The present invention relates to a radio communication system.
Various types of radio communication systems in accordance with the 3GPP (Third Generation Partnership Project) standard are in use. In a radio communication system that complies with the LTE/SAE (Long Term Evolution/System Architecture Evolution) standard with 3GPP, a logical communication path (user-plane path (U-Plane path)) used for user data communication is established between a packet gateway (PDN Gateway) and user equipments, via a serving gateway (Serving Gateway) and an eNB (evolved Node B), which is a base station. User equipments can perform communication with an external network (the Internet, etc.), using the established U-Plane path.
More specifically, U-Plane paths (EPS bearers) established between the packet gateway and the user equipment include a U-Plane path (S5/S8 bearer) established between the packet gateway and the serving gateway, a U-Plane path (an S1-U bearer) established between the serving gateway and the base station (eNB), and a U-Plane path (a data radio bearer) established between the base station (eNB) and the user equipment. The control (establishment, change, release, etc.) of the U-Plane path can be executed with the initiative by an MME (Mobile Management Entity), which is a switching station. For example, the S1-U bearer is established by the switching station controlling the serving gateway and the base station (eNB), which are endpoints of the S1-U bearer (i.e., the switching station transmits or receives control signals to or from the serving gateway and the base stations via a control-plane path (C-Plane path)).
Non-Patent Document 1 3GPP TS 36.300 V10.6.0 (2011-12), 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 10)
We assume that the above radio communication system includes new types of base stations in addition to eNBs. These assumed new types of base stations are capable of connecting to serving gateways differing from those to which the eNBs connect. Also, a part of these assumed new types of the base stations do not have a C-Plane path to the switching station. Accordingly, it is difficult to realize a system configuration including a new type of base station such as above, with a conventional radio communication system in which the switching station controls the U-Plane path established between the serving gateway and a conventional base station (eNB).
In consideration of the above conditions, the present invention has, as an object, to realize a radio communication system including a new type of base station.
A radio communication system of the present invention has a user equipment; plural base stations radio-communicable with the user equipment; plural serving gateways; and a switching station for controlling a user-plane path that is a logical path that is set between a base station and a serving gateway, the logical path being a path for transmitting a user data signal; the plural base stations including: a first base station having a control-plane path that is a logical path that is set to the switching station, the logical path being a path for transmitting a control signal; and a second base station having no control-plane path to the switching station. The user equipment has a reporter configured to report, to a first base station to which the user equipment is radio-connecting, report information containing measurement information related to reception quality of a radio signal received from each base station and identification information of each base station corresponding to each measurement information. The first base station has a storage device configured to store a base station list having stored pieces of identification information of plural second base stations; a path setting determiner configured to determine whether to set, based on the measurement information reported from the user equipment, a user-plane path having, as one endpoint, a base station corresponding to the measurement information; and a base station determiner configured to determine, based on the identification information reported from the user equipment, whether a base station corresponding to the identification information is the second base station, by using the base station list.
In a preferred embodiment of the present invention, the first base station additionally has a path setting requester configured to transmit, to the switching station, a path setting request requiring the setting of the user-plane path via the control-plane path, in a case in which the path setting determiner determines that the user-plane path is to be established and when the base station determiner determines that a base station to be one endpoint of the user-plane path is the second base station, and the switching station includes a gateway selector that selects a serving gateway to be another endpoint of the user-plane path of which the path setting requester requires setting.
In a preferred embodiment of the present invention, the base station list stored by the storage device of the first base station stores, in association with each other, identification information of the second base station and identification information of a serving gateway that is to be another endpoint of a user-plane path having, as one endpoint, the second base station corresponding to the identification information. The first base station additionally has a gateway selector configured to, when the base station determiner determines that a base station to be the one endpoint of the user-plane path is the second base station in a case in which the path setting determiner determines to set the user-plane path, select a serving gateway to be another endpoint of the user-plane path, by using the base station list; and a path setting requester configured to transmit, to the switching station via the control-plane path, a path setting request requiring setting of the user-plane path between the second base station and the serving gateway selected by the gateway selector.
In a preferred embodiment of the present invention, the switching station has a base station list generator configured to generate the base station list; and a base station list transmitter configured to dynamically transmit the generated base station list to the first base station.
Another radio communication system of the present invention has a user equipment; plural base stations radio-communicable with the user equipment; plural serving gateways; and a switching station for controlling a user-plane path that is a logical path that is set between a base station and a serving gateway, the logical path being a path for transmitting a user data signal, the plural base stations including: a first base station having a control-plane path that is a logical path that is set to the switching station, the logical path being a path for transmitting a control signal; and a second base station having no control-plane path to the switching station. The user equipment has a reporter configured to report, to a first base station to which the user equipment is radio-connecting, report information containing measurement information related to reception quality of a radio signal received from each base station and identification information of each base station corresponding to each measurement information, and the first base station has a base station transmitter configured to transmit the report information reported from the user equipment to the switching station via the control-plane path, and the switching station has a storage device configured to store a base station list having stored pieces of identification information of plural second base stations; a path setting determiner configured to determine whether to set, based on the measurement information reported from the user equipment, a user-plane path having, as one endpoint, a base station corresponding to the measurement information; and a base station determiner configured to determine, based on the identification information reported from the user equipment, whether a base station corresponding to the identification information is the second base station, by using the base station list.
In a preferred embodiment of the present invention, the switching station additionally has a gateway selector configured to, when the base station determiner determines that a base station to be the one endpoint of the user-plane path is the second base station in a case in which the path setting determiner determines to set the user-plane path, select a serving gateway to be another endpoint of the user-plane path having the second base station as the one endpoint.
Another radio communication system of the present invention has a user equipment; plural base stations radio-communicable with the user equipment; plural serving gateways; and a switching station for controlling a user-plane path that is a logical path that is set between a base station and a serving gateway, the logical path being a path for transmitting a user data signal, the plural base stations including: a first base station having a control-plane path that is a logical path that is set to the switching station, the logical path being a path for transmitting a control signal; and a second base station having no control-plane path to the switching station. The user equipment has a storage device configured to store a first base station list having stored pieces of identification information of plural second base stations; a measurement information obtainer configured to obtain measurement information about reception quality of a radio signal received from each base station; an identification information obtainer configured to obtain identification information of a base station corresponding to each measurement information; a base station determiner configured to determine, based on the identification information obtained by the identification information obtainer, whether a base station corresponding to the identification information is the second base station, by using the base station list; and a reporter configured to report, to a first base station to which the user equipment is being radio-connecting, report information containing each measurement information, the identification information corresponding to the each measurement information, and determination information indicating whether the base station corresponding to the identification information is the second base station.
In a preferred embodiment of the present invention, the first base station has a path setting determiner configured to determine whether to set, based on the measurement information reported from the user equipment, a user-plane path having, as one endpoint, a base station corresponding to the measurement information; a storage device configured to store a second base station list that associates identification information of a second base station and identification information of a serving gateway that is to be another endpoint of the user-plane path having, as one endpoint, a second base station corresponding to the identification information; a gateway selector configured to, when the determination information reported from the user equipment indicates that a base station to be the one endpoint of the user-plane path is the second base station in a case in which the path setting determiner determines to set the user-plane path, select a serving gateway to be another endpoint of the user-plane path, by using the second base station list; and a path setting requester configured to transmit, to the switching station via the control-plane path, a path setting request requiring setting of the user-plane path between the second base station and the serving gateway selected by the gateway selector.
In a preferred embodiment of the present invention, the first base station has a base station transmitter configured to transmit the report information reported from the user equipment to the switching station via the control-plane path, and the switching station has a path setting determiner configured to determine whether to set, based on the measurement information contained in the report information transmitted from the first base station, a user-plane path having, as one endpoint, a base station corresponding to the measurement information; and a gateway selector configured to, when the determination information contained in the report information indicates that a base station to be the one endpoint of the user-plane path is the second base station in a case in which the path setting determiner determines to set the user-plane path, select a serving gateway to be another endpoint of the user-plane.
In a preferred embodiment of the present invention, the switching station has a base station list generator configured to generate the first base station list; and a base station list transmitter configured to dynamically transmit the generated first base station list to the user equipment via the first base station.
In a preferred embodiment of the present invention, the switching station additionally has a path controller configured to transmit a first path setting instruction instructing to set the user-plane between the serving gateway and the second base station, to the serving gateway to be another endpoint of the user-plane path selected by the gateway selector. The serving gateway has a responder configured to transmit to the switching station, in response to receiving of the first path setting instruction from the switching station, a first path setting instruction response containing identification information of the serving gateway. The path controller of the switching station transmits, via the control-plane path to the first base station, a second path setting instruction containing the identification information of the serving gateway in response to receiving of the first path setting instruction response from the serving gateway. The first base station additionally has a transferor configured to transfer the second path setting instruction to the second base station, the second base station has a path setter configured to set the user-plane path for an uplink by using the identification information of the serving gateway contained in the second path setting instruction transferred from the first base station; a responder configured to transmit, to the first base station, a second path setting instruction response containing identification information of the second base station after the user-plane path for the uplink is set, the transferor of the first base station transfers the second path setting instruction response to the switching station via the control-plane path. The path controller of the switching station transmits, to the serving gateway, a third path setting instruction containing the identification information of the second base station in response receiving of the second path setting instruction response from the first base station. The serving gateway additionally has a path setter configured to set the user-plane path for a downlink by using the identification information of the second base station contained in the third path setting instruction transmitted from the switching station.
In a preferred embodiment of the present invention, the path setter of the serving gateway transmits, to the switching station, a third path setting instruction response after the user-plane path for the downlink is set, and the path controller of the switching station, in a case in which a user-plane path via the first base station has been established, determines whether to release the user-plane path in response to receiving of the third path setting instruction response, and, in a case in which the user-plane path is to be released, controls the first base station and the switching station so as to release the user-plane path.
In a preferred embodiment of the present invention, the first base station additionally has a first interface having plural protocol layers set to the second base station and a second interface having plural protocol layers set to the switching station, and the transferor of the first base station transfers control information from the switching station to the second base station and transfers control information from the second base station to the switching station by rewriting the identification information of a destination node corresponding to any one of the plural protocol layers.
In a preferred embodiment of the present invention, the transferor of the first base station transfers control information from the switching station to the second base station and transfers control information from the second base station to the switching station by rewriting a tunnel endpoint identifier being identification information corresponding to an S1-AP layer included in the plural protocol layers.
In a preferred embodiment of the present invention, the transferor of the first base station transfers control information from the switching station to the second base station and transfers control information from the second base station to the switching station by rewriting an IP address being identification information corresponding to an IP layer included in the plural protocol layers.
In a preferred embodiment of the present invention, the switching station additionally has a request transmitter configured to transmit a path setting request to the serving gateway to be another endpoint of the user-plane path selected by the gateway selector, in response to receiving of the path setting request transmitted from the first base station, and the serving gateway has a responder configured to transmit to the switching station, in response to receiving of the path setting request from the switching station, a path setting request completion response containing identification information of the serving gateway. The switching station additionally has a response transmitter configured to transmit, in response to receiving of the path setting request completion response from the serving gateway, a path setting request completion response for the first base station, the response containing the identification information of the serving gateway, and the path setting requester of the first base station transmits to the second base station, in response to receiving of the path setting request completion response from the switching station, a path setting request completion response containing the identification information of the serving gateway. The second base station has a path setter configured to set the user-plane path for an uplink by using the identification information of the serving gateway contained in the path setting request transferred from the first base station; and a responder configured to transmit, to the first base station, a path setting request completion response containing identification information of the second base station after the user-plane path for the uplink is set, the path setting requester of the first base station transmits to the switching station, in response to receiving of the path setting request completion response from the second base station, a path change request containing the identification information of the second base station, the request transmitter of the switching station transmits, in response to receiving of the path change request from the first base station, a path change request for the serving gateway. The serving gateway additionally has a path setter configured to set the user-plane path for a downlink by using the identification information of the second base station contained in the path change request transmitted from the switching station.
In a preferred embodiment of the present invention, the path setter of the serving gateway transmits, to the switching station, a path change request completion response after the user-plane path for the downlink is set, and the response transmitter of the switching station transmits to the first base station the path change request completion response from the serving gateway. The first base station additionally has a path releaser configured to, in a case in which a user-plane path via the first base station has been established, determine whether to release the user-plane path in response to receiving of the path change request completion response, and in a case in which the user-plane path is to be released, to control the switching station and the first base station so as to release the user-plane path.
In a preferred embodiment of the present invention, the first base station additionally has a first interface having plural protocol layers set to the second base station and a second interface having plural protocol layers set to the switching station, the first interface is set asymmetrically with the first base station as an upper layer and the second base station as a lower layer, and the second interface is set asymmetrically with the first base station as an upper layer and with the switching station as a lower layer.
According to present invention, it is determined, based on identification information contained in report information transmitted from a user equipment, whether a base station corresponding to the identification information is a second base station. Therefore, it becomes clear whether the base station for which a user-plane path is to be established is a first base station having a C-Plane path to a switching station or is a second base station having no C-Plane path to the switching station, and a radio communication system having a new type of base station (second base station) can be realized.
Each element of the radio communication system CS executes communication in accordance with a predetermined access technology such as the LTE/SAE (Long Term Evolution/System Architecture Evolution) prescribed in the 3GPP standard (Third Generation Partnership Project). According to terms defined in the 3GPP standard, the user equipment UE is “User Equipment”, the first base station eNB is “evolved Node B, the switching station MME is “Mobile Management Entity”, the first serving gateway SGW1 and the second serving gateway SGW2 each are “Serving Gateway”, and the packet gateway PGW is Packet Data Network (PDN) Gateway. Also, the second base station PhNB is a new type of base station that differs from the first base station eNB. The details of the second base station will be described later.
According to the present embodiment, description is given of an embodiment in which the radio communication system CS operates in accordance with the LTE/SAE in principle, but it is not intended to limit the scope of the present invention. The present invention is applicable to other radio access technologies when necessary design changes are made.
The user equipment UE is capable of communicating by radio with the first base station eNB and the second base station PhNB. A system of the radio communication between the user equipment UE and each base station (eNB, PhNB) can be freely selected. For example, OFDMA (Orthogonal Frequency Division Multiple Access) may be adopted for the downlink, whereas SC-FDMA (Single-Carrier Frequency Division Multiple Access) may be adopted for the uplink.
The first base station eNB is connected to the second base station PhNB, the switching station MME, and to the first serving gateway SGW1 by wire. The second base station PhNB is connected to the first base station eNB and the second serving gateway SGW2 by wire. A configuration can be employed in which the first base station eNB and the second base station PhNB are connected by radio. The switching station MME is connected, in addition to the first base station eNB, to the first serving gateway SGW1 and the second serving gateway SGW2. The packet gateway PGW is connected to each serving gateway SGW and additionally to the Internet IN, which is an external network with respect to the radio communication system CS. That is, the packet gateway PGW serves as a connection point (access point) with the eternal network.
In
In the above interfaces, a protocol configuration of an EPS (Evolved Packet System) prescribed in the 3GPP is employed, in principle. As an interface to be set between the first base station eNB and the second base station PhNB, an extended S1-AP (S1-AP extended) interface which is an extension of an S1-AP interface which is an interface that is set between the switching station MME and the first base station eNB, such as shown in
In the radio communication system CS, signals are exchanged via a bearer (Bearer), which is a logical path. The bearer is a logical path that is established and released as needed. For the U-Plane, a data radio bearer is established between the user equipment UE and the first base station eNB, or between the user equipment UE and the second base station PhNB. An S1-U bearer S1B is established between the first base station eNB and the first serving gateway SGW1, or between the second base station PhNB and the second serving gateway SGW2. An S5/S8 bearer is established between the first serving gateway SGW1 and the packet gateway PGW, or between the second serving gateway SGW2 and the packet gateway PGW.
Nodes in the radio communication system CS each have unique identification information. The identification information may include an IP address, a TEID (tunnel end point identifier), a network address, etc., of each node. The identification information of the first base station eNB and that of the second base station PhNB each may include a physical cell ID (Physical Cell ID) for identifying a cell C that the base station corresponding to the identification information forms. The IP address is an address value for uniquely identifying each node in the radio communication system CS. TEID is an identifier that identifies an endpoint of a bearer (GTP tunnel) which logically connects nodes. The network address is, in a case in which the radio communication system CS is sectioned into multiple subnets, an address value identifying a subnet the node belongs to. Each node in the radio communication system CS is capable of identifying another node based on the identification information of the other node and of transmitting and receiving signals to and from the identified node.
Description will be given of an example operation of a selection of a serving gateway (S10) and setting of an S1-U bearer (S50) according to the first embodiment, with reference to
The radio communicator 110 of the user equipment UE receives radio signals from each neighboring base station (first base station eNB, second base station PhNB). The measurement information obtainer 132 of the user equipment UE obtains measurement information about reception quality of radio signals received from each base station (S100). More specifically, the measurement information obtainer 132 of the user equipment UE obtains, as measurement information, the reception power (or reception quality) of a reference signal included in radio signals which each base station (first base station eNB, second base station PhNB) transmits. Furthermore, the identification information obtainer 134 of the user equipment UE obtains identification information (physical cell ID) of a base station that is contained in the radio signals that each base station transmits. In other words, the measurement information obtainer 132 of the user equipment UE obtains identification information of a base station corresponding to each received piece of measurement information (S100). Subsequently, the reporter 138 of the user equipment UE transmits a Measurement Report message (report information) containing the measurement information and identification information obtained with regard to every base station, to the first base station to which the user equipment is being radio-connected (S120).
The report information receiver 242 of the first base station eNB receives the Measurement Report message transmitted from the user equipment UE. The report information receiver 242 supplies, to the path setting determiner 244, the measurement information contained in the Measurement Report message and also supplies, to the base station determiner 246, the identification information contained in the Measurement Report message. The path setting determiner 244 determines, based on the measurement information, whether to set an S1-U bearer S1B having, as one endpoint, a base station corresponding to the measurement information, and supplies the determination result to the path setting requester 250 (S140). In this example, we assume that the path setting determiner 244 determines that an S1-U bearer S1B having the second base station PhNB as one endpoint should be set, based on the reception power of radio signals from the second base station PhNB being greater than the reception power of radio signals from the first base station eNB. Furthermore, the base station determiner 246 determines, based on identification information of a base station, whether a base station corresponding to the identification information is the second base station PhNB, by using the base station list BL1 stored in the storage device 230 and supplies the determination result to the path setting requester 250 (S140). The base station list BL1 is a list of storing pieces of identification information of the second base stations PhNB. Therefore, the base station determiner 246 can determine a base station to be the second base station PhNB based on identification information of a certain base station that is stored by the base station list BL1.
The path setting requester 250 of the first base station eNB transmits, to the switching station MME through the C-Plane path, a Bearer Setup Request message (path setting request) requiring that the S1-U bearer S1B be set when the path setting determiner 244 determines that the S1-U bearer S1B should be set and when the base station determiner 246 determines a base station which should be one endpoint of the S1-U bearer S1B to be the second base station PhNB (S160). The gateway selector 440 of the switching station MME selects a serving gateway SGW which is to be another endpoint of the S1-U bearer S1B, which the Bearer Setup Request message requires setting, the message having been received from the first base station eNB (S180). The criteria for selection of a serving gateway SGW can be freely selected. For example, the closeness of the logical distance with the second base station PhNB or the congestion degree of the serving gateway SGW, etc., (or a combination thereof) can be adopted as criteria for selection. In this example, it is assumed that the gateway selector 440 selects the second serving gateway SGW2 connected to the second base station PhNB as another endpoint of the S1-U bearer S1B.
Hereinafter, the serving gateway selection operation of the first embodiment from the above-mentioned Steps S100 to S180 is collectively referred to as Step S10.
The path controller 442 of the switching station MME transmits a Bearer Setup Requirement message (first path setting instruction) to the second serving gateway SGW2 which is to become another endpoint of the above S1-U bearer S1B, with the second serving gateway SGW2 having been selected by the gateway selector 440, and the Bearer Setup Requirement message instructing that the S1-U bearer S1B is set between the second serving gateway SGW2 and the second base station PhNB (S500). The communication controller 532 of the second serving gateway SGW2, upon receiving the Bearer Setup Requirement message from the switching station MME, controls the responder 534 (S520) so as to transmit, to the switching station MME, a Bearer Setup Ack message (first path setting instruction reply) containing the identification information (TEID and the like) of the second serving gateway SGW2 (S540).
The path controller 442 of the switching station MME, upon receiving the Bearer Setup Ack message from the second serving gateway SGW2, generates a Bearer Setup Requirement message (second path setting instruction) containing the identification information of the second serving gateway SGW2 (S560), and transmits the message to the first base station eNB through the C-Plane path (S580). The transferor 252 of the first base station eNB transfers, to the second base station PhNB, the Bearer Setup Requirement message transmitted from the switching station MME (S600). More specifically, the transferor 252 rewrites the identification information of a destination node contained in the Bearer Setup Requirement message from the identification information of the first base station eNB to the identification information of the second base station PhNB. The identification information of the above destination node may be identification information of either protocol layer. For example, the identification information of the destination node may be the tunnel end point identifier, which is identification information of the S1-AP layer, or may be the IP address, which is identification information of the IP layer (
The path setter 342 of the second base station PhNB sets an uplink S1-U bearer S1B by using the identification information of the second serving gateway SGW2 contained in the Bearer Setup Requirement message transferred from the first base station eNB (S620). When the uplink S1-U bearer S1B is set, the responder 344 transmits, to the first base station eNB, a Setup Complete message (second path setting instruction response) containing the identification information of the second base station PhNB, with the message indicating the above bearer setting having been completed (S640). The transferor 252 of the first base station eNB transfers the Setup Complete message transmitted from the second base station PhNB to the switching station MME through the C-Plane path (S660).
The path controller 442 of the switching station MME, upon receiving the Setup Complete message transferred from the first base station eNB, generates a Bearer Setup Requirement message (third path setting instruction) that contains the identification information of the second base station PhNB contained in the Setup Complete message (S680), and transmits the message to the second serving gateway SGW2 (S700). The path setter 536 of the second serving gateway SGW2 uses the identification information of the second base station PhNB contained in the Bearer Setup Requirement message transmitted from the switching station MME, to set a downlink S1-U bearer S1B (S720). The path setter 536 of the second serving gateway SGW2, when the downlink S1-U bearer S1B is set, transmits a Setup Complete message (third path setting instruction response) to the switching station MME (S740). With the above operation, the S1-U bearer S1B, which is bidirectionally communicable, is set. It is to be noted that, even after the setting of the S1-U bearer S1B, the C-Plane path (signaling radio bearer) established between the user equipment UE and the first base station eNB is maintained.
Hereinafter, the S1-U bearer setting operation of the first embodiment from the above Steps S500 to S740 is collectively referred to as Step S50.
According to the first embodiment described in the foregoing, a radio communication system having the second base station PhNB, which is a new type differing from the first base station eNB, is realized. According to the above configuration, it is determined, based on identification information contained in the report information transmitted from the user equipment UE, whether a base station corresponding to the identification information is the second base station PhNB. Therefore, it becomes clear whether the base station, for which the S1-U bearer S1B is to be established, is the first base station eNB having the C-Plane path to the switching station MME or the second base station PhNB which does not have the C-Plane path to switching station MME, and this is made to be used for the following determination.
Furthermore, when it is determined that an S1-U bearer S1B should be established, and when one endpoint of the S1-U bearer S1B is the second base station PhNB, the switching station MME selects a serving gateway SGW to which the second base station PhNB is to be connected (an element to which the S1-U bearer S1B is to be set). Therefore, a connection point (an element to which the S1-U bearer S1B is to be set) that is suitable for the second base station PhNB, which is the endpoint of the S1-U bearer S1B, can be selected.
Furthermore, the switching station MME takes the initiative in controlling the second serving gateway SGW2 and the second base station PhNB, to establish the S1-U bearer S1B. The switching station MME transmits and receives control signals to and from the second base station PhNB via the first base station eNB. Therefore, with the above configuration, even though the C-Plane path does not exist between the second base station PhNB and the switching station MME, the U-Plane path to the second base station PhNB can be set.
The second embodiment of the present invention is described below. In each mode illustrated below, for elements for which action and function are the same as those of the first embodiment, the reference numerals used in the foregoing description will also be used, and description thereof will be omitted as appropriate.
In the first embodiment, the switching station MME selects a serving gateway SGW to which the S1-U bearer S1B should be set (S10). Furthermore, the S1-U bearer S1B is set with the initiative by the switching station MME (S50). In the second embodiment, the first base station eNB selects a serving gateway SGW to which the S1-U bearer S1B should be set (S12). Furthermore, the S1-U bearer S1B is set with the initiative by the first base station eNB (S52).
Description will be given of an example operation of a selection of the serving gateway and setting of the S1-U bearer according to the second embodiment, with reference to
The path setting determiner 244 determines, based on the measurement information, whether to set an S1-U bearer S1B having, as one endpoint, a base station corresponding to the measurement information, and supplies the determination result to the gateway selector 248 (S140). In this example, similarly to what is described previously, we assume that the path setting determiner 244 determines that an S1-U bearer S1B having the second base station PhNB as one endpoint should be set. Furthermore, the base station determiner 246 determines, based on identification information of a base station, whether a base station corresponding to the identification information is the second base station PhNB, by using the base station list BL2 stored in the storage device 230 and supplies the determination result to the gateway selector 248 (S140). As described earlier, because the base station list BL2 stores the identification information of the second base station PhNB, the base station determiner 246 can determine a base station to be the second base station PhNB based on identification information of a certain base station being stored in the base station list BL2.
In a case in which the path setting determiner 244 determines that an S1-U bearer S1B should be set, when the base station determiner 246 determines that one endpoint of the S1-U bearer S1B is the second base station PhNB, the gateway selector 248 of the first base station eNB selects a serving gateway SGW to be another endpoint of the S1-U bearer S1B, by using the base station list BL2, and supplies, to the path setting requester 250, information indicating the selected serving gateway SGW (S150). As described earlier, the gateway selector 248 can select a serving gateway SGW corresponding to the second base station PhNB determined by the base station determiner 246 because the base station list BL2 stores, in correspondence with each other, pieces of identification information of the second base stations PhNB and pieces of identification information of the serving gateways SGW. In this example, it is assumed that the gateway selector 248 selects the second serving gateway SGW2 connected to the second base station PhNB as another endpoint of the S1-U bearer S1B. The path setting requester 250 of the first base station eNB transmits, to the switching station MME through the C-Plane path, a Bearer Setup Requirement message (path setting request) requiring setting of the S1-U bearer S1B between the second serving gateway SGW2 that the gateway selector 248 has selected and the second base station PhNB (S170).
Hereinafter, the serving gateway selection operation of the second embodiment from the above-mentioned Steps S100 to S170 is collectively referred to as Step S12.
The request transmitter 444 of the switching station MME, upon receiving a Bearer Setup Requirement message transmitted from the path setting requester 250 of the first base station eNB, transmits the Bearer Setup Requirement message for the second serving gateway SGW2 which is to become another endpoint of the above S1-U bearer S1B, with the second serving gateway SGW2 being selected by the gateway selector 248 (S510). The communication controller 532 of the second serving gateway SGW2, upon receiving the Bearer Setup Requirement message from the switching station MME, controls the responder 534 (S530) so as to transmit, to the switching station MME, a Bearer Setup Ack message (path setting request completion response) containing the identification information of the second serving gateway SGW2 (S550). The response transmitter 446 of the switching station MME, upon receiving the Bearer Setup Ack message from the second serving gateway SGW2, transmits a Bearer Setup Ack message for the first base station eNB through the C-Plane path, the message containing the identification information of the second serving gateway SGW2 (S570).
The path setting requester 250 of the first base station eNB, upon receiving the Bearer Setup Ack message from the switching station MME, generates a Bearer Setup Requirement message (path setting request) containing the identification information of the second serving gateway SGW2 (S590), and transmits the message to the second base station PhNB (S610). The path setter 342 of the second base station PhNB sets the uplink S1-U bearer S1B using the identification information of the second serving gateway SGW2 contained in the Bearer Setup Requirement message transmitted from the path setting requester 250 of the first base station eNB (S630). When the uplink S1-U bearer S1B is set, the responder 344 transmits, to the first base station eNB, a Setup Complete message (path setting request completion response) containing the identification information of the second base station PhNB, with the message indicating the above bearer setting having been completed (S650).
The path setting requester 250 of the first base station eNB, upon receiving the Setup Complete message, generates a Bearer Modify Request message (path change request) containing the identification information of the second base station PhNB (S670), and transmits the message to the switching station MME through the C-Plane path (S690). The request transmitter 444 of the switching station MME, upon receiving the Bearer Modify Request message transmitted from the path setting requester 250 of the first base station eNB, transmits the Bearer Modify Request message for the second serving gateway SGW2 (S710). The path setter 536 of the second serving gateway SGW2 uses the identification information of the second base station PhNB contained in the Bearer Modify Request message transmitted from the switching station MME, to set the downlink S1-U bearer S1B (S730). The path setter 536 of the second serving gateway SGW2, when the downlink S1-U bearer S1B is set, transmits a Modify Complete message (path change request completion response) to the switching station MATE (S750). The response transmitter 446 of the switching station MME transmits the Modify Complete message from the second serving gateway SGW2 to the first base station eNB (S770). With the above operation, the S1-U bearer S1B, which is bidirectionally communicable, is set. It is to be noted that, even after the setting of the S1-U bearer S1B, the C-Plane path (signaling radio bearer) established between the user equipment UE and the first base station eNB is maintained.
Hereinafter, the setting operation of the S1-U bearer of the second embodiment from the above-mentioned Steps S510 to S770 is collectively referred to as Step S52.
According to the second embodiment described in the foregoing, similarly to the first embodiment, a radio communication system having the second base station PhNB, which is a new type differing from the first base station eNB, is realized. According to the above configuration, it is determined, based on identification information contained in the report information transmitted from the user equipment UE, whether a base station corresponding to the identification information is the second base station PhNB. Therefore, it becomes clear whether the base station for which the S1-U bearer S1B is to be established is the first base station eNB having the C-Plane path to the switching station MME or the second base station PhNB which does not have the C-Plane path to the switching station MME, and this is made to be used for the following determination.
Furthermore, when it is determined that an S1-U bearer S1B should be established and that one endpoint of the S1-U bearer S1B is the second base station PhNB, the first base station eNB selects a serving gateway SGW to be a connection point of the second base station PhNB (an element to which the S1-U bearer S1B is to be set). Therefore, a connection point (an element to which the S1-U bearer S1B is to be set) that is suitable for the second base station PhNB, which is an endpoint of the S1-U bearer S1B, can be selected.
Furthermore, instead of the switching station MME, the first base station eNB takes the initiative in controlling the second serving gateway SGW2 and the second base station PhNB, to establish the S1-U bearer S1B. Therefore, with the above configuration, even though the C-Plane path does not exist between the second base station PhNB and the switching station MME, the U-Plane path to the second base station PhNB can be set.
In the first and the second embodiments, the first base station eNB (the path setting determiner 244) determines, based on measurement information reported from the user equipment UE, whether to set an S1-U bearer S1B to a base station corresponding to the measurement information. In the third embodiment, the switching station MME has such a path setting determiner.
Description will be given of an example operation of a selection of a serving gateway according to the third embodiment, with reference to
The path setting determiner 436 of the switching station MME determines, based on the measurement information contained in the Measurement Report message, whether to set an S1-U bearer S1B having, as one endpoint, a base station corresponding to the measurement information, and supplies the determination result to the gateway selector 440 (S260). In this example, similarly to what is described in the previous embodiments, we assume that the path setting determiner 436 determines that an S1-U bearer S1B having the second base station PhNB as one endpoint should be set. Furthermore, the base station determiner 438 of the switching station MME determines, based on identification information of a base station contained in the Measurement Report message, whether a base station corresponding to the identification information is the second base station PhNB, by using the base station list BL1 stored in the storage device 420 and supplies the determination result to the gateway selector 440 similarly to what is described in the previous embodiments (S260). In a case in which the path setting determiner 436 determines that an S1-U bearer S1B should be set, when the base station determiner 438 determines that a base station to be one endpoint of the S1-U bearer S1B is the second base station PhNB, the gateway selector 440 of the switching station MME selects a serving gateway SGW to be another endpoint of the S1-U bearer S1B (S280).
Hereinafter, the serving gateway selection operation of the third embodiment from the above-mentioned Steps S200 to S280 is collectively referred to as Step S20.
When the above-mentioned Step S20 is completed, the switching station MME is in a condition to know the serving gateway SGW having been selected as another endpoint of the S1-U bearer S1B. This situation can be understood as being similar to a situation in which Step S10 of the first embodiment is completed and a situation in which Step S12 of the second embodiment is completed. Therefore, after the completion of Step S20 of the third embodiment, the S1-U bearer setting operation by Step S50 of the first embodiment may be performed, or the S1-U bearer setting operation by Step S52 of the second embodiment may be performed.
According to the third embodiment described in the foregoing, similarly to the first and second embodiments, a radio communication system having the second base station PhNB, which is a new type differing from the first base station eNB, is realized. According to the above configuration, effects similar to those in the previously described embodiments are attained.
In the first and second embodiments, the first base station eNB (base station determiner 246) determines whether a base station corresponding to the identification information is the second base station, and in the third embodiment, the switching station MME (base station determiner 438) determines whether a base station corresponding to the identification information is the second base station. In the fourth embodiment, the user equipment UE has a base station determiner to determine whether a base station is the second base station.
Description will be given of an example operation of a selection of a serving gateway according to the fourth embodiment, with reference to FIG. 21. The initial assumptions with respect to the U-Plane bearer and the C-Plane bearer are similar to those of
The path setting determiner 244 determines, based on the measurement information, whether to set an S1-U bearer S1B having, as one endpoint, a base station corresponding to the measurement information, and supplies the determination result to the gateway selector 248 (S360). In this example, similarly to what is described previously, we assume that the path setting determiner 244 determines that an S1-U bearer S1B having the second base station PhNB as one endpoint should be set. In a case in which the path setting determiner 244 determines that an S1-U bearer S1B should be set, when the determination information reported from the user equipment UE indicates that a base station to be one endpoint of the S1-U bearer S1B is the second base station PhNB, the gateway selector 248 selects a serving gateway SGW to be another endpoint of the S1-U bearer S1B, by using the base station list BL2, and supplies, to the path setting requester 250, information indicating the selected serving gateway SGW, as described earlier (S380). The path setting requester 250 transmits, to the switching station MME through the C-Plane path, a Bearer Setup Requirement message (path setting request) requiring setting of the S1-U bearer S1B between the second serving gateway SGW2 that the gateway selector 248 has selected and the second base station PhNB (S400).
Hereinafter, the serving gateway selection operation of the fourth embodiment from the above-mentioned Steps S300 to S400 is collectively referred to as Step S30.
When the above-mentioned Step S30 is completed, the switching station MME is in a condition to know the serving gateway SGW having been selected as another endpoint of the S1-U bearer S1B. This situation can be understood as being similar to a situation in which Step S10 of the first embodiment is completed and a situation in which Step S12 of the second embodiment is completed. Therefore, after the completion of Step S30 of the fourth embodiment, the S1-U bearer setting operation by Step S50 of the first embodiment may be performed, or the S1-U bearer setting operation by Step S52 of the second embodiment may be performed.
In the above fourth embodiment, the first base station eNB selects a serving gateway SGW to be an endpoint of the S1-U bearer S1B, but a configuration can be adopted in which the switching station MME selects a serving gateway SGW. For example, as shown in
A Measurement Report message is reported from the user equipment UE to the first base station eNB (S300 to S340), similarly to what is described above. The transferor 252 of the first base station eNB transmits the received Measurement Report message to the switching station MME through the C-Plane path (S370). Thus, the transferor 252 serves as a base station transmitter. The path setting determiner 436 of the switching station MME determines, based on the measurement information contained in the Measurement Report message transmitted from the first base station eNB, whether to set an S1-U bearer S1B having, as one endpoint, a base station corresponding to the measurement information, and supplies the determination result to the gateway selector 440 (S390). In a case in which the path setting determiner 436 determines that an S1-U bearer S1B should be set, when the determination information contained in the Measurement Report message indicates that a base station to be one endpoint of the S1-U bearer S1B is the second base station PhNB, the gateway selector 440 selects a serving gateway SGW to be another endpoint of the S1-U bearer S1B (S410).
Hereinafter, the serving gateway selection operation of the fourth embodiment from the above-mentioned Steps S300 to S410 is collectively referred to as Step S32.
When the above Step S32 is completed, because the switching station MME is in a condition to know the serving gateway SGW being selected as another endpoint of the S1-U bearer S1B, similarly to the previous description, the S1-U bearer setting operation by Step S50 of the first embodiment may be performed after the completion of Step S32, or the S1-U bearer setting operation by Step S52 of the second embodiment may be performed after the completion of Step S32.
According to the fourth embodiment described in the foregoing, similarly to the first and second embodiments, a radio communication system having the second base station PhNB, which is a new type differing from the first base station eNB, is realized. According to the above configuration, effects similar to those in the previously described embodiments are attained.
5. Modifications
Various modifications may be applied to the above-described embodiment. Specific modifications are exemplified below. Two or more modifications selected from among the above embodiments and the following modifications may be combined.
When the above-mentioned Step S12 of the second embodiment is completed, the switching station MME is in a condition to know the serving gateway SGW having been selected as another endpoint of the S1-U bearer S1B. This situation can be understood as being similar to a situation in which Step S10 of the first embodiment is completed. Therefore, after the completion of Step S12 of the second embodiment, the S1-U bearer setting operation by Step S50 of the first embodiment may be performed, instead of Step S52 of the second embodiment. Also, similarly, after the completion of Step S10 of the first embodiment, the S1-U bearer setting operation by Step S52 of the second embodiment may be performed, instead of Step S50 of the first embodiment.
In the above-described embodiment, one S1-U bearer S1B (U-Plane path) is set. The above-described path setting can be employed in newly establishing an S1-U bearer S1B and also in changing a path of an already established S1-U bearer S1B. For example, in a case in which an S1-U bearer S1B has not been established, the above-described path setting can be employed in newly establishing an S1-U bearer S1B. Also, in a case in which an S1-U bearer S1B has already been established between the first base station eNB and the first serving gateway SGW1, the above path setting can be employed in additionally establishing a new S1-U bearer S1B between the second base station PhNB and the second serving gateway SGW2. Also, in a case in which an S1-U bearer S1B has been established through the first base station eNB and the first serving gateway SGW1, the above path setting can be employed in changing a path so that the S1-U bearer S1B passes the second base station PhNB and the second serving gateway SGW2.
The setting method of the base station list BL (BL1,BL2) stored in each storage device (120,230,420) in the above-described embodiments may be freely selected. For example, the base station list BL (BL1,BL2) may be set, in advance, to a node (user equipment UE, first base station eNB, switching station MME) having the storage device. Furthermore, it may be configured so that the base station list generator 432 of the switching station MME generates the base station list BL (BL1, BL2) and that the base station list transmitter 434 transmits the generated base station list BL (BL1, BL2) to each node (user equipment UE, first base station eNB) dynamically (e.g., depending on the updating of a list). With the above configuration, the base station list BL (BL1, BL2) is generated and is transmitted depending on a state (e.g., an installed condition of the second base station PhNB, a congestion state of the serving gateway SGW, etc.) of the radio communication system CS. Therefore, the determination using base the station list BL (BL1, BL2) better reflects a state of the radio communication system CS.
In the above-described embodiments, the base station list BL1 stores pieces of identification information of the second base stations PhNB. Instead, the base station list BL1 may store pieces of identification information of the first base stations eNB and pieces of identification information of the second base stations PhNB, and store, in correspondence with each other, each identification information piece and a piece of information indicating whether a base station corresponding to each piece of identification information is the first base station eNB or the second base station PhNB. The same applies to the base station list BL2.
In the above-described embodiment, after the setting of the S1-U bearer S1B (Step S50 of the first embodiment and Step S52 of the second embodiment) is completed, the S1-U bearer S1B that has been established prior to the above setting may be released.
Description will be given of an example of releasing the S1-U bearer S1B, with reference to
Description will be given of another example of releasing the S1-U bearer S1B, with reference to
In the above-described modifications, the criteria as to whether to release the S1-U bearer S1B can be freely selected. For example, a configuration can be adopted in which the path controller 442 or the path releaser 254 determines that an S1-U bearer S1B is to be released in a case in which the reception power of radio signals from a base station (the first base station eNB in the above examples) to which the S1-U bearer S1B is set is equal to or less than a predetermined value.
In the above-described embodiments, control messages of various names (e.g., Bearer Setup Request message, Bearer Setup Requirement message, etc.) are used. However, it is understood as a matter of course that the name of each control message can be freely selected. Each control message is a concept that subsumes any control signal having an equivalent function.
In the above-described embodiment, the size of a cell C (the range in which radio waves arrive effectively) which each base station forms therearound can be freely selected. For example, a configuration can be employed in which the radio transmission ability (average transmitted power, maximum transmitted power, etc.) of the first base station eNB is greater than the radio transmission ability of the second base station PhNB and in which the size of a cell (macro cell C1) the first base station eNB forms is greater than the size of a cell (small cell C2) the second base station PhNB forms. In the above-described configuration, for example, as shown in
A configuration can be adopted in which a frequency band of radio waves, which the first base station eNB transmits, differs from a frequency band of radio waves which the second base station PhNB transmits. For example, we assume a configuration in which the first base station eNB performs radio communication using the first frequency band (e.g., 2 GHz band) and the second base station PhNB performs radio communication using the second frequency band (e.g., 3.5 GHz band) that is higher than the first frequency band. This is because the higher the frequency is, the larger propagation loss becomes, and the radio communication using the first frequency band is higher in stability than the radio communication using the second frequency band, in many cases. As described in the above embodiments, the first base station eNB performs transmission and reception (communication of C-Plane) of control signals (control messages) to and from the user equipment UE. Therefore, when the configuration of this modification is employed, since transmission and reception (communication of C-Plane) of control signals is performed in the first frequency band, which is more stable, the user equipment UE can be controlled with a higher degree of certainty.
In the above-described embodiment, the first base station eNB is an evolved Node B prescribed in the 3 GPP standard. However, the first base station eNB can be any radio base station. For example, the first base station eNB may be a base station forming the above-described small cell C2.
In the above-described embodiment, the second base station PhNB does not transmit or receive control signals to and from the user equipment UE. However, a configuration can be adopted in which the second base station PhNB can transmit and receive control signals of a subordinate layer (e.g., L1 layer, L2 layer). Also in this configuration, the second base station PhNB does not transmit or receive signals related to radio resource control (control signals of an RRC layer).
The user equipment UE is capable of communicating by radio with the first base station eNB and the second base station PhNB. The user equipment UE may be a cell phone terminal, e.g., a feature phone or a smart phone, a desk-top type personal computer, a laptop personal computer, a UMPC (ultra-mobile personal computer), a portable game machine, or other type of radio terminal.
In each of the elements in the radio communication system CS (the user equipment UE, the first base station eNB, the second base station PhNB, the switching station MME, the serving gateway SGW, the packet gateway PGW), functions executed by the CPU may be executed instead by hardware or by a programmable logic device, such as an FPGA (Field Programmable Gate Array) or a DSP (Digital Signal Processor).
UE . . . user equipment, 110 . . . radio communicator, 120 . . . storage device, 130 . . . controller, 132 . . . measurement information obtainer, 134 . . . identification information obtainer, 136 . . . base station determiner, 138 . . . reporter, 150 . . . data transceiver, eNB . . . first base station, 210 . . . radio communicator, 220 . . . network communicator, 230 . . . storage device, 240 . . . controller, 242 . . . report information receiver, 244 . . . path setting determiner, 246 . . . base station determiner, 248 . . . gateway selector, 250 . . . path setting requester, 252 . . . transferor, 254 . . . path releaser, 270 . . . data transceiver, PhNB . . . second base station, 310 . . . radio communicator, 320 . . . network communicator, 330 . . . storage device, 340 . . . controller, 342 . . . path setter, 344 . . . responder, 350 . . . data transceiver, MME . . . switching station, 410 . . . network communicator, 420 . . . storage device, 430 . . . controller, 432 . . . base station list generator, 434 . . . base station list transmitter, 436 . . . path setting determiner, 438 . . . base station determiner, 440 . . . gateway selector, 442 . . . path controller, 444 . . . request transmitter, 446 . . . response transmitter, 448 . . . path releaser, SGW . . . serving gateway, 510 . . . network communicator, 520 . . . storage device, 530 . . . controller, 532 . . . communication controller, 534 . . . responder, 536 . . . path setter, 540 . . . data transceiver, PGW . . . packet gateway, 610 . . . network communicator, 620 . . . external network communicator, 630 . . . storage device, 634 . . . data transceiver, 640 . . . controller, 642 . . . communication controller, 644 . . . data transceiver, BL . . . base station list, C . . . cell, C1 . . . macro cell, C2 . . . small cell, CS . . . radio communication system, IN . . . the Internet, NW . . . network, S1B . . . S1-U bearer, S1B-D . . . downlink S1-U bearer, S1B-U . . . uplink S1-U bearer.
Number | Date | Country | Kind |
---|---|---|---|
2012-150810 | Jul 2012 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2013/063537 | 5/15/2013 | WO | 00 |