This application claims priority to a Chinese Application No. 201710185673.2, filed on Mar. 26, 2017. The Chinese Application is incorporated herein by reference in its entirety.
This invention relates to a building construction machinery, specifically to a rack assembly for an in-field 3D construction printer.
In the existing technology, the construction of an exterior wall, insulation and exterior wall decoration for most buildings is basically implemented in steps. During exterior wall construction, the interior/exterior molds are required. For insulation and exterior wall decoration, it is necessary to set up a scaffold, however bringing such scaffold structure can complicate a construction procedure, cause long construction time and create heavy material wasting. In recent years, with the progress of digital technology, some building members can be implemented with a 3D printing technology in a plant building, and the building members from the digital print can be sent to the field for installation. But this is not a field print, and it is still a distance away from a truly 3D printed building. Field print means printing on the spot, in the field. Even for the buildings printed on the spot in the field, following problems occurs. For example, 3D printing head has to rise as the height of the building increases, so far there is not a good method to achieve the height management, therefore the current 3D printed building is only limited to one or two floors in height. Another prominent issue is that the cement concrete mortar required by the 3D printing has even poorer ability to flow and is more difficult to transport, compared with cement concrete mortar used in the traditional process. In addition, simultaneous construction of water and electricity equipment and a series of other issues have yet to be resolved. The technology of printing buildings needs to be further improved.
The objective of this invention is to provide a rack assembly for a 3D construction printer which has a simple structure and can be operated very conveniently. The rack assembly in the present invention is aimed to overcome the existing technical issues in the 3D construction printing.
The present invention is achieved through the following technical solutions. The rack assembly of one 3D construction printer comprises two rows of vertical supporting posts anchored from the ground, separated by a first predetermined distance along a lateral direction (a width direction of the rack assembly), disposed in symmetrical arrangements, wherein each row of vertical supporting posts consists essentially of a plurality of vertical supporting posts along a longitudinal direction (a length direction of the rack assembly), spaced apart from each other with a second pre-determined distance and anchored from the ground. Within each row of vertical supporting posts, between two neighboring vertical supporting posts, longitudinal beams are provided and extended along the length direction of the rack assembly, and longitudinal beams placed symmetrically on inner sides of vertical supporting post, across from each other, the longitudinal beams are configured to provide support and allow a cart carrying a 3D construction printer to move in the longitudinal direction of the rack assembly. Said longitudinal beams are uniformly distributed along a height direction of the vertical supporting beams, and on upper surface of the longitudinal beams disposed are guiding rails for the movement of the cart carrying the 3D construction printer. On a top of the rack assembly, from one row to the other row of the vertical supporting posts, a rectangular ring frame is provided, which is formed by another sets of lateral and longitudinal beams, and on each of the longitudinal ends of the rows of vertical supporting beams, a cantilever extension end, being suspended, is connected to said rectangular ring frame. Further on the upper surface of a bottom longitudinal beam of the rectangular ring frame, guiding rails are provided in order for the cart carrying a bridge crane to move along the longitudinal direction of the rectangular ring frame.
There is a canopy on the top of said rectangular ring frame.
Compared with the existing technology, the rack structure for a field building 3D printer, disclosed in this invention, has the following advantages. In this invention, after the 3D construction printer is placed on the longitudinal beam of the rack structure, the 3D construction printer can start work according to a predetermined a sequence of procedures. The bridge crane located on the rectangular ring frame of the rack can not only continuously feed material supply to the 3D construction printer, but also can lift and move the 3D construction printer onto the longitudinal beam from a bottom floor to an upper floor for continued printing. The rack assembly for an in-field 3D construction printer disclosed in the present invention enables continuous working of the 3D construction printer.
This invention is further described in combination with the embodiments below. The rack assembly disclosed as one embodiment of the present invention, which illustrates a front view in the
In this invention, the following measures will be further taken: there is the canopy on the top of said rectangular ring frame. Such structure can still ensure the work even in the rainy days.
The present invention is accomplished according to the following work principles and executes in the following method steps. The present invention provides a rack for a 3D construction printer. The method to build a house using the rack according to the aspects of the present invention and a 3D construction printer is described below. First, providing drawings on the ground where a house is going to be built and determining the number of required vertical supporting posts and the distance between the two rows of the vertical supporting posts, according to the size of the house to be built. In one embodiment of the present invention, two rows of 3 vertical supporting posts are required. Then, the method further comprises according to the height of the house to be built, determining the number of longitudinal beams that is used to support for 3D construction printer to move in the horizontal direction, which is the direction along the length of the rack. For example, in the same embodiment of the present invention, three longitudinal beams are used in three bottom floors of the rack. In each floor, guiding rails are laid on the surface of the longitudinal beams. The 3D construction printer itself has three moving mechanisms. A first moving mechanism can drive the 3D construction printer to move along the rails on the longitudinal beam. A second moving mechanisms is to make the 3D construction printer to move between the two rows of vertical supporting posts using self-provided guide rails. A third moving mechanisms is to allow the 3D construction printer to move in the vertical direction when the 3D construction printer is positioned on the longitudinal beams of the rack, moving up and down, using the self-provided guiding rails. The 3D construction printer can print a housing structure according to a preset program by its own moving mechanisms once it is placed on the guided rails of the longitudinal beams of the rack disclosed in the present invention.
When the house to be built is relatively high, and the vertical movement of 3D construction printer using its self-provided guiding rails and movement mechanism cannot move that high, then the 3D construction printer need to be lifted to guiding rails on a higher floor of the rack to continue the printing. The lift is accomplished by a crane on a rectangular ring frame of the rack. The 3D construction printer is first removed off from the longitudinal beams by a crane, then it is moved to below an overhanging cantilever of the rectangular ring frame as the crane moves, and subsequently the 3D construction printer is delivered to the height of the desired longitudinal beam and transferred over and placed on to the desired guiding rails on the longitudinal beams rails. Further, according to the aspects of the present invention, the crane placed in the rectangular ring frame of the rack can not only lift and deliver the 3D construction printer as describe, the cement concrete slurry is also delivered to a storage hopper of the 3D construction printer through the crane, so that the 3D construction printer can print continuously.
The structure in this invention has been described in combination with the attached drawings and the embodiment, and it does not constitute a restriction to this invention. A person skilled in this art can make the adjustment according to the actual need, and the changes or modifications made within the scope of the claims shall be within the scope of the invention to be protected.
Number | Name | Date | Kind |
---|---|---|---|
4555890 | Gartner | Dec 1985 | A |
20100119336 | Echauri Senosiain | May 2010 | A1 |
20100207288 | Dini | Aug 2010 | A1 |
20140252668 | Austin | Sep 2014 | A1 |
Number | Date | Country |
---|---|---|
0867581 | Sep 1998 | EP |
Number | Date | Country | |
---|---|---|---|
20180274250 A1 | Sep 2018 | US |