Claims
- 1. A process for the manufacture of hydrogen sulfide by reacting sulfur and hydrogen comprising the steps of:
- (a) supplying a first stream of hydrogen gas in a first hydrogenation reactor containing sulfur, said sulfur being at least in part as molten sulfur at a first temperature ranging between about 300.degree. C. and about 450.degree. C.;
- (b) reacting said molten sulfur and said first stream of hydrogen gas at a pressure of 0.3 to 30 kg/cm.sup.2 G in said first hydrogenation reactor to produce a first effluent gas comprising hydrogen sulfide and unreacted sulfur vapor from said first hydrogenation reactor, said unreacted sulfur vapor having been formed by gasification of molten sulfur using heat generated by said first hydrogenation reaction;
- (c) supplying a second stream of hydrogen gas into said first effluent gas in a second hydrogenation reactor;
- (d) reacting said stream of second hydrogen gas with said unreacted sulfur vapor in said first effluent gas at a second temperature within the range of 200.degree. to 300.degree. C. to form a second effluent gas containing additional hydrogen sulfide; and
- (e) recovering hydrogen sulfide from said second effluent gas.
- 2. The process according to claim 1, wherein step (b) is performed at a pressure of 3 to 30 kg/cm.sup.2 G.
- 3. The process according to claim 1, wherein step (e) is performed by passing said second effluent gas from said second reactor through a condenser to condense residual unreacted sulfur vapor contained in said second effluent gas.
- 4. The process according to claim 3, wherein the condensed residual unreacted sulfur is supplied to said first reactor at the upper portion thereof.
- 5. The process according to claim 1, wherein step (b) is performed in the presence of a catalyst selected from the group consisting of oxides and sulfides of cobalt-molybdenum, nickel-molybdenum, nickel sulfide and combinations of the foregoing.
- 6. The process according to claim 5, wherein said catalyst is used in the form of a fixed bed catalyst.
- 7. The process according to claim 1, wherein said first stream of hydrogen gas is supplied at the lower portion of said first reactor.
- 8. The process according to claim 7, further comprising dividing a source of hydrogen gas into first and second hydrogen gas streams prior to said step (a).
- 9. The process according to claim 1, wherein step (d) is performed in the presence of a catalyst selected from the group consisting of oxides and sulfides of cobalt-molybdenum, nickel-molybdenum, nickel sulfide, and combinations of the foregoing.
- 10. The process according to claim 9, wherein said catalyst is used in the form of a fixed bed catalyst.
- 11. A process for the manufacture of hydrogen sulfide by reacting sulfur and hydrogen comprising the steps of:
- (a) supplying a first stream of hydrogen gas in a first hydrogenation reactor containing sulfur, said sulfur being at least in part as molten sulfur at a first temperature ranging between about 300.degree. C. and about 450.degree. C.;
- (b) reacting said molten sulfur and said first hydrogen gas at a pressure of 0.3 to 30 kg/cm.sup.2 G in said first hydrogenation reactor to produce a first effluent gas comprising hydrogen sulfide and unreacted sulfur vapor from said first hydrogenation reactor, said unreacted sulfur vapor having been formed by gasification of molten sulfur using heat generated by said first hydrogenation reaction;
- (c) supplying a second stream of hydrogen gas into said first effluent gas in a second hydrogenation reactor;
- (d) reacting said second hydrogen gas with said unreacted sulfur vapor in said first effluent gas at a second temperature within the range of 200.degree. to 250.degree. C. in the presence of a catalyst to form a second effluent gas containing additional hydrogen sulfide, said catalyst selected from the group consisting of oxides and sulfides of cobalt-molybdenum, nickel-molybdenum and nickel-sulfide and combinations of the foregoing; and
- (e) recovering hydrogen sulfide from said second effluent gas by passing said second effluent gas through a condenser to condense residual unreacted sulfur vapor contained in said second effluent gas.
- 12. The process according to claim 11, wherein said condensed residual sulfur of step (e) is supplied to said first reactor.
Priority Claims (2)
Number |
Date |
Country |
Kind |
63-86086 |
Apr 1988 |
JPX |
|
63-204439 |
Aug 1988 |
JPX |
|
Parent Case Info
This is a continuation of application Ser. No. 07/335,187 filed Apr. 7, 1989 and abandoned.
US Referenced Citations (9)
Foreign Referenced Citations (7)
Number |
Date |
Country |
1113446 |
Sep 1961 |
DEX |
44-1686 |
Jan 1969 |
JPX |
46-5572 |
Feb 1971 |
JPX |
63-139007 |
Jul 1989 |
JPX |
398405 |
Jul 1924 |
GBX |
558432 |
Sep 1932 |
GBX |
1193040 |
May 1970 |
GBX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
335187 |
Apr 1989 |
|