Claims
- 1. An electricity meter for obtaining line voltage and current measurements on a power line, comprising:
- (a) means for making line voltage and line current measurements;
- (b) processor means including a first real time clock means for measuring real time (days, hours, minutes, seconds) and processing said line voltage and current measurements to obtain electrical energy consumption data during predetermined real time intervals, and first memory means for storing said data;
- (c) a power supply for converting line voltage from said power line to an operating voltage to power said processor means;
- (d) a circuit for retaining real time and electrical energy consumption data during a power line outage, said circuit comprising:
- (1) a non-volatile, second memory means, which second memory means does not rely upon a battery for it to be non-volatile;
- (2) a second real time clock means for accumulating elapsed real time (days, hours, minutes, seconds);
- (3) a backup battery;
- (4) line power detector means for detecting line power outages and resumptions, said line power detector means being immediately operable upon the resumption of line power;
- (5) first output means responsive to a line power outage detected by said detector means for (i) transferring real time and electrical energy consumption data stored in the first memory means of said processor means to said second memory means, (ii) connecting said backup battery to energize only said second real time clock means, and (iii) resetting said second real time clock means to enable said second real time clock means to accumulate the total, actual real time (days, hours, minutes, seconds) elapsed from the time of the beginning of the power outage;
- (6) second output means responsive to a line power resumption detected by said detector means for (i) transferring said real time and electrical energy consumption data stored in said second memory means to said processor means, (ii) transferring the elapsed real time accumulated by said second real time clock means to said processor means, and (iii) in said processor means, updating said real time data of said first real time clock means by said elapsed real time;
- (7) battery testing means for testing said backup battery; and
- (8) means responsive to said battery testing means for reading the content of said second real time clock means only if said backup battery has at least a predetermined supply capacity,
- whereby the updated real time data of said first real time clock means corresponds to the total time of said power outage added to the real time at which said power outage occurred.
- 2. The meter of claim 1, wherein said detector means includes means for disabling said processor means immediately following transfer of said real time and electrical energy consumption data to said first memory means to prevent transfer of erroneous data to said first memory means as said processor means power down through an uncertainty region of operation thereof.
- 3. The meter of claim 1, including means for disconnecting said backup battery from said second real time clock means following resumption of line power.
- 4. The meter of claim 1 wherein said battery testing means includes alarm means for indicating that said backup battery has less than said predetermined supply capacity, said second output means including means for energizing said alarm means.
- 5. In an electricity meter having means for obtaining line voltage and current measurements on a power line, processor means including a first real time clock means for accumulating real time (days, hours, minutes, seconds) and processing said line voltage and current measurements to obtain line electrical energy consumption data during predetermined time intervals and first memory means for storing said data, and a power supply for converting line voltage from said power line to an operating voltage to power said processor means:
- (a) a circuit for retaining real time and line power data during a power line outage, comprising a second memory means;
- (b) a second real time clock means for accumulating elapsed real time (days, hours, minutes, seconds);
- (c) a backup battery;
- (d) line power detector means for detecting line power outages and resumptions;
- (e) first output means responsive to a line power outage detected by said detector means for:
- (1) transferring first real time clock and electrical energy consumption data accumulated by said processor means to said second memory means,
- (2) connecting said backup battery to energize said second real time clock means, and
- (3) resetting said second real time clock means to enable said second real time clock means to accumulate a real time (days, hours, minutes, seconds) elapsed from the time of the beginning of the outage;
- (f) second output means responsive to a line power resumption detected by said detector means for:
- (1) transferring said real time clock and electrical energy consumption data stored in said second memory means to said processor means,
- (2) transferring the elapsed real time accumulated by said second real time clock means to said processor means, and
- (3) updating said real time data of said first real time clock means by said elapsed real time;
- (g) battery testing means for testing said backup battery; and
- (h) means responsive to said battery testing means for reading the content of said second real time clock means only if said backup battery has at least a predetermined supply capacity.
- 6. The meter of claim 5 wherein said battery testing means includes alarm means for indicating that said backup battery has less than said predetermined supply capacity, said second output means including means for energizing said alarm means.
- 7. The meter of claim 5 wherein said second memory means comprises a non-volatile memory and wherein said first output means includes means for connecting said battery backup to energize only said second real time clock means.
- 8. The meter of claim 5 including means for disconnecting said battery backup from said second real time clock means following resumption of line power.
- 9. The meter of claim 5 wherein said detector means includes means responsive to a predetermined voltage on said power line for controlling said first and second output means.
- 10. The meter of claim 9 wherein said detector means includes means for disabling said processor means immediately following transfer of said real time and electrical energy consumption data to said first memory means to prevent transfer of erroneous data to said first memory means as said processor means power down through an uncertainty region of operation thereof.
Parent Case Info
This is a continuation of copending application Ser. No. 07/358,494 filed on May 30, 1989 now abandoned which was a continuation of Ser. No. 07/036,633 filed on Apr. 10, 1987, now abandoned.
US Referenced Citations (4)
Number |
Name |
Date |
Kind |
4197582 |
Johnston et al. |
Apr 1980 |
|
4467434 |
Hurley et al. |
Aug 1984 |
|
4509128 |
Coppola et al. |
Apr 1985 |
|
4594545 |
Germer |
Jun 1986 |
|
Continuations (2)
|
Number |
Date |
Country |
Parent |
358494 |
May 1989 |
|
Parent |
36633 |
Apr 1987 |
|