The present invention relates to the rail industry. More specifically, the present invention relates to railway signaling systems.
The rail industry, for both passenger and freight trains, is an important industry worldwide. Obviously the safety and reliability of train systems is crucial. Rail systems are particularly vulnerable to catastrophic accidents since trains travel on fixed tracks at speeds that prevent them from being able to stop quickly.
Railway signaling systems are used to communicate a multitude of information to various railway personnel. Various types of trackside equipment (point/switch machine, signals, track circuits) are used along the track line. Trackside equipment can communicate different types of information, such as track status, required speeds, etc., all being crucial to preventing trains from colliding.
The consequence of failure of trackside equipment can be disastrous. As such, current systems employ safety methods to mitigate failure or error. Regular maintenance of trackside equipment must also be taken into account.
Generally, trackside equipment is managed by devices such as interlockings and zone controllers. Typically these controllers manage trackside field equipment through vital relay groups, in some cases, custom direct drive boards have been developed to interface with particular equipment types.
Existing known solutions which manage dual outputs (redundant configuration for zone controllers) are controlled through an external hardware “OR” device, which is a single point of failure. Additionally, these design solutions are configured only as active-passive and thus manage a controlled switchover which interrupts the final condition.
Currently there is no redundant configuration solid state direct driver solution in the art of railway signaling systems which is free of a single point of failure to provide an active-active configuration for outputs connected to a common load. Embodiments of the present invention provide a safe solution for active-active redundant system which eliminates the switching time required by the active-passive system during the controlled switchover. Therefore there will be no interruption in the control and monitoring of the trackside equipment, eliminating the transitory periods (signals flashing or interlocking relays being wrongfully de-energized)
Embodiments of the present invention also provide means of safe testing of one redundant system without affecting the safe functionality of the other system.
Accordingly, disclosed is a railway signaling system comprised of a dedicated control circuit in an entirely redundant configuration (and thus with no single point of failure). Embodiments of the invention power dual outputs seamlessly, providing a continuous and unflinching electrical supply to a load to counteract output disruption during both scheduled maintenance and fail-over.
The load in accordance with the teachings of this invention is any suitable trackside equipment (for example: signals) or interlocking relay used in railway signaling systems.
Embodiments of the invention contemplate providing a redundant design, entirely free of single point of failures, such that a failure or planned maintenance activity in one resident partner of the system can be achieved without affecting system operations. In addition, the actual outputs are driven simultaneously between each hardware partner commanding a common load, reacting to failover/switchover without perturbation to outputs resulting in seamless redundancy.
In accordance with the teachings of this invention, full system hardware redundancy is supported by using two independent controllers which command a load in active-active (where both controllers are on-line) configuration. With each controller active and healthy, the current through the load is shared between each system.
It is envisaged that when one of the autonomous units detects a failure in functionality, that failed controller is disconnected and isolated from the working system while the live redundant controller continues to command the load seamlessly.
Since embodiments of the invention are envisaged for use in railway signaling systems, various safety critical features are provided. These include continuous output current monitoring, voltage threshold detection, management of outputs, and means of load current supervision of dual “active-active” outputs at higher processing level.
Thus, according to one aspect, the invention provides a railway signaling system for controlling a load, the system comprising a first autonomous controller with a first power output connectable to the load; a second autonomous controller which is redundant with the first controller such that there is no single point of failure, the second controller having a second power output connectable to the load; the first and second controllers operable in either an on-line mode wherein both power outputs provide power to the load or an off-line mode wherein a single power output does not, provide power to the load; wherein the first and second controllers normally operate in the on-line mode to control the load such that current through the load is shared between the first and second controllers; wherein if one of the first or second controllers is operating off-line, the other controller continues to operate on-line to control the load, whereby control of the load is uninterrupted.
Thus, according to one aspect, the invention provides a method of controlling a load in a railway signaling system, the method comprising providing a first autonomous controller connectable to the load and a second autonomous controller which is redundant with the first controller such that there is no single point of failure; operating the first and second controllers in either: an on-line mode wherein both controllers provide power to the load to control the load such that current through the load is shared between the first and second controllers; or in an off-line mode wherein a single controller does not provide power to the load and the other controller continues to operate on-line to control the load, whereby control of the load is uninterrupted.
Thus, according to one aspect, the invention provides a railway signaling system for controlling a load, the system comprising a first autonomous controller and a second autonomous controller which is redundant with the first controller, each controller connectable to the load such that there is no single point of failure; the first and second controllers operable in either an on-line mode wherein both power outputs provide power to the load or an off-line mode wherein a single power output does not provide power to the load.
Embodiments of this invention are designed based on CENEC EN-50129 and AREMA Part 16 and 17 standards and industry standard principles.
Other aspects and advantages of embodiments of the invention will be readily apparent to those ordinarily skilled in the art upon a review of the following description.
Embodiments of the invention will now be described in conjunction with the accompanying drawings, wherein:
This invention will now be described in detail with respect to certain specific representative embodiments thereof, the materials, apparatus and process steps being understood as examples that are intended to be illustrative only. In particular, the invention is not intended to be limited to the methods, materials, conditions, process parameters, apparatus and the like specifically recited herein.
Referring to
Both controllers MPU1 and MPU2 use the same power supply, though each is protected by individual circuit breakers. This common power supply can be either AC or DC source. The DC power source for the outputs is represented in
Referring back to
The load (there could be more than one) in accordance with the teachings of this invention is any suitable physical signal used in railway signaling systems. For example, the load could be a light system to communicate various information to a train conductor.
The system is designed to react in specific actions based on the operation of the controllers.
If both controllers on on-line, the both controllers provide power via respective outputs, DDO, to the load. In such an active-active mode (where both controllers are on-line), the current through the load is shared by the two controllers. The imbalance of current sharing between the two redundant systems is allowed up to a threshold limit. If the threshold limit is exceeded by one system, that system will declare a failure and isolate from the load, thus the redundant system will control solely the load. Each DDO is composed out of two microcontrollers (uC) in a 2oo2 configuration (uC-A and uC-B), and the specific functional circuits to provide the interface to external elements.
Referring back to
In order to correctly determine the load status, each controller (MPU 1 and MPU2) monitors if the load is shared or not (information available based on communication path between the two systems) and also the configuration of the load. It should be noted that there could be multiple loads connected in parallel, controlled with a single output from each controller as illustrated in
The current is monitored continuously. In order to validate the current measurement, there are two threshold references: for minimum load (preferably: 10% of nominal current) and nominal load (preferably: 75% of nominal current). The two threshold references are common for both controllers. These references are used to characterize the A/D conversion parameters for each controller.
In case of threshold failure (based on exceeding the tolerance of reference readings from each controller) the system will declare a failure and it will isolate itself from the load.
Each DDO also has a disconnection mechanism 25, 30 (isolation from load). The disconnection mechanism (illustrated in
Embodiments of the invention ensure that when one of the autonomous controllers MPU1 and MPU2 fail or goes off-line, the remaining on-line controller continuously monitors that no failure of the off-line controller will compromise safe system operations. In particular, it can be seen from
System 1 controls the load from the supply line (L1) through the disconnection relay (S1-KD-A1) a solid state relay (S1-SSR1-1) under S1-DDO-uC1 control, a solid state relay (S1-SSR1-2) under S1-DDO-uC2 control, current measuring for S1-DDO-uC1 (S1-CM1-1), current measuring for S1-DDO-uC2 (S1-CM1-2), load, disconnection relay (S1-KD-B1) to return line (L2).
Supply line (L1) and return line (L2) can be either AC or DC supply.
System 2 controls the load from the supply line (L1) through the disconnection relay (S2-KD-A1) a solid state relay (S2-SSR1-1) under S2-DDO-uC1 control, a solid state relay (S2-SSR1-2) under S2-DDO-uC2 control, current measuring for S2-DDO-uC1 (S2-CM1-1), current measuring for S2-DDO-uC2 (S2-CM1-2), load, disconnection relay (S2-KD-B1) to return line (L2). Under normal conditions the current through load is equally shared between the two systems.
System 1 controls the load from the supply line (L1) through the disconnection relay (S1-KD-A1) a solid state relay (S1-SSR1-1) under S1-DDO-uC1 control, a solid state relay (S1-SSR1-2) under S1-DDO-uC2 control, disconnection relay (S1-KD-B1), current measuring for S1-DDO-uC1 (S1-CM1-1), current measuring for S1-DDO-uC2 (S1-CM1-2) load, to return line (L2).
Supply line (L1) and return line (L2) can be either AC or DC supply.
System 2 controls the load from the supply line (L1) through the disconnection relay (S2-KD-A1) a solid state relay (S2-SSR1-1) under S2-DDO-uC1 control, a solid state relay (S2-SSR1-2) under S2-DDO-uC2 control, disconnection relay (S2-KD-B1), current measuring for S2-DDO-uC1 (S2-CM1-1), current measuring for S2-DDO-uC2 (S2-CM1-2), load, to return line (L2).
Under normal conditions the current through load is equally shared between the two systems.
Embodiments of the invention also contemplate latent failure detection test of reactive solid state hardware components. Referring to
A test is implemented to validate the OFF state of the load by simulating leakage on both LFD SSRs 10, 11, commanding LFD A1-1 and LFD B1-1 simultaneously. The current through the load is limited by the LFD resistors which guarantee that the current cannot increase during test. The test to validate the OFF state of the load is performed every time when the LFD test is performed.
The latent failure detection test has no effect on outputs which are commanded ON. The LFD test sequence is implemented on programmable devices (FPGAs). The start of LFD test is generated by the controllers (uCs) command to FPGAs. The output LFD timing is found in
Implementation:
Referring to
Signals OLFD_B(0) to OLFD_B(7) are generated by the FPGA2 to enable the LFD SSRs B1-1 to LFD_B8-1.
Signals OUT_STATUS_(0) to OUT_STATUS_(7) are the result at the system level of the sequential commands from both FPGAs.
It should be understood that embodiments of the invention can be installed at any suitable lineside location, such as the start of a section of track, at a junction, etc. or used in single or double tracks.
Numerous modifications may be made without departing from the spirit and scope of the invention as defined in the appended claims.