Railcar maintenance management method

Information

  • Patent Grant
  • 6446912
  • Patent Number
    6,446,912
  • Date Filed
    Wednesday, November 29, 2000
    24 years ago
  • Date Issued
    Tuesday, September 10, 2002
    22 years ago
Abstract
The present invention relates to a system and a method for managing the repairing, cleaning, painting, or otherwise maintaining of railcars within a railcar maintenance facility. Specifically, the present invention relates to a railcar maintenance management system and method for maintaining railcars within a facility wherein the facility has an inbound track, an outbound track, and a plurality of maintenance stations for moving a railcar in and out of the facility and for repairing, cleaning, or painting the same. Further, the railcar maintenance management system and method allows for efficient movement of railcars through the facility by queueing the railcars at strategic locations within the railcar facility.
Description




FIELD OF INVENTION




The present invention relates to a method for managing the repairing, cleaning, painting, or other maintenance of railcars within a railcar maintenance facility. Specifically, the present invention relates to a method for managing the maintenance of railcars within a facility wherein the facility has an inbound track, an outbound track, and a plurality of repair stations for moving a railcar in and out of the facility and for repairing, cleaning, or painting the same. Moreover, the invention relates to a management method that has a plurality of communication devices for signaling the availability of maintenance stations within the maintenance facility. Further, the railcar maintenance process allows for efficient movement of railcars through the facility by queueing the railcars at strategic locations within the railcar facility.




BACKGROUND OF THE INVENTION




The railcar industry presently suffers from high costs associated with railcar repair. Regularly scheduled repair and maintenance, along with the inevitable number of wrecks and bad orders, cause some percentage of each fleet of railcars to be out of service at any given time. While out of service for repair, a railcar is unable to generate income for the owner of the railcar. Thus, it is desirable to minimize the throughput time of a repair facility and maximize the efficiency of the railcar's service time. Additionally, decreasing the throughput time for repair facilities allows the industry to rely on smaller fleets, as fewer backup railcars are needed. Furthermore, it is desirable to minimize the variability of a repair facility's throughput time to promote accurate estimates of when railcars will return to service. Accurate estimates of throughput time decrease costs to the industry by reducing the need for redundant planning.




Traditionally, railcar repair facilities, as well as many other manufacturing operations, release product into the facility as soon as it arrives regardless of the state of the production system. Railcar repair facilities traditionally consist of a series of maintenance stations located sequentially along a continuous track. The assembly-line repair method and repair facility design may be appropriate when working with a standardized product that requires uniform treatment at each stage of the assembly-line procedure. However, pushing railcars with individual repair process requirements through an assembly-line repair facility leads to inconsistent throughput performance with large backlogs, increased work-in-process levels, and increased cycle times having high levels of variation. If a single railcar is delayed due to lengthy repair work or a shortage of necessary materials, every railcar in the facility behind the delayed railcar may also be delayed. Thus, a single railcar can create a work-in-process bottleneck effecting the entire repair production system. These bottlenecks may cause the high throughput times and the equally high variability of throughput times of traditional railcar repair facilities. Moreover, typical maintenance processes fail to identify the process bottleneck, thereby leading to solutions that fail to provide constant work to the bottleneck. Failure to identify the process bottleneck may lead to inefficiencies, otherwise known as “bottleneck starving.”




A major limitation of the assembly-line process is the inability to implement any form of bottleneck planning. In a traditional railcar repair facility, high levels of work-in-process hide the bottleneck operation preventing the facility from running at its highest efficiency. One key to improving a maintenance facility's efficiency is to identify the bottleneck operation and ensure that process is in continuous operation.




Accordingly, it would be desirable to improve the efficiency and predictability of railcar repair by identifying a facility layout capable of eliminating unnecessary work-in-process bottlenecks. Further, it is desirable to implement a railcar maintenance facility having a plurality of stations to service a plurality of types of railcars having a plurality of maintenance needs.




SUMMARY OF THE INVENTION




The present invention relates to a railcar maintenance management system and method. More specifically, the present invention relates to a system and a method for managing the repairing, cleaning, painting, or otherwise maintaining of railcars within a railcar maintenance facility. Further, the railcar repair process allows for efficient movement of railcars through the facility by queuing the railcars at strategic locations within the railcar facility.




Therefore, it is an advantage of the present invention to utilize a process layout facility to optimize both efficiency and predictability of railcar repair.




It is an additional advantage of the present invention to employ customized routing patterns through the maintenance facility based on the individual maintenance needs of each railcar.




And it is an additional advantage of the present invention to optimize workstation efficiency by eliminating work-in-process bottlenecks within the railcar maintenance facility.




Still further, it is an advantage of the present invention to increase workstation utilization within the railcar maintenance facility by providing workstations capable of servicing multiple product types.




And it is an additional advantage of the present invention to prevent the identified bottleneck process from starving.




It is a further advantage of the present invention to provide a railcar maintenance facility that utilizes a system of queues to efficiently move railcars that need maintenance through the facility.




These and other advantages of the present invention will become apparent upon examining the drawings and figures together with the accompanying written description thereof.











BRIEF DESCRIPTION OF THE DRAWINGS




The present invention will be hereafter described by way of example with reference to the following drawings:





FIG. 1

represents a plan view of the railcar maintenance facility having inbound and outbound rails, queues, transfer tables, and maintenance stations in an embodiment of the present invention.





FIG. 2

is a perspective view of an interior blast workstation in an embodiment of the present invention.





FIG. 3

illustrates a flowchart for a tank car that requires specific maintenance performed thereto in an embodiment of the present invention.





FIG. 4

illustrates a flowchart for a bad order tank car that requires specific maintenance performed thereon in another embodiment of the present invention.





FIG. 5

illustrates a flowchart for a hopper railcar in an embodiment of the present invention.





FIG. 6

illustrates a flowchart for a wrecked hopper railcar requiring specific maintenance in an embodiment of the present invention.











DETAILED DESCRIPTION OF THE PRESENTLY PREFERRED EMBODIMENTS




The present invention relates to a railcar maintenance management system and method for cleaning, repairing, painting, and/or otherwise maintaining railcars. Specifically, the present invention relates to a process for maintaining railcars that allows for efficient movement of railcars through a maintenance facility by queuing the railcars at strategic locations and by communicating the availability of maintenance stations within the railcar maintenance facility.




Railcar Maintenance Facility





FIG. 1

illustrates an embodiment of the present invention showing a railcar maintenance facility


10


for maintaining a plurality of railcars. Railcars may include hoppers, pressurized storage and/or transport tanks and/or any other means for holding, storing and/or transporting goods via railway. For example, a typical railcar serviced by the railcar maintenance facility


10


may be a tank car having a lining therein for transporting corn syrup, citric acid, starches and/or ethanol.




In

FIG. 1

, the railcar maintenance facility


10


may include inbound railways


12




a,




12




b


leading to a series of railways acting as inbound queues


14




a


-


14




d.


Railcars entering the facility


10


may enter via a single railway (not shown) and may be sorted at an inspection station (not shown) based on particular types of railcars and particular types of maintenance to be completed on the railcars. For example, maintenance may include cleaning the railcar or components thereof, repairing, painting, and/or any other maintenance activity apparent to those skilled in the art.




An inspector within the inspection facility may direct each inbound railcar to the proper inbound queue


14




a


-


14




d


based on the type of railcar and/or the type of work to be performed thereon. Moreover, the inspector may label the inbound railcars with maintenance facility routing schedules (not shown) according to each railcar's product type and maintenance requirements. For example, the inspector may prepare a color coded magnetic routing schedule and adhere the schedule on each railcar to indicate the routing pattern the railcar will take through the maintenance facility


10


. The schedule may further include a list of required operations having a check box located adjacent to each operation listed. Upon completion of each operation, the corresponding check box may be marked and signed thereby initiating the next operation on the schedule.




A railcar entering the facility


10


may be classified, for example, as either “light” or “heavy” based on the amount of work to be performed thereon. “Light” maintenance may refer to exterior or interior cleaning, exterior painting, minor repair, and/or any other maintenance apparent to those skilled in the art as being “light”. Alternatively, “heavy” maintenance may refer to major repair and/or any other maintenance apparent to those skilled in the art.




A railcar designated as “light” may be routed to the facility


10


via the inbound railway


12




a.


Moreover, inbound queues


14




a,




14




b


may be utilized to hold railcars until the facility


10


has the capabilities to have the work performed thereon. Further, railcars designated as needing “heavy” maintenance work thereto may be routed to the facility via the inbound railway


12




b.


A railcar may be queued in inbound queues


14




c,




14




d.


The inbound queues


14




a


-


14




d


may hold and/or store railcars until stations are free within the facility that may be necessary to carry out the required maintenance on the railcars.




In an alternate embodiment of the invention illustrated in

FIG. 1

, there may be four inbound queues


14




a


-


14




d.


One queue, such as, for example,


14




b,


may be designated for railcars requiring only repair service. A second queue, such as, for example,


14




a,


may be designated for railcars requiring only repair service but are waiting for the arrival of repair parts to the repair facility


10


, as noted above. A third queue, such as, for example,


14




d,


may be designated for railcars requiring repair service and lining service. A fourth queue, such as, for example,


14




c,


may be designated for railcars requiring repair service and lining service but are waiting for the arrival of repair parts to the repair facility


10


. As specified above, these queues may be utilized to hold railcars before the railcars enter the railcar maintenance facility


10


for specific types of maintenance. However, the types of maintenance should not be limited as noted above. Any type of maintenance may be carried out within the railcar maintenance facility


10


. Further, it should be noted that the queues may be utilized for any purpose apparent to those skilled in the art and should not be limited as herein described.




The inbound queues


14




a


-


14




d


for the sorted railcars may terminate at a transfer area


18


that may be used to transfer railcars throughout the railcar maintenance facility


10


based on the type of maintenance needed. A primary transfer table


20


may be located within the transfer area


18


and may operate along a length of track


22


that may be adjacent to maintenance stations, described below. The primary transfer table


20


may facilitate the movement of railcars between the inbound queues


14


and the maintenance stations


24


. The maintenance stations may include, but may not be limited to: repair stations


28




a


-


28




e,


an interior blast station


30


, an exterior blast station


32


, an exterior paint station


34


, interior paint stations


35




a


-


35




c,


cure stations


36




a


-


36




c,


and an assembly and test station


37


.




A secondary transfer table


38


may be located within the transfer area


18


and may also operate along track


22


. The secondary transfer table


38


may facilitate movement between the inbound queues


14




a


-


14




d,


a cleaning facility


42


and/or the outbound railway


44


. Although the primary transfer table


20


and the secondary transfer table


38


may have dedicated responsibilities as noted above, either transfer table may be capable of maintaining the entire transfer of railcars in the event of equipment breakdown or for any other reason.




In a preferred embodiment, the primary transfer table


20


and the secondary transfer table


38


may be identical in size, shape, and performance. The tables


20


,


38


may be disposed on the track


22


within a shallow pit. The primary transfer table


20


and secondary transfer table


38


may be approximately sixteen feet wide by eighty feet long with a maximum capacity of sixty tons. However, any size and shape may be implemented that may be apparent to those skilled in the art. A motor, preferably a forty horsepower variable frequency electric driven motor (not shown), may drive each transfer table


20


,


38


at a plurality of speeds, preferably between about thirty and one hundred and fifty feet per minute. Additionally, the transfer tables


20


,


38


may be capable of soft starts, electric braking, and loading and unloading railcars via a mounted railcar mover (not shown) thus eliminating the need for track mobiles and similar equipment. Further, railcars may be loaded and unloaded from either side of the transfer tables


20


,


38


. It should be noted, however, that any system for moving the tables


20


,


38


and/or loading and unloading mounted railcars may be utilized and this invention is not meant to be limited as herein described.




Although the maintenance facility


10


may be designed in any manner apparent to those skilled in the art, the maintenance facility


10


may preferably have two rectangular buildings located on opposite sides of the track


22


. On a first side


13


of the track


22


, the maintenance facility


10


may include a series of the repair stations


28




a


-


28




e


that may be equipped to process any type of railcar, such as, for example, tank cars and hoppers. On the opposite side


15


of the track


22


, the maintenance facility


10


may include series of stations (as described below) that may be required to perform interior and exterior paint operations and cleaning. However, any type of station may be located on either side, or in any other location, as may be apparent to those skilled in the art. Generally, the design of the maintenance facility


10


and the placement of the maintenance stations therein allow for efficient movement of railcars therethrough.




The repair stations


28




a


-


28




e


may preferably be located adjacent to the transfer table area


18


or in any other location apparent to those having skill in the art. Maximum efficiency and utility may be gained by equipping each repair workstation


28




a


-


28




e


with general-purpose railcar maintenance equipment that may be capable of servicing a plurality of types of railcars serviced by the maintenance facility


10


. For example, equipment located in each repair workstation


42


may include: cranes, welding equipment, jacks, and/or other various mechanical tools apparent to a person having ordinary skill in the art of maintaining railcars. Railcars having damage or damaged parts may be repaired in the repair stations


28




a


-


28




e.






Additionally, the present invention illustrated in

FIG. 1

may preferably include an administrative building


43


having offices therein and a service parts inventory storage area


45


located adjacent to the repair stations


28




a


-


28




e.


The service parts inventory storage area


45


may contain a plurality of parts useful for repairing or otherwise maintaining railcars. Generally, a repair station worker may retrieve parts from within the service parts inventory storage area


45


to repair railcars within the repair stations


28




a


-


28




e.


Moreover, a maintenance area


48


may be provided that may house equipment for repairing specific parts on the railcars, or for any other purpose that may be apparent to those skilled in the art. For example, damaged valves on tank cars may be repaired by being removed from the tank cars in one of the repair stations


28




a


-


28




e.


The valve may then be taken to the maintenance area


46


for repair.




The present invention may further include a cleaning station


42


adjacent to the transfer table area. The cleaning facility


42


may be capable of cleaning any type of railcar serviced by the maintenance facility


10


. Generally, the cleaning station


42


may include a plurality of bays for servicing a plurality of railcars at any one time. The cleaning station


42


typically contains equipment necessary to implement the cleaning of any type of railcar, such as, for example, solvents, detergents, water hoses, vacuums, drains and/or any other equipment apparent to those skilled in the art.




In a preferred embodiment, the cleaning facility


42


may be a simultaneous cleaning facility capable of cleaning a plurality of railcars at the same time. The cleaning facility


42


may include a plurality of high-pressure hot water cleaning systems. Each system may be equipped with a high-pressure hot water injector having pressure gauges, steam and water supply inlets, air compressors, discharge piping and/or any other equipment that may be apparent to those skilled in the art. An overhead mezzanine (not shown) may allow easy and safe access to the railcars for access to the tops of the railcars and to any hatches that may be contained on the railcars. A crane may be installed on the mezzanine for the easy removal of cover plates, valves, hatch covers or any other part or component of the railcar.




The cleaning facility


42


of the preferred embodiment may be controlled by a central programmable logic control (“PLC”) system (not shown). The PLC system may be capable of automatically routing wastewater and rinse water into and/or away from the cleaning facility


42


. Further, the PLC system may monitor temperature and flow rate of the water, and may electronically record the individual railcar cleaning time periods. Therefore, efficiency may be maximized and data relating to various parameters, such as, for example, amount of water used, time period for cleaning and/or other parameters may be measured and recorded.




Furthermore, the cleaning facility


42


of the preferred embodiment may include a cleaning pad (not shown) that may have suitable grating to allow for easy discharge of wastewater to an underground drainage system (not shown). The drainage system may be provided beneath the four railroad tracks at the cleaning station to convey the wastewater and/or rinse water to a sump by gravity flow and for discharge according to safe environmental practices. For example, the repair facility


10


may include an onsite wastewater treatment plant (not shown) for treating the wastewater generated by the cleaning facility


42


. Alternatively, the cleaning facility


42


may tie into an existing wastewater system such as, for example, a municipal wastewater treatment facility.




Still referring to

FIG. 1

, the interior blast station


30


may be utilized to strip the interior of a railcar. The blast station


30


may send a powerful jet of steam, water, metal grit, sand or other material into the interior of the railcar to remove any material therein and/or remove any protective coatings adhered to the walls and/or other components of the railcar. Specifically, the blast station


30


may be utilized to remove liners that have been coated to the interior of the railcar that may be damaged or otherwise unfit for use within the railcar.




For example,

FIG. 2

illustrates an embodiment of the interior blast station


30


. The interior blast station


30


may include a plurality of railcar bays


100


-


104


having railcars


110


-


114


therein. The railcar bays


100


-


104


may provide space for blasting one railcar while cleaning another railcar that may already have been blasted. A blasting operation may be performed to remove a faulty lining of a railcar before a new lining may be applied. The blasting operation may be accomplished by any means obvious to one with skill in the art, such as, for example, metal pellet or metal grit blasting. As noted, a preferred embodiment of the interior blast station


30


may include a plurality of railcar bays


100


-


104


. More preferably, a robotic blast arm


106


in a first railcar bay


100


may enter the railcar and perform a blast cycle, preferably for about two hours, in a first railcar while a high powered vacuum in a second railcar bay


102


(not shown) may perform a cleaning cycle, preferably for about four hours, in a second railcar. A third railcar bay


104


may be used for transferring railcars into and out of the interior blast station


30


.




The robotic blast arm


106


may be moveably mounted within a truss system


108


that may allow the robotic blast system


106


to service all three railcar bays


100


-


104


. The moveably mounted robotic blast arm


106


may allow each of the bays within the interior blast station


30


to be used for prepping, blasting, and/or cleaning, thereby eliminating the need to transfer the railcars between bays within the interior blast station


30


.




In a preferred embodiment, the robotic blast arm


106


may be any type of cleaning arm that may be designed to enter the top hatch of a tank car or via any other hatch, door or opening. The arm


106


may be hinged at various locations to allow the arm to gain access to the interior of the railcar. Further, the arm


106


may telescope forward to reach a specified distance within the railcar. In a preferred embodiment, the arm


106


may reach an entirety of the interior of the railcar or may come within a specified distance, such as within eighty inches or any other distance, of the far ends of the tank car. The arm


106


may be equipped with two blast nozzles that may operate at a specified pressure.




In a preferred embodiment, the arm


106


may include ⅝″ blast nozzles that may operate at about 150 psi, however any size nozzle and pressure may be implemented according to this invention. The arm


106


may be capable of rotating ninety degrees while oscillating the blast nozzles to ensure a thorough and even coverage of the blast within the railcar. The process time may be any time period that may fully and efficiently blast and clean the interior of the railcar. As noted in the preferred embodiment, the estimated process time of the interior blast operation may be about two hours, followed by about a four-hour clean period. The cleaning operation may be completed using a high powered vacuum (not shown) to remove the blasting material, such as metal grit, sand or water, and any residue that has been blasted from the interior of the railcar.




Referring again to

FIG. 1

, the exterior blast station


32


is illustrated and may be used to prepare railcars for an exterior paint or coating operation. Generally, the exterior blast station


32


may contain any equipment useful for removing a coating and/or any other residual material from the exterior of a railcar. In a preferred embodiment, the exterior blast station


32


may have space for two railcars. A first bay (not shown) within the exterior blast station


32


may be utilized for the blasting of the exterior of the railcar. Moreover, a second bay (not shown) within the exterior blast station


32


may be utilized to provide light repair to the railcar prior to or after the blasting of the railcar. The second bay may allow repairs to be made to the railcar without using one of the repair stations


28




a


-


28




e.


This may prevent delays that may occur when a mechanical defect is discovered on a railcar that has been loaded into the exterior blast station


32


. If a railcar loaded into the exterior blast station


50


requires mechanical repair prior to the exterior blasting operation, the railcar can be transferred forward into the second bay for mechanical repair allowing the first bay to continue the blasting operation without a delay.




An air compressor area


33


may be disposed adjacent to both the interior blast station


30


and the exterior blast station


32


. The air compressor area


33


may contain an air compressor (not shown) and any other equipment for providing the requisite air pressure necessary for the blasting equipment.




An exterior paint station


34


may be provided within the facility


10


for providing an external coating of paint or other material to the railcar. Typically, a railcar will receive an external coating after blasting has removed a previous coating. Of course, railcars may be coated within the exterior paint station


34


without being blasted in the exterior blast station


32


. The exterior paint station


34


may contain equipment and any other materials apparent to those skilled in the art for providing external coatings to railcars. In a preferred embodiment, the exterior paint station


34


may have an open ceiling having a filter therein to facilitate direct airflow through the entire length of the exterior paint station


34


. The exterior paint station may further have a plurality of pneumatic lifts to enable a painter access to most, if not all, of the exterior of the railcar without using ladders and/or catwalks.




Internal paint stations


35




a


-


35




c


may also be provided to allow liners and/or coatings to be administered to the interiors of the railcars that may cycle through the facility


10


. Typically, a railcar may receive an internal coating of paint after having been blasted and cleaned in the interior blast station


30


. Of course, the railcar may receive a liner or a coating of paint without being blasted in the interior blast station


30


; it is not necessary, however, it is preferable, for a railcar to be blasted and cleaned first. Further, any number of internal paint stations may be constructed depending on the particular needs of the facility


10


and the invention should not be limited as herein described.




A paint kitchen


37


may be disposed adjacent both the exterior paint station


34


and the interior paint stations


35




a


-


35




c.


The paint kitchen


37


may contain any equipment and materials necessary to allow an individual to develop desirable coating materials for placement of the coating materials onto or within the railcars.




Paint cure stations


36




a


-


36




c


may be provided for allowing railcars having been coated in the exterior paint stations


34


or the interior paint stations


35




a


-


35




c


to be cured thereby setting the coatings on the railcars. The cure stations


36




a


-


36




c


may contain any equipment or other materials necessary to provide a suitable cure for the coatings. For example, the cure stations


36




a


-


36




c


may contain an air circulation system (not shown) for circulating air, such as, for example, heated air, within and around the railcar to aid in curing the coating of paint or other materials onto the railcar.




Still referring to

FIG. 1

, the lining queue area


26


may be provided to prevent works-in-process from draining the efficiency of the repair workstations


28




a


-


28




e.


It has been determined that the interior blasting operation that may be implemented within the interior blast station


30


may cause a bottleneck within the maintenance facility


10


since it the time period required to complete the interior blasting operation is relatively longer than any other operation implemented in any other maintenance station. Railcars requiring service from the interior blast station


30


may be stored within a set of tracks within the lining queue area


26


prior to blasting so that the railcars do not delay the services of, for example, one of the repair stations


28




a


-


28




e.


Further, holding the railcars within the lining queue area


26


may allow a railcar to enter the interior blast station


30


in a quick and efficient manner due to the proximity of the railcar to the interior blast station


30


and also because a railcar would be readily available to enter the interior blast station


30


immediately. Moreover, after the railcar has been blasted in the interior blast station


30


, painted and cured, the railcar may be stored within the cure queue area


27


. These queue stations


26


,


27


may allow a railcar to be stored and therefore not take up space within one of the stations that may be utilized for another railcar.




In a preferred embodiment, the lining queue area


26


and/or the cure queue area


27


may have space for any number of railcars within the queues. When a railcar is transferred from the lining queue area


26


to the interior blast station


30


, the available space in the lining queue area


26


may be filled by transferring a railcar from the inbound queues


14




a


-


14




d


or one of the repair workstations


28




a


-


28




e


to the lining queue area


26


or any other station within the facility


10


on a first come, first serve basis. Moreover, when a railcar is transferred from the cure queue area


27


to one of the cures stations


36




a


-


36




c,


the available space within the cure queue area


27


may be filled by transferring a railcar from the exterior paint station


34


and/or the interior paint stations


35




a


-


35




c.






There may be other queue areas provided within the facility


10


as may be apparent to those having ordinary skill in the art. Typically, the queue areas are designed to provide areas for storing railcars so that the railcars do not take up space within the maintenance stations within the facility, thereby allowing railcars to quickly and efficiently move through the facility


10


.




The assembly and test station


37


may be utilized to reassemble railcars after repair, cleaning, painting, coating, lining and/or any other type of maintenance that may have been performed on the railcar. Further the assembly and test station


37


may be utilized to test the railcars to verify that the maintenance to the railcars was successful. For example, if a lining was coated to the interior of a railcar, then the lining may be tested to ensure that the lining has been properly applied. Generally, testers may determine whether the railcar has, in fact, received the maintenance required. Further, testers may determine whether the maintenance performed on the railcars meets predefined standards of acceptability. Standards may include internal company standards or may be specified by governmental bodies or agencies or other governing bodies.




In the preferred embodiment of the repair facility


10


, safety may be enhanced through the use of video equipment designed to monitor all processes that may require a person to be inside railcar. Such operations may include the interior cleaning process that follows the interior blast operation and the interior paint operation. Remote video may provide full visual contact for all areas of the interior tank and may allow a human observer, who has limited sight access, to be deployed to another operation within the repair facility


10


.




After a railcar has had maintenance performed thereon and has been tested and/or reassembled in the assembly and test station


37


, the railcars may exit the railcar maintenance facility


10


via an outbound railway


44


. The outbound railway


44


may be connected with the assembly and test station


37


or may otherwise be connected to the transfer area


18


, as shown in FIG.


1


. The transfer tables


20


,


38


may transport a railcar to the outbound tracks


44


for exiting of the railcar from the railcar maintenance facility


10


.




Routing Patterns within the Maintenance Facility




Generally, the routing of railcars through the maintenance facility


10


is dependent on the type of railcar, the product type within the railcar, and the maintenance work that may be necessary for the railcar. For example, types of railcars may include tanks, pressurized tanks, hoppers and/or any other type of railcar apparent to those skilled in the art. The railcars may carry a plurality of different product types such as, for example, food grade commodities such as corn syrup sweeteners, citric acid, starches and ethanol. Moreover, the railcars may carry hazardous materials such as products for oil refining industries. Railcars may be routed through the maintenance facility based on whether the railcars require repairs, such as heavy repairs for railcars that are highly damaged, or light repairs, internal blasting, external blasting, cleaning material, painting, external painting and paint.





FIGS. 3-6

illustrate particular routing patterns that may be implemented for particular types of railcars that may have particular maintenance requirements. It should be noted, however, that any type of railcar may be serviced by the maintenance facility


10


in any routing pattern that may be apparent to those skilled in the art. The invention should not be limited as herein described with respect to the particular routing patterns.





FIG. 3

illustrates a routing pattern


200


for a tank car


202


. The tank car


202


may be any type of tank, such as pressurized or unpressurized tank cars, attached to a set of trucks for transporting the tank on a set of rails. Moreover, the tank car


202


may require heavy repair or light repair and may further require internal and/or external paint or lining.




The tank car


202


may enter the maintenance facility


10


via the set of rails


12




a


or


12




b.


The tank car may have been inspected via an inspection step


204


at an inspection station (not shown). Preferably, the railcars may enter the inspection facility via a single railway (not shown). After the railcars are inspected at the inspection station, then the railcars may be transferred to the particular set of rails


12




a


or


12




b


based on the results of the inspection. If the tank car


202


requires “heavy” repair, due to large amounts of damage to the tank car


202


, then the tank car


202


may be routed via inbound railway


12




b


and may further be queued in inbound queue


14




c,




14




d


until one of the repair stations


28




a


-


28




e


opens to allow entry of the tank car


202


therein to.




Moreover, if the tank car


202


requires “light” maintenance, the tank car


202


may be routed to the maintenance facility


10


via the inbound railway


12




a


where the tank car


202


may be queued in queues


14




a,




14




b


until one of the repair stations


28




a


-


28




e


that may be capable of handling the light repair becomes vacant. It should be noted that repair stations


28




a


-


28




e


may be specifically designated either for “heavy” or “light” maintenance depending on the volume of railcars being served at the maintenance facility


10


. Alternatively, and in a preferred embodiment, each of the repair stations


28




a


-


28




e


may be capable of handling any type of railcar having any type of repair designation.




Moreover, tank cars may enter the maintenance facility


10


in a wrecked state and may receive a “wrecked” designation via the inspection step


204


. The “wrecked” designation may indicate that the tank car requires a thorough cleaning and major repairs, interior blasting and painting, exterior blasting and painting, and assembly/testing, as will be discussed more fully below.




Generally, a determination as to whether the tank car


202


requires “heavy” or “light” repair, interior lining and/or exterior painting may be made at the inspection step


204


. This determination sets the tank car


202


on a particular path through the maintenance facility where the entirety of the required maintenance may be performed thereon. The determination allows inspectors to assign a designation to the tank car


202


based on the particular routing pattern necessary prior to entering the maintenance facility


10


.




The particular designation may determine the precise routing pattern that is necessary for the tank car


202


to receive the necessary maintenance. The routing pattern designation may be marked on the tank car


202


to be seen by railcar handlers throughout the maintenance facility


10


so that the tank car


202


is routed to the proper maintenance stations. The designation may be removably attached to the tank car


202


with magnets or may constitute any other designation device apparent to those skilled in the art. Hence, a railcar maintenance worker within the railcar maintenance facility


10


may see the designation and the required maintenance steps and route the railcar accordingly through the maintenance facility


10


.




If only “light” repair is necessary, then the tank car


202


may be routed via the “fast track” repair pattern


208


. The fast track repair pattern


208


merely requires that the tank car


202


enter one of the repair stations


28




a


-


28




e


and be visually inspected for minor damage such as if the tank car


202


requires replacement parts for valves and/or the like. The tank car


202


may then be repaired. Moreover, the tank car


202


is then cleaned via step


210


. It should take a relatively short period of time for the tank car


202


to enter and exit a repair station


28




a


-


28




e


for fast track repair.




If “heavy” repair is required, then the tank car


202


may be cleaned via step


212


and further may be fully repaired via step


214


. The “full repair” step


214


may require various parts of the tank car


202


to be disassembled. Moreover, major pieces of the tank car


202


may be repaired and/or replaced depending on the type of damage done. The time period may be significantly longer than with fast track repair.




After the tank car


202


is repaired via the fast track repair step


208


or the full repair


214


, then the tank car


202


may be removed from the repair station


28




a


-


28




e.


If the tank car


202


does not require interior or exterior painting (as noted below) then the tank car


202


may proceed directly to an “assembly and test” step


216


whereby the tank car


202


may enter the assembly and test station


37


. After the tank car


202


is reassembled and/or tested the tank car


202


may be removed from the assembly and test station


37


via one of the transfer tables


20


,


38


and may exit the maintenance facility


10


via step


218


on the outbound railway


44


.




However, in many instances, the tank car


202


may need interior painting or lining. The determination of whether the tank car


202


needs interior painting or lining may be made via the inspection step


204


. If the tank car


202


requires interior painting or lining then the tank car


202


may be transferred to the interior blast station


30


where the interior of the tank car


202


may be blasted via an interior blast step


222


by metal grit, pellets, sand or any other material apparent to those skilled in the art for stripping any paint or lining that may be adhered to the interior of the tank car


202


. Moreover, the interior may then be cleaned via the vacuum. It should be noted that a plurality of tank cars may be located within the interior blast station


30


. For example, as noted above with reference to

FIG. 2

, a tank car may be blasted in the first bay


100


, a second tank car may be cleaned in the second bay


102


, and the third bay


104


may be used to transfer tank cars into and out of the interior blast station


30


.




If there is no bay available to conduct the interior blast via step


222


, then the tank car


202


may be held in the lining queue area


26


(as shown in FIG.


1


). The lining queue area


26


may hold and store the tank car until a bay in the interior blast station becomes available. This may allow the tank car


202


to be removed from its repair station


28




a


-


28




e


and held without effectively blocking the repair station


28




a


-


28




d


from being used for other railcars. Therefore, railcars may move through the maintenance facility


10


without being bottlenecked at the interior blast station


30


.




After the interior of the tank car


202


is blasted and cleaned, the tank car


202


may be transferred to an interior paint station


35




a


-


35




c


where a first coat of a lining may be coated via step


224


. After the interior coating or lining is painted, the tank car


202


may be cured in one of the cure stations


36




a


-


36




c.






After the tank car


202


has been cured via the interior cure step


226


, the tank car


202


may be transferred back to one of the interior paint stations


35




a


-


35




c


for a second application of paint via step


228


. However, if no interior paint station


35




a


-


35




c


is available to take the tank car


202


for a second coat, then the tank car


202


may be held within the cure queue area


27


until an interior paint station


35




a


-


35




c


becomes available. This may allow tank cars to be removed from the cure stations


36




a


-


36




c


and not block the use of the cure stations


36




a


-


36




c.


After the second application of paint is applied to the interior of the tank car


202


, the tank car


202


may be cured a second time via a second interior cure step


230


via one of the cure stations


36




a


-


36




c.






If needed, the tank car


202


may have painted on its exterior an application of paint. The determination as to whether the tank car


202


needs exterior paint may be made via the inspection step


204


. If a tank car


202


requires exterior paint, then the tank car


202


may be transferred to the exterior blast station


32


where the tank car


202


may be blasted via step


234


by metal grit, pellets, sand or any other material that may remove the previous painted coating on the exterior of the tank car


202


. A vacuum may then be utilized to clean the exterior of the tank car


202


thereby removing the residual metal grit, pellets, sand or other material and any paint that may have been removed from the tank car


202


. Then, the tank car


202


may be transferred to the exterior paint station


34


for a first exterior paint application step


236


. The first exterior paint application may then be cured via an exterior cure step


238


, whereupon a second exterior paint coat may be applied via step


240


. The second exterior paint coat may be cured via step


242


.




After the exterior has been painted, then the tank car


202


may proceed to the “assembly and test” step


216


to be reassembled, if necessary, and tested to verify that the required repairs have been accomplished and that the internal lining or coating adequately holds product without leakage, as noted above with reference to FIG.


1


. After the tank car


202


has been reassembled and/or tested via the “assembly and test” step


216


, then the tank car


202


may be transferred to the outbound railway


44


via the “exit” step


218


.




It should be noted that tank cars requiring a plurality of services may be routed through the maintenance facility


10


via the routing pattern illustrated in FIG.


3


. For example, as noted above, tank cars requiring light or heavy services may be routed via routing pattern


200


. However, tank cars that have been wrecked through train accidents or that may have extremely serious damage may also be routed via the routing pattern


200


.




A “bad order” tank car may refer to a newly produced tank car that may have minor defects in parts on the tank car and therefore may require minor maintenance. A “Bad Order” tank car routing pattern


250


is illustrated in

FIG. 4. A

bad order tank car


252


may be inspected via step


254


to determine its routing pattern through the maintenance facility


10


. However, since a bad order tank car


252


is newly produced and only requires minor maintenance, then the bad order tank car


252


may be automatically designated for fast track repair via step


256


. Moreover, cleaning may be required as determined by the inspection step


254


. If cleaning is required, then the bad order tank car


252


may be cleaned via step


258


at the cleaning station


42


. The bad order tank car


252


may then exit the facility via step


260


on the outbound railway


44


.




Hopper railcars may also be serviced by the maintenance facility


10


, as illustrated by the routing pattern


300


illustrated in

FIG. 5. A

hopper railcar


302


may be inspected via an inspection step


304


prior to entering the maintenance facility


10


. As before with the tank cars noted above with respect to

FIGS. 3 and 4

, the hopper


302


may be inspected for a determination as to whether “heavy” repairs or “light” repairs are necessary. If “light” repairs are necessary, then the hopper may be designated to a fast track repair route via a “fast track” repair step


308


. The hopper railcar


302


may then exit the facility via step


310


by being transferred to the outbound railway


44


via the transfer tables


20


,


38


.




If the hopper railcar is not designated for fast track repair, then the hopper railcar may have “heavy” maintenance performed thereon via a “full repair” step


312


. Further, after the full repair step


312


, the hopper


302


may require cleaning via step


316


. After the cleaning, the hopper


302


may exit the maintenance facility


10


via step


310


by being transferred to the outbound railway


44


by one of the transfer tables


20


,


38


.





FIG. 6

illustrates a routing pattern


350


for a hopper railcar


352


that may be wrecked due to, for example, a train crash. An inspection step


354


may indicate what maintenance needs are required. Generally, wrecked hoppers require full repair via a full repair step


356


. If the hopper railcar


352


requires an exterior painting then the exterior of the hopper railcar


352


may be blasted via step


360


. The hopper railcar


352


may then be painted via step


362


and cured via step


364


. As noted above with respect to

FIG. 2

, the hopper railcar


352


may be transferred via the transfer tables


20


,


38


to the exterior blast station


32


, the exterior paint station


34


and one of the cure stations


36




a


-


36




c.


The hopper railcar


352


may further be reassembled and tested via step


366


and may exit the maintenance facility


10


via step


368


via the outbound railway


44


.




Maintenance Facility Management




The railcars described herein may be released into the maintenance facility


10


at a rate that maintains a constant level of work-in-process. In other words, there are certain stations within the maintenance facility that may cause “bottlenecks” if not managed properly. For example, the interior lining operation of tank cars, specifically, the interior blasting operation, carried out in the interior blasting station


30


, may cause bottlenecks because many tank cars require this operation and it may take a relatively longer period of time to complete this operation as other operations, such as repairing and cleaning. Therefore, the introduction of railcars into the maintenance facility


10


must be monitored closely to ensure that tank cars awaiting interior lining are not causing delays in other areas of the maintenance facility


10


. However, any maintenance station within the maintenance facility


10


may cause a bottleneck and this invention should not be limited as herein described.




To implement this system, the maintenance facility


10


may utilize a hybrid Constant Work-In-Process (“ConWIP”) and kanban system. The ConWIP may be implemented at a bottleneck source within the maintenance facility, such as before the interior blast station


30


at the lining queue area


26


. However, it should be noted that the ConWIP may be located at any maintenance station apparent to those skilled in the art as causing bottlenecks within the maintenance facility


10


. Moreover, it should be noted that a plurality of ConWIPs may be utilized and implemented within the maintenance facility


10


at any maintenance station that may cause a bottleneck. Specifically, a ConWIP


50


may be located at the lining queue area


26


. As noted above, in a system such as the one described above with reference to

FIGS. 1 and 2

, bottlenecks may occur most frequently at the interior blast station


30


. By placing the ConWIP system at the lining queue area


26


, the interior blast station


30


may be efficiently managed to prevent tank cars from delaying other processes within the maintenance facility


10


.




Generally, the ConWIP


50


may be implemented to monitor the status of the bays


100


-


104


within the interior blast station


30


and/or the lining queue area


26


. When the bays


100


-


104


and the lining queue area


26


are filled with tank cars either being blasted, cleaned or awaiting process, then the ConWIP


50


may communicate to the inbound railways


12




a,




12




b


and/or inbound queues


14




a


-


14




d


to not release any tank cars requiring a lining operation into the maintenance facility


10


via a communication means


52


. Therefore, since the tank cars requiring the lining operation may also require repairing at a repair station


28




a


-


28




e,


cleaning via the cleaning stations


42


, and/or exterior painting via the exterior paint station


32


, then the tank car will not be released into maintenance facility


10


thereby allowing the repair stations


28




a


-


28




e,


the cleaning stations


42


and/or the exterior paint station


32


to remain free of these railcars and open to other types of railcars thereby eliminating the bottleneck.




As a complement to the ConWIP card “pull” and monitoring system noted above, kanbans


54


may be used to prevent the transfer tables


20


,


38


from bringing railcars into the maintenance facility when no maintenance station is available. Each maintenance station may have a kanban


54


to communicate whether a railcar may be transported thereto and loaded therein to. For example, if the repair station


28




a


is filled with a railcar, then the kanban system may communicate to the inbound railways


12




a,




12




b


via the communication means


52


that no further railcar should be released to the repair stations


28




a.


The operator of the transfer tables


20


,


38


may then look for the next available repair station


28




b


-


28




e


as indicated by the kanban system. If no repair station is available, then the railcar may remain in the inbound queue


14




a


-


14




d


until a repair station


28




a


-


28




e


is available.




Both the ConWIP and kanban systems may use any type of communication system apparent to those having ordinary skill in the art. However, a preferred embodiment may be a green light/red light communication system to communicate whether a railcar should be released into the maintenance facility


10


. For example, at the bottleneck process (at the interior blasting station


30


), the ConWIP may communicate, via a red light, that all bays and the lining queue area


26


are filled with waiting or in-process tank cars. Therefore, an operator at the inbound railways


12




a,




12




b


would know not to release a tank car requiring, specifically, a lining operation among other operations into any maintenance station within the maintenance facility


10


. If the ConWIP is green, then the operator at the inbound railways may check the kanbans at any individual stations to determine where he should route the railcar. Further, if a kanban shows red, then the operator at the inbound railways


12




a,




12




b


would know not to release a railcar to that particular station. In an alternate embodiment of the ConWIP and kanban systems, there may be a lighted board or a computer screen showing the ConWIP and kanban systems and whether railcars may be released into the maintenance facility


10


and/or to any particular maintenance station.




An operator at the inbound railways


12




a,




12




b


would need to know how to route a railcar through the maintenance facility


10


. Therefore, the operator would note the color of the attached routing schedule to move the railcars to the proper maintenance station. Further, it should be noted that any communication system may be utilized to indicate to a operator whether railcars should be released into the maintenance facility


10


. Moreover, the ConWIP system may be implemented at any stage within the maintenance facility


10


as may be apparent to those skilled in the art for relieving the maintenance facility


10


of bottlenecks and other delays that may occur within the maintenance facility


10


.




It should be noted that various changes and modifications to the presently preferred embodiments described herein will be apparent to those skilled in the art. Such changes and modifications may be made without departing from the spirit and scope of the present invention and without diminishing its attendant advantages. It is, therefore, intended that such changes and modifications be covered by the appended claims.



Claims
  • 1. A method for managing a railcar maintenance facility comprising the steps of:providing a railcar maintenance facility having a number of maintenance stations; providing a first communication means associated with a first maintenance station wherein the first communication means indicates whether the first maintenance station is available to receive a railcar requiring services of the first maintenance station; providing a first railcar requiring the services of a first plurality of maintenance stations including the first maintenance station; providing a second railcar requiring the services of a second plurality of maintenance stations excluding the first maintenance station; holding the first railcar outside the facility if the first communication means indicates that the first maintenance station is unavailable to receive the first railcar; sending the second railcar into the facility to the second plurality of maintenance stations.
  • 2. The method of claim 1 further comprising the steps of:providing an inbound railway connected to the railcar maintenance facility; providing a communication receiving means at the inbound railway for receiving the communication from the first communication means; receiving a signal from the first communication means at the inbound railway indicating that the first maintenance station is unavailable to receive the first railcar.
  • 3. The method of claim 1 further comprising the steps of:inspecting the first railcar to determine maintenance requirements of the first railcar; transferring the railcar through the facility to the first plurality of maintenance stations if the communication from the first communication means associated with the first maintenance station indicates that the first maintenance station is available to receive the railcar.
  • 4. The method of claim 1 further comprising the steps of:providing an inbound queue area outside the maintenance facility; transferring the first railcar to the inbound queue area if the first communication means indicates that the first maintenance station is unavailable to receive the first railcar.
  • 5. The method of claim 1 further comprising the steps of:providing a second communication means associated with a second maintenance station; providing a third communication means associated with a third maintenance station; providing a third railcar in the second maintenance station requiring services of the third maintenance station; holding the third railcar at the second maintenance station if the third communication means associated with the third maintenance station indicates that the third maintenance station is unavailable to receive the third railcar.
  • 6. The method of claim 1 further comprising the steps of:providing a first queue area associated with the first maintenance station; moving the first railcar to the first queue area if the first maintenance station is unavailable to receive the railcar.
  • 7. The method of claim 1 further comprising the step of:designating maintenance requirements on the railcar.
  • 8. The method of claim 7 further comprising the step of:designating a routing pattern through the maintenance facility on the railcar based on the maintenance requirements of the railcar; and routing the railcar through the facility based on the routing pattern.
  • 9. The method of claim 1 further comprising the steps of:providing an inbound queue connected to the facility; and holding the first railcar in the inbound queue if the first communication means indicates that the associated maintenance station in unavailable to receive the railcar.
  • 10. The method of claim 1 further comprising the steps of:transferring a railcar from another maintenance station to the first maintenance station if the first communication means indicates that the first maintenance station is available to receive a railcar prior to allowing the first railcar to enter the facility; and allowing the first railcar to enter the facility if not other railcars are transferred from other maintenance stations when the first communication means indicates that the first maintenance station is available to receive a railcar.
  • 11. The method of claim 1 further comprising the steps of:transferring the first railcar to the first maintenance station if the first communication means associated with the first maintenance station indicates that the first maintenance station is available to receive the railcar; performing maintenance on the railcar at the first maintenance station; providing a second communication means associated with a second maintenance station; and transferring the first railcar to the second maintenance station if the second communication means indicates that the second maintenance station is available to receive the first railcar.
  • 12. The method of claim 10 further comprising the steps of:transferring the first railcar into the facility if the first communication means indicates that the first maintenance station is available to receive a railcar and no other railcars inside the facility are available to be transferred to the first maintenance station.
  • 13. A method of managing a railcar maintenance facility comprising the steps of:providing a railcar maintenance facility having a number of maintenance stations and an inbound railway; providing first communication means associated with each maintenance station wherein the first communication means indicates whether each respective maintenance station is available to receive a railcar requiring services of the respective maintenance stations; providing a second communication means associated with a second maintenance station for sending a communication that communicates whether the second maintenance station is available to receive railcars requiring the services of the second maintenance station wherein the railcar maintenance facility will not accept railcars if the second communication means communicates that the second maintenance station is unavailable; providing a communication receiving means at the inbound railway for receiving the communication from the second communication means; providing a first railcar requiring the services of the maintenance facility; inspecting the first railcar to determine maintenance requirements of the railcar; transferring the railcar into the facility to a plurality of maintenance stations if the communication from the second communication means indicates that the associated maintenance station is available to receive the first railcar; and transferring the first railcar to each respective maintenance station based on the maintenance requirements of the railcar and whether the first communication means indicates that each maintenance station is available to receive the railcar.
US Referenced Citations (11)
Number Name Date Kind
1560878 Tatum Nov 1925 A
2948234 Hughson Aug 1960 A
2951452 Karlet Sep 1960 A
3944986 Staples Mar 1976 A
4770122 Ichihashi et al. Sep 1988 A
5072900 Malon Dec 1991 A
5445347 Ng Aug 1995 A
5867801 Denny Feb 1999 A
5947423 Clifton et al. Sep 1999 A
6154735 Crone Nov 2000 A
6263265 Fera Jul 2001 B1