Claims
- 1. A christmas tree to control the production from a subsea oil or gas well comprising:
a) a tree body having a first production flow port; b) a tubing hanger landed within the tree body; c) an actuation mandrel landed within the tree body, the actuation mandrel having a second production flow port in fluid communication with said first flow port; and d) a flow diverter disposed within the actuation mandrel to divert flow through the production flow ports.
- 2. The christmas tree of claim 1 further comprising a backup flow diverter disposed within the actuation mandrel.
- 3. The christmas tree of claim 2 wherein the flow diverter and backup flow diverter comprise plugs.
- 4. The christmas tree of claim 1 wherein the plugs are set by wireline.
- 5. The christmas tree of claim 1 wherein the first flow port is a production flow port.
- 6. The christmas tree of claim 5 wherein the first flow port is a radial bore through the tree body.
- 7. The christmas tree of claim 1 wherein the tree body comprises a second flow port.
- 8. The christmas tree of claim 7 wherein the second flow port comprises an annulus flow port.
- 9. The christmas tree of claim 8 wherein annulus flow port comprises a first partial bore, a second partial bore, and a channel extending therebetween.
- 10. The christmas tree of claim 9 wherein the channel extends substantially longitudinally along the tree body.
- 11. The christmas tree of claim 9 wherein the first and second partial bores are arranged opposite one another.
- 12. The christmas tree of claim 1 wherein the tree body further comprises an integral production valve.
- 13. The christmas tree of claim 1 wherein the tree body further comprises a first countersunk area receptive of a production valve assembly.
- 14. The christmas tree of claim 13 wherein the tree body further comprises a second countersunk area receptive of an annulus flow assembly.
- 15. The christmas tree of claim 14 wherein the annulus flow assembly attaches to external fluid circulation lines.
- 16. The christmas tree of claim 15 wherein the external fluid circulation lines comprise choke or kill lines.
- 17. The christmas tree of claim 7 further comprising a third flow port.
- 18. The christmas tree of claim 17 wherein the third flow port provides fluid communication to a downhole safety valve.
- 19. The christmas tree of claim 18 wherein the third flow port is receptive of a hydraulic penetrator to establish fluid communication to the downhole safety valve.
- 20. The christmas tree of claim 17 further comprising a fourth flow port.
- 21. The christmas tree of claim 20 wherein the fourth flow port provides for chemical injection into the well.
- 22. A method of controlling production from a subsea oil or gas well comprising steps of:
a) installing a side valve tree onto a wellhead; b) running a tubing hanger into the wellbore; c) landing the tubing hanger in the tree body; d) installing an actuation mandrel with a plurality of plugs set therein; wherein there are no plugs set in the tubing hanger.
- 23. The method of claim 22 further wherein the step of installing a side valve tree onto a wellhead further comprises providing a tree bore protector.
- 24. The method of claim 22 wherein the tubing hanger comprises a production tubing suspended therefrom.
- 25. The method of claim 22 wherein the tubing hanger comprises an orientation key mating with an orientation sleeve.
- 26. The method of claim 25 further comprising the step of orienting the tubing hanger within the tree body.
- 27. The method of claim 22 further comprising the step of locking the tubing hanger within the tree body.
- 28. The method of claim 22 wherein the step of installing an actuation mandrel with a plurality of plugs set therein further comprises orienting the actuation mandrel.
- 29. The method of claim 22 wherein the actuation mandrel comprises a plurality of reduced-diameter shoulders and pack-off seals.
- 30. The method of claim 29 wherein the step of installing an actuation mandrel with a plurality of plugs set therein further comprises landing the shoulders and seal within the tree body.
- 31. A method of servicing a subsea oil or gas well with a side-valve christmas tree comprising steps of:
a) running an actuation mandrel retrieval tool into the christmas tree; b) engaging the actuation mandrel retrieval tool with the actuation mandrel; c) retrieving the actuation mandrel; and d) retrieving a tubing hanger; wherein there is no step of retrieving any plugs from within the tubing hanger.
Parent Case Info
[0001] This is a continuation-in-part of U.S. patent application Ser. No. 09/770,588, filed Jan. 26, 2001.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60178845 |
Jan 2000 |
US |
Continuations (1)
|
Number |
Date |
Country |
Parent |
09805090 |
Mar 2001 |
US |
Child |
10356463 |
Jan 2003 |
US |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
09770588 |
Jan 2001 |
US |
Child |
09805090 |
Mar 2001 |
US |