1. Technical Field
The present invention relates to a radio base station and a mobile communication method.
2. Background Art
In a mobile communication system of an LTE (Long Term Evolution) scheme defined in the 3GPP, each mobile station UE is configured to transmit a scheduling request (hereinafter, referred to as “SR”) that requests scheduling for uplink data communication to a radio base station eNB via PUCCH (Physical Uplink Control Channel).
However, since a method for assigning an SR transmission resource to each mobile station UE has not been defined in the 3GPP, there is a problem that the SR transmission resource may not be appropriately assigned in the above-mentioned mobile communication system.
Therefore, the present invention is intended to overcome the above-described problem. An object of the present invention is to provide a radio base station capable of appropriately assigning an SR transmission resource, and a mobile communication method therefor.
The first feature of the present invention is summarized in that a radio base station comprising: a resource assignment unit configured to determine a time direction resource, a frequency direction resource, and a code direction resource which are to be assigned as a scheduling request transmission resource for transmitting a scheduling request that requests scheduling for uplink data communication to each mobile station, the resource assignment unit is configured to determine the time direction resource and the frequency direction resource, which are to be assigned as the scheduling request transmission resource, and then determine the code direction resource to be assigned as the scheduling request transmission resource the resource assignment unit is configured to assign, as the scheduling request transmission resource, in order from a frequency direction resource having a lower usage rate of the code direction resource in each time direction resource.
The second feature of the present invention is summarized in that a mobile communication method, comprising: a step A of determining a time direction resource, a frequency direction resource, and a code direction resource which are to be assigned as a scheduling request transmission resource for transmitting a scheduling request that requests scheduling for uplink data communication to each mobile station; and a step B of notifying each mobile station of the time direction resource, the frequency direction resource, and the code direction resource which have been assigned as the scheduling request transmission resource, in the step A, the time direction resource and the frequency direction resource to be assigned as the scheduling request transmission resource are determined, and then the code direction resource to be assigned as the scheduling request transmission resource is determined in the step A, each time direction resource are assigned as the scheduling request transmission resource, in order from a frequency direction resource having a lower usage rate of the code direction resource.
As described above, according to the present invention, it is possible to provide a radio base station capable appropriately assigning an SR transmission resource, and a mobile communication method therefor.
(Configuration of Mobile Communication System According to First Embodiment of the Present Invention)
With reference to
The mobile communication system according to the present embodiment is a mobile communication system of an LTE scheme. In the mobile communication system according to the present embodiment, as illustrated in
As illustrated in
The resource assignment unit 11 is configured to assign a predetermined physical channel resource in each cell subordinate to the radio base station eNB.
For example, the resource assignment unit 11 is configured to assign a PUCCH resource, a PUSCH (Physical Uplink Shared Channel) resource and the like as an uplink physical channel resource in each cell subordinate to the radio base station eNB.
Further, the resource assignment unit 11 is configured to assign a PDCCH (Physical Downlink Control Channel) resource, a PDSCH (Physical Downlink Shared Channel) resource and the like as a downlink physical channel resource in each cell subordinate to the radio base station eNB.
Here, the resource assignment unit 11 is configured to assign a CQI transmission resource, an A/N transmission resource, or an SR transmission resource among the PUCCH resources.
A specific example of the operation in which the resource assignment unit 11 assigns the resource will be explained later.
The notification unit 12 is configured to notify the resource assigned by the resource assignment unit 11 in each cell subordinate to the radio base station eNB.
Specifically, the notification unit 12 is configured to notify each mobile station UE of the CQI transmission resource, the A/N transmission resource, or the SR transmission resource by way of an RRC message.
The specific example of the operation in which the resource assignment unit 11 assigns the resource will be explained, below.
Specifically, the resource assignment unit 11 is configured to determine a time direction resource, a frequency direction resource, and a code direction resource which are to be assigned to each mobile station UE as the SR transmission resource.
As illustrated in
For example, as illustrated in
As illustrated in
Here, each resource block (hereinafter, referred to as “RB”) is configured by 7 OFDM symbols and 12 sub-carriers.
It is noted that, as illustrated in
Further, the resource assignment unit 11 is configured to assign the PUCCH resource between a first half portion (slot) within a single sub-frame and a second half (slot) thereof, by way of “Intra-subframe frequency hopping” as illustrated in
As illustrated in
As illustrated in
It is noted that, as illustrated in
The resource assignment unit 11 is configured to determine RB (frequency direction resource) to be assigned to each mobile station UE as the SR transmission resource, from the RBs assigned as the PUCCH RBs.
Further, as illustrated in
As illustrated in
That is, the resource assignment unit 11 is configured to determine a resource index for specifying a resource (combinations of RBs and CS/OCs) in each sub-frame assigned as the SR transmission resource, the notification unit 12 is configured to notify each mobile station UE of the determined resource index, and each mobile station UE is configured to transmit the SR using the SR transmission resource (within the PUCCH resource) specified by the notified resource index.
Further, in RB #NRB(2) where CQI, A/N and SR are present together, as illustrated in
Here, NCS(1) denotes the number of the CSs assignable as the A/N transmission resource and the SR transmission resource in the RBs where the CQI, the A/N and the SR are present together, and is a multiple of Δshift. The Δshift denotes the amount of “Cyclic Shift” used when calculating the CS.
In the example of
It is noted that, in order to avoid interference, a code direction resource (CS) for guard is provided between the code direction resource (CS) assignable as the CQI transmission resource and the code direction resource (CS) assignable as the A/N transmission resource and the SR transmission resource. Further, the code direction resource (CS) for guard may be provided between the code direction resources (CSs) assignable as the CQI transmission resource.
The resource index imparted to the code direction resource (CS) assignable as the CQI transmission resource and the resource index imparted to the code direction resource (CS/OC) assignable as the A/N transmission resource and the SR transmission resource are separated from each other.
Further, as illustrated in
Here, a semi-persistent scheduling (hereinafter, referred to as “SPS”) denotes scheduling configured to periodically assign a fixed resource (e.g., a PDSCH resources and a PDUCH resource) to the mobile station UE, and dynamic scheduling (hereinafter, referred to as “DS”) denotes scheduling configured to assign a resource (e.g., a PDSCH resource and a PDUCH resource) to the mobile station UE in each sub-frame.
Further, the SPS A/N transmission resource is used to transmit A/N for downlink data scheduled by the SPS and transmitted via PDSCH, and the DS A/N transmission resource is used to transmit A/N for downlink data scheduled by the DS and transmitted via PDSCH.
Specifically, as illustrated in
In this case, the number of CS/OCs necessary for the DS A/N transmission resource is fixedly determined by a system bandwidth. For example, when the system bandwidth is “5 MHz”, the number of CS/OCs necessary for the DS A/N transmission resource is “20”.
Further, as illustrated in
It is noted that, since the transmission frequency of SR is low, the CS/OC available as the SR transmission resource is inserted among the CS/OCs available as the SPS A/N transmission resource, so that it is possible to reduce interference.
As described above, the resource assignment unit 11 is configured to determine the sub-frame and the RB to be assigned as the SR transmission resource, and then determine the CS/OC to be assigned as the SR transmission resource.
For example, the resource assignment unit 11 may be configured to determine the RB to be assigned as the SR transmission resource based on the usage situation of the CS/OC in each RB.
Specifically, the resource assignment unit 11 may be configured to preferentially assign RB having a smaller number of CS/OCs in use, as the SR transmission resource, within each sub-frame.
Further, the resource assignment unit 11 may be configured to preferentially assign RB having a larger number of available CS/OCs, as the SR transmission resource, within each sub-frame.
Here, the resource assignment unit 11 may be configured to use CS/OC that has elapsed a constant period of time after being released within each sub-frame as the available CS/OC.
Also, the resource assignment unit 11 may be configured to preferentially assign RB having a smaller usage rate of CS/OC within each sub-frame as the SR transmission resource.
For example, the resource assignment unit 11 may be configured to calculate the usage rate of the CS/OC in each RB by (the usage rate of CS/OC)=(the amount of resources used in each RB) (the number of CS/OCs assignable as SR transmission resource and SPS A/N transmission resource in each RB).
Here, the amount of the resources used in each RB may be calculated by (the amount of the resources used in each RB)=WSR×(the number of CS/OCs used as SR transmission resource in each RB)+WSPS A/N×(the number of CS/OC s used as SPS A/N transmission resource).
It is noted that, the WSR and the WSPS A/N denote a weight coefficient determined in consideration of the transmission frequency of the SR and the SPS A/N.
That is, in such a case, the resource assignment unit 11 is configured to determine RB to be assigned as the SR transmission resource based on the usage situation of CS/OC used as the SPS A/N transmission resource and the usage situation of CS/OC used as the SR transmission resource in each RB.
As a result, it is possible to suppress interference in the same RBs as much as possible.
As illustrated in
In such a case, the resource assignment unit 11 may be configured to assign CS/OC to which an even resource index is imparted as the SPS A/N transmission resource, in order from CS/OC to which the largest resource index is imparted, from among remaining CS/OCs other than the CS/OCs available as the DS A/N transmission resource from among the CS/OCs available within the RBs where the CQI, the A/N, and the SR are present together.
Here, as illustrated in
As a result, it is possible to adjust a “resource ratio” indicating the ratio of the number of the CS/OCs used as the SPS A/N transmission resource, relative to the number of the CS/OCs used as the SR transmission resource.
In the example of
N
start
SR+2i(i=0,1, . . . ,ceil(Ntotal/2)−1)
N
start
SR+2j+1(j=0,1, . . . ,NSR□(Ntotal/2)−1)
Further, in the example of
N
start
SR+2j+1(j=NSR□ceil(Ntotal/2), . . . ,floor(Ntotal/2)−1)
Here, the NstartSR denotes the smallest resource index of the CS/OC available as the SR transmission resource, the NSR denotes the number of the CS/OCs available as the SR transmission resource, and the Ntotal denotes the number of remaining CS/OCs other than the CS/OCs available as the DS A/N transmission resource among the CS/OCs available in RBs where the CQI, the A/N, and the SR are present together.
It is noted that, the resource assignment unit 11 may be configured to assign CS/OC to which an even resource index is imparted as the SR transmission resource, in order from CS/OC to which the smallest resource index is imparted, from among remaining CS/OCs other than the CS/OCs available as the DS A/N transmission resource from among the CS/OCs available in the RBs where the CQI, the A/N, and the SR are present together.
In such a case, the resource assignment unit 11 may be configured to assign CS/OC to which an odd resource index is imparted as the SPS A/N transmission resource, in order from CS/OC to which the largest resource index is imparted, from among remaining CS/OCs other than CS/OCs available as the DS A/N transmission resource from among CS/OCs available in RBs where the CQI, the A/N, and the SR are present together.
Further, the resource assignment unit 11 may be configured to assign CS/OC to which an even resource index is imparted as the SR transmission resource, in order from CS/OC to which the largest resource index is imparted, from among remaining CS/OCs other than the CS/OCs available as the DS A/N transmission resource from among the CS/OCs available in the RBs where the CQI, the A/N, and the SR are present together.
In such a case, the resource assignment unit 11 may be configured to assign CS/OC to which an odd resource index is imparted as the SPS A/N transmission resource, in order from CS/OC to which the smallest resource index is imparted, from among remaining CS/OCs other than CS/OCs available as the DS A/N transmission resource from among CS/OCs available in RBs where the CQI, the A/N, and the SR are present together.
Moreover, the resource assignment unit 11 may be configured to assign CS/OC to which an odd resource index is imparted as the SR transmission resource, in order from CS/OC to which the largest resource index is imparted, from among remaining CS/OCs other than the CS/OCs available as the DS A/N transmission resource from among the CS/OCs available in the RBs where the CQI, the A/N, and the SR are present together.
In such a case, the resource assignment unit 11 may be configured to assign CS/OC to which an even resource index is imparted as the SPS A/N transmission resource, in order from CS/OC to which the smallest resource index is imparted, from among remaining CS/OCs other than CS/OCs available as the DS A/N transmission resource from among CS/OCs available in RBs where the CQI, the A/N, and the SR are present together.
Further, the SR transmission resource in each RB is assigned to the mobile station UE in order from the CS/OC to which the smallest resource index is imparted, by an odd-numbered CS/OC, and then is assigned to the mobile station UE in order from the CS/OC to which the smallest resource index is imparted, by an even-numbered CS/OC.
Further, at the time of the assignment, the CS/OC assigned as the SR transmission resource may be assigned in a round-robin manner.
(Operation of Mobile Communication System According to First Embodiment of the Present Invention)
With reference to
As illustrated in
When it is determined that a vacant resource exists, the radio base station eNB proceeds to the process of step S102. When it is determined that the vacant resource does not exist, the radio base station eNB fails in the assignment of the SR transmission resource.
In step S102, the radio base station eNB evaluates a minimum value N, of the resource usage rate (the usage rate of CS/OC) in RBs including the vacant resource assignable as the SR transmission resource.
The radio base station eNB sets “k=0” in step S103 and determines whether “p(k)>Nmin” is established in step S104. Here, the p(k) denotes the resource usage rate in RB#k (kth RB).
When it is determined that the “p(k)>Nmin” is established, the radio base station eNB increments “k” by one in step S105 until it exceeds the total number of RBs in a subframe, and returns to the operation of step S104.
Meanwhile, when it is determined that the “p(k)>Nmin” is not established, the radio base station eNB assigns the RB#k as the SR transmission resource in step S106, and calculates “n” by “n=(MkSR+1) mod NkSR” in step S107.
Here, the MkSR denotes the number of SR transmission resources used in the kth RB, and the NkSR denotes the number of all SR transmission resources available in the kth RB.
In step S108, the radio base station eNB determines whether an n-th resource (CS/OC) in the RB#k is available.
When it is determined that the n-th resource (CS/OC) in the RB#k is available, the radio base station eNB assigns the n-th resource (CS/OC) in the RB#k as the SR transmission resource in step S109.
Meanwhile, when it is determined that the n-th resource (CS/OC) in the RB#k is not available, the radio base station eNB increments “n” by one in step S110 and determines whether “n>NkSR” is established in step S111.
When it is determined that the “n>NkSR” is established, the radio base station eNB returns to the operation of step S105. When it is determined that the “n>NkSR” is not established, the radio base station eNB returns to the operation of step S108.
(Operation and Effect of the Mobile Communication System According to the First Embodiment of the Present Invention)
In accordance with the mobile communication system according to the first embodiment of the present invention, since the radio base station eNB is configured to determine sub-frame and RBs to be assigned as SR transmission resource, and then determine CS/OC to be assigned as the SR transmission resource, the number of CS/OCs assigned as the SR transmission resource in the same RBs is reduced, so that it is possible to suppress the influence of interference.
The above-mentioned characteristics of the embodiment may be expressed as follows:
A first characteristic of this embodiment is a radio base station eNB including: a resource assignment unit 11 configured to determine a sub-frame (time direction resource), RB (frequency direction resource), and CS/OC (code direction resource) which are to be assigned as SR transmission resource (scheduling request transmission resources) for transmitting SR (scheduling request) that requests scheduling for uplink data communication to each mobile station UE, that is, to determine a resource index for specifying the resource (combination of frequency direction resource and code direction resource) in each sub-frame which is to be assigned as the SR transmission resource, in which the resource assignment unit 11 is configured to determine a sub-frame and RB to be assigned as the SR transmission resource, and then to determine CS/OC to be assigned as the SR transmission resource.
In the first characteristic of this embodiment, the resource assignment unit 11 may be configured to determine the RB to be assigned as the SR transmission resource based on the usage situation of CS/OC in each RB.
In the first characteristic of this embodiment, the resource assignment unit 11 may be configured to assign, as the SR transmission resource, in order from RB having a smaller number of CS/OCs in use, within each sub-frame.
In the first characteristic of this embodiment, the resource assignment unit 11 may be configured to assign, as the SR transmission resource, in order from RB having a larger number of available CS/OCs within each sub-frame.
In the first characteristic of this embodiment, the resource assignment unit 11 may be configured to assign, as the SR transmission resource, in order from RB having a smaller usage rate of CS/OC within each sub-frame.
In the first characteristic of this embodiment, the resource assignment unit 11 may be configured to use CS/OC that has elapsed a constant period of time after being released within each sub-frame, as available CS/OC.
In the first characteristic of this embodiment, an SPS A/N transmission resource (resource for transmitting a semi-persistent scheduling transmission acknowledgement signal) is used to transmit A/N (transmission acknowledgement signal) for downlink data scheduled by SPS (semi-persistent scheduling) and transmitted via PDSCH (downlink data channel), a DS A/N transmission resource (resource for transmitting a dynamic scheduling transmission acknowledgement signal) is used to transmit A/N for downlink data scheduled by DS (dynamic scheduling) and transmitted via PDSCH, and the resource assignment unit 11 may be configured to use remaining CS/OCs other than CS/OCs available as the DS A/N transmission resource, among CS/OCs available in RBs assigned as the SR transmission resource, as CS/OC available as the SPS A/N transmission resource or the SR transmission resource.
In the first characteristic of this embodiment, the resource assignment unit 11 may be configured to determine RB to be assigned as the SR transmission resource based on the usage situation of CS/OC used as the SPS A/N transmission resource and the usage situation of CS/OC used as the SR transmission resource in each RB.
In the first characteristic of this embodiment, the resource assignment unit 11 may be configured to assign CS/OC to which an even resource index (even number) is imparted as the SR transmission resource, in order from CS/OC to which the smallest resource index (number) is imparted among the remaining CS/OCs other than the CS/OCs available as the DS A/N transmission resource.
In the first characteristic of this embodiment, the resource assignment unit 11 may be configured to assign CS/OC to which an odd resource index (odd number) is imparted as the SR transmission resource, in order from CS/OC to which the smallest resource index (number) is imparted among the remaining CS/OCs other than the CS/OCs available as the DS A/N transmission resource.
In the first characteristic of this embodiment, the resource assignment unit 11 may be configured to assign CS/OC to which an even resource index (even number) is imparted as the SR transmission resource, in order from CS/OC to which the largest resource index (number) is imparted among the remaining CS/OCs other than the CS/OCs available as the DS A/N transmission resource.
In the first characteristic of this embodiment, the resource assignment unit 11 may be configured to assign CS/OC to which an odd resource index (odd number) is imparted as the SR transmission resource, in order from CS/OC to which the largest resource index (number) is imparted among the remaining CS/OCs other than the CS/OCs available as the DS A/N transmission resource.
A second characteristic of this embodiment is a mobile communication method including: a step A of determining a sub-frame, RB, and CS/OC, which are to be assigned to each mobile station UE as an SR transmission resource; and a step B of notifying each mobile station UE of the sub-frame, the RB, and the CS/OC assigned as the SR transmission resource, in which in the step A, the sub-frame and the RB to be assigned as the SR transmission resource are determined, and then the CS/OC to be assigned as the SR transmission resource is determined.
Note that operation of the above described the radio base station eNB and the mobile station UE may be implemented by means of hardware, a software module executed by a processor, or a combination of both.
The software module may be provided in any type of storage medium such as an RAM (Random Access Memory), a flash memory, a ROM (Read Only Memory), an EPROM (Erasable Programmable ROM), an EEPROM (Electronically Erasable and Programmable ROM), a register, a hard disk, a removable disk, or a CD-ROM.
The storage medium is connected to the processor so that the processor can read and write information from and to the storage medium. Also, the storage medium may be integrated into the processor. Also, the storage medium and the processor may be provided in an ASIC. The ASIC may be provided in the radio base station eNB or the mobile station UE. Also, the storage medium and the processor may be provided in the radio base station eNB or the mobile station UE as a discrete component.
It is noted that see the following for the details in
□resource usage rate of k-th RB: p(k)
Total SR transmission resource number in k-th RB: NkSR
Total SPS A/N transmission resource number in k-th RB: NkAN
SR transmission resource number used in k-th RB: MkSR
SPS A/N transmission resource number used in k-th RB: KAN
□p(k)=(wSRMkSR+WANMkAN)/(NkSR+NkAN)
□ in k-th RB,
SR transmission resource assigned last time: m(k)
□x-th RB used in this case means x-th RB of a serial number assigned to all the RB in all subsframes
□x-th resource used in this case means a resource assigned x-th in SR transmission resource in the RB (number in RB, and different from a resource index that is provided as a serial number over RB)
Hereinabove, the present invention has been described in detail using the above embodiment; however, it is apparent to those skilled in the art that the present invention is not limited to the embodiment described herein. Modifications and variations of the present invention can be made without departing from the spirit and scope of the present invention defined by the description of the scope of claims. Thus, what is described herein is for illustrative purpose, and has no intention whatsoever to limit the present invention.
Number | Date | Country | Kind |
---|---|---|---|
2009-075220 | Mar 2009 | JP | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/JP2010/055019 | 3/24/2010 | WO | 00 | 11/16/2011 |