Claims
- 1. A method for assembling a radiating truss roof support array, comprising the steps:
- providing a peripheral ring defining an outer periphery for an array;
- locating a central girder within the periphery of said peripheral ring;
- suspending a plurality of trusses, said trusses extending generally radially from said central girder to said peripheral ring for connecting said central girder to said peripheral ring;
- connecting adjacent radial trusses with a plurality of inner truss members extending generally perpendicularly from the associated radial trusses to form multiple concentric rings of said inner truss members, said rings radiating from said central girder outward to said peripheral ring, said concentric rings being separated by first fixed intervals, being interrupted at second fixed intervals leaving predetermined adjacent radial trusses unconnected by said inner-truss members.
- 2. A method for assembling a radiating truss roof support array as in claim 1, and further comprising the step:
- tensioning said radial trusses between said central girder and peripheral ring.
- 3. A method of assembling a radiating truss roof support array as in claim 2, and further comprising the step:
- completing said interrupted concentric rings after said tensioning by inserting additional inner-truss members to connect adjacent radial trusses at at least a portion of said second intervals.
- 4. A method of assembling a radiating truss roof support array as in claim 2, wherein said tensioning of said radial trusses is completed in a preselected sequence.
- 5. A method of assembling a radiating truss roof support array as in claim 1, and further comprising the step:
- vertically supporting said peripheral ring.
- 6. A method as in claim 4, wherein said peripheral ring is an oval having a long axis, and a short axis and includes a pair of curved ends connected together by an intermediate straight portion, said sequence includes the steps of first tensioning the radial trusses of said straight portion and then tensioning the radial trusses of said curved portions.
- 7. A method as in claim 6, wherein in tensioning said radial trusses of said curved portions, the radial trusses parallel to said long axis and at 45.degree. relative to said long axis are tensioned first.
Priority Claims (1)
Number |
Date |
Country |
Kind |
63-123353 |
May 1988 |
JPX |
|
Parent Case Info
This is a division of application Ser. No. 354,452, filed May 19, 1989 now U.S. Pat. No. 5,058,334.
US Referenced Citations (4)
Foreign Referenced Citations (2)
Number |
Date |
Country |
1451762 |
Sep 1966 |
FRX |
2150066 |
Jun 1987 |
GBX |
Non-Patent Literature Citations (2)
Entry |
Popular Mechanics "Domed College Arena Built without Pillars" p. 75 .COPYRGT.Aug. 1956. |
Architectural Record "Prestressing Prevents Flutter of Caple Roof" pp. 178-181 .COPYRGT.Aug. 1959. |
Divisions (1)
|
Number |
Date |
Country |
Parent |
354452 |
May 1989 |
|