Claims
- 1. In a pre-existing structurally sound load bearing reinforced concrete post, the method of maintaining the load bearing capacity of said post with bands during earthquake tremors, comprising the steps of:
- (a) providing a plurality of band segments,
- (b) bonding spacers to said band segments,
- (c) securing said segments around said post, thus fitting the spacers to said post,
- (d) fastening the segments together, thus completely forming said bands,
- (e) vertically spacing apart said bands one from the other along the longitudinal axis of said post,
- (f) interposing a hardenable bonding agent between said post and said bands, and
- (g) permitting said bonding agent to harden sufficiently to convert said post, bonding agent and bands into an integral structure,
- whereby decrease of load bearing capacity of said post is minimized by said bonded bands when said post is subjected to the attrition of flexing and shear due to earthquake tremors.
Priority Claims (3)
Number |
Date |
Country |
Kind |
46-87488 |
Nov 1971 |
JA |
|
46-87490 |
Nov 1971 |
JA |
|
47-101023 |
Oct 1972 |
JA |
|
Parent Case Info
This application is a continuation-in-part of our copending application Ser. No. 501,995, filed Aug. 30, 1974, now abandoned, which was a continuation of application Ser. No. 303,199, filed Nov. 2, 1972, now abandoned.
US Referenced Citations (12)
Continuations (1)
|
Number |
Date |
Country |
Parent |
303199 |
Nov 1972 |
|
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
501995 |
Aug 1974 |
|