Claims
- 1. In a railway information transmission system wherein information transmission between on-vehicle control equipment for a train operating on a track and ground control equipment for administering an operation of the train is performed by a consecutive transmission mode between a transmission side and a reception side of the system through a plurality of ground transmitters/receivers which are coupled with the ground control equipment by a network, said railway information transmission system comprising:each one of said ground control equipment and said on-vehicle control equipment includes therein redundant code generation means for generating a redundant code which is updated in accordance with a predetermined procedure, and that the transmission side is furnished with means for affixing the redundant code, which is updated each time information is transmitted from said redundant-code generation means, to communication information so as to form transmission information, while the reception side is furnished with means for updating said redundant code of said redundant-code generation means on said reception side each time the transmission information is received, and also with means for performing logical operation on said redundant code affixed to said transmission information and another redundant code updated by said reception side itself and further, when said ground control equipment transmits transmission information to said on-vehicle control equipments of a plurality of trains, said ground control equipment creates separate communication information items for the plurality of trains.
- 2. A railway information transmission system according to claim 1, wherein when the logical operation by said means for performing logical operation on the redundant codes results in disagreement, means for reporting the result of the logical operation is caused to transfer said logical operation result to situation responsive means.
- 3. A railway information transmission system according to claim 1, further including means for outputting a result of the logical operation as a signal and transferring the signal to means for coping with an emergency condition of the train, on condition that said logical operation by said means for performing logical operation on the redundant codes results in disagreement.
- 4. A railway information transmission system according to claim 1, further including means for executing an initialization process which starts updating the redundant codes in said redundant-code generation means, when the train is at a stop in compliance with a stop indication.
- 5. A railway information transmission system according claim 1, further including means for commanding signal apparatuses, which are installed within a control range of said ground control equipment, to present stop indications, in order to execute an initialization process which starts updating the redundant codes produced by said redundant-code generation means.
- 6. A railway information transmission system according to claim 1, wherein each of the redundant codes generated by said redundant-code generation means contains at least part of another redundant code to be subsequently generated, as preannouncement information, andwherein at least one of said ground control equipment and said on-vehicle control equipment operating at the reception side retains, at least, the preannouncement information contained in the communicating redundant code received last and performs a logical operation on the retained preannouncement information and the content of a communicating redundant code received anew.
- 7. A railway information transmission system according to claim 1, wherein each of the redundant codes generated by said redundant-code generation means contains part of another redundant code generated last, as acknowledgment information, andwherein at least one of said ground control equipment and said on-vehicle control equipment operating at the reception side retains, at least, the acknowledgment information contained in the communicating redundant code received last and performs a logical operation on the retained acknowledgment information and the content of a communicating redundant code received anew.
- 8. A railway information transmission system according to claim 1, characterized in that at least one of said ground control equipment and said on-vehicle control equipment includes means for creating and retaining a logical operation redundant-code table at a start of processing beforehand, the table containing the redundant codes which are to be outputted by the redundant-code generation processes, and means for performing a logical operation on a changing state of a reception information string based on the redundant codes which are contained in, at least, a plurality of reception information items, and the contents of the logical operation redundant-code table.
- 9. A railway information transmission system according to claim 1, wherein said on-vehicle control equipment at the reception side includes means for accepting a redundant-code table from said ground control equipment at the transmission side and then retaining said table therein before a start of processing, the table being based on the redundant codes which are to be outputted by said redundant-code generation means in said ground control equipment at the transmission side, and means for performing a logical operation on a changing state of a reception information string based on the redundant codes which are contained in, at least, a plurality of reception information items, and the contents of the redundant-code table.
- 10. A railway information transmission system according to claim 1, wherein the reception side is formed by the ground control equipment and the transmission side is formed by the on-vehicle control equipment, andwherein each of said reception side and transmission side generate a redundant code.
- 11. A railway information transmission system according to claim 1, wherein the reception side is formed by the on-vehicle control equipment and the transmission side is formed by the ground control equipment, and wherein each of said reception side and transmission side generate a redundant code.
- 12. In a railway information transmission method wherein information is transmitted by a consecutive transmission mode between on-vehicle control equipment for a train operating on a track and ground control equipment for administering an operation of the train, a railway information transmission method comprising:affixing a first redundant code which is updated in a predetermined procedure every transmission processing to information to-be-communicated; transmitting the information; and performing a logical operation on the first redundant code which is contained in the received information and a second redundant code which is created on a reception side and which is updated in another predetermined procedure.
- 13. In a railway information transmission system wherein information transmission between on-vehicle control equipment for a train operating on a track and ground control equipment for administering an operation of the train is performed by a consecutive transmission mode between a transmission side and a reception side of the system through a plurality of ground transmitters/receivers which are coupled with the ground control equipment by a network, said railway information transmission system comprising:each one of said ground control equipment and said on-vehicle control equipment includes therein redundant-code generation means for generating a redundant code which is updated in accordance with a predetermined procedure, and that the transmission side is furnished with means for affixing the redundant code, which is updated each time information is transmitted from said redundant-code generation means, to communication information so as to form transmission information, while the reception side is furnished with means for updating said redundant code of said redundant-code generation means on said reception side each time the transmission information is received, and also with means for performing logical operation on said redundant code affixed to said transmission information and another redundant code updated by said reception side itself.
- 14. A railway information transmission system according to claim 4, wherein when the logical operation by said means for performing logical operation on the redundant codes results in disagreement, means for reporting the result of the logical operation is caused to transfer said performed logical operation result to situation responsive means.
- 15. A railway information transmission system according to claim 4, further including means for outputting a result of the logical operation as a signal and transferring the signal to means for coping with an emergency condition of the train, on condition that said logical operation by said means for performing a logical operation on the redundant codes results in disagreement.
- 16. A railway information transmission system according to claim 4, further including means for executing an initialization process which starts updating the redundant codes in said redundant-code generation means, when the train is at a stop in compliance with a stop indication.
- 17. A railway information transmission system according to claim 4, further including means for commanding signal apparatuses, which are installed within a control range of said ground control equipment, to present stop indications, in order to execute an initialization process which starts updating the redundant codes produced by said redundant-code generation means.
- 18. A railway information transmission system according to claim 4, wherein each of the redundant codes generated by said redundant-code generation means contains at least part of another redundant code to be subsequently generated, as preannouncement information, andwherein at least one of said ground control equipment and said on-vehicle control equipment operating at the reception side retains, at least, the preannouncement information contained in the communicating redundant code received last and performs a logical operation on the retained preannouncement information and the content of a communicating redundant code received anew.
- 19. A railway information transmission system according to claim 4, wherein each of the redundant codes generated by said redundant-code generation means contains at least part of another redundant code generated last, as acknowledgment information, andwherein at least one of said ground control equipment and said on-vehicle control equipment operating at the reception side retains, at least, the acknowledgment information contained in the communicating redundant code received last and performs a logical operation on the retained acknowledgment information and the content of a communicating redundant code received anew.
- 20. A railway information transmission system according to claim 4, wherein at least one of said ground control equipment and said on-vehicle control equipment includes means for creating and retaining a logical operation performing redundant-code table at a start of processing beforehand, the table containing the redundant codes which are to be outputted by the redundant-code generation processes, and means for performing logical operation on a changing state of a reception information string based on the redundant codes which are contained in, at least, a plurality of reception information items, and the contents of the logical operation performing redundant-code table.
- 21. A railway information transmission system according to claim 4, wherein said on-vehicle control equipment at the reception side includes means for accepting a redundant-code table from said ground control equipment at the transmission side and then retaining said table therein before a start of processing, the table being based on the redundant codes which are to be outputted by said redundant-code generation means in said ground control equipment at the transmission side, and means for performing logical operation on a changing state of a reception information string based on the redundant codes which are contained in, at least, a plurality of reception information items, and the contents of the redundant-code table.
- 22. A railway information transmission system according to claim 3, wherein said first and second redundant codes are the same.
- 23. A railway information transmission system according to claim 3, wherein a reception side is formed by the ground control equipment and a transmission side is formed by the on-vehicle control equipment, andwherein each of said reception side and transmission side generate a redundant code.
- 24. A railway information transmission system according to claim 3, wherein a reception side is formed by the on-vehicle control equipment and the transmission side formed by the ground control equipment, andwherein each of said reception side and transmission side generate a redundant code.
- 25. A railway information transmission system according to claim 4, wherein the reception side is formed by the ground control equipment and the transmission side is formed by the on-vehicle control equipment, andwherein each of said reception side and transmission side generate a redundant code.
- 26. A railway information transmission system according to claim 4, wherein the reception side is formed by the on-vehicle control equipment and the transmission side is formed by the ground control equipment, andwherein each of said reception side and transmission side generate a redundant code.
Parent Case Info
This is a continuation of application Ser. No. 09/254,181, filed Mar. 2, 1999, now U.S. Pat. No. 6,230,086 which is a national stage of PCT/JP96/02502 filed Sep. 4, 1996.
US Referenced Citations (2)
| Number |
Name |
Date |
Kind |
|
5420883 |
Swensen et al. |
May 1995 |
A |
|
6230086 |
Oguma et al. |
May 2001 |
B1 |
Continuations (1)
|
Number |
Date |
Country |
| Parent |
09/254181 |
|
US |
| Child |
09/819706 |
|
US |