SPE 23050, Electrical Submersible Pumps in Subsea Completions, P.A. Scott, M. Bowring and B. Coleman, 1991. |
Electric Submersible Pump for Subsea Completed Wells, Sigbjorn Sangesland, Nordic Counsel of Ministers Program for Petroleum Technology, Nov. 26-27, 1991. |
A Simplified Subsea System Design, Sigbjorn Sangesland, Underwater Technology Conference, Bergen 1990. |
Simplified Subsea System Design, Sigbjorn Sangesland, Subsea Production Technology, CE-Course, Oct. 23-27 and Nov. 20-24, 1989. |
A Simplified Subsea System Design, Sigbjorn Sangesland, Presented at Underwater Technology Conference in Bergen, Mar. 19-21, 1990. |
Declaration of David Lorimer (and attchments dated 1991), David Lorimer, Submitted in Civil Action No. H-97-0155 (Cooper Cameron Corp. v. Kvaerner Oilfield Prods, Inc.), Jul. 10, 2002. |
Subsea Submersible Pumping Project Task Series 1000 Equipment Evaluations, Vetco Gray. |
First Interim Report—Technical, Subsea Intervention Systems, Ltd., Project No. TH/03328/89, Jun. 1991. |
Subsea Submersible Pumping Project Task No. 2000 Conceptual Design Report, Jan., 1991. |
Second Interim Report—Technical, Subsea Intervention Systems, Ltd., Project No. TH/03328/89, Jun. 1991. |
Third Interim Report—Technical, Subsea Intervention Systems, Ltd., Project No. TH/03328/89, Dec. 1991. |
Subsea Submersible Pumping Project, Final Report vol. 1, Subsea Intervention Systems, Ltd., Task Nos. 3000 and 4000, Mar. 1992. |
Subsea Submersible Pumping Project, Final Report vol. 2, Subsea Intervention Systems, Ltd., task Nos. 3000 and 4000, Mar. 1992. |
Subsea Submersible Pumping Project, Final Report vol. 3, Subsea Intervention Systems, Ltd., Task Nos. 3000 and 4000, Mar. 1992. |
Through Bore Tree System, Ref: TSD 6302, National Oilwell (UK) Limited, Jan. 1993. |
Declaration of Sigbjorn Sangesland and Attachments, Sigbjorn Sangesland, Submitted in Civil Action No. H-97-0155 (Cooper Cameron Corp. v. Kvaerner Oilfield Prods, Inc.), Undated. |