Not applicable.
Not applicable.
Not applicable.
The present invention relates to the installation and removal of subsea structures. More particularly, the present invention relates to the non-vertical installation and removal of structure on wellheads and/or blowout preventers. More particularly, the present invention relates to the installation and removal of such items when vertical access is restricted.
As the worldwide demand for hydrocarbon fuel has increased, and known onshore reserves have not kept up with the demand, there has been increasing activity in offshore oil exploration and production. Reserves of oil known to exist in the offshore areas have steadily increased and an increasing percentage of world production is from these offshore areas. The offshore environment has presented numerous new challenges to the oil drilling industry which have been steadily overcome to allow efficient drilling and production in these areas, although the costs have been considerably higher than those of onshore operations.
Not only has the offshore environment made production more difficult to accomplish, it has also generally increased the risk of environmental damage in the event of a well blowout or other uncontrolled loss of hydrocarbons into the sea. As a result, known safety equipment, such as blowout preventers which have been used successfully in onshore operations, have been used in offshore operations also. In spite of safety precautions, blowouts of offshore oil wells are known to occur and will occur in the future.
Subsea drilling operations may experience a blowout, which is an uncontrolled flow of formation fluids into the drilling well. These blowouts are dangerous and costly, and can cause loss of life, pollution, damage to drilling equipment, and loss of well production. To prevent blowouts, blowout prevention equipment is required. This blowout prevention equipment typically includes a series of equipment capable of safely isolating and controlling the formation pressures and fluids at the drilling site. BOP functions include opening and closing hydraulically-operated pipe rams, annular seals, shear rams designed to cut the pipe, a series of remote-operated valves to allow control the flow of drilling fluids, and well re-entry equipment. In addition, process and condition monitoring devices complete the BOP system. The drilling industry refers to the BOP system as the BOP stack.
One of the problems associated with diverter systems for such blowout preventers is that, under certain circumstances, the pressure of the fluid released from the blowout preventer is of extremely high pressures, up to 15,000 p.s.i. Under such circumstances, if there is a release from the blowout preventer, or from the wellhead, these extreme pressure will cause boiling and turbulence in the water directly above the blowout preventer and/or wellhead. This boiling of hydrocarbons in the water directly adjacent to the oil platform is extremely hazardous. First, the amount of turbulence caused by such boiling makes it extremely difficult to carry out further repair activities. Under other circumstances, the presence of such hydrocarbons on the top of the water will create an extreme fire and explosion hazard. As such, it is extremely important so as to avoid the release of hydrocarbons from the subsea well such that the boiling action of the released hydrocarbons is diverted away from the offshore platform or from marine vessels associated therewith.
In the event of a subsea blowout in shallow water, where vertical access to the well is not available due to environmental conditions on the surface, it is important to be able to remove subsea debris or deploy subsea equipment, while maintaining separation of the surface boil from personnel involved in the response. As such, it is important to be able to allow operators to gain vertical access to shallow water high-rate gas well blowouts while keeping personnel out of harms way.
Gas making its way to the surface makes station keeping in the surface boil impossible. Vessels need to be positioned outside the perimeter of the plume. Gas expression on the surface makes the local environment hazardous for personnel. To mitigate this problem, personnel need to maintain separation upwind from the boil.
Additionally, the plume created from the subsea blowout can make movement of the payload toward the subsea structure difficult. As such, it is important to be able to adapt the lowering of equipment to rough seas states and/or gas boiling conditions. It is also necessary to improve the accuracy of moving the payload toward the subsea structure in order to properly install the payload on to the subsea structure.
Under certain circumstances, the blowout can be contained through the use of a capping stack. The capping stack is the subject of various patents by the present Applicant. For example, U.S. Pat. No. 9,080,411, issued on Jul. 14, 2015 to the present Applicant, describes a subsea diverter system for use with a blowout preventer. This apparatus diverts fluid from a subsea well. A diverter is affixed between the upper and lower portions of the blowout preventer. Each of the upper portion and lower portion of the blowout preventer has a flow passageway extending vertically therethrough. The diverter has an interior passageway extending vertically therethrough in alignment with the flow passageway of the upper and lower portions of the blowout preventer. The diverter has a flowline communicating with the interior passageway and extends outwardly therefrom. The flowline has a valve thereon which is movable between an open position and a closed position. The open position is suitable for allowing at least a portion of the fluid from the flow passageway to pass outwardly of the flowline to a location remote from the blowout preventer.
U.S. Pat. No. 9,038,728, issued on May 26, 2015 to the present Applicant, describes a system and method for diverting fluids from a wellhead by using a modified horizontal Christmas tree. The system has a capping stack with a connector suitable for connection or interconnection to the wellhead, a flow base fixedly positioned in the subsea environment, and a conduit connected to the outlet of a diverter line of the capping stack and connected to the inlet of an interior passageway of the flow base. The conduit is suitable for passing fluids from the capping stack toward the flow base. The flow base is a modified horizontal Christmas tree.
U.S. Pat. No. 8,720,580, issued on May 13, 2014 to the present Applicant, also describes a system and method for diverting fluids from a damaged blowout preventer. The system has a capping stack with a connector suitable for connection to the blowout preventer, a flowing stack, and an intervention blowout preventer connected to the connector of the flowing stack. The capping stack as a fluid passage extending from the connector. The capping stack has at least one diverter line in communication with the fluid passage. The flowing stack has an interior passageway extending to the connector at an upper end thereof. The flowing stack has at least one pipe in communication with the interior passageway. The pipe is connected with the diverter line of the capping stack such that a flow fluid passing through the diverter line passes through the pipe into the interior passageway of the flowing stack.
U.S. Pat. No. 9,033,051, issued on May 19, 2015, teaches a system for diversion of fluid flow from a wellhead. The system has a mudline closure mechanism suitable for attachment to the wellhead, a blowout preventer connected or interconnected to the mudline control mechanism, and a flow control line having one end connected to a diversion passageway of the mudline control mechanism and extending therefrom such that an opposite end of the flow control line is disposed away from the mudline closure mechanism. The mudline closure mechanism has a main passageway communicating with the flow passageway of the blowout preventer. The mudline closure mechanism has a valve suitable for switching fluid flow from the main passageway to the diversion passageway. The blowout preventer is positioned above the mudline closure mechanism. The flow control line is supported by a base anchored to the subsea floor away from the mudline closure mechanism.
U.S. Patent Application Publication No. 2017/0350210, published on Dec. 7, 2017 to the present Applicant, teaches a rapid mobilization air-freightable capping stack system. This is a method and apparatus for transporting a capping stack for use in a subsea structure. This apparatus includes a capping stack having a capping stack spool, a connector body connected to the capping stack spool and at least one diverter leg connectable to the capping stack spool. A first skid receives the capping stack spool on the floor thereof. The second skid receives the connector body on a floor thereof. A third skid receives the diverter leg thereon. The first, second and third skids are adapted to be received within an interior of an aircraft. The skids and the connected components can then be flown by the aircraft to a desired location so as to be assembled at a location near a wellhead.
Of course, one difficulty associated with any attempt to install the capping stacks of the present Applicant is when the well is blowing so as to create a large plume from the wellhead up to the surface of the water. Since the gases associated with the plume are extremely explosive and toxic, it is important to be able to install the capping stack without placing personnel in a hazardous position in relation to the plume. As such, it is necessary for all personnel associated with the installation of the capping stack to reside outside the plume. Unfortunately, the blowing well is usually at the center of the plume. As such, there has been a difficulty in installing the capping stack while, at the same time, maintaining personnel away from the plume.
Under certain circumstances, vertical access to the well and/or blowout preventer is restricted by objects or conditions that restrict vertical access. For example, a rig can be located in a position above the well. As such, direct vertical access to the well is restricted by the position of the rig on the surface of the water. As such, a need has developed whereby access to the subsea structure can be obtained in a non-vertical manner.
It is object of the present invention to provide a system for installing and removing a subsea structure in which access to the subsea structures obtained in a non-vertical manner.
It is another object the present invention to provide a system for installing and removing a subsea structure which maintains personnel a safe distance away from a plume associated with the well.
It is another object the present invention to provide a system which avoids potential explosions and fires during the process of installing and removing the subsea structure.
It is another object of the present invention provide a system that improves the health and safety of workers associated with the installation and removal of the subsea structures.
It is another object of the present invention to provide a system for installing and removing subsea structure which avoids the use of divers and other underwater personnel.
It is still a further object of the present invention to provide a system that quickly and efficiently closes a blowing well.
It is still further object of the present invention provide a system that utilizes conventional and readily available equipment for the installation or removal of subsea structures.
It is still a further object of the present invention to provide a system that absorbs the motion of rough sea states and/or gas boiling conditions.
It is still a further object of the present invention to provide a system that allows for relatively accurate and rapid placement of the payload onto the subsea structure.
These and other objects and advantages of the present invention will become apparent from a reading of the attached specification and appended claims.
The present invention is a process for installing or removing a subsea structure in a non-vertical manner to or from a wellhead located at the sea floor. The process includes the steps of: (1) securing a plurality of barges together in a linear formation in which one of the plurality of barges has a downline extending therefrom; (2) connecting one end of the plurality of barges to a primary vessel; (3) moving the primary vessel such that at least one of the plurality of barges is positioned vertically over a target at or adjacent to the well; (4) connecting a plurality of secondary vessels by a plurality of mooring lines adjacent an opposite end of the plurality of barges; (5) tensioning the plurality of mooring lines so as to fix a position of the opposite end of the plurality of barges over the target; (6) positioning a deployment vessel away from the plurality of barges; (7) deploying an ROV from the deployment vessel; (8) manipulating the ROV so as to connect the subsea structure to the downline; and (9) moving the downline and the subsea structure toward or away from the well.
In the preferred embodiment of the present invention, the well is a blowing well. The blowing well forms a plume and the water surface. The step of moving the primary vessel includes moving the primary vessel such that at least one of the plurality of barges is positioned within the plume. The target is the wellhead of the blowing well or a blowout preventer or lower marine riser package (LMRP) at the blowing well. The process further includes lowering the subsea structure from the deployment vessel toward the target and moving the subsea structure with the ROV toward the downline. The step of moving the downline includes moving the downline of the subsea structure toward the target and affixing the subsea structure to the wellhead, to the blowout preventer or to the LMRP at the wellhead.
In an alternative embodiment of the present invention, the process is for the removal of the subsea structure. The subsea structure is positioned adjacent to the wellhead. The process includes deploying the ROV from the deployment vessel such that the ROV moves downwardly toward the subsea structure, affixing the downline to the subsea structure, and raising the subsea structure by paying in the downline from the plurality of barges.
In the process of the present invention, a gas detection device is installed on the plurality of barges and the deployment vessel. Gas conditions are sensed by the gas detection device at the plurality of barges and the deployment vessel.
The step of tensioning includes moving the plurality of secondary vessels so as to triangulate the opposite end of the plurality of barges within the primary vessel and the plurality of secondary vessels. In particular, the plurality of second vessels can comprise a pair of secondary vessels that extend at an approximately 120° angle relative to linear formation of the plurality of barges.
In the preferred embodiment of the present invention, the subsea structure is a capping stack. The step of affixing the subsea structure comprises affixing the capping stack to the blowout preventer.
The primary vessel and the plurality of secondary vessels and the deployment vessel reside outside of the side of the plume throughout the process within the scope of the present invention, the deployment vessel can be one of the primary or secondary vessels. In particular, the primary vessel and the plurality of barges are moved in a direction that is downwind.
Each of the plurality of secondary vessels has a winch thereon. The winch is actuated so as to pay in the mooring lines so that the mooring lines are tensioned such that an end of the plurality of barges is fixed in position over the wellhead. The plurality of barges includes at least three barges. The primary vessel and the plurality of secondary vessels are moved such that the end of the plurality of barges is located directly above the wellhead.
In the preferred embodiment of the present invention, the subsea structure is moved laterally into the plume with the ROV prior to the step of lowering. The capping stack is positioned over a mandrel of the blowout preventer. The capping stack is lowered onto the blowout preventer. Ultimately, the capping stack is locked on the mandrel of the blowout preventer. The downline can then be released from the capping stack after the capping stack is affixed to the blowout preventer or wellhead.
In the present invention, a shock absorber is attached to the downline from the plurality of barges. The shock absorber has one end connected to the downline from the plurality of barges and an opposite end of the shock absorber is connected to the subsea structure. Variations in sea conditions caused by rough sea states and/or gas boiling conditions are accommodated by the shock absorber. The shock absorber minimizes increase dynamic loads and motion from the environment. The shock absorber comprises a housing having a piston-and-cylinder arrangement therein. The shock absorber is a passive heave compensator which is a spring-damper system based on a gas (e.g. nitrogen) pressure and hydraulic fluid. The passive heave compensator is generally connected between the crane/winch hook and the payload in order to reduce the dynamic load on the hoisting system, the payload and the crane tip.
In the present invention, in order to provide accuracy toward the placement of the subsea structure under the blowout preventer or wellhead, a pair of winches are deployed in the subsea environment. The subsea winches are connected to the subsea structure and to an adapter spool affixed to the wellhead or blowout preventer. The lines extending from the subsea wenches are joined to slings connected to the subsea structure. The wenches will draw the subsea structure toward the mandrel of the blowout preventer by moving along sheaves placed on the adapter spool. Ultimately, the connector of the subsea structure can continue to be drawn by the slings and lines toward the mandrel so as to land properly upon the mandrel.
The present invention is also a process for installing a capping stack onto a wellhead or a blowout preventer. This process includes the steps of: (1) securing a plurality of barges together in a linear formation in which one of the plurality of barges has a downline extending therefrom; (2) connecting one end of the plurality of barges to a primary vessel; (3) moving the primary vessel such that at least one of the plurality of barges is positioned within the plume; (4) connecting a plurality of secondary vessels by a plurality of mooring lines adjacent to an opposite end of the plurality of barges; (5) tensioning the plurality of mooring lines so as to fix a position of the opposite end of the plurality of barges generally above the wellhead; (6) positioning a deployment vessel away from the plurality of barges and away from the periphery of the plume; (7) lowering the subsea structure from the deployment vessel downwardly toward a seabed; (8) moving the subsea structure with the ROV toward the downline of the barge; (9) connecting the subsea structure to the downline; (10) moving the downline of the subsea structure toward the blowing well; and (11) affixing the subsea structure to the wellhead or the blowout preventer at the wellhead.
This foregoing Section is intended to describe, with particularity, the preferred embodiments of the present invention. It is understood that modifications to this preferred embodiment can be made within the scope of the present claims. As such, this Section should not to be construed, in any way, as limiting of the broad scope of the present invention. The present invention should only be limited by the following claims and their legal equivalents.
Importantly, the present invention can also be used so as to install or remove a subsea structure and a non-vertical manner. In certain circumstances, there may be no plume that is released from a blowing well. Within the concept of the present invention, there can be obstacles to the vertical deployment or removal of the subsea structure. These obstacles can be items such as a rig or other structure affixed within the body of water above the wellhead. As such, access to the well, under those circumstances of a blowing well or under those circumstances of obstacles, needs to be carried out in a non-vertical manner. The present invention is intended to provide access for the installation or removal of a subsea structure from a location laterally offset from the wellhead.
The barge 22 will have a downline 64 (see
In
In
All of the operations described in
The shock absorber 110 is a passive heave compensator. This is a spring-damper system based on gas pressure and hydraulic fluid. The shock absorber 110 is generally connected between the crane/winch hook and the payload 114 in order to reduce the dynamic load on the hoisting system, the payload and the crane tip. The shock absorber 110 is a standalone system. No external connection of hydraulic/pneumatic hoses or wires are required. This shock absorber 110 is a commercially available unit that by Cranemaster which are certified for subsea lifting operations up to a 3000 meter water depth.
Under certain circumstances, it is necessary to accurately move the subsea structure onto the blowout preventer or wellhead.
With reference to the above figures, the process of the present invention can also be used for the removal of subsea structures at the seabed adjacent to the wellhead. This is also carried out in a non-vertical manner. In this process, the plurality of barges are secured together in a linear formation and one end of the plurality of barges is connected to the primary vessel. The primary vessel moves such that at least one of the plurality of barges is positioned over a target or over the subsea structure adjacent to the well. The plurality of secondary vessels are connected by a plurality of mooring lines adjacent to an opposite end of the plurality of barges. These mooring lines are tensioned so as to fix a position of the opposite end of the plurality of barges. The deployment vessel is positioned away from the plurality of barges. An ROV is deployed from the deployment vessel. The ROV is manipulated so as to connect the subsea structure to the downline. The downline and the subsea structure are lifted toward the plurality of barges. The plurality of barges can then be moved such that the deployment vessel can retrieve the subsea structure.
Under certain circumstances there may be no blowing well and no plume from the blowing well. However, it is necessary to provide non-vertical installation or removal of a subsea structure because of an obstruction in the body of water. This obstruction would prevent the vertical installation of such equipment. As such, in the present invention, the end of the plurality of barges can be positioned by the primary vessel in a location generally above the target or subsea structure. The end of the plurality of barges will be away from the obstruction in the water. As such, the same steps, as described hereinabove, can be carried out so as to install or remove the subsea structure.
The foregoing disclosure and description of the invention is illustrative and explanatory thereof. Various changes in the details of the described process can be made within the scope of the present claims without departing from the true spirit of the invention. The present invention should be limited to the following claims and their legal equivalents.
Number | Name | Date | Kind |
---|---|---|---|
4324505 | Hammett | Apr 1982 | A |
4358218 | Graham | Nov 1982 | A |
4797035 | Hunter | Jan 1989 | A |
7882794 | Baylot | Feb 2011 | B2 |
8430171 | Cochrane | Apr 2013 | B2 |
8720580 | Lugo | May 2014 | B1 |
8826989 | Lyle | Sep 2014 | B2 |
8992127 | Joensen | Mar 2015 | B2 |
9033051 | Lugo | May 2015 | B1 |
9038728 | Lugo | Jun 2015 | B1 |
9080393 | Wishahy | Jul 2015 | B2 |
9080411 | Lugo | Jul 2015 | B1 |
9316081 | Hanna | Apr 2016 | B2 |
9340942 | Luppi | May 2016 | B2 |