This application is a filing under 35 USC 371 of PCT/EP2005/006578, filed Jun. 17, 2005.
The invention relates to an arrangement for mounting a rail having a rail foot on a support, such as a concrete tie using a load-distributing plate, such as a ribbed plate, arranged between the rail foot and the support, a resilient first intermediate layer supporting the plate relative to the support, and, if required, a second intermediate layer, extending between the first intermediate layer and the support, of essentially inflexible material such as hard plastic, a holding element being connected to the support, from which holding element extends at least one resilient clip which comprises several legs, and which supports itself directly or indirectly on the rail foot.
A corresponding arrangement is found in EP-B-0 619 852. Here, the clip exhibits approximately an M-shape in plan view and comprises two outer legs and two inner legs, which are connected to each other by arch sections. The outer legs are fixed in receptacles of a holding element, whereas the inner legs, or rather the arch connecting them, rest on a rail foot. The holding element comprises two spaced-apart shoulders with U-shaped channel-like openings that serve as receptacles, into which the ends of the outer legs can be driven, so that the inner legs hold down, with the necessary prestress, the rail which is to be secured. The holding element can either be embedded in a concrete tie through a stud or can be joined, e.g. by welding, to a ribbed plate.
A clip, which in plan view exhibits an E-shape, for fastening a rail is known from AT-C-350 608. For the purpose of fixing the clip, a leg is driven into a channel of an anchor element, which in turn is cast into a concrete tie.
A clip with W-shaped geometry is described in DE-C-30 18 091. Sections of the clip are fixed in a channel-like depression of an angular-guide plate. Opposing sections of the clip rest on a rail foot. The clip itself is connected to a concrete tie through a through-bolt.
Rail fastening systems with clips known in the art have the disadvantage that not enough space is available, in particular in the area of rail switches and rail intersections where the rails are positioned in close proximity to each other, for positioning and securing the clips. For this reason, these areas in principle require customized designs for fastening the rails.
The problem to be solved by the present invention is to further develop a rail fastening arrangement of the above-mentioned type in such a way that uncomplicated construction measures can be used to secure the rail or rails in the region of a switch, in particular, whereby an resilient bearing of the rail should be possible to a degree as is known according to the state of technology and is required in the area of switches. In particular, the goal is to provide the capability of carrying a rail with simple design measures in such a way that the spring system, formed by the resilient clip and the resilient first intermediate layer, exhibits a characteristic curve with a bend, so that good damping is provided when passing, but that otherwise a quasi rigid unit results. Independently of this, it should be ensured that the stresses on the clips do not lead to a loss in fatigue strength.
According to the invention, this problem is solved mainly by the fact that the holding element is formed as a first insert that is removably insertable into the load-distributing plate and/or forms a unit with the plate, and that the load-distributing plate can be directly or indirectly preloaded relative to the support through the holding element.
Direct preloading through the holding element means that the holding element establishes the prestressing of the load-distributing plate, i.e. the degree to which the resilient first intermediate layer is compressed in the absence of an additional load on the rail. The load-distributing plate is then adjustable relative to the holding element in the direction of the support, so that the required prestressing of the clip can be effected. A construction of this type is intended in particular for firm rail bearings.
In contrast, indirect preloading means that the load-distributing plate and the holding element form a unit—be that by means of a positive connection, or by an integral formation—and that the preloading is established by a spacer element, which preferably is insertable as a removable insert into the holding element, which consequently is adjustable relative to the insert.
By employing measures of this type, the bearing of the rail on the support point can be developed as firm or soft as is required, whereby a high resilience can be achieved through an indirect preloading of the load-distributing plate through the holding element, since a relative movement between the load-distributing plate and the holding element will not take place and as a result the clip itself does not have to follow large excursions of the spring system. This ensures the required fatigue strength.
As a further development of the invention it is provided that the holding element has a base section with a shaped projection extending along the bottom, and that from the area of the base section facing away from the shaped projection, i.e. its upper side, extends at least one receptacle, such as a shoulder or channel, in which extends one leg of the clip or a section of a leg.
In a sectional view, the shaped projection preferably exhibits a circular or oval geometry of its circumference, whereby the planar extent preferably is smaller than the planar extent of the base section. In a structure of this type, the holding element is inserted into the load-distributing plate from the side further from the support. If the planar extent of the base section is smaller than that of the shaped projection, the holding element will have to be inserted from the bottom of the load-distributing plate.
Differing from sleeper mountings known in the art, the invention proposes a holding element with a clip, in which the holding element is removably insertable into a load-distributing plate, which in turn can be formed as a ribbed plate or as an elevated region in the vicinity of a heel of a switch tongue. The holding element is then secured by a screw element passing through it, such as a through-bolt, the load-distributing plate being, at the same time, fixed by the holding element.
In particular, it is foreseen that the shaped projection of the holding element not only engages by a positive connection into the load-distributing plate, but rather also has a shape- and friction-locked connection with the latter, if prestressing of the load-distributing plate is to be achieved directly through the holding element.
When securing the holding element and with it the load-distributing plate, a first support surface of the holding element rests on a section of the load-distributing plate forming a second support surface. In addition, the holding element should have an axial opening, in which is located a second insert, which is movable relative to the holding element and through which passes the screw element, e.g. a through-bolt, which connects the holding element to the support and which can be screwed directly or indirectly into the support. If the holding element is then fixed and therefore the load-distributing plate is fixed as well, the screw element, or a disk-shaped element that the screw element passes through, rests with a frictional connection either on a third support surface of the holding element, at the side facing away from the support, or on the second insert, depending on whether the load-bearing plate is to be prestressed directly or indirectly through the holding element.
For prestressing to be applied indirectly through the holding element, i.e. when the second insert is tightened positively between the screw element and the support, or an essentially rigid plate arranged thereon, a special embodiment of the invention provides that at least two projections protrude peripherally from the shaped projection, with the respective clearances of the projections to the support surface extending from the holding element being equal to or slightly greater than the clearance between the second support surface, extending from the load-distributing plate and the bottom surface of the load-dissipating plate, along which extends or from which extends the resilient first intermediate layer. Thus, the peripherally protruding projections can embrace the load-distributing plate, making it possible to achieve the desired positive connection.
To achieve this technically, an independently inventive proposal provides that the holding element be connected to the load-distributing plate in a bayonet-joint-like manner. For this purpose, the through-opening which accepts the insert, of the load distributing-plate has a geometry that is matched to the outer geometry of the shaped projection. However, the cut-outs associated with the projections extend in such a manner that the holding element must be inserted into the load-distributing plate in a position that is offset relative to the position that is oriented towards the rail foot, so that it can subsequently be rotated and be oriented towards the rail to be secured.
If, as mentioned, the holding element is preferably removably connected to the load-distributing plate, then it is of course also possible that the two are formed as an integral unit. For example, the load-distributing plate and the holding element can be formed as one piece, for example by casting.
To achieve the desired prestressing, the following constructional options, in particular, are available. If the load-distributing plate is prestressed directly through the holding element, then, with the screw element or the disk-shaped element through which it passes supported by fictional engagement, the holding element rests through a fourth support surface on the support, such as the concrete tie or the second intermediate plate, which is made substantially inflexible and for example consists of hard plastic. A clearance then exists, between the first and the fourth support surfaces of the holding element, which is smaller than the thickness of the resilient first intermediate layer, when the screw element is loosened, and the clearance between the second support surface and the undersurface of the load-distributing plate. Consequently, when the screw element is tightened, and thus the holding element and therefore the load-distributing plate are secured, the resilient first intermediate layer is compressed to the required degree and the desired prestressing is achieved.
For indirect prestressing, i.e. the screw element or the disk-shaped rests in a frictionally engaged manner upon the second insert, the second insert has an axial extent which, upon tightening of the screw element, results in a displacement of the holding element with the load-distributing plate in the direction of the support and consequently a compression of the resilient first intermediate layer. The screw element, i.e. its head or the disc-shaped element, then obviously rests upon a region of the holding element. Since in this case the holding element and the load-distributing plate form a unit, the clip only has to compensate for tilting forces introduced by the rail, so that no loss of fatigue strength occurs.
A further proposal of the invention provides that two shoulders, each of which accommodates one leg section of the clip, extend from the base section of the holding element, the screw element, such as a through-bolt, extending between the shoulders. Also extending between the shoulders is the leg or legs of the clip, which rests or rest upon the rail foot or upon an element, and by which rails running next to each other can be secured
An independently inventive proposal of the invention, it is provided that the base section of the holding element is arranged between two rail feet, that two pairs of shoulders extend from the base section, that one clip extends from each pair of shoulders, and that between two pairs of shoulders there extends a plate element which is adjustable relative to the base element and which rests upon the rail feet, and upon which rests at least one leg of each clip. Instead of two pairs of shoulders, two spaced-apart channel-like receptacles can extend from the base section in order to be able to accept a leg of a clip exhibiting an E-shape in plan view, as described in AT-C-350 608.
By the construction of the clips which are supported on a plate element mounted on the rail feet, reliable holding down of rails that run immediately next to each other, as is the case in the region of rail switches and rail intersections, is possible in a simple manner.
The base section, which comprises the two pairs of shoulders or the two channels, preferably exhibits a quadratic geometry, whereby from the base section projects a quadratically shaped protrusion, having a cross-section of rectangular geometry with rounded corners and engaging the load-dissipating plate and having a positive connection with the latter.
The intermediate plate, or its support surfaces for the clips, should then have a slope that corresponds to the slope of the rail foot that is usually to be secured.
The holding element or the first insert comprises metal, whereas the second insert comprises plastic, in particular polyamide with a fibre glass content between 50% and 70%, preferably approximately 60%.
Further details, advantages, and characteristics of the invention can be found not only in the claims and the features described therein, independently and/or in combination, but also in the following description of preferred embodiments shown in the drawings, in which:
The Figures, which always use the same reference numbers for identical elements, illustrate fastenings for a rail extending in a rail switch. To fasten the rails, one employs resilient tensioning clamps,—also referred to as clips—and holding elements accepting the clips, as they have been described on principle in EP-B-0 619 852, in particular in its FIGS. 1-5. In this respect, reference is made to the relevant disclosure. However, the invention is not limited to the corresponding shape of the clips. Furthermore, the teaching of the invention is also realizable with clips of different geometry and with clips of a type that are accepted by holding elements, which for the purpose of securing clips have a channel, for example, instead of shoulders, as is known from the fastening system according to AT-C-350 608. In this respect, reference is particularly made to the relevant disclosure therein.
The ribbed plate 14 is supported by a resilient intermediate layer 30, which in turn rests on an essentially inflexible plate 32, made for example of hard plastic. In this exemplary embodiment, the plate 32 in turn extends directly from a concrete tie 34.
Below the rail foot 16, the resilient intermediate layer 30 can have, for example according to WO-A-200227099, recessed areas 36, which under normal loading of the rail 10 extend at a spacing from the intermediate plate 32. Under excessively high loads, the recessed regions will come to rest on the intermediate plate 32, so that the intermediate layer 30 will become stiffer.
The clips 22, 24 have in plan view an approximate M-shape and comprise the outer legs 38, 40, which merge through arch sections 42, 44 into the inner legs 46, 48, which in turn are connected by an arch section 50.
When fastening the clips 22, 24, the outer legs 38, 40 are driven into the holding elements 26, 28, in particular into so-called shoulders 52, 54, or rather into hollow spaces surrounded by the shoulders. Owing to the shape of the legs 38, 40, 46, 48 and the shape of the arch sections 42, 44, the arch section 50 subsequently rests with prestress upon the rail foot 16 or rather the respective longitudinal edge 18, 20 and thus holds down the stock rail 10. In this, the arch section 50 is surrounded by a sleeve 56 consisting of electrically insulating material.
The basic design of the clips 22, 24 was described on the basis of clip 22 alone, but this applies analogously to clip 24. In the following, the design of the holding elements 26, 28 will also be described by using holding element 26 as an example.
The holding element 26 and the shoulders 52, 54, which accept the outer legs 38, 40 and each of which has a laterally open U-shaped channel 58, 60 for accepting the legs 38, 40, originate in a plate-shaped base section 62, which in turn on its bottom has a shaped projection 64, which preferably exhibits a cup-shaped geometry with a circumferential wall 66 and a bottom wall 68. The bottom wall 68 is provided with a through-opening 70, to accept an insert 72, which can also be regarded as an adjusting cone. The insert has a through-opening 74, through which passes a shaft 76 of a through-bolt for securing the holding element 26 and thus the ribbed plate 14. For this purpose, the base section 62 rests with a first support surface 80 upon a section of the ribbed plate 14 forming a second support surface 82. The ribbed plate 14 has a through-opening 84 to be able to positively accept the shaped projection 64. To fasten the holding element 26, 28 and thus the ribbed plate 14, the respective holding element 26, 28, i.e. the shaped projection 64, is inserted into the corresponding opening 84 of the ribbed plate 14. Subsequently, the insert 72 is inserted into the through-opening 70 of the holding element 26. The through-bolt is then screwed into a nut 88, which is accommodated by a sleeve 86 arranged in the concrete tie 34. The sleeve 86 is accommodated by a widening 90, which extends from a socket 92, which is embedded in the concrete tie 34 and which surrounds the shaft 76 of the through-bolt 78 in its assembled state, as illustrated in the sectional view of
The through-bolt 78, i.e. its head 94, is supported on a washer 96, which in turn rests on the interior surface of the bottom of the shaped projection 64. When the through-bolt 78 is tightened, the holding element 26, 28 is drawn onto the essentially rigid plate 32 and rests in frictional engagement with the latter. During this, the washer 96 rests upon the edge region of the interior surface of the bottom wall 68 surrounding the through-opening 70, which consequently is referred to as third support surface 98. Simultaneously, the ribbed plate 14 is pulled along, which resiliently prestresses the ribbed plate 14, since the distance between the first support surface 80 of the holding element 26 and its fourth support surface 100 resting on the plate 32 is smaller than the thickness of the ribbed plate 14 and the resilient intermediate layer 30 in the relaxed state, i.e. with loosened through-bolt 78. Tightening the through-bolt 78 consequently compresses the resilient intermediate layer 32, which allows the desired prestressing of the ribbed plate 14 to be achieved.
Under load, the stock rail 10 is able to deflect to the necessary degree. The resilient intermediate layer 30, together with the washer 96, thereby forms a spring system, which allows realization of a characteristic curve with a knee-point, which is shown in DE-C-42 43 990. Of course, an equivalent characteristic curve could also be achieved if the head 94 rested directly on the bottom wall 68.
Since the prestressing of the ribbed plate 14 is provided by the holding element 26, 28, a relative movement is possible between the ribbed plate 14 and the holding element 26, 28 and therefore the stock rail 10. As a result of this, the clip 22, 24 must if necessary execute spring excursions, in dependence on the subsidence of the stock rail 10, which can lead to loss of fatigue strength. To eliminate this possibility, the prestressing of the ribbed plate 14 can be realized, in accordance with the exemplary embodiment of
As illustrated particularly clearly in
The circumferential wall 114 of the shaped projection 110 is surrounded, in a form-fitting manner, by inner surfaces 120, 122 of openings 124, 126 in the ribbed plate 14, the peripherally protruding projections 112 extending along the bottom 128 of the ribbed plate 14. Further, in accordance with the exemplary embodiment of
To allow insertion of the holding elements 106, 108 into the openings 124, 126, the openings 124, 126 have cut-outs 132, 134 matching the projections 112, the projections 112 passing through these in a position of the holding element 106 in which the latter is not aligned properly relative to the rail foot 16. When the holding element 106 has been inserted into the opening and the peripheral projections 112 extend along the bottom 128 of the ribbed plate 14, the holding element 106 is rotated to the proper alignment relative to the rail foot, the holding element 106 being connected to the ribbed plate 14 in a bayonet-joint-like manner. Now, the insert 102 is inserted into the opening 118 of the bottom wall 116. The insert 102 then exhibits a height such that during tightening of the through-bolt 78, the required prestressing of the ribbed plate 14 can be achieved by compressing an intermediate layer 136 arranged below the ribbed plate 14. The resilient intermediate layer 136 is then attached—otherwise than the exemplary embodiment of FIGS. 2-5—at the bottom 128 of the ribbed plate 114. This can be effected by vulcanizing.
Insertion of the holding element 106, 108 into the ribbed plate 14 and thus the interlocking and friction-locking joining of these is also illustrated by
Furthermore, the other reference numerals used in
Prior to driving the clip 22, 24 into the holding element 104, 106, the latter and therefore the ribbed plate are secured via the through-bolt 78, which is screwed into the nut 88 and is tightened. During this, the washer 96 rests upon the insert 102 and, when the through-bolt 78 has been tightened, the insert 102 rests upon the intermediate plate 32, which consists of a hard material. Therefore, the insert 102 is friction-locked between the intermediate plate 32 and the washer 96. Disks 138, 140 acting as disc springs can be arranged between the bolt head 94 and the washer 96, as illustrated in
As described in connection with
In the exemplary embodiment, the height of the insert 102, 104 is smaller than the thickness of the bottom wall 116 of the holding element 106, 108 and the thickness of the resilient intermediate layer 136 in the relaxed state.
Because the holding element 106, 108 is connected to the ribbed plate 14 by interlocking and friction-locking, these two are moved as a unit relative to the insert 102, 104, so that as a result no additional spring loads arise for the clips 22, 24 from a subsidence of the stock rail 10. Consequently, fatigue strength is ensured.
The design of a removable holding element, which can be used to indirectly or directly preload a load-distributing plate for a rail, in particular in the region of rail switches, and further can be used to preferably removably arrange the load-distributing plate, is not limited to application in the region of normal rails or in the region of a stock rail immediately before a switch blade, but can also find use in the region of a tongue blade 142, which for reasons of simplicity was omitted in
In this region of the rail switch, corresponding to the section B-B of
The slide plate 146 can be removably fastened to the ribbed plate 44 via bar spring elements 148, 150, which extend along the longitudinal side edges of the ribbed plate 144 and which can be loaded via thrust blocks 152, 154, which originate from the ribbed plate 144 and have a U-shaped cross-section. The thrust blocks 152, 154 extend between supports 156, 158, 160, 162 of the slide plate 146, upon which the bar spring elements 148, 150 rest when the slide plate 146 is fixed.
In its end region on the slide plate side, the ribbed plate 144 is secured by a through-bolt 164, which can be tightened by means of a nut 168, which is accommodated in a positive connection by a collar 166, extending within a concrete tie 170, from which extends the ribbed plate 144. Analogous to the explanations for the through-bolt 78, the shank 172 of the through-bolt 164 is surrounded by sleeve 174, which is cast into the concrete tie 170 and consists of an electrically insulating material.
As in the embodiments of
Accordingly, the holding element 108 consists of a plate-like base section 178, which in a plan view is rectangular, from which extends a shaped projection 180 having a circular cross-section, which consists of a circumferential wall 182 equivalent to a section of a hollow cylinder as well as a bottom wall 184, which has a through-opening 186, into which an insert 188 can be inserted with positive connection. The insert 188 accepts a through-bolt 190, which can be screwed into a nut 192, which in turn is accepted in a positive connection by a collar 194 in the concrete tie 170.
The insert 188 has a height, which, when the through-bolt 190 is tightened and there is thus a friction-locked contact of the insert 188, on the one hand, on the plate 196, which is arranged on the concrete tie 170 and consists of inflexible material such as hard plastic, and on the other hand at the washer 198, through which extends the through-bolt 190, ensures that the resilient intermediate layer 176 is compressed by the holding element 108 and the ribbed plate 144 connected to the latter to a degree that is sufficient to achieve the desired prestressing. Discs 202, 204 acting as disc springs can in that case be arranged between the head 200 of the bolt 290 and the washer 198, in accordance with the illustration of
The washer 198, which rests frictionally on the top of the insert 188, is also supported on the inner surface of the bottom wall 184 of the holding element 108, which in turn is connected by interlocking and friction-locking to the ribbed plate 144, as was described in connection with
To allow insertion of the holding element 108, the ribbed plate 144, which positively accepts the holding element 108, i.e. its shaped projection 180, has a corresponding through-opening 208 with an inner geometry that corresponds to the outer geometry of the shaped projection 180, whereby the cut-outs 210, 212 corresponding to the projections 206 extend in such a manner that the holding element 108 is to be inserted into the ribbed plate 144 in a position in which the clip 24 would not be supported properly, or would not at all be supported, on the rail foot 16, so that consequently the holding element 108 must be rotated to reach its operating position. As a result of this, the projections 206 extend below the ribbed plate 144 without a possibility of detaching the holding element 108.
In other words, a design of this type realizes a bayonet-joint-like connection between the holding element 108 and the ribbed plate 144.
For completeness sake, it must be pointed out, with regard to the embodiment of
The clip 24, in the exemplary embodiment, rests on the left side edge 20 of the stock rail 10. The opposing side edge 18 is hold downed by the slide plate 146. In this respect we refer to the customary designs.
The prestressing of the ribbed plate 144, i.e. the compression of the resilient intermediate layer 176, is achieved in the end region of the ribbed plate 144, on the slide plate side, via the through-bolt 164, which, via a washer 218, rests on an insert 220, having a height that is smaller than the thickness of the ribbed plate 144 and the thickness of the resilient intermediate layer 176 in the relaxed state, i.e. when the through-bolt 164 is loosened. Therefore, if the insert 220 is tightened between the washer 218 and the plate 196, the resilient intermediate layer 176 is compressed accordingly. Naturally, the height of the insert 220 is greater than the thickness of the ribbed plate 144.
To ensure that the holding element 108 and likewise the holding element 106 of
In other words, the base section 178 extends along the top of the ribbed plate 226 and the projections 206, given a properly inserted holding element 108, extend along the bottom surface of the ribbed plate 226. This is how the desired positive connection is ensured in bayonet-joint-like manner. The prestressing of the ribbed plate 226 is accomplished via the friction-locked fit of the insert 188 between the plate 232, which is arranged on a concrete tie 230 and consists of a hard material, and the washer 198, through which passes the through-bolt 190, which can be tightened by means of the nut 192 secured in the concrete tie 230.
When the clip 24 is properly aligned relative to the side edge 20 of the rail foot 16, the holding element 108 can also be locked by means of the lock pin 222.
The side edge 233 of the foot of the tongue blade, which faces away from the stock rail also serves as support for a clip 234 of the previously-described design, which extends from a holding element 236, which has a plate-like base section 238 that rests upon the top 240 of the intermediate plate 228. The holding element 236 is then connected by interlocking and friction-locking to the intermediate plate 228 and the ribbed plate 226, which supports the intermediate plate 228 and in the exemplary embodiment is made in two pieces. This is realized in a manner described previously. For this purpose, a shaped projection 242 extending from the base section 238 has protruding projections 244, which in the usual manner can be inserted positively into the intermediate plate 228 and the ribbed plate 226 and subsequently rotated relative thereto. In this respect, reference is made to the description relating to
The through-opening 246 of the holding element 236 accommodates an insert 248, the height of which provides the prestressing of the ribbed plate 226, i.e. the compression of the resilient intermediate layer 250 extending from the bottom of the ribbed plate 226, which can be vulcanized to the bottom of the ribbed plate 226 or can be embodied as separate layer. The intermediate layer 250 can thereby have a fundamental design, as shown for example in EP-A-0 953 681, i.e. can have recessed sections that only come to rest on the plate 232 if, under excessively high loads acting upon the stock rail 10 or the tongue blade 142, it is desired that the intermediate layer 250 become stiffer.
To hold down or load the stock rail 10 and the tongue blade 142 with appropriate above-described clips at their mutually opposed side edges 18, 25, a design was chosen that has independent inventive merit. Between the stock rail 10 and the tongue blade 142 extends a holding element 254, which has a plate-like base section 256, which is rectangular in plan view, with a shaped projection 258 of rectangular cross-section extending from the bottom of the base section. Analogous to the exemplary embodiment described above, the cross-section of the shaped projection 258 is smaller than that of the base section 256. The shaped projection 258 has a through-opening, through which a through-bolt 288 can pass.
Viewed longitudinally of the rails 10, 142, two pairs of shoulders, 262, 264 and 266, 268 extend at some distance from each other, which in each, like the above-described holding elements, form channel-like receptacles with U-shaped cross-sections for the outer legs of clips 270, 272, which have a design and function corresponding to those of e.g. clips 22, 24. Extending between the shoulders 262, 264 on one side and the shoulders 266, 268 on the other side, there is an intermediate plate 274, which can be viewed as a bridge element and which is adjustable relative to the holding element 254, and rests by border sections 280, 282, bounded by steps 276, 278, upon the rail foot 16, 236 of the stock rail 10 and the tongue blade 142, respectively, or rather their side edges 18, 252, as is particularly well illustrated in the sectional view of
The centre legs of the clips 270, 272 then rest upon the top 286 of the intermediate plate 274, whereby the intermediate plate 276 is pressed onto the rail feet 16, 233. Therefore, narrowly spaced rails, i.e. the stock rail 10 and the tongue blade 142 in the exemplary embodiment, can be loaded in a space-saving manner via clips that are employed in the other parts of the rail switch.
To ensure identical geometric conditions with respect to holding down, such as when the clips are directly supported on a rail foot, the top surface of the intermediate plate 274 preferably has a roof-like geometry with slopes that correspond to those of the support surfaces of the rail feet 16, 236 in those regions, which usually serve as support for the clips.
Analogous to the holding elements 108, 236, the holding element 254 is fastened via the through-bolt 288. Since the holding element 254 does not grip or have a positive connection to the ribbed plate 256—as was described on the basis of FIGS. 5 to 10—, but is only positively inserted into a matching through-opening 290, a relative movement between it and the holding element 256, and thus additional loading on the clips 270, 272, can occur in dependence on the subsidence of the ribbed plate 226. However, since the holding element 254 is secured by the through-bolt 288 in the centre region of the intermediate plate 274, which is considered a bridge element, the spring excursions which occur can be kept low enough to not affect the fatigue strength of the clips 270, 272. Also contributing to this is that the ribbed plate 262 is split in the region of the through-opening 290, so that a relative movement occurs between the section 292 accepting the stock rail 10 and the section 294 supporting the tongue blade 142. Correspondingly, the resilient intermediate layer 250 is also divided into sections 296, 298. The contact lines between the sections 292, 294 and 296, 298, respectively, then pass through the through-opening 290.
A so-called double-securement, as was described in connection with the holding element 254 and the directly adjacently extending stock rail 10 and tongue blade 142, can also be found in the section D-D of
On the other hand, the mutually opposed side edges 318, 320 of the rail sections 300, 302 are held down by means of clips and an intermediate plate or bridge element, as has been described in connection with
Across the holding element 322 extends an intermediate plate 326, which can also be viewed as a bridge element and which performs the function of the intermediate plate 274 of
Therefore, the intermediate plate 326 is a separate component part, which is placed upon the holding element 322, i.e. the top of the base section 256, whereby for the purpose of achieving proper alignment relative to the holding element 322, the intermediate plate 326 has, on its side facing the holding element, a recess 328 having a width corresponding to that of the base section 256. In the case of proper positioning, the intermediate plate 326 lies, at its side edges, which are bounded by steps 334, 336, on the longitudinal side edges 338, 340 of the rail sections 300, 302, so that subsequently the clips 270, 272 are driven into the holding element 322, i.e. into the shoulders 321, 323, 325, 327.
The fact that the holding element 322 extends in the split region of the sections 306, 308 of the ribbed plate 304 allows a relative movement between the rail sections 300, 302 to take place, the spring loading of the clips 270, 272 being simultaneously reduced.
A sectional view E-E of
The supports 344 are connected by through-bolts to the concrete tie 348 accommodating the rail section 342. In this regard, reference is made to sufficiently well known designs.
Number | Date | Country | Kind |
---|---|---|---|
10 2004 029 730 | Jun 2004 | DE | national |
10 2004 031 632 | Jun 2004 | DE | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/EP2005/006578 | 6/17/2005 | WO | 00 | 1/4/2007 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2005/124025 | 12/29/2005 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
4325510 | Sherrick | Apr 1982 | A |
4349150 | Lubbers | Sep 1982 | A |
4756477 | Schumaker | Jul 1988 | A |
4844338 | Bucksbee | Jul 1989 | A |
4967954 | von Lange | Nov 1990 | A |
5221044 | Guins | Jun 1993 | A |
5361986 | Meier et al. | Nov 1994 | A |
5692677 | Duconseil | Dec 1997 | A |
6079631 | Ortwein et al. | Jun 2000 | A |
6499667 | Rhodes et al. | Dec 2002 | B1 |
6619558 | Jang | Sep 2003 | B1 |
6651897 | Porrill et al. | Nov 2003 | B1 |
6761322 | Porrill et al. | Jul 2004 | B1 |
6880764 | Schwarzbich | Apr 2005 | B2 |
7261244 | Urmson et al. | Aug 2007 | B2 |
7374109 | Ellerhorst | May 2008 | B2 |
7533829 | Osler et al. | May 2009 | B2 |
20040084548 | Schwarzbich | May 2004 | A1 |
20070235551 | Ellerhorst | Oct 2007 | A1 |
20080093472 | Hohne et al. | Apr 2008 | A1 |
Number | Date | Country |
---|---|---|
9320372 | Jun 1994 | DE |
2370062 | Jun 2002 | GB |
Number | Date | Country | |
---|---|---|---|
20080093472 A1 | Apr 2008 | US |