The present invention relates to a method, which may be called “gas-pressurized casting method” hereinafter, and a gas-permeable casting mold for producing a casting by gravity-pouring a metal melt in a volume smaller than that of an entire cavity and larger than that of a production cavity into a gas-permeable casting mold, and then supplying a gas through a sprue to push the metal melt upward in the production cavity through a flow path, so that a desired cavity portion is filled with the metal melt.
In the production of castings by gravity pouring, which may be called simply “pouring” below, a so-called sand mold, which is a gas-permeable casting mold formed by sand particles, is most commonly used. When a melt is charged into such a gas-permeable casting mold, which may be called simply “casting mold,” a gas (generally air) remaining in a cavity having a particular shape is discharged through the cavity surface, so that the cavity is fully filled with the metal melt, which may be called simply “melt” below, resulting in a casting having substantially the same shape as that of the cavity. The casting cavity generally comprises a sprue, a runner, a riser and a product-forming cavity in this order from the melt-supplying side. In conventional technology, pouring is completed by forming a melt head as high as filling a product-forming cavity in a sprue.
A solidified casting has a shape corresponding to combined shapes of a sprue, a runner, a riser and a product-forming cavity. The riser is not an unnecessary portion as a cavity for obtaining a good product, while the sprue and the runner are inherently unnecessary portions because they are merely paths for a melt to flow to the product-forming cavity. Accordingly, as long as a melt is solidified in a state of filling the sprue and the runner, drastic improvement in a pouring yield cannot be obtained. In a case where unnecessary cast portions are integrally connected to a cast product, unnecessary cast portions should be separated from the cast product in a subsequent step, resulting in low production efficiency. Accordingly, cast portions in the sprue and the runner pose a serious problem in gravity pouring.
JP 2007-75862 A and JP 2010-269345 A propose a method of drastically solving the above problem, which comprises gravity-pouring a melt in a volume smaller than that of the entire cavity and substantially equal to that of a desired cavity portion, part of a gas-permeable casting cavity which may be called simply “cavity,” to charge the metal melt into the desired cavity portion; supplying a compressed gas through a sprue before the poured melt is solidified, such that the desired cavity portion is filled with the melt; and then solidifying the melt. Because pressure provided by the melt head is obtained by the compressed gas by this method, it is expected that a melt need not exist in the sprue and the runner.
As a result of investigation for materializing the methods described in JP 2007-75862 A and JP 2010-269345 A, the inventors have found that when a melt in a volume corresponding to that of a desired cavity portion is poured, part of a gas supplied may likely intrude into a product-forming cavity or a riser because of disturbance in the supplying speed and pressure of a gas due to unstable operation of a gas-supplying means, resulting in defects such as misrun and shrinkage voids. This phenomenon will be explained below referring to the attached drawings.
However, if there were disturbance in the speed and pressure of a gas G supplied for some reasons, as shown in
The inventors' investigation has revealed that when a proper gas-supplying state is kept in the methods of JP 2007-75862 A, etc., a metal melt is given inertia, clogging the runner. Because a metal melt clogging the runner by sufficient inertia is quickly solidified, a gas does not flow faster than the melt into a production cavity, so that the production cavity is properly filled with the metal melt. However, with variations in a gas-supplying state due to insufficient pressure, etc., the gas may flow faster than the melt to intrude into the product-forming cavity along a ceiling of the runner. An effective solution of this problem has not been proposed yet.
Accordingly, to mass-produce castings stably by gas-pressurized casting, gas-supplying conditions for proper gas pressure should be investigated and strictly controlled in mass production. However, because the production cavities have various sizes and shapes, their changes likely cause defects such as misrun, shrinkage voids, etc. in castings as described above, at least until the above-described strict control is established.
It has been found that the above-described defects occur more likely when a smaller amount of a melt is poured, namely, when the volume of a melt is closer to the volume of a desired cavity portion, a necessary minimum volume for obtaining a good casting, and that the defects occur less as the amount of a melt poured increases. However, the pouring of a melt in a larger amount than necessary undesirably leads to a lower yield. Accordingly, to obtain good castings with a high pouring yield, it is necessary to develop a casting method using a necessary and sufficient amount of a melt to prevent the intrusion of a gas into a production cavity.
Accordingly, an object of the present invention is to provide a gas-pressurized casting method and a gas-permeable casting mold for producing a casting by pouring a melt in a volume necessary and sufficient for preventing part of a gas supplied from intruding into a product-forming cavity or a riser.
As a result of intensive research in view of the above object, the inventors have found that to minimize influence by control factors such as the pressure and flow rate of a gas supplied, gas-pressurized casting can be conducted without the intrusion of the gas into the production cavity, by taking into consideration the volume of a hypothetical liquid free from solidification, evaporation, expansion, shrinkage, intrusion into a casting mold, and the absorption and desorption of a gas, and a flow path shape, in a hypothetical equilibrium state in which the hypothetical liquid statically fills a production cavity and occupies at least part of a runner. The present invention has been completed based on such finding.
Thus, the method of the present invention for producing a casting using a gas-permeable casting mold comprising a cavity composed of a production cavity and a flow path, the flow path comprising a sprue through which a gravity-poured melt flows downward, and a runner connecting the production cavity to the sprue, comprises
In a hypothetical equilibrium state of a liquid achieved by supplying the gas, the surface height hs of the hypothetical liquid remaining in the flow path and the height ht of the highest bottom portion of the runner preferably meet hs<ht.
The gas-permeable casting mold of the present invention comprises a cavity composed of a production cavity and a flow path, the flow path comprising a sprue through which a gravity-poured melt flows downward, and a runner connecting the production cavity to the sprue for gravity-pouring a metal melt, and then supplying a gas through the sprue to push the metal melt in the flow path, thereby pushing the metal melt upward in the production cavity, so that the desired cavity portion is filled with the metal melt;
The height H3 of a point P3, at which a bottom of the sprue-side flow path is connected to the downward-bent flow path, preferably meets H1≤H3.
Because the present invention makes unnecessary strict control of factors such as inertia applied to a charged metal melt, the acceleration of a solidification speed, etc., which are largely affected by the properties of a melt, a cavity shape, etc., good castings can be produced stably.
A gas-pressurized casting method, a basic technology of the present invention, will be explained first. The present invention is based on gas-using casting methods (gas-pressurized casting methods) proposed by JP 2007-75862 A and JP 2010-269345 A, though not restricted by the disclosures of these patent references.
The gas-pressurized casting method comprises supplying a metal melt into a flow path through a sprue of gas-permeable casting mold, and supplying a gas through the sprue to push the metal melt in the flow path into a desired cavity portion, so that a production cavity constituting the desired cavity portion is filled with the metal melt. Though pushing a metal melt in a flow path leads to pushing a metal melt in a production cavity upward or downward depending on the arrangement of a production cavity, the method of the present invention is applicable to a case where the metal melt is pushed upward in the production cavity, namely, a case where the production cavity is higher than the runner.
A gas-permeable casting mold used in the present invention is not restricted to have a riser. However, because the riser supplements a melt to a product-forming cavity in which the melt shrinks by solidification, the riser would not sufficiently perform its roll if it were not fully filled with a melt before solidification, resulting in defects such as shrinkage voids, etc. in products. Accordingly, the riser is preferably filled with a melt at least when gas pressuring is completed. The embodiments of the present invention are thus explained, taking for example a case where not only the product-forming cavity but also the riser are filled with a melt. The product-forming cavity, or a cavity comprising both product-forming cavity and riser may be called “production cavity” hereinafter.
Though the gas-permeable casting mold is generally a green sand mold, a shell mold, a self-hardening mold, or any other casting mold composed of sand particles, it may be formed by ceramic or metal particles. Materials having no gas permeability, such as gypsum, can be used for a gas-permeable casting mold, by adding or partially using gas-permeable materials for sufficient gas permeability. Even a casting mold having no gas permeability at all, such as a metal die, may be used as a gas-permeable casting mold, when vents such as vent holes for gas permeability are added.
The melt may be made of metals generally used for the production of castings, such as iron alloys such as cast iron and cast steel, aluminum alloys, copper alloys, magnesium alloys, zinc alloys, etc.
By the gas-pressurized casting method, even a melt in a smaller volume than that of the entire cavity can fill a production cavity by a gas supplied through a sprue. In gravity-pouring casting using a conventional gas-permeable casting mold, a melt filling all cavity including the product-forming cavity should be solidified to obtain a good product, resulting in a pouring yield of at most about 70%, with no drastic improvement expected. On the other hand, the gas-pressurized casting method enables the gravity pouring of a melt in a volume smaller than that of the entire cavity and larger than that of the production cavity, theoretically resulting in a pouring yield of almost 100%.
However, because it has been known from the inventors' investigation as described above that part of a gas supplied may enter the production cavity depending on the gas-supplying conditions, etc. in a conventional gas-pressurized casting method. To compensate this, the volume of a melt poured is not set substantially equal to that of the production cavity for a pouring yield of 100%, but actually increased to such extent that a slight amount of the melt may remain in the runner.
Even though the amount of a melt poured is increased, part of a gas supplied may enter the production cavity when the melt does not fill the runner up to the ceiling. Thus, such a complicated cooling control that a melt is solidified in the runner to plug the runner against gravity may be necessitated as described in, for example, JP 2007-75862 A (FIGS. 6-8) or JP 2010-269345 A (FIG. 8).
In the gas-pressurized casting method of the present invention, the volume of a hypothetical liquid (liquid free from solidification, evaporation, expansion, shrinkage, intrusion into a casting mold, and absorption and desorption of a gas) is calculated, such that the hypothetical liquid remains in the flow path after filling the production cavity when a gas is supplied, the surface height hs of the hypothetical liquid, the height h1 of the lowest point of the runner ceiling, and the height h2 of a connecting point of the runner ceiling to the sprue meeting the relation of h2>hs>h1; and a metal melt in the same volume as that of the hypothetical liquid is poured. The relation of h2>hs>h1 is met, for example, in a state where an excess of the hypothetical liquid after filling the production cavity occupies at least part of the runner [near a connecting point of the runner 27 to the production cavity 5 in
“Plugging at least part of the runner” means that the runner is filled with a hypothetical liquid up to the lowest point of its ceiling, with no vacancy in the flow path communicating from an inlet of the sprue to the production cavity. With a melt poured in the same volume as that of a hypothetical liquid occupying at least part of the runner, it fills the production cavity when a gas is supplied, resulting in a stable horizontal surface of the melt existing in the flow path continuously from the production cavity. Thus, even with variations in the flow rate, pressure, etc. of a gas supplied, a gas supplied theoretically would not enter the production cavity, because the gas supplied pushes the melt surface at least perpendicularly. Accordingly, an operation of solidifying the melt while keeping a non-equilibrium state of the melt pushed by inertia is not needed.
As described above, the hypothetical liquid occupies at least part of the runner without filling the runner, leaving vacancy in part of the runner. With the same volume as that of a hypothetical liquid not filling all of the runner, the amount of a melt poured can be reduced, resulting in a higher pouring yield.
In an equilibrium state of a hypothetical liquid achieved by supplying the gas, a melt in the same volume as that of the hypothetical liquid meeting hs<ht, wherein ht is the height of the highest bottom portion of the runner, is preferably poured as shown in, for example,
The gas-permeable casting mold of the present invention comprises a cavity comprising a production cavity and a flow path; the flow path comprising a sprue through which a gravity-poured melt flows downward, and a runner connecting the production cavity to the sprue; and the runner having a downward-bent flow path provided in an intermediate portion thereof for downward melt flow, for example, as shown in
Because the runner has the downward-bent flow path for downward flow in an intermediate portion thereof, vacancy, if any in the runner ceiling for some reason, would be shut by the connecting point P1 in an equilibrium state, so that part of a gas supplied less likely enters the product-forming cavity or the riser, as long as a melt has a volume reaching the point P1 as high as H1, at which the downward-bent flow path is connected to a ceiling of the flow path extending from the downward-bent flow path to the production cavity as shown in
With a downward-bent flow path provided in its intermediate portion, the runner is constituted by the downward-bent flow path, a sprue-side flow path extending from the sprue to an upper portion of the downward-bent flow path, and a production-cavity-side flow path extending from lower portion of the downward-bent flow path to the production cavity. Namely, the runner is constituted by the sprue-side flow path, the downward-bent flow path, and the production-cavity-side flow path in this order, from the sprue side to the production cavity side. The downward-bent flow path may be vertical or inclined downward from the sprue toward the production cavity, as long as it bends a melt flow from the sprue downward. When the downward-bent flow path is inclined from the sprue toward the production cavity, the production-cavity-side flow path is not indispensable, but the downward-bent flow path may be directly connected to the production cavity.
Larger difference is better between the height H1 of the point P1 at which the ceiling of the production-cavity-side flow path is connected to the downward-bent flow path and the height H2 of the lowest ceiling portion P2 of the sprue-side flow path. When the point P3 at which a bottom of the sprue-side flow path is connected to the downward-bent flow path has a height H3, H1<(H2+H3)/2 is preferable [see
The more preferred embodiments of the present invention will be explained below.
To introduce a predetermined amount of a melt into the cavity efficiently, a sprue in the gas-permeable casting mold preferably has a cup portion having a larger diameter than that of a path receiving a melt flowing downward from a melt-pouring means.
Though the gas supplied may be air for cost, it is preferably a non-oxidizing gas such as argon, nitrogen, carbon dioxide, etc. to prevent the oxidation of the melt. Though the gas may be supplied from a fan, a blower, etc., a compressed gas is preferable because it can uniformly push the melt at higher pressure.
The gas-supplying means preferably has a nozzle-shaped portion connected to the sprue. The nozzle-shaped portion can be easily fit (inserted) into the sprue (particularly a pipe portion connected to the sprue cup portion), enabling the quick connection of the gas-supplying means.
The nozzle preferably has a tapered side surface. With a tapered wall complementary to the sprue (pipe portion), the nozzle can be surely fit into the sprue (pipe portion).
To solidify the charged melt while preventing its reverse flow, a method of continuing as high a gas-supplying pressure as preventing the reverse flow of a pushed-up melt, a method of introducing water through a sprue to accelerate the solidification of a melt, and other methods described in JP 2007-75862 A and JP 2010-269345 A can be used.
Various embodiments will be explained in detail below referring to the attached drawings. To make clear the features of the present invention, the embodiments are explained below referring to vertical cross sections each including a production cavity and a flow path, though an actual cavity generally has portions perpendicular to a paper surface. It should be noted that embodiments described below are merely typical examples, to which the present invention is not restricted.
In Embodiment 1, a green sand mold, which is a gas-permeable casting mold, is used as a casting mold 1. The casting mold 1 is composed of an upper mold 1a supported by an upper flask 2a constituting a casting mold flask 2, and a lower mold 1b supported by a lower flask 2b constituting the casting mold flask 2, both molds 1a, 1b being combined and arranged on a support plate 3. A cavity 4 is constituted by a production cavity 5 comprising a product-forming cavity 5a, and a riser 5b connected to the product-forming cavity 5a on the side of a sprue 8; and a flow path 6 comprising a runner 7 horizontally extending to the production cavity 5, and a sprue 8 connected to the runner 7 for a melt to flow downward; a ceiling of the runner 7 near the production cavity 5 being downward inclined toward the production cavity 5. The production cavity may not have a riser. The same is true in other embodiments below.
In a state shown in
When hs>h1 is not met, namely when a liquid Q is poured in a volume of hs<h1, the surface Sv of the liquid Q pushed by the gas G toward the production cavity 5 becomes lower than the lowest ceiling point p1 of the runner 7, as shown in
As in
In Embodiment 1 shown in
In actual gas-pressurized casting, the height hs of the liquid surface Sv preferably has a slight height margin to the height h1 of p1. h1+1 mm≤hs≤h1+25 mm is preferable. The same is true in Embodiments 2-5 below. When the liquid surface Sv is slightly higher than the lowest ceiling point p1 of the runner 7 despite hs>h1, for example, when the height hs of the liquid surface Sv meets h1+1 mm>hs>h1, large inertia is preferably added to a metal melt in an actual gas-pressurized casting, with a large pressure increase speed at an early stage of supplying, thereby charging the melt into the production cavity.
Though a reference height plane L may be an arbitrary horizontal plane equal to or lower than the lowest point of the cavity 4, it is an upper surface of a flat plate 3 in Embodiment 1. The same is true in other embodiments.
In a hypothetical equilibrium state shown in
In the casting mold 1 in Embodiment 1, a ceiling portion of the runner 7 downward inclined toward the production cavity 5 is directly connected to the production cavity 5 as shown in
Though various vertical cross sections of the cavity 4 shown in
In Embodiment 2, too, the liquid Q is in a volume meeting the relation of hs>h1, wherein h1 is the height of the lowest ceiling point p1 of the runner 17 constituting the flow path 16, and hs is the height of the liquid surface Sv, to prevent a gas G from intruding into the production cavity 5, as in Embodiment 1. In Embodiment 2, too, the lowest ceiling point p1 of the runner 17 at a connecting point to the production cavity 5 is lower than a connecting point p2 to the sprue 18, thereby h2>h1, as in Embodiment 1. Accordingly, in Embodiment 2, too, the liquid surface Sv need not be higher than the connecting point p2. The liquid surface Sv may be in the runner 17, meeting h2>hs>h1, preferably reducing the volume of the liquid Q.
As is clear from
In actual gas-pressurized casting, a metal melt is poured in a volume of the liquid Q reaching the liquid surface Sv in a hypothetical equilibrium state in which the liquid Q fills the production cavity 5, as shown in
With the runner 27 having a horizontal runner portion 27a on the side of the production cavity 5 from the downward-bent flow path 27c, and a horizontal runner portion 27b on the side of the sprue 8 from the downward-bent flow path 27c, the lowest ceiling point p1 of the runner 27 corresponds to the lowest ceiling point of the runner 27a. Because a ceiling of the runner 27a is inclined upward toward the production cavity 5 in
In Embodiment 3 comprising the downward-bent flow path 27c, too, the intrusion of a gas G into the production cavity 5 can be prevented by setting the volume of the liquid Q to meet the relation of hs>h1, wherein h1 is the height of the lowest ceiling point p1 of the runner 27 constituting the flow path 26, and hs is the height of the liquid surface Sv. As in Embodiments 1 and 2, the liquid surface Sv can be located at a position meeting h2>hs>h1 in the runner 27, reducing the volume of the liquid Q.
When the height h3 of a connecting point p3 of a bottom of the runner 27b to the downward-bent flow path 27c meets the relation of h3>h1, the height hs of the liquid surface Sv can be above p1 and equal to or lower than p3, h3≥hs>h1. In this case, the liquid surface Sv does not exist in the runner 27b, most preferably reducing the amount of the liquid Q.
In actual gas-pressurized casting, a metal melt is poured in a volume corresponding to the volume of the liquid Q filling up to a liquid surface Sv in addition to filling the production cavity 5 in a hypothetical equilibrium state shown in
In Embodiment 4, too, the volume of the liquid Q is set to have a volume meeting the relation of hs>h1, wherein h1 is the height of the lowest ceiling point p1 of the runner 37 constituting the flow path 36, and hs is the height of the liquid surface Sv, thereby preventing the intrusion of a gas G supplied into the production cavity 5, as in Embodiment 2. In Embodiment 4, the lowest ceiling point p1 is located in an intermediate portion of the runner 37, lower than the connecting point p2 to the sprue 8, as in Embodiments 1-3 described above. Namely, the height h2 of the connecting point p2 to the sprue 8 meets h2>h1. Accordingly, in Embodiment 4, the liquid surface Sv need not be higher than p2. The liquid surface Sv is preferably located in the runner 37, meeting h2>hs>h1, thereby reducing the volume of the liquid Q.
With a low ceiling in an intermediate portion of the runner 37, the solidification of a melt in this portion is accelerated in actual casting, thereby quickly stopping the reverse flow of a melt from the production cavity 5. A low ceiling portion of the runner 37 may be wide as shown in
The volume of a metal melt poured in actual gas-pressurized casting is equal to the volume of a liquid Q continuously occupying the production cavity 5 and up to a liquid surface Sv in a hypothetical equilibrium state shown in
With the runner 47 having a horizontal runner portion 47a on the side of the production cavity 5 from the downward-bent flow path 47c, and a horizontal runner portion 47b on the side of the sprue 8 from the downward-bent flow path 47c, the lowest ceiling point p1 of the runner 47 corresponds to the lowest ceiling portion of the runner 47a.
In Embodiment 5 comprising the downward-bent flow path 47c, too, the intrusion of a gas G into the production cavity 5 can be prevented by setting the volume of the liquid Q to meet the relation of hs>h1, wherein h1 is the height of the lowest ceiling point p1 of the runner 47 constituting the flow path 46, and hs is the height of the liquid surface Sv. As in Embodiments 1-4, the liquid surface Sv can be located at a position meeting h2>hs>h1 in the runner 47, reducing the volume of the liquid Q.
Because a runner 47b having a low ceiling near a connecting point of the runner 47b to the runner 47c in Embodiment 5 is thinner than in Embodiment 3, the solidification of a melt in this portion is accelerated in actual casting, thereby quickly stopping the reverse flow of a melt from the production cavity 5. A low ceiling portion of the runner 47b may be wide as in Embodiment 4.
The volume of a metal melt poured in actual gas-pressurized casting is equal to the volume of a liquid Q continuously occupying the production cavity 5 and up to a liquid surface Sv in a hypothetical equilibrium state shown in
In the gas-permeable casting mold in Embodiment 6, a runner 57 has a substantially vertical downward-bent flow path 59 for generating downward flow in its intermediate portion. An upper portion of the downward-bent flow path 59 is connected to a runner 57b extending to a sprue 8, and a lower portion of the downward-bent flow path 59 is connected to a runner 57a extending to the production cavity 5. Thus, the runner 57 is constituted by a horizontal runner 57a on the side of the production cavity 5 from the downward-bent flow path 59, a horizontal runner 57b on the side of the sprue, and the downward-bent flow path 59. Though
The height H1 of the point P1, at which the ceiling of the runner 57a extending from the downward-bent flow path 59 to the production cavity 5 is connected to the downward-bent flow path, and the height H2 of the lowest ceiling portion P2 of the horizontal runner portion 57b extending from the sprue 8 to the downward-bent flow path meet the relation of H1<H2. With the downward-bent flow path 59 meeting H1<H2, even a gas flowing toward the production cavity 5 along the ceiling of the runner 57b by the variations of pressure, flow rate, etc. of the gas can be stopped by the downward-bent flow path 59 to prevent it from flowing forward. On the other hand, in a conventional gas-permeable casting mold having a linear horizontal runner with no downward-bent flow path 59 as shown in
As shown in
Though
Though the downward-bent flow path 59 may be located at an arbitrary position in the horizontal runner 57, it is preferably as close to the production cavity 5 as possible, to reduce the amount of a melt poured. The same is true in Embodiment 7.
In this embodiment, when the point P1 at which the ceiling of the runner 67a is connected to the downward-bent flow path, and the point P3 at which the bottom of the runner 67b on the side of the sprue is connected to the downward-bent flow path have the same height, H1=H3, for example, on the same parting surface, the upper mold 1a and the lower mold 1b can be easily combined.
When the point P1 at which the ceiling of the runner 67a is connected to the downward-bent flow path is lower than the point P3 at which the bottom of the runner 67b on the side of the sprue is connected to the downward-bent flow path, H1<H3 as shown in
Number | Date | Country | Kind |
---|---|---|---|
2014-037839 | Feb 2014 | JP | national |
2014-075070 | Apr 2014 | JP | national |
This is a divisional of application Ser. No. 15/121,654 filed Aug. 25, 2016, which is the National Stage of International Application No. PCT/JP2014/083773 filed Dec. 19, 2014 (claiming priority based on Japanese Patent Application Nos. 2014-037839 filed Feb. 28, 2014 and 2014-075070 filed Apr. 1, 2014), the contents of which are incorporated herein by reference in their entirety.
Number | Name | Date | Kind |
---|---|---|---|
2155800 | Perazo | Apr 1939 | A |
3256571 | Lund | Jun 1966 | A |
4614217 | Keaton | Sep 1986 | A |
20090151887 | Goka | Jun 2009 | A1 |
20160361757 | Wang et al. | Dec 2016 | A1 |
Number | Date | Country |
---|---|---|
60-130447 | Jul 1985 | JP |
6229844 | Feb 1987 | JP |
04-052068 | Feb 1992 | JP |
2007-075862 | Mar 2007 | JP |
2010-269345 | Dec 2010 | JP |
Entry |
---|
Communication dated Jul. 17, 2018, from the Japanese Patent Office in counterpart Application No. 2016-505008. |
International Search Report for PCT/JP2014/083773 dated Mar. 31, 2015 [PCT/ISA/210. |
EPO machine translation of JP 60130447 A (Year: 1985); 3 pages. |
Number | Date | Country | |
---|---|---|---|
20190160522 A1 | May 2019 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 15121654 | US | |
Child | 16262096 | US |