90 cm. The hot blast is distributed to a central orifice (9) with a diameter of 20 cm and four lateral orifices (10) with an angle of inclination of 150 against the vertical direction of the jet. Natural gas is injected at the orifices via separate pipes (11). Since the device is operated at a sub critical flow velocity, a special design of the orifices is not required. They consist of simple circular openings. At an operation close to sound-velocity the hot blast is divided to the separate orifices according to the cross section. When pressure is reduced to approx. 0.4 bar during phase 2, a larger proportion of hot blast is supplied via the central orifice (9). This, however, is desired, because it facilitates the post combustion of the process gases during this phase.

Claims
  • 1. Process for improving energy supply when heating and melting a scrap bulk, wherein preheated oxidizing gas with addition of fossil fuels melts a channel into the scrap bulk, and further energy supply occurs through this channel and wherein hot blast is supplied to the scrap bulk from the top.
  • 2. The process as claimed in claim 1, wherein hot blast supply occurs centrally from the top.
  • 3. The process as claimed in claim 1, wherein the hot blast is divided into several separate jets.
  • 4. The process as claimed in claim 1, wherein the hot blast is distributed to a central jet with 35 to 65% of the total amount and several jets outside the central jet for the rest.
  • 5. The process as claimed in claim 1, wherein hot blast is supplied via a vertically adjustable lance.
  • 6. The process as claimed in claim 5, wherein the hot blast lance rotates around the vertical axis.
  • 7. The process as claimed in claim 1, wherein a hot heel remains in the furnace.
  • 8. The process as claimed in claim 7, wherein the hot heel in the furnace makes up 10 to 30% of the melt.
  • 9. The process as claimed in claim 1, wherein oxygen is injected via bottom blowing tuyeres.
  • 10. The process as claimed in claim 9, wherein the bottom blowing tuyeres are installed in an indentation of the furnace bottom.
  • 11. The process as claimed in claim 1, wherein a high hot blast velocity (500 to 900 m/sec) is applied during a first phase and a reduced hot blast velocity (approx. 300 to 500 m/sec) during a second phase.
  • 12. The process as claimed in claim 1, wherein the hot blast jet is enriched with oxygen to 30 to 50% in phase 1, whereas there is no or hardly any oxygen enrichment in phase 2.
  • 13. The process as claimed in claim 1, wherein the distance of the hot blast jet to the surface of the scrap is 0.2 to 0.5 m in phase 1 and is adjusted to a distance to the iron bath of at least 3 m during phase 2.
Priority Claims (1)
Number Date Country Kind
103 17 195.9 Apr 2003 DE national
PCT Information
Filing Document Filing Date Country Kind 371c Date
PCT/EP04/03881 4/13/2004 WO 00 6/13/2007