Claims
- 1. A process for the production of a wall for a package which comprises the steps of
- (A) producing a preform of the wall, and
- (B) stretching the preform of the wall, -the time between the completion of step (A) and the commencement of step (B) being denoted by t.sub.AB, the preform comprising, or including a layer comprising, a composition comprising a polymer and having oxygen-scavenging properties, wherein the preform and the stretching ratios applied to it in step (B) are chosen so that
- (i) if the preform were stretched on the same day as the preform was produced (t.sub.AB =0 day), the time t.sub.I which the permeance of the wall for oxygen would take to rise to 1/5 of the value it would have in the absence of oxygen scavenging would be at least 10 days ((t.sub.I .gtoreq.10 days) and
- (ii) if the preform were stretched at that time t.sub.I after the preform was produced (t.sub.AB =t.sub.I), the time t.sub.D which the permeance of the wall for oxygen would take to rise to 1/5 of the value it would have in the absence of scavenging would be at least 1/4 of the time t.sub.I (t.sub.D .gtoreq.0.25 t.sub.I) and
- the time between completion of step (A) and the commencement of step (B) is at least 10 days (t.sub.AB .gtoreq.10 days).
- 2. A process according to claim 1, wherein t.sub.I .ltoreq.500 day.
- 3. A process according to claim 1, wherein t.sub.I .ltoreq.200 day.
- 4. A process according to any one of claims 1 to 3, wherein t.sub.AB .gtoreq.0.25 t.sub.I.
- 5. A process according to any one of claims 1 to 3, wherein t.sub.AB .gtoreq.0.5 t.sub.I.
- 6. A process according to any one of claims 1 to 3, wherein t.sub.AB .gtoreq.1.0 t.sub.I.
- 7. A process according to any one of claims 1 to 3, wherein the wall has a permeance for oxygen in the absence of scavenging of less than 50 cm.sup.3 /(m.sup.2 atm day).
- 8. A process according to any one of claims 1 to 3, wherein the wall has a permeance for oxygen in the absence of scavenging in the range from 1.5 to 30 cm.sup.3 /(m.sup.2 atm day).
- 9. A process according to any one of claims 1 to 3, wherein the wall has a permeance for oxygen in the absence of scavenging in the range from 3.0 to 18 cm.sup.3 /(m.sup.2 atm day).
- 10. A process according to claim 4, wherein the wall has a permeance for oxygen in the absence of scavenging of less than 50 cm.sup.3 /(m.sup.2 atm day).
- 11. A process according to claim 4, wherein the wall has a permeance for oxygen in the absence of scavenging in the range from 1.5 to 30 cm.sup.3 /(m.sup.2 atm day).
- 12. A process according to claim 4, wherein the wall has a permeance for oxygen in the absence of scavenging in the range from 3.0 to 18 cm.sup.3 /(m.sup.2 atm day).
- 13. A process according to anyone of claims 1 to 3, wherein the composition scavenges oxygen through the metal-catalysed oxidation of an oxidisable organic component thereof and wherein the oxidisable organic component is a polyamide containing units of the formula
- --CO--NH--CH.sub.2 --arylene--CH.sub.2 --NH--CO--.
- 14. A process according to anyone of claims 1 to 3 wherein the composition scavenges oxygen through the metal-catalysed oxidation of an oxidisable organic component thereof and wherein the metal catalyst is a compound of cobalt, copper, or rhodium.
- 15. A process according to claim 4, wherein the composition scavenges oxygen through the metal-catalysed oxidation of a polyamide therein and wherein the metal catalyst is a compound of cobalt, copper, or rhodium.
- 16. A process according to any one of claims 1 to 3, wherein the polymer is formally a condensation polymer of one or more aromatic dicarboxylic acids with one or more compounds containing at least two alcoholic hydroxy groups per molecule.
- 17. A process according to any one of claims 1 to 3, wherein the polymer is a polyolefin.
- 18. A process for producing a package filled with an oxygen-sensitive product which comprises producing a wall for the package according to any one of claims 1 to 3 and filling the package with the oxygen-sensitive product.
- 19. A process according to claim 18, wherein the package is filled time t.sub.BC after the production of the wall is complete and
- (t.sub.AB +t.sub.BC).gtoreq.0.25t.sub.I.
- 20. A process according to claim 18, wherein the package is filled time t.sub.BC after the production of the wall is complete and
- (t.sub.AB +t.sub.BC).gtoreq.1.0t.sub.I.
- 21. A process according to claim 18, wherein the time t.sub.BC in days between production of the wall and filling of the package is more than zero and less than eight times the square root of t.sub.I (as defined in claim 21) minus 16.
- 22. A process for producing a package filled with an oxygen-sensitive product which comprises producing a wall for the package according to claim 4, and filling the package with the oxygen-sensitive product.
- 23. A process according to claim 22, wherein the package is filled time t.sub.BC after the production of the wall is complete and
- (t.sub.AB +t.sub.BC).gtoreq.0.25t.sub.I.
- 24. A process according to claim 22, wherein the package is filled time t.sub.BC after the production of the wall is complete and
- (t.sub.AB +t.sub.BC).gtoreq.1.0t.sub.I.
- 25. A process according to claim 22, wherein the time t.sub.BC in days between production of the wall and filling of the package is more than zero and less than eight times the square root of t.sub.I (as defined in claim 21) minus 16.
CROSS-REFERENCE TO RELATED APPLICATIONS;
This application is a continuation-in-part of U.S. application Ser. No. 07/340,416, filed Mar. 23, 1989 now U.S. Pat. No. 5,021,515 and U.S. application Ser. No. 07/375,957, filed Jul. 6, 1989, now abandoned.
US Referenced Citations (10)
Foreign Referenced Citations (3)
Number |
Date |
Country |
0083826 |
Jul 1983 |
EPX |
0045152 |
Feb 1972 |
JPX |
2212102 |
Jul 1989 |
GBX |
Non-Patent Literature Citations (1)
Entry |
H. F. Mark, "Encyclopedia of Polymer Science and Engineering", vol. 2, 1985, pp. 84-85 (Page 85, para. 3). |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
340416 |
Mar 1989 |
|