Hydril Operator's Manual, pp. 1-1 (6553-7/80), 3-3 (6553-3/80), and 3-3 (6715-12/81), 183/4" Ram Blowout Preventers. |
Cameron Iron Works, "Torque Requirements Slashed with New Cameron BOP Seal Carrier," p. 7 (with `U` BOP-FIG. 1). |
Cameron Iron Works, Drilling Systems: Ram-Type Blowout Preventers, 1988, pp. 642, 643, 646 and 647. |
Cameron Iron Works, Drilling Systems: Ram-Type Blowout Preventers, 1988, UII BOP, pp. 650-653. |
NL Shaffer, "Protected Hydraulic System . . . Simplified Ram Changing and Maintenance . . . Long-Wearing Seals". |
Koomey Inc., J-Line, "Blowout Preventers," Model PB and Model L (two pages). |