This invention relates, in general, to managing customer environments to provide support for business resiliency, and in particular, to managing processing within a computing environment by programmatically controlling whether proposed actions are to be executed.
Today, customers attempt to manually manage and align their availability management with their information-technology (IT) infrastructure. Changes in either business needs or the underlying infrastructure are often not captured in a timely manner and require considerable rework, leading to an inflexible environment.
Often high-availability solutions and disaster-recovery technologies are handled via a number of disparate point products that target specific scopes of failure, platforms or applications. Integrating these solutions into an end-to-end solution is a complex task left to the customer, with results being either proprietary and very specific, or unsuccessful.
Customers do not have the tools and infrastructure in place to customize their availability-management infrastructure to respond to failures in a way that allows for a more graceful degradation of their environments. As a result, more drastic and costly actions may be taken (such as a site switch) when other options (such as disabling a set of applications or users) could have been offered, depending on business needs.
Coordination across availability management and other systems-management disciplines is either nonexistent or accomplished via non-reusable, proprietary, custom technology.
There is little predictability as to whether the desired recovery objective will be achieved, prior to time of failure. There are only manual, labor-intensive techniques to connect recovery actions with the business impact of failures and degradations.
Any change in the underlying application, technologies, business recovery objectives, resources or their interrelationships require a manual assessment of impact to the hand-crafted recovery scheme.
Based on the foregoing, a need exists for a capability to facilitate management of an IT environment. In particular, a need exists for a capability to manage processing within the environment. As one example, a need exists for a technique to programmatically enforce whether proposed actions are allowed to execute. The enforcement is based on the projected effect execution of an action would have on the environment.
The shortcomings of the prior art are overcome and additional advantages are provided through the provision of a computer-implemented method to manage processing within a computing environment. The method includes, for instance, projecting an effect on the computing environment of execution of a proposed action, said proposed action selected based on real-time conditions of the computing environment; and programmatically determining, based on the projected effect, whether the proposed action is to be executed or is to be prevented from being executed.
Computer program products and systems relating to one or more aspects of the present invention are also described and claimed herein.
Additional features and advantages are realized through the techniques of the present invention. Other embodiments and aspects of the invention are described in detail herein and are considered a part of the claimed invention.
One or more aspects of the present invention are particularly pointed out and distinctly claimed as examples in the claims at the conclusion of the specification. The foregoing and other objects, features, and advantages of the invention are apparent from the following detailed description taken in conjunction with the accompanying drawings in which:
In managing a customer's environment, such as its business environment, there is a set of requirements unaddressed by existing technology, which causes unpredictable down time, large-impact failures and recoveries, and significant extra labor cost, with resulting loss of business revenue. These requirements include, for instance:
The above set of requirements is addressed, however, by a Business Resiliency (BR) Management System, of which one or more aspects of the present invention are included. The Business Resiliency Management System provides, for instance:
One goal of the BR system is to allow customers to align their supporting information technology systems with their business goals for handling failures of various scopes, and to offer a continuum of recovery services from finer-grained process failures to broader scoped site outages. The BR system is built around the idea of identifying the components that constitute a business function, and identifying successive levels of recovery that lead to more complex constructs as the solution evolves. The various recovery options are connected by an overall BR management capability that is driven by policy controls.
Various characteristics of one embodiment of a BR system include:
A Business Resilience System is capable of being incorporated in and used by many types of environments. One example of a processing environment to incorporate and use aspects of a BR system, including one or more aspects of the present invention, is described with reference to
Processing environment 100 includes, for instance, a central processing unit (CPU) 102 coupled to memory 104 and executing an operating system 106. Examples of operating systems include AIX® and z/OS®, offered by International Business Machines Corporation; Linux; etc. AIX® and z/OS® are registered trademarks of International Business Machines Corporation, Armonk, N.Y., U.S.A. Other names used herein may be registered trademarks, trademarks or product names of International Business Machines Corporation or other companies.
The operating system manages execution of a Business Resilience Runtime Component 108 of a Business Resilience System, described herein, and one or more applications 110 of an application container 112.
As examples, processing environment 100 includes an IBM® System z™ processor or a pSeries® server offered by International Business Machines Corporation; a Linux server; or other servers, processors, etc. Processing environment 100 may include more, less and/or different components than described herein. (pSeries® is a registered trademark of International Business Machines Corporation, Armonk, N.Y., USA.)
Another example of a processing environment to incorporate and use aspects of a BR System, including one or more aspects of the present invention, is described with reference to
As shown, a processing environment 200 includes for instance, a central processing complex 202 coupled to an input/output (I/O) subsystem 204. Central processing complex 202 includes, for instance, a central processing unit 206, memory 208, an operating system 210, a database management system 212, a Business Resilience Runtime Component 214, an application container 216 including one or more applications 218, and an I/O facility 220.
I/O facility 220 couples central processing complex 202 to I/O subsystem 204 via, for example, a dynamic switch 230. Dynamic switch 230 is coupled to a control unit 232, which is further coupled to one or more I/O devices 234, such as one or more direct access storage devices (DASD).
Processing environments 100 and/or 200 may include, in other embodiments, more, less and/or different components.
In yet another embodiment, a central processing complex 300 (
For example, network service 302 of central processing complex 300 is coupled to a switch 308 of network subsystem 306. Switch 308 is coupled to a switch 310 via routers 312 and firewalls 314. Switch 310 is further coupled to a network service 316 of processing environment 304.
Processing environment 304 further includes, for instance, a central processing unit 320, a memory 322, an operating system 324, and an application container 326 including one or more applications 328. In other embodiments, it can include more, less and/or different components.
Moreover, CPC 300 further includes, in one embodiment, a central processing unit 330, a memory 332, an operating system 334, a database management system 336, a Business Resilience Runtime Component 338, an application container 340 including one or more applications 342, and an I/O facility 344. It also may include more, less and/or different components.
I/O facility 344 is coupled to a dynamic switch 346 of an I/O subsystem 347. Dynamic switch 346 is further coupled to a control unit 348, which is coupled to one or more I/O devices 350.
Although examples of various environments are provided herein, these are only examples. Many variations to the above environments are possible and are considered within the scope of the present invention.
In the above-described environments, a Business Resilience Runtime Component of a Business Resilience System is included. Further details associated with a Business Resilience Runtime Component and a Business Resilience System are described with reference to
In one example, a Business Resilience System 400 is a component that represents the management of recovery operations and configurations across an IT environment. Within that Business Resilience System, there is a Business Resilience Runtime Component (402) that represents the management functionality across multiple distinct Recovery Segments, and provides the service level automation and the support of creation of the recovery sequences. In addition, there are user interface (404), administration (406), installation (408) and configuration template (410) components within the Business Resilience System that enable the administrative operations that are to be performed. Each of these components is described in further detail below.
Business Resilience Runtime Component 402 includes a plurality of components of the BR System that are directly responsible for the collection of observations, creation of PSEs, policy acceptance, validation, error detection, and formulation of recovery sequences. As one example, Business Resilience Runtime Component 402 includes the following components:
In addition to the Business Resilience Runtime Component of the BR system, the BR system includes the following components, previously mentioned above.
The user interface, admin mailbox, install logic and/or template components can be part of the same computing unit executing BR Runtime or executed on one or more other distributed computing units.
To further understand the use of some of the above components and their interrelationships, the following example is offered. This example is only offered for clarification purposes and is not meant to be limiting in any way.
Referring to
As a result of these conditions leading up to runtime, the following subscriptions have already taken place:
These steps highlight one example of an error detection process:
In addition to the above, BR includes a set of design points that help in the understanding of the system. These design points include, for instance:
Goal Policy Support
BR is targeted towards goal-based policies—the customer configures his target availability goal, and BR determines the preparatory actions and recovery actions to achieve that goal (e.g., automatically).
Availability management of the IT infrastructure through goal-based policy is introduced by this design. The BR system includes the ability to author and associate goal based availability policy with the resource Recovery Segments described herein. In addition, support is provided to decompose the goal policy into configuration settings, preparatory actions and runtime procedures in order to execute against the deployed availability goal. In one implementation of the BR system, the Recovery Time Objective (RTO—time to recover post outage) is a supported goal policy. Additional goal policies of data currency (e.g., Recovery Point Objective) and downtime maximums, as well as others, can also be implemented with the BR system. Recovery Segments provide the context for association of goal-based availability policies, and are the scope for goal policy expression supported in the BR design. The BR system manages the RTO through an understanding of historical information, metrics, recovery time formulas (if available), and actions that affect the recovery time for IT resources.
RTO goals are specified by the customer at a Recovery Segment level and apportioned to the various component resources grouped within the RS. In one example, RTO goals are expressed as units of time intervals, such as seconds, minutes, and hours. Each RS can have one RTO goal per Pattern System Environment associated with the RS. Based on the metrics available from the IT resources, and based on observed history and/or data from the customer, the RTO goal associated with the RS is evaluated for achievability, taking into account which resources are able to be recovered in parallel.
Based on the RTO for the RS, a set of preparatory actions expressed as a workflow is generated. This preparatory workflow configures the environment or makes alterations in the current configuration, to achieve the RTO goal or to attempt to achieve the goal.
In terms of optimizing RTO, there are tradeoffs associated with the choices that are possible for preparatory and recovery actions. Optimization of recovery choice is performed by BR, and may include interaction at various levels of sophistication with IT resources. In some cases, BR may set specific configuration parameters that are surfaced by the IT resource to align with the stated RTO. In other cases, BR may request that an IT resource itself alter its management functions to achieve some portion of the overall RS RTO. In either case, BR aligns availability management of the IT resources contained in the RS with the stated RTO.
Metrics and Goal Association
In this design, as one example, there is an approach to collecting the required or desired metrics data, both observed and key varying factors, system profile information that is slow or non-moving, as well as potential formulas that reflect a specific resource's use of the key factors in assessing and performing recovery and preparatory actions, historical data and system information. The information and raw metrics that BR uses to perform analysis and RTO projections are expressed as part of the IT resources, as resource properties. BR specific interpretations and results of statistical analysis of key factors correlated to recovery time are kept as BR Specific Management data (BRMD).
Relationships used by BR, and BR Specific Resource Pairing Information
BR maintains specific information about the BR management of each resource pairing or relationship between resources. Information regarding the BR specific data for a resource pairing is kept by BR, including information such as ordering of operations across resources, impact assessment information, operation effect on availability state, constraint analysis of actions to be performed, effects of preparatory actions on resources, and requirements for resources to co-locate or anti-co-locate.
Evaluation of Failure Scope
One feature of the BR function is the ability to identify the scope and impact of a failure. The BR design uses a Containment Region to identify the resources affected by an incident. The Containment Region is initially formed with a fairly tight restriction on the scope of impact, but is expanded on receiving errors related to the first incident. The impact and scope of the failure is evaluated by traversing the resource relationships, evaluating information on BR specific resource pairing information, and determining most current state of the resources impacted.
Generation and Use of Workflow
Various types of preparatory and recovery processes are formulated and in some cases, optionally initiated. Workflows used by BR are dynamically generated based on, for instance, customer requirements for RTO goal, based on actual scope of failure, and based on any configuration settings customers have set for the BR system.
A workflow includes one or more operations to be performed, such as Start CICS, etc. Each operation takes time to execute and this amount of time is learned based on execution of the workflows, based on historical data in the observation log or from customer specification of execution time for operations. The workflows formalize, in a machine readable, machine editable form, the operations to be performed.
In one example, the processes are generated into Business Process Execution Language (BPEL) compliant workflows with activities that are operations on IT resources or specified manual, human activities. For example, BRM automatically generates the workflows in BPEL. This automatic generation includes invoking routines to insert activities to build the workflow, or forming the activities and building the XML (Extensible Mark-Up Language). Since these workflows are BPEL standard compliant, they can be integrated with other BPEL defined workflows which may incorporate manual activities performed by the operations staff. These BR related workflows are categorized as follows, in one example:
Since the set of BR actions described above modify existing IT environments, visibility to the actions that are taken by BR prior to the actual execution is provided. To gain trust in the decisions and recommendations produced by BR, the BR System can run in ‘advisory mode’. As part of advisory mode, the possible actions that would be taken are constructed into a workflow, similar to what would be done to actually execute the processes. The workflows are then made visible through standard workflow authoring tooling for customers to inspect or modify. Examples of BPEL tooling include:
BR tooling spans the availability management lifecycle from definition of business objectives, IT resource selection, availability policy authoring and deployment, development and deployment of runtime monitors, etc. In one example, support for the following is captured in the tooling environment for the BR system:
The policy lifecycle for BR goal policies, such as RTO goals, includes, for example:
One of the points in determining operational state of a Recovery Segment is that this design allows for customers to configure a definition of specific ‘aggregated’ states, using properties of individual IT resources. A Recovery Segment is an availability management context, in one example, which may include a diverse set of IT resources.
The customer may provide the rules logic used within the Recovery Segment to consume the relevant IT resource properties and determine the overall state of the RS (available, degraded and unavailable, etc). The customer can develop and deploy these rules as part of the Recovery Segment availability policy. For example, if there is a database included in the Recovery Segment, along with the supporting operating system, storage, and network resources, a customer may configure one set of rules that requires that the database must have completed the recovery of in-flight work in order to consider the overall Recovery Segment available. As another example, customers may choose to configure a definition of availability based on transaction rate metrics for a database, so that if the rate falls below some value, the RS is considered unavailable or degraded, and evaluation of ‘failure’ impact will be triggered within the BR system. Using these configurations, customers can tailor both the definitions of availability, as well as the rapidity with which problems are detected, since any IT resource property can be used as input to the aggregation, not just the operational state of IT resources.
Failure During Workflow Sequences of Preparatory, Recovery, Preventive
Failures occurring during sequences of operations executed within a BPEL compliant process workflow are intended to be handled through use of BPEL declared compensation actions, associated with the workflow activities that took a failure. The BR System creates associated “undo” workflows that are then submitted to compensate, and reset the environment to a stable state, based on where in the workflow the failure occurred.
Customer Values
The following set of customer values, as examples, are derived from the BR system functions described above, listed here with supporting technologies from the BR system:
Management of the IT environment is adaptively performed, as described herein and in a U.S. Patent Application “Adaptive Business Resiliency Computer System for Information Technology Environments,” (POU920070364US1), Bobak et al., co-filed herewith, which is hereby incorporated herein by reference in its entirety.
Many different sequences of activities can be undertaken in creating a BR environment. The following represents one possible sequence; however, many other sequences are possible. This sequence is provided merely to facilitate an understanding of a BR system and one or more aspects of the present invention. This sequence is not meant to be limiting in any way. In the following description, reference is made to various U.S. Patent Applications, which are co-filed herewith.
On receiving the BR and related product offerings, an installation process is undertaken. Subsequent to installation of the products, a BR administrator may define the configuration for BR manager instances with the aid of BRM configuration templates.
Having defined the BRM configuration a next step could be to define Recovery Segments as described in “Recovery Segments for Computer Business Applications,” (POU920070108US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
Definition of a RS may use a representation of resources in a topology graph as described in “Use of Graphs in Managing Computing Environments,” (POU920070112US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
It is expected that customers will enable BR operation in “observation” mode for a period of time to gather information regarding key metrics and operation execution duration associated with resources in a RS.
At some point, sufficient observation data will have been gathered or a customer may have sufficient knowledge of the environment to be managed by BR. A series of activities may then be undertaken to prepare the RS for availability management by BR. As one example, the following steps may be performed iteratively.
A set of functionally equivalent resources may be defined as described in “Use of Redundancy Groups in Runtime Computer Management of Business Applications,” (POU920070113US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
Specification of the availability state for individual resources, redundancy groups and Recovery Segments may be performed as described in “Use of Multi-Level State Assessment in Computer Business Environments,” (POU920070114US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
Representations for the IT environment in which BR is to operate may be created from historical information captured during observation mode, as described in “Computer Pattern System Environment Supporting Business Resiliency,” (POU920070107US1), Bobak et al., which is hereby incorporated herein by reference in its entirety. These definitions provide the context for understanding how long it takes to perform operations which change the configuration—especially during recovery periods.
Information on relationships between resources may be specified based on recommended best practices—expressed in templates—or based on customer knowledge of their IT environment as described in “Conditional Computer Runtime Control of an Information Technology Environment Based on Pairing Constructs,” (POU920070110US1), Bobak et al., which is hereby incorporated herein by reference in its entirety. Pairing processing provides the mechanism for reflecting required or desired order of execution for operations, the impact of state change for one resource on another, the effect execution of an operation is expected to have on a resource state, desire to have one subsystem located on the same system as another and the effect an operation has on preparing the environment for availability management.
With preliminary definitions in place, a next activity of the BR administrator might be to define the goals for availability of the business application represented by a Recovery Segment as described in “Programmatic Validation in an Information Technology Environment,” (POU920070111US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
Managing the IT environment to meet availability goals includes having the BR system prioritize internal operations. The mechanism utilized to achieve the prioritization is described in “Serialization in Computer Management,” (POU920070105US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
Multiple operations are performed to prepare an IT environment to meet a business application's availability goal or to perform recovery when a failure occurs. The BR system creates workflows to achieve the required or desired ordering of operations, as described in “Dynamic Generation of Processes in Computing Environments,” (POU920070123US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
A next activity in achieving a BR environment might be execution of the ordered set of operations used to prepare the IT environment, as described in “Dynamic Selection of Actions in an Information Technology Environment,” (POU920070117US1), Bobak et al, which is hereby incorporated herein by reference in its entirety.
Management by BR to achieve availability goals may be initiated, which may initiate or continue monitoring of resources to detect changes in their operational state, as described in “Real-Time Information Technology Environments,” (POU920070120US1), Bobak et al, which is hereby incorporated herein by reference in its entirety. Monitoring of resources may have already been initiated as a result of “observation” mode processing.
Changes in resource or redundancy group state may result in impacting the availability of a business application represented by a Recovery Segment. Analysis of the environment following an error is performed. The analysis allows sufficient time for related errors to be reported, insures gathering of resource state completes in a timely manner and insures sufficient time is provided for building and executing the recovery operations—all within the recovery time goal, as described in “Management Based on Computer Dynamically Adjusted Discrete Phases of Event Correlation,” (POU920070119US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
A mechanism is provided for determining if events impacting the availability of the IT environment are related, and if so, aggregating the failures to optimally scope the outage, as described in “Management of Computer Events in a Computer Environment,” (POU920070118US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
Ideally, current resource state can be gathered after scoping of a failure. However, provisions are made to insure management to the availability goal is achievable in the presence of non-responsive components in the IT environment, as described in “Managing the Computer Collection of Information in an Information Technology Environment,” (POU920070121US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
With the outage scoped and current resource state evaluated, the BR environment can formulate an optimized recovery set of operations to meet the availability goal, as described in “Defining a Computer Recovery Process that Matches the Scope of Outage,” (POU920070124US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
Formulation of a recovery plan is to uphold customer specification regarding the impact recovery operations can have between different business applications, as described herein, in accordance with one or more aspects of the present invention.
Varying levels of recovery capability exist with resources used to support a business application. Some resources possess the ability to perform detailed recovery actions while others do not. For resources capable of performing recovery operations, the BR system provides for delegation of recovery if the resource is not shared by two or more business applications, as described in “Conditional Actions Based on Runtime Conditions of a Computer System Environment,” (POU920070116US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
Having evaluated the outage and formulated a set of recovery operations, the BR system resumes monitoring for subsequent changes to the IT environment.
In support of mainline BR system operation, there are a number of activities including, for instance:
Making changes to the scope of a business application or Recovery Segment, as described in “Non-Disruptively Changing Scope of Computer Business Applications Based on Detected Changes in Topology,” (POU920070125US1), Bobak et al., which is hereby incorporated herein by reference in its entirety.
Detecting and recovery for the BR system is performed non-disruptively, as described in “Managing Processing of a Computing Environment During Failures of the Environment,” (POU920070365US1), Bobak et al., which is hereby incorporated herein in its entirety.
In order to build a BR environment that meets recovery time objectives, IT configurations within a customer's location are to be characterized and knowledge about the duration of execution for recovery time operations within those configurations is to be gained. IT configurations and the durations for operation execution vary by time, constituent resources, quantity and quality of application invocations, as examples. Customer environments vary widely in configuration of IT resources in support of business applications. Understanding the customer environment and the duration of operations within those environments aids in insuring a Recovery Time Objective is achievable and in building workflows to alter the customer configuration of IT resources in advance of a failure and/or when a failure occurs.
A characterization of IT configurations within a customer location is built by having knowledge of the key recovery time characteristics for individual resources (i.e., the resources that are part of the IT configuration being managed; also referred to as managed resources). Utilizing the representation for a resource, a set of key recovery time objective (RTO) metrics are specified by the resource owner. During ongoing operations, the BR manager gathers values for these key RTO metrics and gathers timings for the operations that are used to alter the configuration. It is expected that customers will run the BR function in “observation” mode prior to having provided a BR policy for availability management or other management. While executing in “observation” mode, the BR manager periodically gathers RTO metrics and operation execution durations from resource representations. The key RTO metrics properties, associated values and operation execution times are recorded in an Observation log for later analysis through tooling. Key RTO metrics and operation execution timings continue to be gathered during active BR policy management in order to maintain currency and iteratively refine data used to characterize customer IT configurations and operation timings within those configurations.
Examples of RTO properties and value range information by resource type are provided in the below table. It will be apparent to those skilled in the art that additional, less, and/or different resource types, properties and/or value ranges may be provided.
A specific example of key RTO properties for a z/OS® image is depicted in
The z/OS® image has a set of RTO metrics associated therewith, as described above. Other resources may also have its own set of metrics. An example of this is depicted in
Further, in one example, the RTO properties from each of the resources that are part of the Recovery Segment for App A have been gathered by BR and formed into an “observation” for recording to the Observation log, as depicted at 850.
Resources have varying degrees of functionality to support RTO goal policy. Such capacity is evaluated by BR, and expressed in resource property RTOGoalCapability in the BRMD entry for the resource. Two options for BR to receive information operation execution timings are: use of historical data or use of explicitly customer configured data. If BR relies on historical data to make recovery time projections, then before a statistically meaningful set of data is collected, this resource is not capable of supporting goal policy. A mix of resources can appear in a given RS—some have a set of observations that allow classification of the operation execution times, and others are explicitly configured by the customer.
Calculation of projected recovery time can be accomplished in two ways, depending on customer choice: use of historical observations or use of customers input timings. The following is an example of values for the RTOGoalCapability metadata that is found in the BRMD entry for the resource that indicates this choice:
If the customer is in observation mode, then historical information is captured, regardless of whether the customer has indicated use of explicitly input timings or use of historical information.
The administrator can alter, on a resource basis, which set of timings BR is to use. The default is to use historical observations. In particular, a change source of resource timing logic is provided that alters the source that BR uses to retrieve resource timings. The two options for retrieving timings are from observed histories or explicitly from admin defined times for operation execution. The default uses information from the observed histories, gathered from periodic polls. If the customer defines times explicitly, the customer can direct BR to use those times for a given resource. If activated, observation mode continues and captures information, as well as running averages, and standard deviations. The impact to this logic is to alter the source of information for policy validation and formulation of recovery plan.
With respect to the historical observations, there may be a statistically meaningful set of observations to verify. The sample size should be large enough so that a time range for each operation execution can be calculated, with a sufficient confidence interval. The acceptable number of observations to qualify as statistically meaningful, and the desired confidence interval are customer configurable using BR UI, but provided as defaults in the BRMD entry for the resource. The default confidence interval is 95%, in one example.
There are metrics from a resource that are employed by BR to enable and perform goal management. These include, for instance:
There is also a set of information about the resource that is employed—this information is provided as defaults in the BRMD entry for the resource, but provided to the BR team in the form of best practices information/defaults by the domain owners:
In addition to the resources defined herein as part of the IT configuration that is managed, there are other resources, referred to herein as assessed resources. Assessed resources are present primarily to provide observation data for PSE formation, and to understand impact(s) on managed resources. They do not have a decomposed RTO associated with them nor are they acted on for availability by BR. Assessed resources have the following characteristics, as examples:
Similarly, there are likely scenarios where a resource exists in a customer environment that already has an alternative availability management solution, and does not require BR for its availability. However, since other resources that are managed by BR may be dependent on them, they are observed and assessed in order to collect observation data and understand their impacts on managed resources. Additionally, there may be resources that do not have alternative management solutions, but the customer simply does not want them managed by BR, but other managed resources are dependent upon them. They too are classified as assessed resources.
These assessed resources share many of the same characteristics of managed resources, such as, for example:
Finally, there are a few restrictions that BR imposes upon assessed resources, in this embodiment:
To facilitate the building of the customer's IT configuration, observations regarding the customer's environment are gathered and stored in an observation log. In particular, the observation log is used to store observations gathered during runtime in customer environments, where each observation is a collection of various data points. They are created for each of the Recovery Segments that are in “observation” mode. These observations are used for numerous runtime and administrative purposes in the BR environment. As examples the observations are used:
BR gathers observations during runtime when “observation mode” is enabled at the Recovery Segment level. There are two means for enabling observation mode, as examples:
The administrator may also disable observation mode for a Recovery Segment, which stops it from polling for data and creating subsequent observation records for insertion in the log. However, the accumulated observation log is not deleted. In one example, an RS remains in observation mode throughout its lifecycle. The UI displays the implications of disabling observation mode.
In BR, the observations that are collected by BR during runtime can be grouped into two categories, as examples:
A periodic poll observation is a point-in-time snapshot of the constituent resources in a Recovery Segment. Observation data points are collected for those resources in the Recovery Segment(s) which have associated BR management data for any of the following reasons, as examples:
The full value of these observations is derived for an RS when they include data that has been gathered for its constituent resources, plus the resources that those are dependent upon. In one embodiment, the administrator is not forced to include all dependent resources when defining a Recovery Segment, and even if that were the case, there is nothing that prevents them from deleting various dependent resources. When defining a Recovery Segment, the BR UI provides an option that allows the customer to display the dependency graph for those resources already in the Recovery Segment. This displays the topology from the seed node(s) in the Recovery Segment down to and including the dependent leaf nodes. The purpose of this capability is to give the customer the opportunity to display the dependent nodes and recommend that they be included in the Recovery Segment.
Preparatory and recovery workflows are built by the BR manager to achieve the customer requested RTO policy based on resource operations timings. During active policy monitoring by the BR manager, measurements of achieved time for operations are recorded in observations to the log and used to maintain the running statistical data on operation execution times. Observations written to the log may vary in the contained resource RTO metrics and operation execution timings.
Observations are also collected from any of the BPEL workflows created by BR in the customer's environment. There is a standard template that each BR BPEL workflow uses. As part of that template, observation data is captured at the start of, during, and at the completion of each workflow. Specifically, in one example, one observation is created at the end of the workflow with data accumulated from completion of each activity. This information is used to gather timings for workflow execution for use in creating subsequent workflows at time of failure.
In accordance with an aspect of the present invention, programmatic enforcement of whether proposed actions are allowed or not allowed to execute is provided. The enforcement for a particular action is based on the projected effect on the environment (e.g., on another action, on a resource, on a business application, etc.) of executing that action. The actions proposed are selected based on the current real-time state of the environment.
Large enterprise customers have traditionally configured IT resources in support of multiple business applications and with high levels of utilization. Increasingly, with growing labor costs and shortage of skills, distributed computing customers are also looking to increase utilization levels and share IT resources. Difficulties arise when multiple business applications are deployed on a set of shared resources as conflicts may arise if insufficient capacity exists to meet the concurrent needs of all applications. Criticality of applications vary depending on customer and within customer depending on business cycles. Traditional approaches have utilized:
In accordance with one or more aspects of the present invention, BR provides a capability to utilize resource and resource relationships in conjunction with expressions of constraints and processing logic to enable sharing of IT resources among multiple business applications with explicit customer controls on the allowable impact to business application relationships from operations performed. This capability enables, for instance:
Support for expressing constraints one business application can have on another business application is built on, for instance, representations of resources, the programmatic representation of a business application, (e.g., RS), and information about operations, such as that defined in pairings. Constraints a customer wishes to have enforced for the impact one business application can have on another business application may be expressed as constraint pairings, in one implementation. Alternately, they may be expressed in a table that describes the business application to business application relationship. In one implementation, a business application is represented by a RS. When a RS is defined, resources are associated with the RS. If a resource is shared among two or more RSs, there exists the possibility for conflicts in recovery decisions as the resource is associated with two or more business applications which may have different Recovery Time Objective (RTO) goals. Determination of recovery actions are performed by BR for shared resources utilizing the context of the business applications which are utilizing the shared resource.
Initial specification of constraint pairings is achieved, in one example, through use of the BR admin UI. Templates representing best practices are provided by BR, in one implementation, to assist customers in establishing constraint pairings. Customer or vendor provided templates may also be utilized to establish pairings. During RS definition, templates can be selected for constraint pairings and customization of the pairings created and approved by the BR administrator.
Modification to constraint pairings can be performed during ongoing runtime operation of BR. Using the BR administrator's UI, existing constraint pairings can be modified or new constraint pairings can be created. Constraint pairings are utilized by BR after an error has been analyzed and operations to perform recovery for the error have been selected, as an example. Alterations to constraint pairings that are made active by the BR administrator take effect on the next error processed.
Where additional service level managers are deployed and manager to manager coordination functionality is desired, the BR constraint pairings may be extended. Where the system supports interactions of multiple management disciplines acting on the same resource, constraint pairings can be defined between business applications at a discipline level, then reconciled at the cross discipline level. The constraint ordering pairings become a direct derivative of the constraints reflecting the impact one business application can have on another business application in the manager to manager coordination.
Information on pairings is used to specify the effect executing an operation on a resource can have to the state of the same or another resource. Specifically, operation effect pairings enable vendors (e.g., IBM® and/or others) and customers to reflect a future state of a resource, as a result of potential execution of a resource operation. Operation effect pairings are used for support of constraint pairings as the future state of one RS, which is the result of execution of a process (e.g., a recovery process) realized by BR through operation effect pairings.
Operation Effect Pairings
In one example, once the scope of an error has been evaluated and recovery operations have been selected, an analysis of operation effect pairings may be performed. Operation effect pairing analysis precedes evaluation of constraint pairings. The process described below generates a list that includes, for instance, a list of doublets, where each doublet includes RS,RS_state resulting from execution of operations in the recovery process.
Although operation effect pairings are described herein with reference to recovery, they are not limited to recovery, but may also be used with other management functions.
Changes resulting from projected execution of resource operations on the state of a resource are indicated in operation effect pairings. Examples are:
In one example, operations to be performed in the recovery process alter the state of resources. Projecting the state change to the resource(s) resulting from recovery operation execution is performed in support of constraint analysis to understand if recovery of one RS should be allowed to impact another RS. The determination of effect can also be driven by the current environment characteristics by comparing, for example, property, value information cached for any resource with the trigger specified for the operation effect rule.
Syntax of Operation Effect Rules
BR utilizes constraint pairings of (RS, RS_state) effect (RS, RS_state) set-of-conditions to determine what action to take when a resource is shared by two or more RSs or in other situations. The effect conditions supported are can and cannot, as examples.
Syntax of Constraint Rules
A recovery operation for RS1 specifies “start cicsa on osi3”.
Customer has indicated that start cicsa on osi3 is to occur after shutdown testdb2 on osi3 if osi3 cpubusy >30%. In one implementation, the customer can use operation ordering pairings to specify this requirement; alternately, a flat file that includes ordering requirements can be used.
On “start cicsa on osi3” indicates (“start cicsa on osi3” after “shutdown testdb2 on osi3” if “osi3 cpubusy >30%”)
BR metadata on operation “shutdown” on resource testdb2 indicates resource state becomes unavailable “(Res_testdb2, shutdown) sets (Res_testdb2,state=unavailable)”.
In one implementation, the customer can use operation effect pairings to specify this requirement; alternately, a flat file that includes ordering requirements can be used.
BR impact pairing indicates “RES testdb2(state,unavailable) makes_unavailable RS2.
Nothing has indicated if RS1 should cause RS2 to be impacted. Constraint pairing could say:
Have an op in recovery for RS1 that says for recovery of RS1, LRG1 is to be recovered and operation on LRG1 is “hyperswap_pprc_session”.
Nothing has indicated if RS1 should cause RS2 to be impacted. Constraint pairing could say:
Constraint pairing analysis is undertaken by the BRM after, for instance, the Containment Region (CR) has been built and recovery operations selected. For each constraint pairing where a RS associated with the CR is referenced, BR assesses the impact to RS state. Assessment of constraint pairings follows assessment of operation effect assessment. Operation effect assessment determines states of RS(s) which would occur as the result of execution of operations in the recovery process (or other process). For each constraint pairing which references a RS impacted by the recovery indicated in the CR, BR assesses the constraint pairing. If recovery is not allowed based on the constraint pairings, BR logs the CR and associated error and recovery information, notifies the BR administrator through the mailbox, and leaves impacted resource(s) in state(s) resulting from the error.
Operation Effect
One embodiment of the logic to assess operation effect is described with reference to
Referring to
For each pairing returned, STEP 908, conditions indicating current applicability of the pairing information is evaluated, STEP 910. In one implementation, this could always indicate the pairing data is to be used. In another implementation, this evaluation is dependent on the conditions and triggers. If the pairing is currently applicable, INQUIRY 912, the resource/resource state associated with the pairing is unioned with the list of resources/resource states for further analysis, analyze_impact, and processing continues at STEP 914. Thereafter, or if the pairing is not currently applicable, processing continues at STEP 908, until the pairings are processed. At that time, the logic returns to STEP 904.
When the operations in the input recovery process list have been processed, STEP 904, the first entry in the list of resource/resource state to be analyzed, analyze_impact list, is selected, STEP 916 (
If the resource from the list of resource/resource state to be analyzed is a Recovery Segment (RS), INQUIRY 920, that RS and RS_state are unioned with the output list, CR.RS_opeffect list, STEP 922.
Thereafter, or if the entry is not a RS, pairings reflecting the impact a change in one resource state can have on other resources are selected, STEP 924. In one implementation, this may be a file that includes records listing a first resource and resource state followed by a second resource and associated resource state. In another implementation, impact pairings may be utilized, as described herein. Pairings are selected such that resource1 from the pairing matches the resource/resource state from the list entry under analysis.
When all returned pairings have been processed, STEP 926 (
If the current resource state is not the same as indicated in the pairing, INQUIRY 934, resource2 and resource2 state from the pairing is added to the list of resource/resource state(s) to be analyzed, STEP 936, by this routine. If resource2 from the pairing is a RS, INQUIRY 938, it is unioned with the set of RS/RS state entries to be returned from this routine, CR.RS_opeffect list, STEP 940, and processing continues with STEP 926. Similarly, a false evaluation from INQUIRIES 932, 934 or 938, return processing to STEP 926.
Constraint Analysis
One embodiment of the logic to perform constraint analysis is described with reference to
Referring to
Pairings are selected by matching the RS/RS state to the first resource in the pairing, STEP 1004. Constraint pairing information may be included in a file, where each record includes a RS/RS state and a second RS/RS state with indication of the impact being allowed or disallowed. In another implementation, constraint information may be contained in pairings, as used in this flow.
For each pairing returned, STEP 1006, each entry in the input RS/RS state list of results of recovery process execution is evaluated, STEP 1008. The RS from the resource2 pairing under evaluation is compared to the RS in the RS/RS state entry under evaluation, INQUIRY 1010. If these are equal, the pairing is analyzed to determine if the state from the pairing matches the state from execution of the recovery process, INQUIRY 1012.
If the pairing matches the RS state, processing continues to determine if the constraint allows, “can”, or disallows, “cannot”, the change resulting from execution of the recovery process. If the effect is allowed, INQUIRY 1014 (
In a further example, where pairings have triggers, those triggers are evaluated to determining whether the pairings are currently applicable.
Returning to INQUIRIES 1010 and 1012, if evaluated false, processing continues at STEP 1008 until the entries have been processed. At that time, processing returns to STEP 1006 until all the pairings have been processed. Then, processing returns to STEP 1002.
In response to completion of the constraint analysis, an indication is provided as to whether a recovery process is allowed or disallowed. If allowed, for instance, a recovery process is prepared (e.g., take operations and place in form to be executed—e.g., invoke a workflow build routine; create a script; provide a command file, etc.), and optionally, invoke the recovery process.
Described in detail herein is a capability for programmatically (i.e., not manually) enforcing whether proposed actions are allowed or disallowed to execute. While the above example is described in the context of recovery operations, one or more aspects of the present invention are equally applicable to other management functions.
One or more aspects of the present invention can be included in an article of manufacture (e.g., one or more computer program products) having, for instance, computer usable media. The media has therein, for instance, computer readable program code means or logic (e.g., instructions, code, commands, etc.) to provide and facilitate the capabilities of the present invention. The article of manufacture can be included as a part of a computer system or sold separately.
One example of an article of manufacture or a computer program product incorporating one or more aspects of the present invention is described with reference to
A sequence of program instructions or a logical assembly of one or more interrelated modules defined by one or more computer readable program code means or logic direct the performance of one or more aspects of the present invention.
Advantageously, a capability is provided for programmatically determining whether a proposed action can be executed or whether it is to be prevented from execution. This determination is made based on the projected effect on the environment of executing the action. Advantageously, the actions that are proposed are selected based on the current real-time state of the environment (e.g., based on current resource state of resources of the environment and/or current relationships between the resources). In one example, the proposed actions are operations on resources to achieve recovery.
Although various embodiments are described above, these are only examples. For example, the processing environments described herein are only examples of environments that may incorporate and use one or more aspects of the present invention. Environments may include other types of processing units or servers or the components in each processing environment may be different than described herein. Each processing environment may include additional, less and/or different components than described herein. Further, the types of central processing units and/or operating systems or other types of components may be different than described herein. Again, these are only provided as examples.
Moreover, an environment may include an emulator (e.g., software or other emulation mechanisms), in which a particular architecture or subset thereof is emulated. In such an environment, one or more emulation functions of the emulator can implement one or more aspects of the present invention, even though a computer executing the emulator may have a different architecture than the capabilities being emulated. As one example, in emulation mode, the specific instruction or operation being emulated is decoded, and an appropriate emulation function is built to implement the individual instruction or operation.
In an emulation environment, a host computer includes, for instance, a memory to store instructions and data; an instruction fetch unit to obtain instructions from memory and to optionally, provide local buffering for the obtained instruction; an instruction decode unit to receive the instruction fetched and to determine the type of instructions that have been fetched; and an instruction execution unit to execute the instructions. Execution may include loading data into a register for memory; storing data back to memory from a register; or performing some type of arithmetic or logical operation, as determined by the decode unit. In one example, each unit is implemented in software. For instance, the operations being performed by the units are implemented as one or more subroutines within emulator software.
Further, a data processing system suitable for storing and/or executing program code is usable that includes at least one processor coupled directly or indirectly to memory elements through a system bus. The memory elements include, for instance, local memory employed during actual execution of the program code, bulk storage, and cache memory which provide temporary storage of at least some program code in order to reduce the number of times code must be retrieved from bulk storage during execution.
Input/Output or I/O devices (including, but not limited to, keyboards, displays, pointing devices, DASD, tape, CDs, DVDs, thumb drives and other memory media, etc.) can be coupled to the system either directly or through intervening I/O controllers. Network adapters may also be coupled to the system to enable the data processing system to become coupled to other data processing systems or remote printers or storage devices through intervening private or public networks. Modems, cable modems, and Ethernet cards are just a few of the available types of network adapters.
Further, although the environments described herein are related to the management of availability of a customer's environment, one or more aspects of the present invention may be used to manage aspects other than or in addition to availability. Further, one or more aspects of the present invention can be used in environments other than a business resiliency environment.
Yet further, many examples are provided herein, and these examples may be revised without departing from the spirit of the present invention. For example, in one embodiment, the description is described in terms of availability and recovery; however, other goals and/or objectives may be specified in lieu of or in addition thereto. Additionally, the resources may be other than IT resources. Further, there may be references to particular products offered by International Business Machines Corporation or other companies. These again are only offered as examples, and other products may also be used. Additionally, although tables and databases are described herein, any suitable data structure may be used. There are many other variations that can be included in the description described herein and all of these variations are considered a part of the claimed invention.
Further, for completeness in describing one example of an environment in which one or more aspects of the present invention may be utilized, certain components and/or information is described that is not needed for one or more aspects of the present invention. These are not meant to limit the aspects of the present invention in any way.
One or more aspects of the present invention can be provided, offered, deployed, managed, serviced, etc. by a service provider who offers management of customer environments. For instance, the service provider can create, maintain, support, etc. computer code and/or a computer infrastructure that performs one or more aspects of the present invention for one or more customers. In return, the service provider can receive payment from the customer under a subscription and/or fee agreement, as examples. Additionally or alternatively, the service provider can receive payment from the sale of advertising content to one or more third parties.
In one aspect of the present invention, an application can be deployed for performing one or more aspects of the present invention. As one example, the deploying of an application comprises providing computer infrastructure operable to perform one or more aspects of the present invention.
As a further aspect of the present invention, a computing infrastructure can be deployed comprising integrating computer readable code into a computing system, in which the code in combination with the computing system is capable of performing one or more aspects of the present invention.
As yet a further aspect of the present invention, a process for integrating computing infrastructure, comprising integrating computer readable code into a computer system may be provided. The computer system comprises a computer usable medium, in which the computer usable medium comprises one or more aspects of the present invention. The code in combination with the computer system is capable of performing one or more aspects of the present invention.
The capabilities of one or more aspects of the present invention can be implemented in software, firmware, hardware, or some combination thereof. At least one program storage device readable by a machine embodying at least one program of instructions executable by the machine to perform the capabilities of the present invention can be provided.
The flow diagrams depicted herein are just examples. There may be many variations to these diagrams or the steps (or operations) described therein without departing from the spirit of the invention. For instance, the steps may be performed in a differing order, or steps may be added, deleted, or modified. All of these variations are considered a part of the claimed invention.
Although embodiments have been depicted and described in detail herein, it will be apparent to those skilled in the relevant art that various modifications, additions, substitutions and the like can be made without departing from the spirit of the invention and these are therefore considered to be within the scope of the invention as defined in the following claims.
Number | Name | Date | Kind |
---|---|---|---|
4979105 | Daly et al. | Dec 1990 | A |
5023873 | Stevenson et al. | Jun 1991 | A |
5386561 | Huynh et al. | Jan 1995 | A |
5452452 | Gaetner et al. | Sep 1995 | A |
5481694 | Chao et al. | Jan 1996 | A |
5530802 | Fuchs et al. | Jun 1996 | A |
5537542 | Eilert et al. | Jul 1996 | A |
5604863 | Allen et al. | Feb 1997 | A |
5631831 | Bird et al. | May 1997 | A |
5652908 | Douglas et al. | Jul 1997 | A |
5734837 | Flores et al. | Mar 1998 | A |
5790780 | Brichta et al. | Aug 1998 | A |
5797005 | Bahls et al. | Aug 1998 | A |
5797129 | Rohan | Aug 1998 | A |
5826080 | Dworzecki | Oct 1998 | A |
5887168 | Bahls et al. | Mar 1999 | A |
6012044 | Maggioncalda et al. | Jan 2000 | A |
6012152 | Douik et al. | Jan 2000 | A |
6041306 | Du et al. | Mar 2000 | A |
6081826 | Masuoka et al. | Jun 2000 | A |
6125442 | Maves et al. | Sep 2000 | A |
6336138 | Caswell et al. | Jan 2002 | B1 |
6385613 | Grewell et al. | May 2002 | B1 |
6393386 | Zager et al. | May 2002 | B1 |
6393485 | Chao et al. | May 2002 | B1 |
6408277 | Nelken | Jun 2002 | B1 |
6449688 | Peters et al. | Sep 2002 | B1 |
6480944 | Bradshaw et al. | Nov 2002 | B2 |
6625751 | Starovic et al. | Sep 2003 | B1 |
6732118 | Hermann et al. | May 2004 | B2 |
6785768 | Peters et al. | Aug 2004 | B2 |
6862696 | Voas et al. | Mar 2005 | B1 |
6874010 | Sargent | Mar 2005 | B1 |
6934247 | Bhattal et al. | Aug 2005 | B2 |
6954786 | Vered et al. | Oct 2005 | B1 |
6983321 | Trinon et al. | Jan 2006 | B2 |
6983362 | Kidder et al. | Jan 2006 | B1 |
7032186 | Gasser et al. | Apr 2006 | B1 |
7039827 | Meyer et al. | May 2006 | B2 |
7047337 | Armstrong et al. | May 2006 | B2 |
7058947 | Raja et al. | Jun 2006 | B1 |
7111297 | Sankaranarayan et al. | Sep 2006 | B1 |
7197749 | Thornton et al. | Mar 2007 | B2 |
7243267 | Klemm et al. | Jul 2007 | B2 |
7281018 | Begun et al. | Oct 2007 | B1 |
7313573 | Leung et al. | Dec 2007 | B2 |
7325161 | Rakic et al. | Jan 2008 | B1 |
7389335 | MacLeod et al. | Jun 2008 | B2 |
7395537 | Brown et al. | Jul 2008 | B1 |
7409356 | Geddes et al. | Aug 2008 | B1 |
7437611 | Agarwal et al. | Oct 2008 | B2 |
7463648 | Eppstein et al. | Dec 2008 | B1 |
7490265 | Baskey et al. | Feb 2009 | B2 |
7499954 | Cherkauer et al. | Mar 2009 | B2 |
7509529 | Colucci et al. | Mar 2009 | B2 |
7523359 | Richards et al. | Apr 2009 | B2 |
7529981 | Childress et al. | May 2009 | B2 |
7536585 | Keeton et al. | May 2009 | B1 |
7568019 | Bhargava et al. | Jul 2009 | B1 |
7587483 | Florissi et al. | Sep 2009 | B1 |
7610512 | Gerber | Oct 2009 | B2 |
7620953 | Tene et al. | Nov 2009 | B1 |
7627728 | Roeck et al. | Dec 2009 | B1 |
7650341 | Oratovsky et al. | Jan 2010 | B1 |
7661033 | Challener et al. | Feb 2010 | B2 |
7707173 | Nanavati et al. | Apr 2010 | B2 |
7707451 | Buskens et al. | Apr 2010 | B2 |
7730363 | Takezawa et al. | Jun 2010 | B2 |
7743001 | Vermeulen et al. | Jun 2010 | B1 |
7747730 | Harlow | Jun 2010 | B1 |
7752310 | Kageyama | Jul 2010 | B2 |
7774457 | Talwar et al. | Aug 2010 | B1 |
7774458 | Trinon et al. | Aug 2010 | B2 |
7818421 | Machida | Oct 2010 | B2 |
7865582 | Santos et al. | Jan 2011 | B2 |
7917814 | Hu et al. | Mar 2011 | B2 |
7933872 | Kulkarni et al. | Apr 2011 | B2 |
7934119 | Takamoto et al. | Apr 2011 | B2 |
7937706 | Casotto | May 2011 | B2 |
7958393 | Bobak et al. | Jun 2011 | B2 |
7962590 | Or et al. | Jun 2011 | B1 |
8051106 | Bird | Nov 2011 | B2 |
8065554 | Herscovitz et al. | Nov 2011 | B2 |
8086758 | Allan et al. | Dec 2011 | B1 |
8260893 | Bandhole et al. | Sep 2012 | B1 |
20010056398 | Scheirer | Dec 2001 | A1 |
20010056554 | Chrabaszcz | Dec 2001 | A1 |
20020022952 | Zager et al. | Feb 2002 | A1 |
20020049749 | Helgeson et al. | Apr 2002 | A1 |
20020059512 | Desjardins | May 2002 | A1 |
20020069102 | Vellante et al. | Jun 2002 | A1 |
20020078130 | Thornton et al. | Jun 2002 | A1 |
20020078381 | Farley et al. | Jun 2002 | A1 |
20020091991 | Castro | Jul 2002 | A1 |
20020194045 | Shay et al. | Dec 2002 | A1 |
20020198727 | Ann et al. | Dec 2002 | A1 |
20030011331 | Minagawa et al. | Jan 2003 | A1 |
20030051186 | Boudnik et al. | Mar 2003 | A1 |
20030056013 | Laschkewitsch et al. | Mar 2003 | A1 |
20030078823 | Yoshioka et al. | Apr 2003 | A1 |
20030084100 | Gahan et al. | May 2003 | A1 |
20030093672 | Cichowlas | May 2003 | A1 |
20030135384 | Nguyen | Jul 2003 | A1 |
20030135609 | Carlson et al. | Jul 2003 | A1 |
20030139956 | Guenther et al. | Jul 2003 | A1 |
20030200482 | Sullivan | Oct 2003 | A1 |
20030212580 | Shen | Nov 2003 | A1 |
20030212685 | Rakotoarivelo et al. | Nov 2003 | A1 |
20030225602 | Hagmann et al. | Dec 2003 | A1 |
20030236677 | Casati et al. | Dec 2003 | A1 |
20040034553 | Cole et al. | Feb 2004 | A1 |
20040054690 | Hillerbrand et al. | Mar 2004 | A1 |
20040078373 | Ghoneimy et al. | Apr 2004 | A1 |
20040111702 | Chan | Jun 2004 | A1 |
20040119752 | Beringer et al. | Jun 2004 | A1 |
20040143470 | Myrick et al. | Jul 2004 | A1 |
20040158777 | Bae et al. | Aug 2004 | A1 |
20040162741 | Flaxer et al. | Aug 2004 | A1 |
20040181476 | Smith et al. | Sep 2004 | A1 |
20040186905 | Young et al. | Sep 2004 | A1 |
20040193476 | Aerdts | Sep 2004 | A1 |
20040199768 | Nail | Oct 2004 | A1 |
20040205101 | Radhakrishnan | Oct 2004 | A1 |
20040210452 | Aboujaoude et al. | Oct 2004 | A1 |
20040243699 | Koclanes et al. | Dec 2004 | A1 |
20050015641 | Alur et al. | Jan 2005 | A1 |
20050027835 | Raikar et al. | Feb 2005 | A1 |
20050033600 | Geddes et al. | Feb 2005 | A1 |
20050043977 | Ahern et al. | Feb 2005 | A1 |
20050049906 | Leymann et al. | Mar 2005 | A1 |
20050060662 | Soares et al. | Mar 2005 | A1 |
20050071470 | O'Brien et al. | Mar 2005 | A1 |
20050086091 | Trumbly et al. | Apr 2005 | A1 |
20050091351 | Badovinatz et al. | Apr 2005 | A1 |
20050096949 | Aiber et al. | May 2005 | A1 |
20050119905 | Wong et al. | Jun 2005 | A1 |
20050125768 | Wong et al. | Jun 2005 | A1 |
20050172306 | Agarwal et al. | Aug 2005 | A1 |
20050177406 | Facciorusso et al. | Aug 2005 | A1 |
20050198244 | Eilam et al. | Sep 2005 | A1 |
20050228707 | Hendrickson | Oct 2005 | A1 |
20050228852 | Santos et al. | Oct 2005 | A1 |
20050235248 | Victoria et al. | Oct 2005 | A1 |
20050262242 | Byers et al. | Nov 2005 | A1 |
20060004265 | Pulkkinen et al. | Jan 2006 | A1 |
20060010234 | Reedy et al. | Jan 2006 | A1 |
20060020866 | Lo et al. | Jan 2006 | A1 |
20060037022 | Byrd et al. | Feb 2006 | A1 |
20060041505 | Enyart | Feb 2006 | A1 |
20060064335 | Goldszmidt et al. | Mar 2006 | A1 |
20060074731 | Green et al. | Apr 2006 | A1 |
20060074736 | Shukla et al. | Apr 2006 | A1 |
20060074993 | Pulamarasetti et al. | Apr 2006 | A1 |
20060106626 | Jeng et al. | May 2006 | A1 |
20060111921 | Chang et al. | May 2006 | A1 |
20060112383 | Chang et al. | May 2006 | A1 |
20060117221 | Fisher et al. | Jun 2006 | A1 |
20060123022 | Bird | Jun 2006 | A1 |
20060129562 | Pulamarasetti et al. | Jun 2006 | A1 |
20060149842 | Dawson et al. | Jul 2006 | A1 |
20060161444 | Lubrecht et al. | Jul 2006 | A1 |
20060161466 | Trinon et al. | Jul 2006 | A1 |
20060161883 | Lubrecht et al. | Jul 2006 | A1 |
20060179136 | Loboz et al. | Aug 2006 | A1 |
20060190368 | Kesterman | Aug 2006 | A1 |
20060190583 | Whalen | Aug 2006 | A1 |
20060190775 | Aggarwal et al. | Aug 2006 | A1 |
20060218558 | Torii et al. | Sep 2006 | A1 |
20060224702 | Schmidt et al. | Oct 2006 | A1 |
20060236061 | Koclanes | Oct 2006 | A1 |
20060245354 | Gao et al. | Nov 2006 | A1 |
20060245369 | Schimmelpfeng et al. | Nov 2006 | A1 |
20060248546 | Andreev et al. | Nov 2006 | A1 |
20060259526 | Booz et al. | Nov 2006 | A1 |
20060287875 | Reddy et al. | Dec 2006 | A1 |
20060293942 | Chaddha et al. | Dec 2006 | A1 |
20070011331 | Morimoto et al. | Jan 2007 | A1 |
20070027734 | Hughes | Feb 2007 | A1 |
20070038490 | Joodi | Feb 2007 | A1 |
20070038492 | Ryan et al. | Feb 2007 | A1 |
20070061385 | Clark et al. | Mar 2007 | A1 |
20070067296 | Malloy et al. | Mar 2007 | A1 |
20070079097 | Karnowski et al. | Apr 2007 | A1 |
20070100712 | Kilpatrick et al. | May 2007 | A1 |
20070112847 | Dublish et al. | May 2007 | A1 |
20070143166 | Leymann et al. | Jun 2007 | A1 |
20070150571 | Haga et al. | Jun 2007 | A1 |
20070165525 | Kageyama | Jul 2007 | A1 |
20070179826 | Cutlip et al. | Aug 2007 | A1 |
20070198678 | Dieberger et al. | Aug 2007 | A1 |
20070198789 | Clark et al. | Aug 2007 | A1 |
20070234408 | Burch et al. | Oct 2007 | A1 |
20070266029 | Baskey et al. | Nov 2007 | A1 |
20070271219 | Agarwal et al. | Nov 2007 | A1 |
20070276885 | Valiyaparambil et al. | Nov 2007 | A1 |
20070286219 | Knop et al. | Dec 2007 | A1 |
20070294406 | Suer et al. | Dec 2007 | A1 |
20070300204 | Andreev et al. | Dec 2007 | A1 |
20080005739 | Sadiq et al. | Jan 2008 | A1 |
20080016335 | Takahashi et al. | Jan 2008 | A1 |
20080052719 | Briscoe et al. | Feb 2008 | A1 |
20080063423 | Matoba | Mar 2008 | A1 |
20080140495 | Bhamidipaty et al. | Jun 2008 | A1 |
20080147452 | Renz et al. | Jun 2008 | A1 |
20080215909 | Bretschneider et al. | Sep 2008 | A1 |
20080294777 | Karve et al. | Nov 2008 | A1 |
20080295100 | Ainsworth | Nov 2008 | A1 |
20080317217 | Bernardini et al. | Dec 2008 | A1 |
20090037363 | Kozlov et al. | Feb 2009 | A1 |
20090077210 | Musman et al. | Mar 2009 | A1 |
20090113383 | Delima et al. | Apr 2009 | A1 |
20090125751 | Dawson et al. | May 2009 | A1 |
20090150456 | Balasubramanian et al. | Jun 2009 | A1 |
20090150887 | Sanghvi et al. | Jun 2009 | A1 |
20090171703 | Bobak et al. | Jul 2009 | A1 |
20090171704 | Bobak et al. | Jul 2009 | A1 |
20090171705 | Bobak et al. | Jul 2009 | A1 |
20090171706 | Bobak et al. | Jul 2009 | A1 |
20090171707 | Bobak et al. | Jul 2009 | A1 |
20090171708 | Bobak et al. | Jul 2009 | A1 |
20090171730 | Bobak et al. | Jul 2009 | A1 |
20090171731 | Bobak et al. | Jul 2009 | A1 |
20090171732 | Bobak et al. | Jul 2009 | A1 |
20090171733 | Bobak et al. | Jul 2009 | A1 |
20090172149 | Bobak et al. | Jul 2009 | A1 |
20090172460 | Bobak et al. | Jul 2009 | A1 |
20090172461 | Bobak et al. | Jul 2009 | A1 |
20090172470 | Bobak et al. | Jul 2009 | A1 |
20090172668 | Bobak et al. | Jul 2009 | A1 |
20090172669 | Bobak et al. | Jul 2009 | A1 |
20090172670 | Bobak et al. | Jul 2009 | A1 |
20090172671 | Bobak et al. | Jul 2009 | A1 |
20090172674 | Bobak et al. | Jul 2009 | A1 |
20090172682 | Bobak et al. | Jul 2009 | A1 |
20090172687 | Bobak et al. | Jul 2009 | A1 |
20090172689 | Bobak et al. | Jul 2009 | A1 |
20090172769 | Bobak et al. | Jul 2009 | A1 |
20090249337 | Vasilevsky et al. | Oct 2009 | A1 |
20100280863 | Wilcock et al. | Nov 2010 | A1 |
20110004564 | Rolia et al. | Jan 2011 | A1 |
Number | Date | Country |
---|---|---|
WO 9910814 | Mar 1999 | WO |
Entry |
---|
Final Office Action for U.S. Appl. No. 11/965,897 dated Sep. 17, 2010. |
Final Office Action for U.S. Appl. No. 11/965,930 dated Sep. 29, 2010. |
Final Office Action for U.S. Appl. No. 11/965,874 dated Oct. 14, 2010. |
Office Action for U.S. Appl. No. 11/965,862 dated Dec. 7, 2010. |
Final Office Action for U.S. Appl. No. 11/965,855 dated Dec. 22, 2010. |
Office Action for U.S. Appl. No. 11/965,832 dated Dec. 22, 2010. |
Final Office Action for U.S. Appl. No. 11/965,872 dated Dec. 22, 2010. |
U.S. Appl. No. 12/975,520, filed Dec. 22, 2010 entitled “Real-Time Information Technology Environments”. |
“BPEL Project”, http://www.eclipse.org/bpel/. |
“Factor Analysis Using SAS Proc Factor”, http://www.utexas.edu/cc/docs/stat53.html. |
“Principal Components and Factor Analysis”, http://statsoft.com/textbook/stfacan.html. |
“WebSphere Intergration Developer”, http://www-306.ibm.com/software/integration/wid/about/?S—CMP=rnav. |
Evans, James, “Optimization Algorithms for Networks and Graphs, Second Edition”, 1992, CCR, ISBN 0824786025, Chapters 1-3 (pp. 1-76) and Chapter 11 (pp. 390-413). |
Jolliffe, Ian T., “Principal Component Analysis”, 2002, Pringer, ISBN 0387954422, Chapters 1-4 (pp. 1-77), Chapters 6-7 (pp. 111-166) and Chapters 12-14 (pp. 299-405). |
Lau, Hang T., “A Java Library of Graph Algorithms and Optimization Discrete Mathematics and Its Applications,” 2006, Chapman & Hall, ISBN 1584887184, Chapter 2.2 (pp. 39-43). |
Horstmann, Cay S. et al., Core Java 2—vol. II—Advanced Features (7th Edition), Sun Microsystems Press, 2005, ISBN 0131118269, Chapter 1 (pp. 1-22). |
“Parasoft BPEL Maestro,” http://www.parasoft.com/jsp/products/home.jsp?product=BPEL. |
Bolie et al., “BPEL Cookbook: Best Practices for SOA-based Integration and Composite Applications Development”, 2006, Packt Publishing, ISBN 1904811337; Chapter 1; 12 pages. |
Juric, et al., Business Process Execution Language for Web Services—An Architect and Developer's Guide to Orchestrating Web Services Using BPEL4WS, Second Edition; 2006; Packt Publishing; ISBN 1904811817; Chapter 5; 28 pages. |
Horstman et al., Core Java 2: vol. I—Fundamentals (7th Edition); Core Series; 2003; Sun Microsystems, Inc., ISBN 0131472025; pp. 324-327. |
Perry, J. Steven, “Java Management Extension: 1st Edition,” Jun. 15, 2002; O'Reilly & Associates, Inc.; ISBN 0596002459; Chapter 1 (pp. 1-32) and Chapter 7 (pp. 207-222). |
Weerawarana et al., “Web Services Platform Architecture: SOAP, WSDL, WS-Policy, WS-Addressing, WS-BPEL, WS-Reliable Messaging, and More,” 2005; Pearson Education, Inc.; ISBN 0131488740; Chapter 14 (pp. 313-340). |
Van Bon, Jan, “Foundations of IT Service Management Based on ITIL,” Sep. 2005; Van Haren Publishing; ISBN 9077212582; Chapter 6 (pp. 69-85). |
Kreger et al., “JAVA and JMX—Building Manageable Systems,” Jan. 2003; ISBN 0672324083; pp. 54-64. |
Office Action for U.S. Appl. No. 11/965,862 dated Jun. 23, 2010. |
Final Office Action for U.S. Appl. No. 11/966,495 dated Jun. 14, 2010. |
Office Action for U.S. Appl. No. 11/965,872 dated Jul. 6, 2010. |
Office Action for U.S. Appl. No. 11/966,495 dated Oct. 29, 2009. |
Office Action for U.S. Appl. No. 11/965,874 dated Mar. 18, 2010. |
Office Action for U.S. Appl. No. 11/965,897 dated Mar. 31, 2010. |
Office Action for U.S. Appl. No. 11/965,930 dated Apr. 1, 2010. |
Office Action for U.S. Appl. No. 11/965,855 dated Apr. 30, 2010. |
Final Office Action for U.S. Appl. No. 11/966,495 dated May 14, 2010. |
Office Action for U.S. Appl. No. 11/966,619 dated Feb. 2, 2011. |
Office Action for U.S. Appl. No. 11/965,926 dated Feb. 3, 2011. |
Rood, Melody A., “Enterprise Architecture: Definition, Content & Utility,” IEEE, Jul. 1994, pp. 106-111. |
Buchanan, Richard D., et al., “Aligning Enterprise and IT Investments with Corporate Goals,” OMG White Paper, 2002, p. 1-13. |
Restriction Requirement for U.S. Appl. No. 11/965,889 dated Feb. 16, 2011. |
Office Action for U.S. Appl. No. 11/965,845 dated Mar. 11, 2011. |
Liu, Rong et al., “Modeling Business Contexture and Behavior Using Business Artifacts,” Lecture Notes in Computer Science, 2007, vol. 4495/2007, pp. 324-339. |
Office Action for U.S. Appl. No. 11/965,922 dated Mar. 16, 2011. |
Office Action for U.S. Appl. No. 11/965,832 dated May 12, 2011. |
Office Action for U.S. Appl. No. 11/965,851 dated May 20, 2011. |
Office Action for U.S. Appl. No. 11/965,978 dated Jun. 22, 2011. |
Office Action for U.S. Appl. No. 11/965,889 dated May 25, 2011. |
Final Office Action for U.S. Appl. No. 11/966,619 dated Jun. 15, 2011. |
Office Action for U.S. Appl. No. 11/965,899 dated Jun. 20, 2011. |
Office Action for U.S. Appl. No. 11/965,877 dated Jun. 20, 2011. |
Office Action for U.S. Appl. No. 11/965,862 dated Jul. 8, 2011. |
Office Action for U.S. Appl. No. 11/965,917 dated Jul. 11, 2011. |
Final Office Action for U.S. Appl. No. 11/965,926 dated Jul. 19, 2011. |
Final Office Action for U.S. Appl. No. 11/965,922 dated Jul. 29, 2011. |
Office Action for U.S. Appl. No. 11/965,845 dated Jul. 29, 2011. |
Office Action for U.S. Appl. No. 11/965,832 dated Aug. 23, 2011. |
Office Action for U.S. Appl. No. 11/965,902 dated Aug. 23, 2011. |
Final Office Action for U.S. Appl. No. 11/965,838 dated Aug. 19, 2011. |
Office Action for U.S. Appl. No. 11/965,894 dated Jul. 18, 2011. |
Office Action for U.S. Appl. No. 11/965,855 dated Oct. 3, 2011. |
Office Action for U.S. Appl. No. 11/965,951 dated Oct. 5, 2011. |
Final Office Action for U.S. Appl. No. 11/965,851 dated Oct. 28, 2011. |
Final Office Action for U.S. Appl. No. 11/965,877 dated Nov. 8, 2011. |
Final Office Action for U.S. Appl. No. 11/965,899 dated Nov. 22, 2011. |
Final Office Action for U.S. Appl. No. 11/965,917 dated Dec. 21, 2011. |
Final Office Action for U.S. Appl. No. 11/965,902 dated Dec. 21, 2011. |
Final Office Action for U.S. Appl. No. 11/965,894 dated Dec. 27, 2011. |
Final Office Action for U.S. Appl. No. 11/965,838 dated Aug. 9, 2013, pp. 1-19. |
Office Action for U.S. Appl. No. 11/965,845 dated Aug. 13, 2013, pp. 1-46. |
Office Action for U.S. Appl. No. 11/9654,926 dated Aug. 14, 2013, pp. 1-29. |
Office Action for U.S. Appl. No. 11/965,922 dated Aug. 14, 2013, pp. 1-35. |
Office Action for U.S. Appl. No. 11/965,899 dated Aug. 28, 2013, pp. 1-20. |
Notice of Allowance for U.S. Appl. No. 11/965,917 dated Aug. 28, 2013, pp. 1-25. |
Notice of Allowance for U.S. Appl. No. 11/965,862 dated Sep. 16, 2013, pp. 1-15. |
Hunter, Erwin L., “Recovery from Software Faults in the EWSD Digital Switching System,” IEEE International Conference on Communications, May 1994, pp. 1784-1788. |
Notice of Allowance for U.S. Appl. No. 11/965,894 dated Nov. 7, 2013, pp. 1-16. |
Final Office Action for U.S. Appl. No. 11/965,922 dated Dec. 27, 2013, pp. 1-65. |
Charfi, Anis and Mira Mezini, “Aspect-Oriented Workflow Languages,” Oct. 2006, pp. 183-200. |
Charfi, Anis and Mira Mezini, “Aspect-Oriented Web Service Composition with A04BPEL,” 2004 (no further date information available), pp. 168-182. |
Lassen, Kristian Bisgaard and Wil M.P. van der Aalst, “WorkflowNet2BPEL4WS: A Tool for Translating Unstructured Workflow Processes to Readable BPEL,” Oct. 2006, pp. 127-144. |
Karastoyanova, Dimka et al., “Extending BPEL for Run Time Adaptability,” Sep. 2005, pp. 15-26. |
Mayer, Philip and Daniel Lubke, “Towards a BPEL Unit Testing Framework,” Jul. 2006, pp. 33-42. |
Notice of Allowance for U.S. Appl. No. 11/965,926 dated Dec. 31, 2013, pp. 1-28. |
Notice of Allowance for U.S. Appl. No. 11/965,845 dated Dec. 31, 2013, pp. 1-28. |
Notice of Allowance for U.S. Appl. No. 12/975,520 dated Jan. 17, 2014, pp. 1-19. |
Final Office Action for U.S. Appl. No. 11/965,832 dated Jan. 9, 2012. |
Final Office Action for U.S. Appl. No. 11/965,889 dated Jan. 11, 2012. |
Office Action for U.S. Appl. No. 11/966,495 dated Feb. 1, 2012. |
Final Office Action for U.S. Appl. No. 11/965,862 dated Feb. 14, 2012. |
Office Action for U.S. Appl. No. 11/965,872 dated Feb. 16, 2012. |
Final Office Action for U.S. Appl. No. 11/965,951 dated Feb. 22, 2012. |
Office Action for U.S. Appl. No. 11/965,926 dated Mar. 2, 2012. |
Office Action for U.S. Appl. No. 11/965,874 dated Mar. 19, 2012. |
Office Action for U.S. Appl. No. 11/965,845 dated Apr. 18, 2012. |
Office Action for U.S. Appl. No. 11/965,922 dated Apr. 20, 2012. |
Crawford, C. H. et al., “Toward an On Demand Service-Oriented Architecture,” IBM Systems Journal, vol. 44, No. 1, 2005, pp. 81-107. |
Office Action for U.S. Appl. No. 11/965,894 dated Jun. 13, 2012. |
Final Office Action for U.S. Appl. No. 11/965,889 dated Jun. 20, 2012. |
Office Action for U.S. Appl. No. 11/965,902 dated Jul. 5, 2012. |
Office Action for U.S. Appl. No. 12/975,520 dated Jul. 18, 2012. |
Final Office Action for U.S. Appl. No. 11/965,906 dated Jul. 23, 2012. |
Final Office Action for U.S. Appl. No. 11/965,922 dated Aug. 28, 2012. |
Office Action for U.S. Appl. No. 11/965,899 dated Aug. 28, 2012. |
Final Office Action for U.S. Appl. No. 11/965,845 dated Aug. 29, 2012. |
Office Action for U.S. Appl. No. 11/965,862 dated Sep. 26, 2012. |
Final Office Action for U.S. Appl. No. 11/965,926 dated Oct. 5, 2012. |
Kramer, Jeff et al., “The Evolving Philosophers Problem: Dynamic Change Management,” Aug. 1991, pp. 1-33. |
Final Office Action for U.S. Appl. No. 11/965,894 dated Oct. 23, 2012. |
Office Action for U.S. Appl. No. 11/965,902 dated Nov. 16, 2012. |
Final Office Action for U.S. Appl. No. 11/965,889 dated Jan. 11, 2013, pp. 1-15. |
Final Office Action for U.S. Appl. No. 11/965,899 dated Jan. 29, 2013, pp. 1-17. |
Final Office Action for U.S. Appl. No. 11/965,862 dated Apr. 4, 2013, pp. 1-19. |
Office Action for U.S. Appl. No. 11/965,838 dated Apr. 30, 2013, pp. 1-30. |
Office Action for U.S. Appl. No. 11/965,894 dated May 8, 2013, pp. 1-9. |
Office Action for U.S. Appl. No. 11/965,832 dated Jul. 17, 2014, 28 pages. |
Office Action for U.S. Appl. No. 11/965,951 dated Sep. 3, 2014, 37 pages. |
Final Office Action for U.S. Appl. No. 11/965,832 dated Jan. 2, 2015, 17 pages. |
Office Action for U.S. Appl. No. 11/965,889 dated Jan. 20, 2015, 22 pages. |
Number | Date | Country | |
---|---|---|---|
20090172688 A1 | Jul 2009 | US |