Abstract
A system or method includes providing coupler portions along a structure. The coupler portions are communicatively engageable with equipment in the structure.
Description
BACKGROUND

A well can be drilled into a subterranean structure for the purpose of recovering fluids from a reservoir in the subterranean structure. Examples of fluids include hydrocarbons, fresh water, or other fluids. Alternatively, a well can be used for injecting fluids into the subterranean structure.


Once a well is drilled, completion equipment can be installed in the well. Examples of completion equipment include a casing or liner to line a wellbore. Also, flow conduits, flow control devices, and other equipment can also be installed to perform production or injection operations.


SUMMARY

In general, according to some implementations, a system or method includes providing coupler portions along a structure. The coupler portions are communicatively engageable with equipment in the structure.


Other or alternative features will become apparent from the following description, from the drawings, and from the claims.





BRIEF DESCRIPTION OF THE DRAWINGS

Some embodiments are described with respect to the following figures:



FIGS. 1-5 illustrate example arrangements having coupler portions on a liner structure to allow for communicative engagement with equipment in a well, according to various embodiments;



FIG. 6 illustrates an example arrangement including equipment for deploying in a multilateral well, according to some embodiments;



FIG. 7 illustrates an example arrangement that includes a tie-back liner having an inductive coupler portion, according to further embodiments;



FIG. 8 illustrates an example arrangement in which jumpers are used to communicatively engage with coupler portions on a liner structure, according to further embodiments;



FIG. 9 illustrates an example arrangement in which jumpers are used to communicatively engage with coupler portions in an openhole section of a well, according to other embodiments;



FIG. 10 illustrates an example arrangement that includes a jumper for connecting coupler portions for lateral branches, according to further embodiments;



FIG. 11 illustrates an example arrangement that includes a tubular structure having coupler portions, and a tool in the tubular structure, according to yet further embodiments; and



FIG. 12 illustrates another example arrangement according to other embodiments.





DETAILED DESCRIPTION

As used here, the terms “above” and “below”; “up” and “down”; “upper” and “lower”; “upwardly” and “downwardly”; and other like terms indicating relative positions above or below a given point or element are used in this description to more clearly describe some embodiments of the invention. However, when applied to equipment and methods for use in wells that are deviated or horizontal, such terms may refer to a left to right, right to left, or diagonal relationship as appropriate.


Various types of components for use in well operations can employ any one or more of the following types of communications: electrical communications, hydraulic communications, and/or optical communications. Examples of components can include components of drilling equipment for drilling a well into a subterranean structure, or components of completion equipment for completing a well to allow for fluid production and/or injection operations. Examples of completion equipment components that can perform the various types of communications noted above include sensors, flow control devices, pumps, and so forth.


The various components can be provided at different points in the well. Due to configurations of equipment used for well operations, it can be challenging to deploy mechanisms for establishing electrical communication, hydraulic communication, and/or optical communication with some components.


In accordance with some embodiments, coupler portions can be provided along a well to provide discrete coupling points that can be selectively engaged to equipment for performing electrical communication, hydraulic communication, and/or optical communication. Such coupling points can be considered docking points (or docking stations) for docking or other engagement of a tool that has component(s) that is to communicate (electrically, hydraulically, and/or optically) with other equipment using respective coupler portion(s). In some implementations, the coupler portions can be inductive coupler portions. In further implementations, the coupler portions can include hydraulic coupler portions and/or optical coupler portions.


Electrical communication refers to electrical coupling between components to allow for communication of power and/or data between the components. As noted above, one type of electrical coupling is inductive coupling that is accomplished using an inductive coupler. An inductive coupler performs communication using induction. Induction involves transfer of a time-changing electromagnetic signal or power that does not rely upon a closed electrical circuit, but instead performs the transfer wirelessly. For example, if a time-changing current is passed through a coil, then a consequence of the time variation is that an electromagnetic field will be generated in the medium surrounding the coil. If a second coil is placed into that electromagnetic field, then a voltage will be generated on that second coil, which is referred to as the induced voltage. The efficiency of this inductive coupling generally increases as the coils of the inductive coupler are placed closer together.


Hydraulic communication between components refers to coupling hydraulic pressure between the components to allow for communication of hydraulic pressure for performing a hydraulic control operation. In some examples, hydraulic coupling can be accomplished by use of hydraulic communication ports in the coupler portions that can be sealingly engaged to allow for transfer of hydraulic fluid between the communication ports to respective hydraulic fluid paths.


Optical communication refers to communicating an optical signal between components. To perform optical communication, coupler portions can be provided with lenses and optical signal paths (e.g. optical fibers, optical waveguides, etc.) to communicate optical signals.



FIG. 1 schematically illustrates an example arrangement that includes a casing 102 that extends from an earth surface 104. The casing 102 lines an inner wall of a well 106. Wellhead equipment 108 is provided at the earth surface 104 above the well 106.


As further depicted in FIG. 1, a liner hanger 110 is engaged to an inner wall of the casing 102. The liner hanger 110 can have an anchoring element to anchor the liner hanger 110 against the inner wall of the casing 102. A liner 112 is attached to the liner hanger 110, and the liner 112 extends below the liner hanger 110 into a lower section 114 of the well 106. The liner 112 lines an inner wall of a corresponding part of the lower well section 114. An openhole section 116 of the well is provided below the bottom end of the liner 112.


The casing 102 and liner 112 of FIG. 1 are examples of liner structures, which are structures used to define an inner bore in which equipment can be deployed. In some cases, a liner structure lines an inner wall of a well. Note that there can be other cases in which a liner structure can be deployed concentrically inside another liner structure.


In accordance with some embodiments, coupler portions 118, 120, and 122 are provided on the liner 112. A coupler portion is provided “on” the liner 112 if the coupler portion is attached to or mounted to the liner 112.


In some implementations, the coupler portions 118, 120, and 122 are inductive coupler portions, and more specifically, female inductive coupler portions. Each female inductive coupler portion is to communicatively engage with a corresponding male inductive coupler portion—engagement of the female inductive coupler portion with a male inductive coupler portion forms an inductive coupler to allow for electrical coupling of power and/or data.


Instead of or in addition to inductive coupler portions, the coupler portions 114, 116, and 118 can include hydraulic coupler portions and/or optical coupler portions. A hydraulic coupler portion allows for mating hydraulic engagement with another hydraulic coupler portion, such that hydraulic pressure can be communicated through the engaged hydraulic coupler portions. An optical coupler portion allows for communication of optical signals with a corresponding optical coupler portion.


More generally, communicative engagement of coupler portions can refer to aligning the coupler portions such that they are in position to communicate with each other, such as electrical communication, hydraulic communication, and/or optical communication.



FIG. 1 further shows a control line 124 that is connected to the coupler portions 118, 120, and 122. If the coupler portions 118, 120, and 122 are inductive coupler portions, then the control line 124 includes an electrical cable, which is used to carry electrical power and/or data.


If the coupler portions 118, 120, and 122 include hydraulic coupler portions, then the control line 124 can include a hydraulic control line that contains hydraulic fluids for delivering hydraulic pressure. If the coupler portions 118, 120, and 122 include optical coupler portions, then the control line 124 can include a fiber optic cable. In some implementations, the control line 124 can include multiple ones of an electrical cable, hydraulic control line, and fiber optic cable.


In examples according to FIG. 1, the control line 124 extends inside the inner bore of the liner 112. In other examples, the control line 124 can extend outside of the liner 112, or the control line 124 can be embedded in the wall structure of the liner 112.


Pre-equipping the equipment shown in FIG. 1 with the coupler portions 118, 120, and 122 allows for subsequently deployed components to establish communication with the coupler portions. Examples of components that can establish communication with the coupler portions include sensors (for sensing well characteristics such as temperature, pressure, fluid flow rate, etc.), control actuators (for actuating other components), and so forth. There is also flexibility in coupling different types of components to the coupler portions 118, 120, and 122—such flexibility allows different types of well operations to be performed to accomplish different goals.



FIG. 2 shows an example arrangement that includes the equipment depicted in FIG. 1, as well as additional equipment. The additional equipment includes a tubing string 202 that has a coupler portion 204 at a lower portion of the tubing string 202, where the coupler portion 204 is for communicative engagement with the coupler portion 118 on the liner 112. The tubing string has a tubing that defines an inner conduit, which can be used for fluid communication (production of fluids or injection of fluids).


In some implementations, the coupler portion 204 on the tubing string 202 includes a male inductive coupler portion for inductive engagement with the female inductive coupler portion 118 once the tubing string 202 is installed in the well. In further implementations, the tubing string coupler portion 204 can include a hydraulic coupler portion and/or an optical coupler portion for communicative engagement with the liner coupler portion 118.


The tubing string 202 further includes a control line 206 that extends from the tubing string coupler portion 204 to earth surface equipment at the earth surface 104. As shown in FIG. 2, the control line 206 extends from the tubing string coupler portion 204 along an outer wall of the tubing string 202 through a feedthrough path of the wellhead equipment 108 to a surface control unit 208. The surface control unit 208 can include devices to perform communication (e.g. electrical communication, hydraulic communication, and/or optical communication) with downhole components through the tubing string coupler portion 204 and liner coupler portions 118, 120, and 122. For example, the surface control unit 208 can include a computer and/or a power supply. In further examples, the surface control unit 208 can include an optical transceiver and/or hydraulic communication equipment.


Note that the control line 206 “extends” to the earth surface 104 if the control line 206 provides communication to the earth surface equipment without having to perform transformation or other type of coupling at any point in the well. For example, an electrical cable extends from a downhole location to the earth surface 104 if the electrical cable provides direct electrical communication from the downhole location (e.g. tubing string coupler portion 204) to surface equipment without passing through any intermediate inductive coupler portion or other intermediate device. Similarly, a hydraulic control line or fiber optic cable extends to the earth surface if the hydraulic control line or fiber optic cable is not passed through intermediate devices that perform some type of conversion on the hydraulic pressure or fiber optic signal.


Although the male coupler portion 204 is shown as being deployed by the tubing string 202 in FIG. 2, note that in other implementations the male coupler portion 204 can be deployed with another type of mechanism, such as a coil tubing, wireline, slickline, and so forth, which provides a control line extending to the earth surface 104.


The equipment shown in FIG. 2 also includes a tool 210 that has various sensors and/or actuators 214 deployed. The tool 210 has a coupler portion 214 for communicative engagement with the liner coupler portion 122. As examples, the coupler portion 214 of the tool 210 can include any one or a combination of the following: inductive coupler portion, hydraulic coupler portion, optical coupler portion.


In examples according to FIG. 2, the tool 210 also includes a tubing section 216, which defines an inner bore through which fluid can pass. In other examples, the tool 210 can be configured without the tubing section 216. Communication with the sensors and/or actuators 212 of the tool 210 is accomplished using the control line 124 and the coupler portions 122 and 214. For example, power can be delivered from the surface control unit 208 down the control line 206 and through the coupler portions 204 and 118 to the control line 124. This power is then passed from the control line 124 through the coupler portions 214 and 122 to the sensors and/or actuators 212. Data (either data from the surface control unit 208 to the sensors/actuators 212, or data from the sensors/actuators 212 to the surface control unit 208) can pass through the same path. Hydraulic communication and/or optical communication would also pass through the same path between the surface control unit 208 and the sensors/actuators 212.


Sensors of the tool 210 can be used to sense various characteristics, such as temperature, pressure, fluid flow rate, and so forth. Actuators of the tool 210 can be commanded (by sending commands to the actuators from the surface control unit 208) to actuate designated devices, such as flow control devices, sealing devices, pumps, and so forth.


Although the sensors/actuators 212 are shown placed relatively close to the liner coupler portion 122 in FIG. 2, note that in other examples, the sensors/actuators 212 can be placed farther away from the liner coupler portion 122.


Installation of the tool 210 at the downhole location corresponding to the liner coupler portion 122 can be accomplished using any of various techniques, such as by use of coil tubing, a tractor, and so forth. Although not depicted in FIG. 2, similar tools can be deployed at other downhole locations corresponding to other liner coupler portions (such as 120 in FIG. 2).



FIG. 3 illustrates a different example arrangement, in which coupler portions 302, 304, and 306 are on a casing 308 that lines a well 310. The coupler portions 302, 304, and 306 (e.g. female coupler portions) are connected to a control line 312, which extends to earth surface equipment including the surface control unit 208. The control line 312 passes through a feedthrough path of the wellhead equipment 108.


As with the implementations depicted in FIGS. 1 and 2, the coupler portions 302, 304, and 306 can each include one or more of: an inductive coupler portion, a hydraulic coupler portion, and an optical coupler portion.


In examples according to FIG. 3, the control line 312 can extend outside the casing 308. In other examples, the control line 312 can extend inside the inner bore of the casing 308, or can be embedded in the wall structure of the casing 308.


As with the example arrangement shown in FIG. 1, additional components can be deployed that are able to communicate with the coupler portions 302, 304, and 306.



FIG. 4 illustrates the arrangement of FIG. 3 with a tool 402 positioned at a downhole location corresponding to the casing coupler portion 306. The tool 402 has a male coupler portion 404 for communicatively engaging with the casing coupler portion 306 on the casing 308. In addition, the tool 402 has sensors and/or actuators 406, similar to the tool 210 shown in FIG. 2.


Communication between the tool 402 and the surface control unit 208 is accomplished using the control line 312 and coupler portions 404 and 306. Other tools similar to tool 402 can also be deployed for communicative engagement with the other female coupler portions 302 and 304. For example, as further shown in FIG. 4, another tool 410 can be deployed at a downhole location corresponding to the casing coupler portions 302 and 304. The tool 410 has sensors/actuators 412 and a coupler portion 414. The tool coupler portion 414 of the tool 410 is to communicatively engage with the casing coupler portion 302.



FIG. 5 shows another example arrangement, which includes a casing 502 that lines a wellbore 504. A lower portion of the casing 502 is provided with a coupler portion 506 (in other words, the coupler portion 506 is mounted or otherwise attached to the casing 502). The casing coupler portion 506 can be a female coupler portion.


Additionally, an upper portion of a liner 508 is mounted in the casing 502 using a liner hanger 511. The upper portion of the liner 508 also has a coupler portion 510 (e.g. a male coupler portion) for communicatively engaging with the casing coupler portion 506. In addition, the liner 508 has further coupler portions 512 and 514 provided at discrete positions below the upper coupler portion 510.


A control line 520 extends from the casing coupler portion 506 to earth surface equipment. Another control line 522 is connected to the coupler portions 510, 512, and 514.


During operation, a tool can be lowered through the casing 502 and into the liner 508, where the tool can include one or more coupler portions for communicatively engaging with respective one or more coupler portions 512 and 514 of the liner 508. Communication between earth surface equipment and such a tool can be performed using the control line 520, coupler portions 506 and 510, the control line 522, and a corresponding one of the liner coupler portions 512 and 514 to which the tool is engaged.


In accordance with further embodiments, FIG. 6 illustrates an example arrangement for a multilateral well that has lateral branches 602 and 604, which extend from a main wellbore 606. A casing 608 lines the main wellbore 606.


A liner 612 is mounted using a liner hanger 610, which is engaged to an inner wall of the casing 608. The liner 612 has coupler portions 614, 616, and 618. A control line 619 is connected to the coupler portions 614, 616, and 618. The liner 612 also has a window 620 through which a lateral tool 622 is able to extend. The window 620 in the liner 612 can be milled using drilling equipment for drilling into the lateral branch 604. The lateral tool 622 extends through the window 620 and into the lateral branch 604.


The lateral tool 636 also has sensors and/or actuators 638, which can be connected by a control line 623 (e.g. electrical cable, hydraulic control line, and/or fiber optic cable) to a coupler portion 640 at an upper portion of the lateral tool 622. The coupler portion 640 of the lateral tool 622 is communicatively engageable with the coupler portion 616 of the liner 612 once the lateral tool 622 is positioned through the window 620 into the lateral branch 604.


As further shown in FIG. 6, another lateral tool 624 can be positioned in the lateral branch 602. The lateral tool 624 has a coupler portion 626 for communicatively engaging with the coupler portion 618 of the liner 612. The lateral tool 624 can also have sensors and/or control devices 628.



FIG. 6 also shows a tubing string 630 deployed inside the casing 608. The lower portion of the tubing string 630 has a coupler portion 632 for communicatively engaging with the coupler portion 614 of the liner 612. A control line 634 extends from the coupler portion 632 of the tubing string 630 along an outer wall of the tubing string 630 and through the wellhead equipment 108 to the surface control unit 208.


In operation, communication between the surface control unit 208 and the lateral tool 624 can be accomplished using the control line 634, coupler portions 632 and 614, control line 619, and coupler portions 626 and 618. Similarly, communication between the surface control unit 208 and the lateral tool 636 can be accomplished using the control line 634, coupler portions 632 and 614, control line 619, and coupler portions 640 and 616.



FIG. 7 shows a different example arrangement that uses a tie-back liner 702 deployed inside casing 704 that lines a well 706. A tie-back liner can refer to a section of a liner that runs from a liner hanger (such as liner hanger 708) back to the earth surface. The tie-back liner 702 is deployed after a lower liner 710 has been deployed. The lower liner 710 is attached to the liner hanger 708, and extends into a lower section of the well 706.


The tie-back liner 702 may be installed for various reasons. For example, the tie-back liner 702 may provide enhanced pressure capacity (ability to handle elevated internal pressure) as compared to the casing 704. Also, in some cases, the casing 704 may have questionable integrity, in which case the tie-back liner 702 can be installed to enhance integrity inside the well 706.


The lower portion of the tie-back liner 702 has a coupler portion 712. This coupler portion 712 can communicatively engage with a corresponding coupler portion 714 provided at the upper portion of equipment 716. The equipment 716 can include various devices, such as sensors, actuators, and so forth. In some cases, the equipment 716 can be referred to as “intelligent equipment.”


A control line 718 extends from the coupler portion 712 of the tie-back liner 704 to earth surface equipment. Additionally, another control line 720 extends from the coupler portion 714 of the equipment 716 to various devices of the intelligent completion equipment 716.


Although FIG. 7 shows just one coupler portion 712 on the tie-back liner 704, it is noted that the tie-back liner 704 can include multiple coupler portions in other examples.


A coupler portion on a liner structure (such as a liner or casing as depicted in the various figures discussed above) may no longer be able to communicate, due to component faults or damage caused by the passage of time or due to downhole well operations that may have caused damage. FIG. 8 illustrates an example arrangement in which jumpers 802 and 804 are used to allow communication of coupler portions experiencing communication faults with a neighboring coupler portion. For example, in FIG. 8, coupler portions 806 and 808 on a liner 812 may not be able to communicate further uphole due to faulty components, such as due to a break in a control line (e.g. control line 834). The faulty liner coupler portions 806 and 808 can be female coupler portions. Additional liner coupler portions 814 and 830 on the liner 812 can also be female coupler portions.


To allow the faulty coupler portion 808 to communicate further uphole, the jumper 804 can be deployed into the bore of the liner 812. The two ends of the jumper 804 can be provided with male coupler portions 816 and 818 that are to communicatively engage with respective liner coupler portions 814 and 808. The male coupler portions 816 and 818 can be connected to each other (such as by an electrical cable, hydraulic control line, or optical fiber 811). In this way, the faulty coupler portion 808 can communicate through the jumper 804 with the neighboring uphole liner coupler portion 814, which in turn is connected by the control line 834 to the liner coupler portion 806.


As noted above, the liner coupler portion 806 can also be faulty, in which case the jumper 802 is deployed into the inner bore of the liner 812 to allow the faulty liner coupler portion 806 to communicate with a casing coupler portion 820 that is on a casing 822. The jumper 802 has male coupler portions 832 and 826 at its two ends to allow the jumper 802 to communicatively engage with respective liner coupler portion 806 and liner coupler portion 830. The male coupler portions 824 and 826 are connected to each other by a control line 810, so that the liner coupler portion 806 can communicate through the jumper 802 to the liner coupler portion 830. The liner coupler portion 830 is connected to another liner coupler portion 824 by a control line 831. The liner coupler portion 824 is positioned adjacent a casing coupler portion 820 to allow for inductive coupling between the coupler portions 824 and 820. The casing coupler portion 820 is electrically connected to a control line 828 to allow the casing coupler portion 820 to communicate with earth surface equipment.



FIG. 9 depicts a variant of the arrangement in FIG. 8. In FIG. 9, the liner 812 is omitted; instead, the coupler portions 806, 814, and 808 are mounted in an openhole section of the well. The coupler portions 806, 814, and 808 can be mounted to an inner surface 902 of the openhole section, such as by use of straddle packers or other mechanisms.


In the example of FIG. 9, the openhole coupler portions 806 and 808 are able to communicate with respective neighboring uphole coupler portions 814 and 820, respectively, using the respective jumpers 804 and 802. The openhole coupler portions 806 and 814 are connected by a control line 904.


In other examples, a jumper can bypass at least one intermediate coupler portion. For example, in either FIG. 8 or 9, a jumper of increased length can be deployed to couple the coupler portion 808 to the coupler portion 820, while bypassing coupler portions 806 and 814.



FIG. 10 illustrates another example arrangement which includes equipment deployed in a multilateral well having later branches 1002 and 1004 that extend from a main wellbore 1006. The equipment is similar in arrangement to that depicted in FIG. 7, and includes a casing 1020 and a liner 1022. The equipment includes coupler portions 1008, 1010, and 1012. The coupler portion 1010 is to establish communication with a tool 1024 in the lateral branch 1002, while the coupler portion 1012 is to establish communication with a tool 1026 in the lateral branch 1004.


As further shown in FIG. 10, liner coupler portions 1040, 1042, and 1044 are provided on the liner 1022. The liner coupler portions 1040, 1042, and 1044 are aligned with respective coupler portions 1008, 1010, and 1012. The liner coupler portions 1040, 1042, and 1044 are connected by a control line 1046.



FIG. 10 further depicts a jumper arranged outside the liner 1022. The jumper includes coupler portions 1048 and 1050 that are interconnected by a control liner 1052. The coupler portions 1048 and 1050 are aligned with respective coupler portions 1040 and 1044. In case of a failure (such as failure of the control line 1046) that prevents communication with the lower coupler portion 1044, the jumper can be used to establish communication with the lower coupler portion 1044.


Although the foregoing example arrangements include equipment for deployment with a liner structure or for deployment in a well, mechanisms or techniques according to some embodiments can also be deployed with other structures or outside a well environment. For example, as shown in FIG. 11, female coupler portions 1104, 1106, and 1108 are deployed at various discrete points along a tubular structure 1102 (the tubular structure 1102 can have a generally cylindrical shape, or can have any other shape). The tubular structure 1102 can be a production tubing (e.g. to produce fluids in a well). In other examples, the tubular structure 1102 can be a pipeline, such as one deployed on an earth surface or on a seafloor for carrying fluids (e.g. hydrocarbons, water, etc.).


The female coupler portions 1104, 1106, and 1108 on the tubular structure 1102 can be connected to a control line 1110 (e.g. electrical cable, hydraulic control line, and/or fiber optic cable). As shown in FIG. 11, a tool 1112 can be run inside the inner bore of the tubular structure 1102. The tool 1112 has a male coupler portion 1114 for communicatively engaging with any of the female coupler portions 1104, 1106, and 1108. The tool 1112 can be used to perform various operations in the inner bore of the tubular structure 1002, such as to brush or clean the inner wall of the tubular structure 1102. In other examples, the tool 1112 can include sensors to sense characteristics inside the tubular structure 1102 (e.g. check for corrosion, etc.).


During operation, communication (of power and/or data) can be performed using the control line 1110 and through one or more of the coupler portions 1104, 1106, and 1108 with the coupler portion 1114 of the tool 1112.



FIG. 12 shows another example arrangement, which includes equipment provided in a multilateral well. Liner coupler portions 1202, 1204, 1206, and 1208 are arranged along a liner 1210. The liner coupler portions 1202, 1204, 1206, and 1208 can be coupled by a control line (not shown). In addition, coupler portions 1212, 1214, and 1216 can be provided in a lateral branch 1218. Lower completion equipment 1220 can be provided, which can be used that has respective coupler portions to communicate with coupler portion 1204 and the lateral coupler portions 1212, 1214, and 1216.


However, if liner coupler portion 1204 becomes defective for some reason, then the lower completion equipment 1220 can be removed, and re-installed with a jumper to allow communication with a further uphole coupler portion 1202.


In the foregoing description, numerous details are set forth to provide an understanding of the subject disclosed herein. However, implementations may be practiced without some or all of these details. Other implementations may include modifications and variations from the details discussed above. It is intended that the appended claims cover such modifications and variations.

Claims
  • 1. A system comprising: a liner structure to line a well, the liner structure having a plurality of inductive coupler portions to provide discrete points of communication;a control line connected to at least one of the coupler portions, wherein the control line is to extend to earth surface equipment; anda jumper comprising a first inductive coupler portion, a second inductive coupler portion, and an intermediate portion between the first and second inductive coupler portions, wherein the jumper is configured to communicatively couple to a particular one of the inductive coupler portions on the liner structure to allow continued communication with the particular coupler portion in a presence of a fault, wherein the jumper is positioned with the first inductive coupler portion on a first side of the fault and the second inductive coupler portion on a second side of the fault opposite the first inductive coupler portion, and wherein the jumper is deployed in an inner bore of the liner structure.
  • 2. The system of claim 1, wherein the fault is a fault of the control line that prevents communication with the particular inductive coupler portion without the jumper.
  • 3. The system of claim 1, wherein the jumper is to be provided outside the liner structure to communicatively couple to selected ones of the plurality of inductive coupler portions including the particular coupler portion.
  • 4. The system of claim 1, wherein the inductive coupler portions include hydraulic coupler portions, and the control line includes a hydraulic control line.
  • 5. The system of claim 1, wherein the inductive coupler portions include optical coupler portions, and the control line includes a fiber optic cable.
  • 6. The system of claim 1, wherein the liner structure includes at least one of a casing or a liner.
  • 7. The system of claim 1, wherein the liner structure includes a liner, the system further comprising: a tubing string for deployment in the well, wherein the tubing string has a coupler portion to communicatively engage with one of the inductive coupler portions on the liner.
  • 8. The system of claim 7, further comprising a casing to line a segment of the well, wherein the tubing string is deployed in the casing; anda liner hanger engaged in the casing, wherein the liner extends from the liner hanger into another segment of the well.
  • 9. The system of claim 1, further comprising a tool deployable through the liner structure and having a coupler portion to communicatively engage with one of the inductive coupler portions on the liner structure.
  • 10. The system of claim 9, wherein the tool is for deployment in a lateral branch extending from a main wellbore of the well.
  • 11. A method comprising: positioning first inductive coupler portions in an openhole section of a well;lowering a jumper into the well, the jumper having a first inductive coupler portion, a second inductive coupler portion, and an intermediate section between the first and second inductive coupler portion, wherein the jumper is configured to engage at least one of the first coupler portions; andpositioning the jumper in the well in an inner bore relative to the inductive coupler portions with the first and second inductive coupler portions bridging a fault, wherein the jumper is configured to bypass the fault.
  • 12. The method of claim 11, wherein the first inductive coupler portions and jumper are selected from among inductive coupler portions, hydraulic coupler portions, and optical coupler portions.
US Referenced Citations (264)
Number Name Date Kind
2214064 Niles Sep 1940 A
2379800 Hare Jul 1945 A
2452920 Gilbert Nov 1948 A
2470303 Greenough May 1949 A
2782365 Castel Feb 1957 A
2797893 McCune et al. Jul 1957 A
2889880 Hughes Jun 1959 A
3011342 Simm Dec 1961 A
3199592 Jacob Aug 1965 A
3206537 Steward Sep 1965 A
3344860 Voetter Oct 1967 A
3363692 Bishop Jan 1968 A
3659259 Chaney, Jr. et al. Apr 1972 A
3913398 Curtis Oct 1975 A
4027286 Marosko May 1977 A
4133384 Allen et al. Jan 1979 A
4241787 Price Dec 1980 A
4415205 Rehm et al. Nov 1983 A
4484628 Lammon, II Nov 1984 A
4559818 Tsang et al. Dec 1985 A
4573541 Josse et al. Mar 1986 A
4597290 Bourdet et al. Jul 1986 A
4733729 Copeland Mar 1988 A
4806928 Veneruso Feb 1989 A
4850430 Copeland et al. Jul 1989 A
4901069 Veneruso Feb 1990 A
4945995 Tholance et al. Aug 1990 A
4953636 Mohn Sep 1990 A
4969523 Martin et al. Nov 1990 A
5183110 Logan et al. Feb 1993 A
5269377 Martin Dec 1993 A
5278550 Rhein-Knudsen et al. Jan 1994 A
5301760 Graham Apr 1994 A
5311936 McNair et al. May 1994 A
5318121 Brockman et al. Jun 1994 A
5318122 Murray et al. Jun 1994 A
5322127 McNair et al. Jun 1994 A
5325924 Bangert et al. Jul 1994 A
5330007 Collins et al. Jul 1994 A
5337808 Graham Aug 1994 A
5353876 Curington et al. Oct 1994 A
5388648 Jordan, Jr. Feb 1995 A
5398754 Dinhoble Mar 1995 A
5411082 Kennedy May 1995 A
5427177 Jordan, Jr. et al. Jun 1995 A
5435392 Kennedy Jul 1995 A
5439051 Kennedy et al. Aug 1995 A
5454430 Kennedy et al. Oct 1995 A
5457988 Delatorre Oct 1995 A
5458199 Collins et al. Oct 1995 A
5458209 Hayes et al. Oct 1995 A
5462120 Gondouin Oct 1995 A
5472048 Kennedy et al. Dec 1995 A
5474131 Jordan, Jr. et al. Dec 1995 A
5477923 Jordan, Jr. et al. Dec 1995 A
5477925 Trahan et al. Dec 1995 A
5499680 Walter et al. Mar 1996 A
5520252 McNair May 1996 A
5521592 Veneruso May 1996 A
5533573 Jordan, Jr. et al. Jul 1996 A
5542472 Pringle et al. Aug 1996 A
5597042 Tubel et al. Jan 1997 A
5655602 Collins Aug 1997 A
5680901 Gardes Oct 1997 A
5697445 Graham Dec 1997 A
5706896 Tubel et al. Jan 1998 A
5730219 Tubel et al. Mar 1998 A
5823263 Morris et al. Oct 1998 A
5831156 Mullins Nov 1998 A
5871047 Spath et al. Feb 1999 A
5871052 Benson et al. Feb 1999 A
5875847 Forsyth Mar 1999 A
5915474 Buytaert et al. Jun 1999 A
5918669 Morris et al. Jul 1999 A
5941307 Tubel Aug 1999 A
5941308 Malone et al. Aug 1999 A
5944107 Ohmer Aug 1999 A
5944108 Baugh et al. Aug 1999 A
5944109 Longbottom Aug 1999 A
5945923 Soulier Aug 1999 A
5954134 Longbottom Sep 1999 A
5959547 Tubel et al. Sep 1999 A
5960873 Alexander et al. Oct 1999 A
5967816 Sampa et al. Oct 1999 A
5971072 Huber et al. Oct 1999 A
5975204 Tubel et al. Nov 1999 A
5979559 Kennedy Nov 1999 A
5992519 Ramakrishnan et al. Nov 1999 A
6003606 Moore et al. Dec 1999 A
6006832 Tubel et al. Dec 1999 A
6035937 Gano et al. Mar 2000 A
6046685 Tubel Apr 2000 A
6061000 Edwards May 2000 A
6065209 Gondouin May 2000 A
6065543 Gano et al. May 2000 A
6073697 Parlin et al. Jun 2000 A
6076046 Vasudevan et al. Jun 2000 A
6079488 Begg et al. Jun 2000 A
6079494 Longbottom et al. Jun 2000 A
6119780 Christmas Sep 2000 A
6125937 Longbottom et al. Oct 2000 A
6173772 Vaynshteyn Jan 2001 B1
6173788 Lembcke et al. Jan 2001 B1
6176308 Pearson Jan 2001 B1
6176312 Tubel et al. Jan 2001 B1
6192980 Tubel et al. Feb 2001 B1
6192988 Tubel Feb 2001 B1
6196312 Collins et al. Mar 2001 B1
6209648 Ohmer et al. Apr 2001 B1
6244337 Cumming et al. Jun 2001 B1
6302203 Rayssiguier et al. Oct 2001 B1
6305469 Coenen et al. Oct 2001 B1
6310559 Laborde et al. Oct 2001 B1
6318469 Patel Nov 2001 B1
6328111 Bearden et al. Dec 2001 B1
6349770 Brooks et al. Feb 2002 B1
6354378 Patel Mar 2002 B1
6360820 Laborde et al. Mar 2002 B1
6374913 Robbins et al. Apr 2002 B1
6378610 Rayssiguier et al. Apr 2002 B2
6415864 Ramakrishnan et al. Jul 2002 B1
6419022 Jernigan et al. Jul 2002 B1
6457522 Bangash et al. Oct 2002 B1
6481494 Dusterhoft et al. Nov 2002 B1
6510899 Sheiretov et al. Jan 2003 B1
6513599 Bixenman et al. Feb 2003 B1
6515592 Babour et al. Feb 2003 B1
6533039 Rivas et al. Mar 2003 B2
6568469 Ohmer et al. May 2003 B2
6577244 Clark et al. Jun 2003 B1
6588507 Dusterhoft et al. Jul 2003 B2
6614229 Clark et al. Sep 2003 B1
6614716 Plona et al. Sep 2003 B2
6618677 Brown Sep 2003 B1
6668922 Ziauddin et al. Dec 2003 B2
6675892 Kuchuk et al. Jan 2004 B2
6679324 Den Boer et al. Jan 2004 B2
6695052 Branstetter et al. Feb 2004 B2
6702015 Fielder, III et al. Mar 2004 B2
6727827 Edwards et al. Apr 2004 B1
6749022 Fredd Jun 2004 B1
6751556 Schroeder et al. Jun 2004 B2
6758271 Smith Jul 2004 B1
6768700 Veneruso et al. Jul 2004 B2
6776256 Kostyuchenko et al. Aug 2004 B2
6787758 Tubel et al. Sep 2004 B2
6789621 Wetzel et al. Sep 2004 B2
6789937 Haddad et al. Sep 2004 B2
6817410 Wetzel et al. Nov 2004 B2
6828547 Tubel et al. Dec 2004 B2
6837310 Martin Jan 2005 B2
6842700 Poe Jan 2005 B2
6845819 Barrett et al. Jan 2005 B2
6848510 Bixenman et al. Feb 2005 B2
6856255 Chalitsios et al. Feb 2005 B2
6857475 Johnson Feb 2005 B2
6863127 Clark et al. Mar 2005 B2
6863129 Ohmer et al. Mar 2005 B2
6864801 Tabanou et al. Mar 2005 B2
6896074 Cook et al. May 2005 B2
6903660 Clark et al. Jun 2005 B2
6911418 Frenier Jun 2005 B2
6913083 Smith Jul 2005 B2
6920395 Brown Jul 2005 B2
6942033 Brooks et al. Sep 2005 B2
6950034 Pacault et al. Sep 2005 B2
6975243 Clark et al. Dec 2005 B2
6978833 Salamitou et al. Dec 2005 B2
6980940 Gurpinar et al. Dec 2005 B1
6983796 Bayne et al. Jan 2006 B2
6989764 Thomeer et al. Jan 2006 B2
7000696 Harkins Feb 2006 B2
7000697 Goode et al. Feb 2006 B2
7007756 Lerche et al. Mar 2006 B2
7040402 Vercaemer May 2006 B2
7040415 Boyle et al. May 2006 B2
7055604 Jee et al. Jun 2006 B2
7063143 Tilton et al. Jun 2006 B2
7079952 Thomas et al. Jul 2006 B2
7083452 Eriksson et al. Aug 2006 B2
7093661 Olsen Aug 2006 B2
7683802 Madhavan et al. Mar 2010 B2
7866414 Patel Jan 2011 B2
8082990 Lovell et al. Dec 2011 B2
20010013410 Beck et al. Aug 2001 A1
20020007948 Bayne et al. Jan 2002 A1
20020050361 Shaw et al. May 2002 A1
20020096333 Johnson et al. Jul 2002 A1
20020112857 Ohmer et al. Aug 2002 A1
20030137302 Clark et al. Jul 2003 A1
20030137429 Clark et al. Jul 2003 A1
20030141872 Clark et al. Jul 2003 A1
20030150622 Patel et al. Aug 2003 A1
20030221829 Patel et al. Dec 2003 A1
20040010374 Raghuraman et al. Jan 2004 A1
20040094303 Brockman et al. May 2004 A1
20040164838 Hall et al. Aug 2004 A1
20040173350 Wetzel et al. Sep 2004 A1
20040173352 Mullen et al. Sep 2004 A1
20040194950 Restarick et al. Oct 2004 A1
20040238168 Echols Dec 2004 A1
20050072564 Grigsby et al. Apr 2005 A1
20050074210 Grigsby et al. Apr 2005 A1
20050083064 Homan et al. Apr 2005 A1
20050087368 Boyle et al. Apr 2005 A1
20050092488 Rodet et al. May 2005 A1
20050092501 Chavers et al. May 2005 A1
20050115741 Terry et al. Jun 2005 A1
20050149264 Tarvin et al. Jul 2005 A1
20050168349 Huang et al. Aug 2005 A1
20050178554 Hromas et al. Aug 2005 A1
20050194150 Ringgenberg Sep 2005 A1
20050199401 Patel et al. Sep 2005 A1
20050236161 Gay et al. Oct 2005 A1
20050274513 Schultz et al. Dec 2005 A1
20050279510 Patel et al. Dec 2005 A1
20060000604 Jenkins et al. Jan 2006 A1
20060000618 Cho et al. Jan 2006 A1
20060006656 Smedstad Jan 2006 A1
20060016593 Gambier Jan 2006 A1
20060042795 Richards Mar 2006 A1
20060060352 Vidrine et al. Mar 2006 A1
20060065444 Hall et al. Mar 2006 A1
20060077757 Cox et al. Apr 2006 A1
20060086498 Wetzel et al. Apr 2006 A1
20060090892 Wetzel et al. May 2006 A1
20060090893 Sheffield May 2006 A1
20060124297 Ohmer Jun 2006 A1
20060124318 Sheffield Jun 2006 A1
20060162934 Shepler Jul 2006 A1
20060196660 Patel Sep 2006 A1
20060225926 Madhavan et al. Oct 2006 A1
20060254767 Pabon et al. Nov 2006 A1
20060283606 Partouche et al. Dec 2006 A1
20070012436 Freyer Jan 2007 A1
20070027245 Vaidya et al. Feb 2007 A1
20070044964 Grigar et al. Mar 2007 A1
20070059166 Sheth et al. Mar 2007 A1
20070062710 Pelletier et al. Mar 2007 A1
20070074872 Du et al. Apr 2007 A1
20070107907 Smedstad et al. May 2007 A1
20070110593 Sheth et al. May 2007 A1
20070116560 Eslinger May 2007 A1
20070142547 Vaidya et al. Jun 2007 A1
20070144738 Sugiyama et al. Jun 2007 A1
20070144746 Jonas Jun 2007 A1
20070151724 Ohmer et al. Jul 2007 A1
20070159351 Madhavan et al. Jul 2007 A1
20070162235 Zhan et al. Jul 2007 A1
20070165487 Nutt et al. Jul 2007 A1
20070199696 Walford Aug 2007 A1
20070213963 Jalali et al. Sep 2007 A1
20070216415 Clark et al. Sep 2007 A1
20070227727 Patel et al. Oct 2007 A1
20070235185 Patel et al. Oct 2007 A1
20070271077 Kosmala et al. Nov 2007 A1
20080066961 Aivalis et al. Mar 2008 A1
20090008078 Patel Jan 2009 A1
20090066535 Patel et al. Mar 2009 A1
20100300678 Patel et al. Dec 2010 A1
20110011580 Clark et al. Jan 2011 A1
20110284219 Pomerantz et al. Nov 2011 A1
20130087325 Bartko et al. Apr 2013 A1
20130120093 Deville et al. May 2013 A1
Foreign Referenced Citations (46)
Number Date Country
795679 Sep 1997 EP
823534 Feb 1998 EP
1158138 Nov 2001 EP
0786578 Dec 2005 EP
2274864 Aug 1994 GB
2304764 Mar 1997 GB
2333545 Jul 1999 GB
2337780 Dec 1999 GB
2345137 Jun 2000 GB
2360532 Sep 2001 GB
2364724 Feb 2002 GB
2376488 Dec 2002 GB
2381281 Apr 2003 GB
2392461 Mar 2004 GB
2395315 May 2004 GB
2395965 Jun 2004 GB
2401385 Nov 2004 GB
2401430 Nov 2004 GB
2401889 Nov 2004 GB
2404676 Feb 2005 GB
2407334 Apr 2005 GB
2408327 May 2005 GB
2409692 Jul 2005 GB
2416871 Feb 2006 GB
2419619 May 2006 GB
2419903 May 2006 GB
2426019 Nov 2006 GB
2428787 Feb 2007 GB
2136856 Sep 1999 RU
2146759 Mar 2000 RU
2171363 Jul 2001 RU
2239041 Oct 2004 RU
9623953 Aug 1996 WO
9850680 Nov 1998 WO
9850680 Nov 1998 WO
9858151 Dec 1998 WO
9913195 Mar 1999 WO
0029713 May 2000 WO
0171155 Sep 2001 WO
0198632 Dec 2001 WO
03023185 Mar 2003 WO
2004076815 Sep 2004 WO
2004094961 Nov 2004 WO
2005035943 Apr 2005 WO
2005064116 Jul 2005 WO
2006010875 Feb 2006 WO
Non-Patent Literature Citations (3)
Entry
Brown, G.A., SPE 62952. “Using Fibre-Optic Distributed Temperature Measurements to Provide Real-Time Reservoir Surveillance Data on Wytch Farm Field Horizontal Extended-Reach Wells” Society of Petroleum Engineers Inc. 2000, pp. 1-11.
Saputelli, L. et al. “Real-Time Decision-making for Value Creation while Drilling” SPE/IADC Middle East Drilling Technology Conference & Exhibition, Oct. 2003.
Lanier et al. “Brunei Field Trial of a Fibre Optic Distributed Temperature Sensor (DTS) System in 1,DOOm Open Hole Horizontal Oil Producer” SPE 84324; SPE Annual Technical Conference and Exhibition, Oct. 5-8, 2003.
Related Publications (1)
Number Date Country
20130192851 A1 Aug 2013 US