The invention relates to a rail loading train for transporting long-welded rails, including loading wagons mobile on a track and a fixing device for anchoring the rails, the fixing device being arranged on the rail loading train and composed of a number of clamping devices provided for anchoring a single rail in each case.
Rail loading trains of this type are already known from WO 2007/065500 A1 or WO 2010/127735 A1. These consist of several loading wagons, with a crane being arranged for mobility on rails along said wagons. Long-welded rails to be transported are anchored in a fixing device arranged on the rail loading train, wherein a separate clamping device is associated with each rail.
It is the object of the present invention to provide a rail loading train of the type mentioned at the beginning, the loading of which can be accomplished as universally and independently as possible.
According to the invention, this object is achieved with a rail loading train of the specified type in that the clamping devices are designed to be adjustable in a longitudinal direction of the wagon relative to the rail loading train by means of a displacement drive.
A rail loading train equipped in this manner can now be loaded at the rail welding plant largely independently of the particular situation at the construction site, but, above all, without being limited by the local conditions. At said rail welding plant, operation of the gantry crane belonging to the rail loading train is often possible only in a very limited way or not at all. At the plant, the rails are merely positioned immediately in front of the fixing device. The actual contact between the clamping device and the rail is established by displacing the fixing device.
Additional advantages of the invention become apparent from the dependent claims and the drawing description.
A rail loading train 1 shown in
As shown in more detail in
Based on the permitted axle load, load carrying capacity and width of the wagon, a configuration of the rail loading train 1 with a total of four carrier plates 17 having ten clamping devices 14 each, i.e. for forty long-welded rails 5, proves especially advantageous.
As far as the design of the clamping device 14 is concerned, reference is made to the state of the art cited at the beginning. Each clamping device 14 has a separate drive 20 for anchoring the rail 5. Furthermore, a sliding device 21 for inserting and guiding the rail 5 is associated with each clamping device 14.
The manner of operation of the fixing device 13 will now be described briefly. As already mentioned, operation of the crane 9 is not always possible. In these cases, the rails 5 are transported in pairs to immediately in front of the sliding devices 21 by a transport device not further shown. By actuation of the displacement drive 15, the carrier plate 17 moves slidingly in the longitudinal guide 18 in the longitudinal direction 11 of the wagon towards the ends 22 of the rails 5. With the aid of the sliding devices 21, the rails 5 are centred and arrive with their ends 22 in the clamping devices 14. By actuation of the drives 20, the two rails 5 are fixed to the fixing device 13 or to the rail loading train 1. After renewed actuation of the displacement drive 21, the rails 5 are moved slightly in the direction towards the end 12 of the rail loading train 1. Now, the next pair of rails 5 is inserted, until the entire carrier plate 17 is furnished with rails 5. After the last displacement of the carrier plate 17 in the direction towards the end 12, the carrier plate 17 is fixed to the fixing device 13 with the aid of the blocking device 19, and the loading operation of the next carrier plate 17 can proceed.
Number | Date | Country | Kind |
---|---|---|---|
20 2013 004 729 U | May 2013 | DE | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2014/001147 | 4/29/2014 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2014/187528 | 11/27/2014 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
8419327 | Muehlbacher | Apr 2013 | B2 |
8708625 | Landrum | Apr 2014 | B1 |
20080232917 | Hertelendi | Sep 2008 | A1 |
20120114443 | Cyrus | May 2012 | A1 |
20130343827 | Schibsbye | Dec 2013 | A1 |
20140255119 | Herzog | Sep 2014 | A1 |
20160052528 | Lichtberger | Feb 2016 | A1 |
20160053740 | Landrum | Feb 2016 | A1 |
20160096533 | Traintinger | Apr 2016 | A1 |
Number | Date | Country |
---|---|---|
2007065500 | Jun 2007 | WO |
2010127735 | Nov 2010 | WO |
Number | Date | Country | |
---|---|---|---|
20160096533 A1 | Apr 2016 | US |