Claims
- 1. A processing system for a power distribution system, comprising:
a first processor for executing a first task having a first priority; and a second processor for executing a second task having a second priority.
- 2. The processing system of claim 1, wherein said processing system is a component of a centralized circuit breaker protection system for said power distribution system.
- 3. The processing system of claim 1, wherein said first processor comprises a digital signal processor.
- 4. The processing system of claim 1, wherein said first task is selected from the group consisting of: an instantaneous overcurrent trip determination, a short time overcurrent trip determination, a long time overcurrent trip determination, and a ground fault trip determination.
- 5. The processing system of claim 1, wherein said first processor makes a protective determination with regard to an event within 4 milliseconds of a receipt of data relating to an occurrence of said event.
- 6. The processing system of claim 1, wherein said first processor is ready to execute said first task within 4 milliseconds of when power is provided to said first processor.
- 7. The processing system of claim 1, wherein said first processor is powered by a power feed of said power distribution system, and wherein said power feed is also feeding a breaker that is controlled by said processing system.
- 8. The processing system of claim 1, wherein said first processor is powered by a first power source and said second processor is powered by a second power source.
- 9. The processing system of claim 8, further comprising a communication interface between said first processor and said second processor that provides power isolation between said first power source and said second power source.
- 10. The processing system of claim 9, wherein said power isolation is achieved by optically coupling signals through said communication interface.
- 11. The processing system of claim 1, further comprising:
a buffer for storing a plurality of data packets from a data communication network, wherein said second processor reads said plurality of data packets from said buffer as a batch.
- 12. A processing system for a centralized circuit breaker protection system for a power distribution system, comprising:
a first processor for executing an instantaneous overcurrent trip determination for said centralized circuit breaker protection system; and a second processor for executing a task other than said instantaneous overcurrent trip determination.
- 13. The processing system of claim 12, wherein said first processor also executes a task selected from the group consisting of: a short time overcurrent trip determination, a long time overcurrent trip determination, and a ground fault trip determination.
- 14. The processing system of claim 12, wherein said first processor makes said instantaneous overcurrent trip determination within 4 milliseconds of a receipt of data relating to an occurrence of an instantaneous overcurrent condition.
- 15. The processing system of claim 12, wherein said first processor is ready to execute said first task within 4 milliseconds of when power is provided to said first processor.
- 16. The processing system of claim 12,
wherein said first processor is powered by a power feed of said power distribution system, and wherein said power feed is also feeding a breaker that is controlled by said processing system.
- 17. The processing system of claim 12, wherein said first processor is powered by a first power source and said second processor is powered by a second power source.
- 18. The processing system of claim 17, further comprising a communication interface between said first processor and said second processor that provides power isolation between said first power source and said second power source.
- 19. The processing system of claim 12, further comprising:
a buffer for storing a plurality of data packets from a data communication network, wherein said second processor reads said plurality of data packets from said buffer as a batch.
- 20. A method of executing tasks in a power distribution system, comprising:
employing a first processor for executing a first task having a first priority; and employing a second processor for executing a second task having a second priority.
- 21. The method of claim 20, wherein said first processor and said second processor are components in a centralized circuit breaker protection system for said power distribution system.
- 22. A method for executing tasks in a centralized circuit breaker protection system for a power distribution system, comprising:
employing a first processor for executing an instantaneous overcurrent trip determination for said centralized circuit breaker protection system; and employing a second processor for executing a task other than said instantaneous overcurrent trip determination.
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] The present application is claiming priority of U.S. Patent Application No. 60/359,544 filed on Feb. 25, 2002 for “Integrated Protection, Monitoring, and Control” the contents of which are incorporated by reference herein. The present application is also claiming priority of U.S. Patent Application No. 60/438,159 filed on Jan. 6, 2003 for “Single Processor Concept for Protection and Control of Circuit Breakers in Low-Voltage Switchgear” the contents of which are incorporated by reference herein.
Provisional Applications (2)
|
Number |
Date |
Country |
|
60359544 |
Feb 2002 |
US |
|
60438159 |
Jan 2003 |
US |