Claims
- 1. A method of assembling individual parts to produce structural components in a production installation comprising a conveyor track defining two parallel conveying paths spanned, at a work station, by a handling device comprising at least one exchangeable grab tool for the individual parts, which comprises the steps of
- (a) conveying a carriage supporting a pallet tray carrying an exchangeable grab tool for the handling device to the handling device along one of the conveying paths,
- (b) causing the handling device to take the exchangeable grab tool from the pallet tray,
- (c) conveying the carriage from the handling device to an idle position,
- (d) conveying another carriage supporting a pallet tray carrying the individual parts to the handling device,
- (e) causing the grab tool on the handling device to grab one of the individual parts from the pallet tray and to assemble the individual part on an assembly pallet positioned at the handling device on the conveying path parallel to the one conveying path, and
- (f) conveying another assembly pallet to the handling device on the parallel conveying path after the individual part has been assembled.
- 2. The assembling method of claim 1, comprising the step of sequentially conveying a plurality of said assembly pallets to the handling device for assembling a respective one of the individual parts on each one of the assembly pallets.
- 3. The assembling method of claim 1, comprising the step of replacing the other carriage by a different carriage supporting a pallet tray carrying individual parts different from the individual parts on the pallet tray supported on the other carriage.
- 4. The assembling method of claim 3, comprising the steps of sequentially conveying a plurality of said assembly pallets to the handling device for assembling a respective one of the individual parts on each one of the assembly pallets, and then sequentially conveying said assembly pallets with the assembled individual parts to the handling device for assembling a respective one of the different individual parts on each one of the assembly pallets.
- 5. The assembling method of claim 4, comprising the further step of conveying the assembly pallet with the assembled individual parts to a further work station.
- 6. The assembling method of claim 5, comprising the further step of conveying empty assembly pallets to the work station for assembling the individual parts thereon.
- 7. The assembling method of claim 4, comprising the further steps of conveying a carriage supporting a pallet tray carrying a different grab tool having exchangeable grab fingers to the handling device, and operating the handling device to exchange the grab fingers.
- 8. A production installation for assembling or processing structural components comprised of individual parts, which comprises
- (a) carriages supporting pallet trays carrying the structural components or the individual parts,
- (b) identical means for detachably coupling each one of the pallet trays to a respective one of the carriages,
- (c) a container for the structural components or individual parts arranged on each one of the pallet trays,
- (d) means for readily exchangeably holding each container on the pallet tray whereon it is arranged,
- (e) a conveyor track comprised of individual and separable conveyor track sections, each conveyor track section comprising
- (1) vertical and lateral guideways for the carriages, and
- a feed device at each conveyor track section operable for conveying the carriages independently of each other along the vertical and lateral guideways of the conveyor track.
- 9. The production installation of claim 8, wherein the conveyor track defines a main conveying path for transporting the carriages in a conveying direction, a conveying path extending parallel to the main conveying path and an auxiliary conveying path extending between, and parallel to, the main and parallel conveying paths, the carriages supporting pallet trays carrying the structural components or the individual parts are disposed on the auxiliary conveying path, and further comprising additional carriages movable along the guideways and supporting pallet trays including assembly receptacles for the structural components or individual parts, the additional carriages being disposed on the conveying path extending parallel to the main conveying path.
- 10. The production installation of claim 9, wherein the conveyor track defines a further auxiliary conveying path extending parallel to the main and parallel conveying paths, the auxiliary conveying paths extending immediately adjacent the parallel conveying path at respective sides thereof, and comprising further carriages movable along the guideways and supporting pallet trays including receptacles for the structural components or individual parts, the further carriages being disposed on the further auxiliary conveying path, and devices for grabbing the structural components or individual parts.
- 11. The production installation of claim 8, wherein the coupling means comprises centering elements for detachably mounting the containers on the pallet trays.
- 12. The production installation of claim 8, wherein the containers are pivotally arranged on the pallet trays and comprise pivotal chutes for the structural components or individual parts, further comprising respective means for pivoting the containers and the chutes, and an energy-storing device for the pivoting means arranged on each pallet tray.
- 13. The production installation of claim 12, wherein the conveyor track defines parallel conveyor paths, the carriages being conveyed along one of the conveyor paths and the chutes define guide channels for the structural components or individual parts, the guide channels being disposed at the same level as corresponding guide channels on pallet trays supported on carriages conveyed along the parallel conveyor path immediately adjacent thereto.
- 14. The production installation of claim 8, wherein the containers define openings whereby they are usable as wash tanks for the structural components or individual parts.
- 15. The production installation of claim 8, wherein a plurality of said carriages are sequentially disposed on a conveying path defined by the conveyor track, and further comprising independently operable positioning devices for positioning the carriages.
- 16. The production installation of claim 8, comprising coding elements on the carriages and decoding elements cooperating therewith disposed along the conveyor track.
- 17. The production installation of claim 8, further comprising display elements on the carriages.
- 18. The production installation of claim 8, further comprising assembly receptacles on the pallet trays for assembling the individual parts.
- 19. The production installation of claim 8, further comprising receptacles on the pallet trays for receiving faulty structural components or individual parts.
- 20. The production installation of claim 8, further comprising means for supporting individual parts separately and singly in predetermined positions on the pallet trays.
- 21. The production installation of claim 8, further comprising means for randomly supporting a heap of the individual parts on the pallet trays.
Priority Claims (1)
Number |
Date |
Country |
Kind |
791/89 |
Apr 1989 |
ATX |
|
CROSS REFERENCE TO RELATED APPLICATION
This is a division of my copending application Ser. No. 07/504,976, filed Apr. 4, 1990 now U.S. Pat. No. 5,205,026.
US Referenced Citations (12)
Foreign Referenced Citations (2)
Number |
Date |
Country |
295136 |
Dec 1988 |
JPX |
251328 |
Nov 1991 |
JPX |
Divisions (1)
|
Number |
Date |
Country |
Parent |
504976 |
Apr 1990 |
|