This application claims the benefit of Chinese Patent Application 202010808872.6 filed on Aug. 12, 2020, the contents of which are incorporated herein by reference.
The present invention relates to the field of engineering machinery, in particular to a distribution control method and apparatus, a material distribution method and apparatus as well as a distribution device.
Concrete distribution device, such as a pump truck and a distribution machines, is a commonly used engineering machinery for transporting concrete through a delivery pipe on a boom to a predetermined location.
An operator is required for the concrete distribution apparatus, needs to constantly operate the boom and pumping to deliver concrete to a designated location according to the requirements of a construction side.
However, due to the long single concrete construction time, the frequent operation and the harsh natural environment, the operator has very long working time and extremely high labour intensity. Therefore, how to achieve an automatic distribution according to the construction requirements is an urgent need to be addressed by the industry.
Two technical solutions are disclosed in the prior art. In a first technical solution, as shown in
In implementation of the present invention, the inventor finds that there are at least following problems in the prior art. The first technical solution suffers from the following drawbacks: 1) a pouring site is preset in advance, and cannot be dynamically adjusted according to the construction demands, a current pouring site of the device, reference signs of concrete, etc., and therefore, adaptation to the actual complex construction demands cannot be achieved, for example, there may be a possibility that concrete C20 may be poured to a pouring site of concrete C30, resulting in severe engineering quality; 2) a determination of a pumping volume by the only consideration of pumping time at the pouring site causes a very large error, because an actual pumping volume is related to many factors such as a number of pumping times, piston strokes and suction conditions, and it cannot be guaranteed that the distribution volume of each pouring site meets the construction requirements; and 3) there is no consideration of the movement track of a boom leaving for a next pouring site, and pause or avoidance of the boom in case of the presence of obstacles and other conditions. Based on the above drawbacks, the first technical solution can only be used for idealized construction scenarios and cannot be practically promoted. The second technical solution suffers from the following drawbacks: only various distribution paths are proposed, but there is no illustration about the cooperation with pumping to ensure that the construction requirements are satisfied when concrete is poured during the boom movement process, and the basis of selection of distribution paths is not proposed.
The objectives of the present invention are to provide a pumping control method and apparatus, a material distribution method and apparatus and a distribution device, solving or at least partly solving the above technical problems.
In order to achieve the above objectives, in one aspect, an embodiment of the present invention provides a pumping control method, including: calculating an initialized pumping speed based on a desired distribution volume and desired distribution time for a to-be-distributed location; controlling a distribution device to pump at the initialized pumping speed; and dynamically adjusting the pumping speed of the distribution device in real time according to a completed real-time distribution volume and real-time distribution time during the pumping of the distribution device until the real-time distribution volume is the desired distribution volume.
Preferably, wherein the real-time distribution volume is determined according to an area of a pumping concrete cylinder and an effective stroke of a piston in pumping at each time.
Preferably, wherein the real-time distribution volume is determined by: multiplying a number of pumping times, the area of the pumping concrete cylinder, and an average value of the effective stroke of the piston in pumping at each time; or determining a distribution volume in pumping at each time based on the area of the pumping concrete cylinder and the effective stroke of the piston in pumping at each time, and accumulating the distribution volume in pumping at each time.
Preferably, wherein the effective stroke of the piston in pumping at each time is determined based on: time when the piston starts to move in pumping at this time, time when a pumping pressure reaches a stable value, time when pumping is completed, and a theoretical stroke of the piston.
Preferably, wherein the effective stroke of the piston in pumping at each time is determined based on: an actual stroke of the piston from the start of pumping to the pumping pressure reaching the stable value during pumping at this time, an actual stroke from the pumping pressure reaching the stable value to the end of pumping during pumping at this time, and a preset suction coefficient.
Preferably, wherein the real-time distribution volume is determined according to a real-time discharge volume of an agitator truck for providing a material for the distribution device.
In addition, in another aspect, an embodiment of the present invention provides a material distribution method, which includes: controlling a distribution device to perform distribution at a to-be-distributed location in a preset distribution area; and after distribution at the to-be-distributed location is completed, determining a next to-be-distributed location in the preset distribution area and performing distribution at the next to-be-distributed location, until distribution at each to-be-distributed location in the preset distribution area is completed, wherein a material required to be distributed at the next to-be-distributed location and a material currently provided by the distribution device are concrete with the same reference sign, and distribution is performed at each to-be-distributed location in the preset distribution area by the above pumping control method.
Preferably, wherein the determining the next to-be-distributed location in the preset distribution area comprising: determining a to-be-distributed location in the preset distribution area based on a preset distribution path planning rule; judging whether a reference sign of desired concrete at the determined to-be-distributed location is the same as a reference sign of concrete currently provided by the distribution device; and in the case that the reference sign of the desired concrete at the determined to-be-distributed location is different from the reference sign of the concrete provided by the distribution device, re-determining a to-be-distributed location in the preset distribution area based on the preset distribution path planning rule, until the reference sign of the desired concrete at the determined to-be-distributed location is the same as the reference sign of the concrete currently provided by the distribution device, wherein the determined to-be-distributed location is the next to-be-distributed location.
Preferably, wherein the preset distribution path planning rule is: such that a path for distribution completed at remaining to-be-distributed locations in the preset distribution area is shortest; or a preset sequence of the to-be-distributed locations in the preset distribution area.
Preferably, wherein a material required to be distributed in the preset distribution area is concrete with the same reference sign, and the determining the next to-be-distributed location in the preset distribution area comprises determining the next to-be-distributed location according to the following formula: BSRi+1=BSRi+λ·{right arrow over (θ)}·β, wherein BSRi+1 is the next to-be-distributed location, BSRiBSRi is a current to-be-distributed location, λ is a first preset proportion coefficient, β is a real-time opening degree of a boom switch of the distribution device, and {right arrow over (θ)} is a direction of the boom switch.
Preferably, wherein a material required to be distributed in the preset distribution area is concrete with the same reference sign, when the distribution device is controlled to perform distribution at one to-be-distributed location in the preset distribution area, desired distribution time for this to-be-distributed location is an opening duration of a pumping switch of the distribution device, and a desired distribution volume at this to-be-distributed location is determined based on the real-time opening degree of the pumping switch, time corresponding to opening and closing in real time, and a second preset proportion coefficient.
Preferably, after determining the next to-be-distributed location in the preset distribution area, the distribution method further comprising: judging whether a current boom end location of the distribution device is the same as the next to-be-distributed location; planning a next boom end location in the case that the current boom end location is different from the next to-be-distributed location; judging whether there is an obstacle at the next boom end location; judging whether the obstacle is a person in the case that there is the obstacle at the next boom end location; in the case that the obstacle is a person, controlling a boom to stop movement until the obstacle is not a person or the next boom end location is clear of an obstacle; and in the case that the obstacle is not a person, avoiding the obstacle, re-planning a next boom end location until a boom end of the distribution device moves to the next to-be-distributed location such that the distribution device performs distribution at the next to-be-distributed location, wherein the planning the next boom end location and re-planning the next boom end location satisfy any one of the following conditions: a distance from the next to-be-distributed location is shortest and a number of movement sections of the boom of the distribution device is least.
Preferably, wherein the to-be-distributed location in the preset distribution area is planned based on at least one of: a distance between the adjacent to-be-distributed locations is less than or equal to a preset distribution interval, and the distance between the adjacent to-be-distributed locations is less than or equal to a distribution diameter of an end hose of the distribution device.
Accordingly, in another aspect, an embodiment of the present invention also provides a pumping control apparatus, comprising: an initialized pumping speed calculation module configured to calculate an initialized pumping speed according to a desired distribution volume and desired distribution time for a to-be-distributed location; and a pumping control module configured to control a distribution device to pump at the initialized pumping speed and dynamically adjust the pumping speed of the distribution device in real time according to a completed real-time distribution volume and real-time distribution time during the pumping of the distribution device until the real-time distribution volume is the desired distribution volume.
Preferably, wherein the real-time distribution volume is determined according to an area of a pumping concrete cylinder and an effective stroke of a piston in pumping at each time.
Preferably, wherein the real-time distribution volume is determined by: multiplying a number of pumping times, the area of the pumping concrete cylinder, and an average value of the effective stroke of the piston in pumping at each time; or determining a distribution volume in pumping at each time based on the area of the pumping concrete cylinder and the effective stroke of the piston in pumping at each time, and accumulating the distribution volume in pumping at each time.
Preferably, wherein the effective stroke of the piston in pumping at each time is determined based on: time when the piston starts to move in pumping at this time, time when a pumping pressure reaches a stable value, time when pumping is completed, and a theoretical stroke of the piston.
Preferably, wherein the effective stroke of the piston in pumping at each time is determined based on: an actual stroke of the piston from the start of pumping to the pumping pressure reaching the stable value during pumping at this time, an actual stroke from the pumping pressure reaching the stable value to the end of pumping during pumping at this time, and a preset suction coefficient.
Preferably, the real-time distribution volume is determined according to a real-time discharge volume of an agitator truck for providing a material for the distribution device.
Accordingly, In another aspect, an embodiment of the present invention also provides a material distribution apparatus, comprising: a distribution control module configured to control a distribution device to perform distribution at a to-be-distributed location in a preset distribution area, and after distribution at the to-be-distributed location is completed, determine a next to-be-distributed location in the preset distribution area and perform distribution at the next to-be-distributed location, until distribution at each to-be-distributed location in the preset distribution area is completed, wherein a material required to be distributed in the next to-be-distributed location and a material currently provided by the distribution device are concrete with the same reference sign, and distribution is performed at each to-be-distributed location in the preset distribution area by the above pumping control method.
Preferably, wherein the determining the next to-be-distributed location in the preset distribution area comprising: determining a to-be-distributed location in the preset distribution area based on a preset distribution path planning rule; judging whether a reference sign of desired concrete at the determined to-be-distributed location is the same as a reference sign of concrete currently provided by the distribution device; and in the case that the reference sign of the desired concrete at the determined to-be-distributed location is different from the reference sign of the concrete provided by the distribution device, re-determining a to-be-distributed location in the preset distribution area based on the preset distribution path planning rule, until the reference sign of the desired concrete at the determined to-be-distributed location is the same as the reference sign of the concrete currently provided by the distribution device, wherein the determined to-be-distributed location is the next to-be-distributed location.
Preferably, wherein the preset distribution path planning rule is: such that a path for distribution completed at remaining to-be-distributed locations in the preset distribution area is shortest; or a preset sequence of the to-be-distributed locations in the preset distribution area.
Preferably, a material required to be distributed in the preset distribution area is concrete with the same reference sign, and the determining the next to-be-distributed location in the preset distribution area comprises determining the next to-be-distributed location according to the following formula: BSRi+1=BSRi+λ·{right arrow over (θ)}·β, wherein BSRi+1 is the next to-be-distributed location, BSRi is a current to-be-distributed location, λ is a first preset proportion coefficient, β is a real-time opening degree of a boom switch of the distribution device, and {right arrow over (θ)} is a direction of the boom switch.
Preferably, wherein a material required to be distributed in the preset distribution area is concrete with the same reference sign, when the distribution device is controlled to perform distribution at one to-be-distributed location in the preset distribution area, desired distribution time for this to-be-distributed location is an opening duration of a pumping switch of the distribution device, and a desired distribution volume at this to-be-distributed location is determined based on the real-time opening degree of the pumping switch, time corresponding to opening and closing in real time, and a second preset proportion coefficient.
Preferably, after determining the next to-be-distributed location in the preset distribution area, the distribution apparatus further comprising: a judgment module configured to judge whether a current boom end location of the distribution device is the same as the next to-be-distributed location after the next to-be-distributed location in the preset distribution area is determined; a planning module configured to plan a next boom end location in the case that the current boom end location is different from the next to-be-distributed location; the judgment module further configured to: judge whether there is an obstacle at the next boom end location, and judge whether the obstacle is a person in the case that there is the obstacle at the next boom end location; the distribution apparatus further comprising: in the case that the obstacle is a person, controlling a boom to stop movement until the obstacle is not a person or the next boom end location is clear of an obstacle; and the planning module is further configured to: in the case that the obstacle is not a person, avoid the obstacle, re-planning a next boom end location until a boom end of the distribution device moves to the next to-be-distributed location such that the distribution device performs distribution at the next to-be-distributed location, wherein the planning the next boom end location and re-planning the next boom end location satisfy any one of the following conditions: a distance from the next to-be-distributed location is shortest and a number of movement sections of the boom of the distribution device is least.
Preferably, wherein the to-be-distributed location in the preset distribution area is planned based on at least one of: a distance between the adjacent to-be-distributed locations is less than or equal to a preset distribution interval, and the distance between the adjacent to-be-distributed locations is less than or equal to a distribution diameter of an end hose of the distribution device.
In addition, in yet another aspect, an embodiment of the present invention provides a distribution device including: the above pumping control apparatus; and/or the above distribution apparatus.
By one embodiment of the above technical solution that during pumping, the pumping speed of the distribution device is dynamically adjusted according to the real-time distribution volume and the real-time distribution time until the real-time distribution volume is the desired distribution volume, it is realized that a final distribution volume satisfies the construction requirements and reaches the desired distribution volume, the problem of incapability of guaranteeing that the distribution volume satisfies the construction requirements due to a large error caused by excessive or insufficient distribution resulted from a fixed pumping speed due to the determination of the pumping volume by the only consideration of the pumping time can be solved, and the accuracy of the final distribution volume is improved. According to another embodiment of the above solution, the distribution can be realized without manual involvement and an automatic distribution is realized.
Other features and advantages of the present invention will be illustrated in the following section of specific embodiments.
The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of this specification and, together with the following specific embodiments, serve to explain the present invention, but do not constitute a limitation to the present invention. In the drawings:
Specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described herein are intended to illustrate and explain the present invention only, and are not intended to limit the present invention.
In an aspect, an embodiment of the present invention provides a pumping control method.
In step S200, an initialized pumping speed is calculated according to a desired distribution volume and desired distribution time for a to-be-distributed location. A distribution location is a location where a material is required to be distributed, wherein the material that is required to be distributed may be concrete. The desired distribution volume and the desired distribution time may be a distribution volume and distribution time set according to actual demands, and may be determined according to specific circumstances. The initialized pumping speed may be calculated by dividing the desired distribution volume by the desired distribution time, specifically, the initialized pumping speed is PVt(i)=(PCRi)/PTRi, where PCRi is the desired distribution volume and PTRi is the desired distribution time.
In step S201, a distribution device is controlled to pump at the initialized pumping speed.
In step S202, during pumping of the distribution device, the pumping speed of the distribution device is dynamically adjusted in real time according to a completed real-time distribution volume and real-time distribution time until the real-time distribution volume is the desired distribution volume. The pumping speed may be dynamically adjusted according to the desired distribution volume, the desired distribution time, the real-time distribution volume, and the real-time distribution time. Specifically, the adjustment can be made with the following formula: an adjusted pumping speed PVt(i)=(PCRi−PC(i))/(PTRi−PT(i)), wherein PC(i) is the real-time distribution volume and PT(i) is the real-time distribution time.
By the above technical solution that during pumping, the pumping speed of the distribution device is dynamically adjusted according to the real-time distribution volume and the real-time distribution time until the real-time distribution volume is the desired distribution volume, it is realized that the final distribution volume satisfies the construction requirements and reaches the desired distribution volume, the problem of incapability of guaranteeing that the distribution volume satisfies the construction requirements due to a large error caused by excessive or insufficient distribution resulted from a fixed pumping speed due to the determination of the pumping volume by the only consideration of the pumping time can be solved, and the accuracy of the final distribution volume is improved.
Preferably, in the embodiments of the present invention, there are many methods to determine the real-time distribution volume, for example, the real-time distribution volume can be determined based on an area of a pumping concrete cylinder and an effective strokes of a piston in pumping at each time. Specifically, the real-time distribution volume may be determined taking into account a number of pumping times, the area of the pumping concrete cylinder and an average value of the effective stroke of the piston in pumping at each time, wherein the effective stroke of the piston is a stroke of the piston under the circumstance that the concrete cylinder of the distribution device is fully filled. Specifically, the real-time distribution volume may be determined by multiplying the number of pumping times, the area of the pumping concrete cylinder area, and the average value of the effective stroke of the piston in pumping at each time, wherein the number of the pumping times is a total number of pumping times up to the time when the real-time distribution volume is calculated. In addition, there are many methods to calculate the average value of the effective strokes of the piston. Preferably, several pumping times may be selected from the number of pumping times up to the time when the real-time distribution volume is calculated, and the average value of the effective strokes of the piston corresponding to the selected several pumping times is calculated. For example, for a certain determination of a real-time volume, a total number of pumping times is 100 up to the time when the real-time volume is calculated, one effective stroke for calculation of the average value is optionally selected every 10 pumping times, and finally the average value of all selected effective strokes of the piston is calculated. In this way, calculation can be simplified, calculation power is saved. In addition, the real-time distribution volume may also be determined by an accumulation of the distribution volume in pumping at each time. Specifically, the distribution volume in pumping at each time is determined based on the area of the pumping concrete cylinder and the effective stroke of the piston in pumping at each time, and then the real-time distribution volume is determined by the accumulation of the distribution volume in pumping at each time, wherein the single distribution volume in the accumulation is the distribution volume corresponding to the pumping at each time among the total number of pumping times up to the time when the real-time distribution volume is calculated at each time. As pumping proceeds, the number of pumping times increases, and the accumulative distribution volume also increases in calculation of the real-time distribution volume. It should be noted that in the embodiments of the present invention, in addition to the method for calculating the real-time distribution volume in the above example, other methods for calculating the real-time distribution volume in the prior art may also be adopted.
In addition, there are many methods to calculate the effective stroke of the piston in the embodiment of the present invention.
Preferably, in the embodiment of the present invention, the effective stroke of the piston in pumping at each time is determined based on time when the piston in pumping at this time starts to move, time when the pumping pressure reaches a stable value, time when pumping is completed, and a theoretical stroke of the piston.
How to determine the effective stroke will be described below by taking the material being concrete as an example. As shown in
According to a pumping pressure (i.e., the pressure generated by pressing concrete through the piston) curve, as shown in
In a single pumping cycle, the piston starts moving from Tmin (n−1) until the pumping pressure reaches the stable value at Tmax (n−1), i.e., the movement time period from Tmax (n−1) to Tmin (n−1) indicates the process of compacting concrete, i.e., it can be seen that no concrete (less concrete) exists in this movement distance, Tmin (n) represents the completion time of pumping at this time, and thus the effective stroke calculation formula is: L1=(Tmin (n)−Tmax (n−1))/(Tmin (n)−Tmin (n−1))*L2, wherein L1 is the effective stroke and L2 is the theoretical stroke.
Preferably, in the embodiment of the present invention, a preset suction coefficient may also be taken into account in the effective stroke to make the calculated effective stroke more accurate. Specifically, for L1=((Tmin (n)−Tmax (n−1))+(Tmax (n−1)−Tmin (n−1))*k)/(Tmin (n)−Tmin (n−1))*L2, k is a preset suction coefficient. Preferably, k may be about 0.5, for example, between 0.4-0.6.
Preferably, in the embodiment of the present invention, the effective stroke of the piston in pumping at each time is determined based on an actual stroke of the piston from the start of pumping to the pumping pressure reaching the stable value during pumping at each time, an actual stroke of the piston from the pumping pressure reaching the stable value to the end of pumping, and the preset suction coefficient.
Specifically, a cylinder piston stroke detection apparatus is added, for example, a magnetostrictive sensor, in combination with the pumping pressure, can directly detect the actual stroke of the piston from the start of pumping to the pumping pressure reaching the stable value and the actual stroke of the piston from the pump pressure reaching the stable value to the end of pumping.
The effective stroke of the piston in pumping at each time is calculated as follows: a product of the actual stroke of the piston from the start of pumping to the pump pressure reaching the stable value and the preset suction coefficient is calculated, plus the actual stroke of the piston from the pumping pressure reaching the stable value to the end of pumping. As shown in
Furthermore, the actual stroke of the piston from the start of pumping to the pumping pressure reaching the stable value can be obtained by subtracting the actual stroke of the piston from the pumping pressure reaching the stable value to the end of pumping from the actual stroke of the piston from the start of pumping to the end of pumping, The effective stroke of the piston in pumping at each time can then be obtained with the actual stroke of the piston from the start to the end of the pumping, the actual stroke of the piston from the pumping pressure reaching the stable value to the end of pumping, and the preset suction coefficient, wherein the actual stroke can be obtained by direct detection. For example, as shown in
Preferably, in the embodiment of the present invention, the real-time distribution volume may also be determined according to a real-time discharge volume of an agitator truck for providing the material for the distribution device. Specifically, when a certain distribution device is provided with the material by the same agitator truck all the time, a real-time discharge volume of the agitator truck is the real-time distribution volume; and when a certain distribution device is provided with the material by a plurality of agitator trucks during pumping, the real-time distribution volume is a total discharge volume of the agitator trucks that have completed the material providing plus a real-time discharge volume of the agitator truck that is providing the material. After the determination of the real-time discharge volume or the real-time discharge volume and the total discharge volume of the agitator truck, the determined data may be transmitted by wireless communication mode to a apparatus performing the pumping control method described in the embodiment of the present invention such that the apparatus receives the determined data and dynamically adjusts the pumping speed of the distribution device according to the received data.
How to determine the real-time discharge volume of the agitator truck that is providing material to the distribution device will be introduced below. The real-time discharge volume of the agitator truck may be determined by arranging one or more weighing sensors at a part for supporting an agitator tank on the agitator truck. It can be seen from the density, volume, and weight relationships that the weight of the agitator tank measured by the weighing sensors and the discharge volume of the agitator truck possess a one-to-one corresponding relationship which is a linear proportion relationship, wherein a specific proportion can be obtained experimentally. A real-time discharge volume that has been finished at a certain time is calculated by an initial weight measured by the weighing sensors when the material in the agitator tank is not discharged minus a weight of the agitator tank at that time, in combination with the corresponding relationship between the weight of the agitator tank and the discharge volume of the agitator truck. In addition, it should be noted that the total discharge volume of the agitator truck that have finished the material providing can also be determined according to the above content, and the total discharge volume is calculated by the initial weight of the agitator tank measured by the weighting sensors when the material is not discharged minus the weight of the agitator tank when the agitator truck has finished the material providing, in combination with the corresponding relationship between the weight of the agitator tank and the discharge volume of the agitator truck. In addition, it should be noted that other solutions for the calculation of the discharge volume of the agitator truck in the prior art can also be adapted to the present invention.
Furthermore, in another aspect, an embodiment of the present invention provides a material distribution method.
In step S700, a distribution device is controlled to perform distribution at a to-be-distributed location in a preset distribution area.
In step S701, after distribution is finished at the to-be-distributed location, a next to-be-distributed location in the preset distribution area is determined, and distribution is performed at the next to-be-distributed location, until distribution at each to-be-distributed location in the preset distribution area is completed, wherein a material required to be distributed at the next to-be-distributed location and a material currently provided by the distribution device are concrete with the same reference sign, distribution is performed at each to-be-distributed location in the preset distribution area by the pumping control method in the above embodiment.
With the above technical solution, the distribution can be realized without manual involvement and an automatic distribution is realized.
Preferably, in the embodiment of the present invention, the step that the next to-be-distributed location in the preset distribution area is determined includes determining a to-be-distributed location in the preset distribution area according to a preset distribution path planning rule; judging whether a reference sign of desired concrete at the determined to-be-distributed location is the same as a reference sign of concrete currently provided by the distribution device; and in the case that the reference sign of the desired concrete at the determined to-be-distributed location is different from the reference sign of the concrete provided by the distribution device, re-determining a to-be-distributed location in the preset distribution area based on the preset distribution path planning rule, until the reference sign of the desired concrete at the determined to-be-distributed location is the same as the reference sign of the concrete currently provided by the distribution device, wherein the determined to-be-distributed location is the next to-be-distributed location. Specifically, when the next to-be-distributed location is determined, firstly, one to-be-distributed location in the preset distribution area is determined based on the preset distribution path planning rule, the determined to-be-distributed location may be the next to-be-distributed location, or may also not be the next to-be-distributed location, and whether the reference sign of the desired concrete required to be distributed at the determined to-be-distributed location is the same as the reference sign of the concrete currently provided by the distribution device needs to be determined. If the reference signs are the same, the determined to-be-distributed location is the next to-be-distributed location; if the reference signs are different, a to-be-distributed location needs to be re-determined according to the preset distribution path planning rule, and whether a reference sign of desired concrete of the re-determined to-be-distributed location is the same as the reference sign of the concrete currently provided by the distribution device is determined, if so, the re-determined to-be-distributed location is the next to-be-distribution location, and otherwise, re-determination is required to continue. This process is cycled until the reference sign of the desired concrete at the to-be-distributed location is determined to be the same as the reference sign of the concrete currently provided by the distribution device in the preset distribution area, so that the next to-be-distribution location is determined. Preferably, the preset distribution path planning rule may be to enable a path for distribution at remaining to-be-distributed locations in the preset distribution area to be shortest, or may be a preset sequence of the to-be-distributed locations in the preset distribution area. The sequence of all the to-be-distributed locations in the preset distribution area is set in advance, and when the distribution is completed at a certain to-be-distributed location, the next possible to-be-distributed location is determined according to the sequence set in advance.
Preferably, in the embodiment of the present invention, a material required to be distributed in the preset distribution area is concrete with the same reference sign, determining the to-be-distributed location in the preset distribution area includes determining the next to-be-distributed location according to the following formula: BSRi+1=BSRi+λ·{right arrow over (θ)}·β, wherein BSRi+1 is the next to-be-distributed location, BSRi is the current to-be-distributed location, λ is a first preset proportion coefficient, β is a real-time opening degree of a boom switch of the distribution device, and {right arrow over (θ)} is a direction of the boom switch. The direction of the boom switch determines a movement direction of a boom end, for example, the boom switch may be a universal switch; and the direction of the boom switch is a direction vector. Further, the direction of the boom switch may be in three-dimensional coordinates or in two-dimensional coordinates, which depends on the specific situations, and is not intended to limit the present invention.
Preferably, in the embodiment of the present invention, desired distribution time and a desired distribution volume may be determined according to a real-time opening degree of a pumping switch.
Specifically, a material required to be distributed in the preset distribution area is concrete with the same reference sign, when the distribution device is controlled to perform distribution at one to-be-distributed location in the preset distribution area, the desired distribution time for the to-be-distributed location is the opening duration of the pumping switch of the distribution device, and the desired distribution volume at the to-be-distributed location is determined based on the real-time opening degree of the pumping switch, the time corresponding to opening and closing in real time, and a second preset proportion coefficient. Specifically, the desired distribution volume is the opening duration of the pumping switch, and the opening duration of the pumping switch may be obtained by addition of time corresponding to real-time opening of the pumping degree, wherein the time corresponding to opening and closing in real time is the duration when the pumping switch is in the opening degree. The desired distribution volume may be determined based on accumulation of the product of each real-time opening degree and the time corresponding to the opening degree and then multiplying by the second preset proportion coefficient. For example, the real-time opening degree of the pumping switch is αi; the accumulated handle opening time is
a required distribution volume converted (desired distribution volume) is
the desired distribution time is T; k2 is the second preset proportion coefficient, which is preset in advance; and Ti is the time corresponding to an ith real-time opening degree. Preferably, in the embodiment of the present invention, the time corresponding to each real-time opening degree is the same sampling period.
In addition, in the distribution process, obstacles in the process may also be avoided to guarantee the construction safety.
Preferably, in the embodiment of the present invention, after the next to-be-distributed location in the preset distribution area is determined, whether the current boom end location of the distribution device is the same as the next to-be-distributed location is judged. In the case that the current boom end location is different from the next to-be-distributed location, a next boom end location is planned. Whether there is an obstacle at the next boom end location is judged. In the case that there is an obstacle at the next boom end location, whether the obstacle is a person is judged. In the embodiment of the present invention, identification may be performed by machine vision, radar, or other ways, or advanced presetting may be performed according to construction scenarios. In the case that the obstacle is a person, the boom is controlled to stop movement until the obstacle is not a person or the next boom end location is clear of obstacles. In the case that the obstacle is not a person, the obstacle is avoided, a next boom end location is re-planned, until the boom end of the distribution device moves to the next to-be-distributed location, such that the distribution device performs the distribution for the next to-be-distributed location, wherein planning the next boom end location and re-planning the next boom end location satisfy any one of the following conditions: a distance from the next to-be-distributed location is shortest and a number of movement sections of the boom of the distribution device is least.
Preferably, in the embodiment of the present invention, the to-be-distributed locations in the preset distribution area are planned based on at least one of: a distance between the adjacent to-be-distributed locations is less than or equal to preset distribution interval, and the distance between the adjacent to-be-distributed locations is less than or equal to a distribution diameter of an end hose of the distribution device.
The pumping control method and the material distribution method provided by the embodiment of the present invention are exemplarily introduced below by taking the material being concrete as an example, wherein a control system, method, apparatus, and device are involved in the introduction.
There are diversified distribution scenarios of concrete, in some scenarios, certain pouring locations need to be fixed for distribution, and in some scenarios, continuous distribution is required, and the demands on different pouring locations are also different. The technical solution provided by the present invention can achieve automatic distribution under different construction demands.
In an embodiment of the present invention, the control system achieves automatic planning of fixed distribution and continuous transfer, improves the degree of operation automation of the device, more closely meets the construction demands, and alleviates the labor intensity of the operation of the device by virtue of the intelligent system.
The technical solution provided by the present invention is as follows: 1) the construction demands are decomposed into pouring locations which form a construction demand matrix, the specific construction is performed innovatively according to the pouring locations, the reference sign, the obstacles, the volume, the time, etc., and the boom movement path and the pumping speed are planned, which not only satisfies the diversified construction demands, but also guarantees the safety; 2) automatic and accurate synergistic control of the boom and the pumping is achieved, since automatic distribution is not only for the pouring locations but also for accurate pouring volume requirements; 3) an automatic grouped distribution method is proposed, which decomposes large construction requirements into smaller construction requirements that are easier to implement, simplifying the difficulty of automatic distribution; 4) an information flow of an automatic distribution-accurate pouring process is broken through to meet the precise demands of engineering construction and this process is automated and intelligent; and 5) a method of adjusting the movement track of the boom according to the type of obstacles is proposed, which does not adopt an obstacle avoidance mode in order to guarantee the safety of a person when the obstacle is the person.
1) Detection Unit
The detection unit may implement the following content. The current boom end location BSt(i) may be calculated by installing a dip angle sensor and a rotation angle sensor on each section of a boom, or can be detected directly by installation of a differential GPS on a boom end or other ways. The volume PC(i) of distribution that has been completed at the current pouring location, i.e., the real-time distribution volume in the embodiment of the present invention, can be calculated by the number of pumping times, the area of a pumping concrete cylinder, a piston stroke, suction conditions, etc., and the specific calculation method refers to the calculation method for the real-time distribution volume in the above embodiment. Time PT(i) for distribution which has been completed at the current pouring location can be calculated by an internal clock of an electronic device, etc, which is equivalent to the real-time distribution time in the embodiment of the present invention. The reference sign information PMt(i) of concrete which is pumped at present can be obtained from a concrete mixing station, a carrier vehicle, a pump, etc., by a communication or identification mode. Obstacle location and type can be identified by machine vision, radar, and other ways (related techniques have been widely applied in the unmanned field), or can be preset in advance according to construction scenarios.
2) Demand Unit
The demand unit may be one or more human-computer interaction units of a mobile phone, a PC, a remote controller, a display, etc., and implements construction demands and distribution mode settings via a human-machine interface or a switch button. The construction demands may be divided into one or more groups. Four examples of the demand unit are listed below.
In a first example, as shown in
In a second example, as shown in
In a third example, on the human-machine interface, the time and volume are set for a construction area requiring the same reference sign of concrete, without presetting pouring sites. As shown in
In a fourth example, pouring sites are determined dynamically, time, a volume or the like of a next pouring site are determined in real time according to a boom switch and a pumping switch. A control device (for example, a remote controller) is configured to setting, and in a construction area requiring concrete with the same reference sign, an opening degree and direction of a control switch on the control device are discretized into locations, volumes and time of the pouring sites, and at the time, reference sign parameter of concrete is invariable. A conversion method is as follows: a discretized sampling period is T0; a real-time opening degree of the pumping switch is αi; the accumulated opening time of a handle is
a required pumping volume converted (desired distribution volume) equals to
pumping time (desired distribution time) equals to T, k2, is a second preset proportion coefficient which is preset in advance. A real-time opening of the boom switch is β, and a direction of the boom switch is {right arrow over (θ)}, the location of the next pouring site is the current location BSRi+1=BSRi+λ·{right arrow over (θ)}·β, and λ is a first preset proportion coefficient which is preset in advance. That is, construction demands can be generated in real time by the pumping switch and the boom switch of the control apparatus. In the example, time corresponding to opening and closing in real time at each time is a sampling period T0
3) Planning Unit
1) Demand Analysis
The construction demands obtained by the demand unit are converted into a demand matrix with n pouring sites, and the pouring demand matrix is
wherein BSR is a location of a required pouring site, PCR is a required pouring volume, PMR is a required reference sign of concrete, PTR is required pouring time. There may be one or more demand matrices (one demand matrix corresponds to one group) according to the grouping condition of the demand unit, and of course, matrix dimensions may also be incremented and decreased according to actual construction demands (e.g. the reference sign of concrete is not considered, etc.).
2) Control Planning
A pumping speed PVt(i) at the current time point is calculated and a boom location BSt(i+1) at the next time point is planned according to the pouring demand matrix, a control command and a current distribution status.
(2.1) Pumping Speed Calculation
(a) If the current location is at an ith pouring site,
an initialized pumping speed is:
PV
t(i)=(PCRi)/PTRi (1)
the pumping speed after dynamic adjustment is:
PV
t(i)=(PCRi−PC(i))/(PTRi−PT(i)) (2).
That is, the initialized pumping speed is calculated according to the desired distribution volume and time at this pouring site, and the pumping speed is dynamically adjusted according to the actual completed distribution volume and time to guarantee that the distribution is completed according to the desired distribution volume and time. When distribution is completed at this pouring site, the pumping speed is 0.
(b) If the current location is not at the pouring site, the pumping speed is: PVt(i)=0.
Whether the current location is at the pouring site is judged according to the relationship between a current boom end location and the pouring site, for example,
ABS(BSt(i)−BSRi)<δ(i) (3)
wherein δ(i) is a required deviation radius, which is given by the distance between the pouring sites and the end hose distribution radius, should be less than half of the distance of the adjacent pouring sites and the end hose distribution radius; BSt(i) represents the current boom end location and BSRi is a location of a pouring site in the pouring area.
(2.2) Boom Path Planning
After the distribution at the current pouring site is completed, that is the pumping speed equals to 0, the next pouring site is planned, two boom path planning modes are provided, and the next pouring site is calculated.
In a first mode, constraint conditions are as follows: a reference sign of concrete required by the next pouring site is the same as a reference sign of concrete provided by a current concrete transportation device, PMRi+1=PMt(i), wherein PMt(i) is the reference sign of concrete provided by the current concrete transportation device; and a path to complete distribution at the remaining pouring sites is shortest,
In a second mode, the distribution sequence of the pouring sites in the distribution area is preset in advance, the location of the next pouring site is a preset location, but at the same time, the reference sign of concrete satisfying the demand of the next pouring site is the same as the reference sign of concrete provided by the current concrete transportation device. When distribution is completed at all the pouring sites of the construction matrix, the planning for the next pouring site is stopped.
The overall plan flow chart of the location of the next pouring site and the current pumping speed may refer to
(2.3) Boom Location Calculation
The location of the next pouring site is planned from the above plan, and the boom location at next time can be calculated according to the current boom location, obstacle location and the location of the next pouring site, as shown in
4) Boom Control Unit and Pumping Control Unit
(1) According to the calculated pumping speed PVt(i), the pumping control unit implements an adjustment by controlling a main pump displacement and an engine speed.
(2) The boom control unit controls, according to the current boom end location BSt(i) and the boom end location BSt(i+1) at next time, and a difference value Ti(Ti=t(i+1)−t(i)) between the two time, a movement direction BDt(i) and a movement speed BVt(i) in a target direction of the boom, BDt(i)=BSt(i+1)−BSt(i), BVt(i)=ABS(BSt(i+1)−BSt(i))/Ti).
Furthermore, the embodiments of the present invention may be applied to a variety of concrete distribution device.
1) Concrete Spreader Device
The reference sign of the current concrete is obtained by a wired or wireless communication mode from a concrete pumping device or a cloud platform, and the construction demands are obtained by the cloud platform, and a distribution control system drives a corresponding actuator of the concrete spreader device to perform distribution.
2) Concrete Pump Truck Device
The reference sign of the current concrete is obtained by a wired or wireless communication mode from a concrete carrier vehicle or a cloud platform, and the construction demands are obtained by the cloud platform, and a distribution control system drives a corresponding actuator of a pumping device to perform distribution.
3) Distribution Device (e.g. a Pump Truck/Spreader, Etc.)
A reference sign of concrete is identified or set directly locally (e.g., by a machine vision identification mode or an artificial setting confirmation mode), and the construction demands (set by the demand unit of the distribution control system) are set.
Further, the construction scenarios of the concrete spreader can refer to
Compared with the prior art, the technical solution provided by the present invention has the following advantages: 1, the boom movement path can be planned automatically according to the specific demands such as the pouring location, reference signs, volumes and time, instead of just using a path presetting mode, and different distribution demands can be adapted; 2, it can be guaranteed that the distribution volume at each pouring site can satisfy the construction demands; 3, concrete with different reference signs can be prevented from pouring to an unmatched pouring site to avoid engineering quality problems; and 4, the boom can be prevented from touching the obstacle in the movement process to guarantee the construction safety.
Correspondingly, in an another aspect, an embodiment of the present invention also provides a pumping control apparatus.
Preferably, in the embodiment of the present invention, the real-time distribution volume is determined according to an area of a pumping concrete cylinder and an effective stroke of a piston in pumping at each time.
Preferably, in the embodiment of the present invention, the real-time distribution volume is determined by: multiplying a number of pumping times, the area of the pumping concrete cylinder, and an average value of the effective stroke of the piston in pumping at each time; or determining a distribution volume in pumping at each time based on the area of the pumping concrete cylinder and the effective stroke of the piston in pumping at each time, and accumulating the distribution volume in pumping at each time.
Preferably, in the embodiment of the present invention, the effective stroke of the piston in pumping at each time is determined based on: time when the piston starts to move in pumping at this time, time when a pumping pressure reaches a stable value, time when pumping is completed, and a theoretical stroke of the piston.
Preferably, in the embodiment of the present invention, the effective stroke of the piston in pumping at each time is determined based on: an actual stroke of the piston from the start of pumping to the pumping pressure reaching the stable value during pumping at this time, an actual stroke from the pumping pressure reaching the stable value to the end of pumping during pumping at this time, and a preset suction coefficient.
Preferably, in the embodiment of the present invention, the real-time distribution volume is determined according to a real-time discharge volume of an agitator truck for providing a material for the distribution device.
The specific working principles and benefits of the pumping control apparatus provided by the embodiment of the present invention are similar to those of the pumping control method provided by the embodiment of the present invention and will not be described in detail herein.
Accordingly, in another aspect, an embodiment of the present invention also provides a material distribution apparatus, including: a distribution control module configured to control a distribution device to perform distribution at a to-be-distributed location in a preset distribution area, and after distribution is completed at the to-be-distributed location, determine a next to-be-distributed location and performing distribution at the next to-be-distributed location until distribution at each to-be-distributed location in the preset distribution area is completed, wherein a material required to be distributed at the next to-be-distributed location and a material currently provided by the distribution device are concrete with the same reference sign, and distribution is performed at each to-be-distributed location in the preset distribution area according to the pumping control method in the embodiment of the present invention.
Preferably, in the embodiment of the present invention, the determining the next to-be-distributed location in the preset distribution area comprising: determining a to-be-distributed location in the preset distribution area based on a preset distribution path planning rule; judging whether a reference sign of desired concrete at the determined to-be-distributed location is the same as a reference sign of concrete currently provided by the distribution device; and in the case that the reference sign of the desired concrete at the determined to-be-distributed location is different from the reference sign of the concrete provided by the distribution device, re-determining a to-be-distributed location in the preset distribution area based on the preset distribution path planning rule, until the reference sign of the desired concrete at the determined to-be-distributed location is the same as the reference sign of the concrete currently provided by the distribution device, wherein the determined to-be-distributed location is the next to-be-distributed location.
Preferably, in the embodiment of the present invention, the preset distribution path planning rule is:
such that a path for distribution completed at remaining to-be-distributed locations in the preset distribution area is shortest; or a preset sequence of the to-be-distributed locations in the preset distribution area.
Preferably, in the embodiment of the present invention, a material required to be distributed in the preset distribution area is concrete with the same reference sign, and the determining the next to-be-distributed location in the preset distribution area comprises determining the next to-be-distributed location according to the following formula: BSRi+1=BSRi+λ·{right arrow over (θ)}·β, wherein BSRi+1 is the next to-be-distributed location, BSRi is a current to-be-distributed location, λ is a first preset proportion coefficient, β is a real-time opening degree of a boom switch of the distribution device, and {right arrow over (θ)} is a direction of the boom switch.
Preferably, in the embodiment of the present invention, a material required to be distributed in the preset distribution area is concrete with the same reference sign, when the distribution device is controlled to perform distribution at one to-be-distributed location in the preset distribution area, desired distribution time for this to-be-distributed location is an opening duration of a pumping switch of the distribution device, and a desired distribution volume at this to-be-distributed location is determined based on the real-time opening degree of the pumping switch, time corresponding to opening and closing in real time, and a second preset proportion coefficient.
Preferably, in the embodiment of the present invention, after determining the next to-be-distributed location in the preset distribution area, the distribution apparatus further comprising: a judgment module configured to judge whether a current boom end location of the distribution device is the same as the next to-be-distributed location after the next to-be-distributed location in the preset distribution area is determined; a planning module configured to plan a next boom end location in the case that the current boom end location is different from the next to-be-distributed location; the judgment module further configured to: judge whether there is an obstacle at the next boom end location, and judge whether the obstacle is a person in the case that there is the obstacle at the next boom end location; the distribution apparatus further comprising: in the case that the obstacle is a person, controlling a boom to stop movement until the obstacle is not a person or the next boom end location is clear of an obstacle; and the planning module is further configured to: in the case that the obstacle is not a person, avoid the obstacle, re-planning a next boom end location until a boom end of the distribution device moves to the next to-be-distributed location such that the distribution device performs distribution at the next to-be-distributed location, wherein the planning the next boom end location and re-planning the next boom end location satisfy any one of the following conditions: a distance from the next to-be-distributed location is shortest and a number of movement sections of the boom of the distribution device is least.
Preferably, in the embodiment of the present invention, the to-be-distributed location in the preset distribution area is planned based on at least one of: a distance between the adjacent to-be-distributed locations is less than or equal to a preset distribution interval, and the distance between the adjacent to-be-distributed locations is less than or equal to a distribution diameter of an end hose of the distribution device.
In addition, in another aspect, an embodiment of the present invention provides a distribution device including: the pumping control apparatus in the above embodiment; and/or the distribution apparatus in the above embodiment.
The preferred embodiments of the present invention are described above in detail with reference to the accompanying drawings, but the present invention is not limited to the specific details in the above embodiments, multiple simple modifications may be made to the technical solutions of the present invention within the technical concept of the present invention, and these simple modifications fall within the scope of protection of the present invention.
Furthermore, it should be noted that various specific technical features described in the above specific embodiments may be combined in any suitable manner in the case of no confliction. In order to avoid unnecessary repetition, various possible combinations are not further described in the present invention.
In addition, optional combination between the various different embodiments of the present invention is also possible as long as it does not depart from the concept of the present invention and should likewise be considered as the disclosure of the present invention.
Number | Date | Country | Kind |
---|---|---|---|
202010808872.6 | Aug 2020 | CN | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2020/127431 | 11/9/2020 | WO |